CN205225088U - Two horizontal wells of SAGD and well head discharging equipment of producing well thereof - Google Patents

Two horizontal wells of SAGD and well head discharging equipment of producing well thereof Download PDF

Info

Publication number
CN205225088U
CN205225088U CN201520996959.5U CN201520996959U CN205225088U CN 205225088 U CN205225088 U CN 205225088U CN 201520996959 U CN201520996959 U CN 201520996959U CN 205225088 U CN205225088 U CN 205225088U
Authority
CN
China
Prior art keywords
pipeline
throttling arrangement
well head
tapping equipment
head tapping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520996959.5U
Other languages
Chinese (zh)
Inventor
张磊
陈森
伍文英
蒲丽萍
游红娟
黄勇
郭文德
何小东
李林
李畅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201520996959.5U priority Critical patent/CN205225088U/en
Application granted granted Critical
Publication of CN205225088U publication Critical patent/CN205225088U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fluid-Pressure Circuits (AREA)

Abstract

The utility model provides a two horizontal wells of SAGD and well head discharging equipment of producing well thereof. Wherein, the SAGD producing well includes the sleeve pipe and sets up at the intraductal fluid -discharge tube of cover that the well head discharging equipment include: first pipeline communicates with the fluid -discharge tube, the second pipeline, the first end and the sleeve pipe intercommunication of second pipeline, the second end of second pipeline is connected on first pipeline, the throttling arrangement of setting on the second pipeline, a throttling arrangement include check valve and first valve that the interval set up, and wherein, the orientation that switches on of check valve is held to the first end of second pipeline for the second by the second pipeline and is switched on. The technical scheme of the utility model it is poisoned easily to have solved the operating personnel when the gassing operation of the SAGD producing well air bleeder among the prior art to the problem of gassing operational pollution environment.

Description

The well head tapping equipment of SAGD dual horizontal well and producing well thereof
Technical field
The utility model relates to Techniques for super heavy oil recovery field, in particular to a kind of well head tapping equipment and SAGD dual horizontal well of SAGD producing well.
Background technology
In oil exploitation technology, a large amount of natural gases be dissolved under HTHP in stratigraphic oil pool are called solution gas.In crude oil production, along with fluid enters producing well, pressure reduces gradually, when crude oil pressure is lower than saturation pressure, solution gas is just separated into free gas gradually from crude oil, and slowly expands, until depart from crude oil to enter oil casing annular space, this part gas is exactly casing gas.If sheath gas pressure is too high, producing fluid level will be made to decline, producing pressure differential reduces, and affects pump efficiency, also can occur " gas lock " time serious, oil well pump cannot normally be worked.
In crude oil production, press through height to prevent producing well inner sleeve and cause the too low phenomenon with there is oil well pump " gas lock " of submergence, the method generally adopted is casing gas discharging.Also there is this problem after terminating to proceed to machine pumping product in Xinjiang Oilfield super-viscous oil SAGD producing well cyclic preheat: in down-hole along with the expansion of vapor chamber, reservoir temperature raises, and hydrogen sulfide gas is separated.Hydrogen sulfide gas is assembled in oil well casing, and a large amount of stink damp is known from experience and accelerated down-hole facility corrosion, also likely causes down-hole string hydrogen embrittlement to break the generation of de-phenomenon.Guarantee that SAGD producing well is normally produced, necessary regularly relief sleeve gas, reduces sulfureted hydrogen gas concentration in sleeve pipe.
The SAGD producing well means of deflation of prior art as shown in Figure 1, means of deflation comprises, and produces gate 1 ', produces pressure meter gate 2 ', produces pressure meter 3 ', produces pressure meter emptying gate 4 ', sleeve plug 5 ', sleeve gate 6 ', casing pressure table gate 7 ', casing pressure table 8 ' and casing pressure table emptying gate 9 '.Wherein, before casing gas discharging, oil well is in production status, and production gate 1 ', production pressure meter gate 2 ', sleeve gate 6 ', casing pressure table gate 7 ' are all in open mode.The bleed method of above-mentioned means of deflation has two kinds, and the first venting mode is that operating personnel stand in casing pressure table 8 ' place, slowly opens casing pressure table emptying gate 9 ', directly puts cover gas; The second way first closes sleeve gate 6 ', then lay down sleeve plug 5 ', then slowly opens sleeve gate 6 ', puts cover gas and enter air.Above-mentioned two kinds of methods all need operating personnel to stand in the operation of sleeve gate 6 ' place, and then make operating personnel have hydrogen sulfide poisoning risk, can cause the pollution to air simultaneously.
Easily cause the problem of hydrogen sulfide poisoning when exitting in order to solve operating personnel, another kind of producing well means of deflation is also used in prior art, as shown in Figure 2, producing well means of deflation in Fig. 2 is compared difference with the producing well means of deflation in Fig. 1 and is, producing well means of deflation in Fig. 2 is at casing pressure table 3 ' and sleeve plug 5 ' between installed again a sleeve gate 6 ' additional, sleeve plug 5 ' is changed into a pipeline (putting cover gas pipeline 10 ') simultaneously, length of pipeline 9.6 meters, when means of deflation in employing in 2 puts cover gas, operating personnel and deflated position spacing are close to 10 meters, this mode can reduce hydrogen sulfide poisoning risk, but risk still exists (such as operating personnel stand in leeward mouth position), still pollution is caused to air simultaneously.
Utility model content
Main purpose of the present utility model is the well head tapping equipment providing SAGD dual horizontal well and producing well thereof, easily poisoning to solve SAGD producing well means of deflation of the prior art operating personnel when bleed air operation, and the problem of bleed air operation contaminated environment.
To achieve these goals, according to an aspect of the present utility model, provide a kind of well head tapping equipment of SAGD producing well, SAGD producing well comprises sleeve pipe and is arranged on the discharging tube in sleeve pipe, well head tapping equipment comprises: the first pipeline, is communicated with discharging tube; Second pipeline, the first end of the second pipeline is communicated with sleeve pipe, and the second end of the second pipeline is connected on the first pipeline; Be arranged on the first throttle device on the second pipeline, first throttle device comprises spaced one way valve and the first valve, and wherein, the conducting direction of one way valve is by the first end conducting of the second end to the second pipeline of the second pipeline.
Further, the first valve is arranged on the upstream of one way valve.
Further, well head tapping equipment also comprises: the 3rd pipeline, and the first end of the 3rd pipeline is connected on the second pipeline, and the second end of the 3rd pipeline is in communication with the outside; Second throttling arrangement, is arranged on the 3rd pipeline, and wherein, the first end of the 3rd pipeline is relative to second end of one way valve near the second pipeline.
Further, well head tapping equipment also comprises: the 3rd throttling arrangement, is arranged on the first pipeline; First pressure tester, is arranged on the first pipeline, and the first pressure tester is positioned at the downstream of the 3rd throttling arrangement, and wherein, the second end of the second pipeline is positioned at the downstream of the 3rd throttling arrangement and the first pressure tester.
Further, the first pressure tester comprises: the 4th pipeline, and the first end of the 4th pipeline is connected on the first pipeline, the 4th pipeline is provided with the 4th throttling arrangement; First pressure meter, is arranged on the second end of the 4th pipeline; 5th pipeline, the first end of the 5th pipeline is connected on the 4th pipeline, and the first end of the 5th pipeline is between the 4th throttling arrangement and the first pressure meter, and the second end of the 5th pipeline is in communication with the outside, and the 5th pipeline is provided with the 5th throttling arrangement.
Further, well head tapping equipment also comprises: the 6th throttling arrangement, is arranged on the first pipeline, and the 6th throttling arrangement is positioned at the downstream of the first pressure tester, and wherein, the second end of the second pipeline is positioned at the downstream of the 6th throttling arrangement.
Further, well head tapping equipment also comprises: the 7th throttling arrangement, is arranged on the second pipeline; Second pressure tester, is arranged on the second pipeline, and the second pressure tester is positioned at the downstream of the 7th throttling arrangement, and wherein, first throttle device is positioned at the downstream of the 7th throttling arrangement and the second pressure tester.
Further, the second pressure tester comprises: the 6th pipeline, and the first end of the 6th pipeline is connected on the second pipeline, the 6th pipeline is provided with the 8th throttling arrangement; Second pressure meter, is arranged on the second end of the 6th pipeline; 7th pipeline, the first end of the 7th pipeline is connected on the 6th pipeline, and the first end of the 7th pipeline is between the 8th throttling arrangement and the second pressure meter, and the second end of the 7th pipeline is in communication with the outside, and the 7th pipeline is provided with the 9th throttling arrangement.
Further, well head tapping equipment also comprises: the 8th pipeline, and the first end of the 8th pipeline is connected on the second pipeline, and the first end of the 8th pipeline is between the first valve and the 7th throttling arrangement, and the second end of the 8th pipeline is in communication with the outside; Protelum stream device, is arranged on the 8th pipeline.
Further, the second end of the 8th pipeline is provided with dismountable plug.
According to another aspect of the present utility model, provide a kind of SAGD dual horizontal well, comprise the well head tapping equipment of SAGD producing well, well head tapping equipment is above-mentioned well head tapping equipment.
Application the technical solution of the utility model, when needs carry out bleed air operation to producing well, by the first valve open of first throttle device, now casing gas flows into the first pipeline along the second pipeline, and casing gas is processed along with continuing operation after crude oil inflow.Said structure makes casing gas no longer be discharged into in air, has stopped the hydrogen sulfide in operating personnel's scution bush gas completely and has caused intoxication accident on the one hand, and on the other hand, casing gas enters in operation and can be recovered utilization after flowing into, and then preventing pollution environment.Meanwhile, the one way valve of first throttle device can prevent the crude oil in the first pipeline from flowing into the second pipeline, and then ensures the normal production run of producing well.Therefore to solve SAGD producing well means of deflation of the prior art operating personnel when bleed air operation easily poisoning for the technical solution of the utility model, and the problem of bleed air operation contaminated environment.
Accompanying drawing explanation
The Figure of description forming a application's part is used to provide further understanding of the present utility model, and schematic description and description of the present utility model, for explaining the utility model, is not formed improper restriction of the present utility model.In the accompanying drawings:
Fig. 1 shows a kind of structural representation putting cover device of air of SAGD producing well of the prior art;
The another kind that Fig. 2 shows SAGD producing well of the prior art puts the structural representation overlapping device of air; And
Fig. 3 shows the structural representation of the embodiment of the well head tapping equipment according to SAGD producing well of the present utility model.
Wherein, above-mentioned accompanying drawing comprises the following drawings mark:
1 ', gate is produced; 2 ', pressure meter gate is produced; 3 ', pressure meter is produced; 4 ', pressure meter emptying gate is produced; 5 ', sleeve plug; 6 ', sleeve gate; 7 ', casing pressure table gate; 8 ', casing pressure table; 9 ', casing pressure table emptying gate; 10 ', cover gas pipeline is put; 10, the first pipeline; 20, the second pipeline; 30, first throttle device; 31, one way valve; 32, the first valve; 40, the 3rd pipeline; 50, the second throttling arrangement; 60, the 3rd throttling arrangement; 70, the first pressure tester; 71, the 4th pipeline; 72, the 4th throttling arrangement; 73, the first pressure meter; 74, the 5th pipeline; 75, the 5th throttling arrangement; 80, the 6th throttling arrangement; 90, the 7th throttling arrangement; 100, the second pressure tester; 110, the 6th pipeline; 120, the 8th throttling arrangement; 130, the second pressure meter; 140, the 7th pipeline; 150, the 9th throttling arrangement; 200, the 8th pipeline; 300, protelum stream device; 400, plug.
Detailed description of the invention
It should be noted that, when not conflicting, the embodiment in the application and the feature in embodiment can combine mutually.Below with reference to the accompanying drawings and describe the utility model in detail in conjunction with the embodiments.
This application provides a kind of well head tapping equipment of SAGD producing well, wherein, SAGD producing well comprises sleeve pipe and is arranged on the discharging tube in sleeve pipe.As shown in Figure 3, the well head tapping equipment of the present embodiment comprises the first pipeline 10, second pipeline 20 and first throttle device 30.Wherein, the first pipeline 10 is communicated with discharging tube, and the first end of the second pipeline 20 is communicated with sleeve pipe, and the second end of the second pipeline 20 is connected on the first pipeline 10.First throttle device 30 comprises one way valve 31 and the first valve 32, and wherein, the conducting direction of one way valve 31 is that the first valve 32 is arranged on the upstream of one way valve 31 by the first end of the second end to the second pipeline 20 of the second pipeline 20.
The technical scheme of application the present embodiment, when needs carry out bleed air operation to producing well, opened by first valve 32 of first throttle device 30, now casing gas flows into the first pipeline 10 along the second pipeline 20, and casing gas is processed along with continuing operation after crude oil inflow.Said structure makes casing gas no longer be discharged into in air, has stopped the hydrogen sulfide in operating personnel's scution bush gas completely and has caused intoxication accident on the one hand, and on the other hand, casing gas enters in operation and can be recovered utilization after flowing into, and then preventing pollution environment.Meanwhile, the one way valve 31 of first throttle device 30 can prevent the crude oil in the first pipeline 10 from flowing into the second pipeline 20, and then ensures the normal production run of producing well.Therefore to solve SAGD producing well means of deflation of the prior art operating personnel when bleed air operation easily poisoning for the technical scheme of the present embodiment, and the problem of bleed air operation contaminated environment.
As shown in Figure 3, in the technical scheme of the present embodiment, one end that well head tapping equipment also comprises the 3rd pipeline 40 and the second throttling arrangement the 50, three pipeline 40 is connected on the second pipeline 20, and the other end of the 3rd pipeline 40 is in communication with the outside.Second throttling arrangement 50 is arranged on the 3rd pipeline 40.3rd pipeline 40 uses as blowdown piping, and then by the remaining casing gas emptying of the 3rd pipeline 40.
As shown in Figure 3, in the technical scheme of the present embodiment, well head tapping equipment also comprises the 3rd throttling arrangement 60,3rd throttling arrangement 60 is arranged on the first pipeline 10, wherein, the 3rd throttling arrangement 60, for controlling whether carry out crude oil production, therefore uses as producing valve.Well head tapping equipment also comprises the first pressure tester 70, is arranged on the first pipeline 10, and the first pressure tester 70 is positioned at the downstream of the 3rd throttling arrangement 60, and the second end of the second pipeline 20 is positioned at the downstream of the 3rd throttling arrangement 60 and the first pressure tester 70.When needs carry out crude oil production, open the 3rd throttling arrangement 60 and make crude oil flow into the first pipeline 10.Meanwhile, crude oil flows into the first pressure tester 70 and carries out the pressure monitor of the first pipeline 10.
Particularly, as shown in Figure 3, the first pressure tester 70 comprises the 4th pipeline 71, the 4th throttling arrangement 72, first pressure meter 73, the 5th pipeline 74 and the 5th throttling arrangement 75.Wherein, the first end of the 4th pipeline 71 is connected on the first pipeline 10, and the 4th throttling arrangement 72 is arranged on the 4th pipeline 71.First pressure meter 73 is arranged on the second end of the 4th pipeline 71, the first end of the 5th pipeline 74 is connected on the 4th pipeline 71, and the first end of the 5th pipeline 74 is between the 4th throttling arrangement 72 and the first pressure meter 73, second end of the 5th pipeline 74 is in communication with the outside, and the 5th pipeline 74 is provided with the 5th throttling arrangement 75.In actual production process, open the 4th throttling arrangement 72, close the 5th throttling arrangement 75, crude oil flows into the first pressure meter 73 by the 4th pipeline 71, and then carries out detected pressures.When stopping production, close the 4th throttling arrangement 72, and the crude oil opened in the 5th throttling arrangement the 75, four pipeline 71 is emptying by the 5th pipeline 74.
As shown in Figure 3, in the technical scheme of the present embodiment, well head means of deflation also comprises the 6th throttling arrangement 80.6th throttling arrangement 80 is arranged on the first pipeline 10, and the 6th throttling arrangement 80 is positioned at the downstream of the first pressure tester 70, and wherein, the second end of the second pipeline 20 is positioned at the downstream of the 6th throttling arrangement 80.Particularly, in actual production process, first can open the 3rd throttling arrangement 60 and close the 6th throttling arrangement 80 and monitor the first pipeline 10, the pressure namely in producing well discharging tube.When the pressure in the first pipeline 10 is suitable, 3rd throttling arrangement 60 opened and carry out production work.
As shown in Figure 3, in the technical scheme of the present embodiment, well head tapping equipment also comprises the 7th throttling arrangement the 90, seven throttling arrangement 90 and is arranged on the second pipeline 20.Whether the 7th throttling arrangement 90 carries out bleed air operation for controlling the second pipeline 20, particularly, when the 7th throttling arrangement 90 cuts out, casing gas cannot flow into the second pipeline 20, when the 7th throttling arrangement 90 is opened, casing gas flows into the second pipeline 20 and starts to carry out deflation operations.
As shown in Figure 3, in the technical scheme of the present embodiment, well head tapping equipment also comprises the second pressure tester 100.Second pressure tester 100 is arranged on the second pipeline 20, and the second pressure tester 100 is positioned at the downstream of the 7th throttling arrangement 90, and wherein, first throttle device 30 is positioned at the downstream of the 7th throttling arrangement 90 and the second pressure tester 100.Second pressure tester 100 for detecting the blow off pressure in the second pipeline 20, and then ensure venting time operating personnel safety.
As shown in Figure 3, in the technical scheme of the present embodiment, the second pressure tester 100 comprises the 6th pipeline 110, the 8th throttling arrangement 120, second pressure meter 130, the 7th pipeline 140 and the 9th throttling arrangement 150.Wherein, the first end of the 6th pipeline 110 is connected on the second pipeline 20, and the 8th throttling arrangement 120 is arranged on the 6th pipeline 110.Second pressure meter 130 is arranged on the second end of the 6th pipeline 110.The first end of the 7th pipeline 140 is connected on the 6th pipeline 110, and the first end of the 7th pipeline 140 is between the 8th throttling arrangement 120 and the second pressure meter 130, second end of the 7th pipeline 140 is in communication with the outside, and the 7th pipeline 140 is provided with the 9th throttling arrangement 150.Particularly, when needing to monitor the blow off pressure in the second pipeline 20, opening the 8th throttling arrangement 120 and closing the 9th throttling arrangement 150, now a casing gas part flows into the second pressure meter 130 along the 6th pipeline 110 and realizes pressure monitor.When not needing to monitor the blow off pressure in the second pipeline 20, closing the 8th throttling arrangement 120 and opening the 9th throttling arrangement 150, the casing gas now participated in the 6th pipeline 110 is drained along the 7th pipeline 140.
As shown in Figure 3, in the technical scheme of the present embodiment, well head tapping equipment also comprises the 8th pipeline 200 and protelum stream device 300.Wherein, the first end of the 8th pipeline 200 is connected on the second pipeline 20, and the first end of the 8th pipeline 200 is between the first valve 32 and the 7th throttling arrangement 90, and the second end of the 8th pipeline 200 is in communication with the outside.Protelum stream device 300 is arranged on the 8th pipeline 200.Meanwhile, the second end of the 8th pipeline 200 is provided with plug 400.When first throttle device 30 go wrong cannot normally work time, original exhaust mode can be used by the 8th pipeline 200 and protelum stream device 300, to prevent the casing gas hypertonia in the second pipeline 20.
Present invention also provides a kind of method for exhausting of SAGD producing well, SAGD producing well comprises sleeve pipe and is arranged on the discharging tube in sleeve pipe, SAGD producing well also comprises the well head tapping equipment of SAGD producing well, method for exhausting comprises: be communicated with discharging tube by the first pipeline 10 of well head tapping equipment, and the first end of the second pipeline 20 of well head tapping equipment is communicated with sleeve pipe, and the second end of the second pipeline 20 is connected on the first pipeline 10; The aperture of the first valve 32 of well head tapping equipment is regulated, to make one way valve 31 one-way conduction of well head tapping equipment by gas flow guiding to the first pipeline 10 in sleeve pipe according to the gas pressure in sleeve pipe.
Present invention also provides a kind of SAGD dual horizontal well, comprise the well head tapping equipment of SAGD producing well according to the embodiment of the SAGD dual horizontal well of the application, well head tapping equipment is above-mentioned well head tapping equipment.
It should be noted that, the concrete meaning of the SAGD of the application is SAGD, and its four letters are respectively the acronym of SteamAssistedGravityDrainage.SAGD oil production method is a kind of steam driving exploitation mode, namely injects high temperature continuously to steam injection well, high-quality steam, first vapor chamber is grown, while heating oil reservoir, keep certain formation pressure (supplementing stratum energy), crude oil is driven to around in producing well, then extraction.The concrete oil production method of SAGD oil recovery technique and oil production equipment are prior art, do not repeat them here.
The foregoing is only preferred embodiment of the present utility model, be not limited to the utility model, for a person skilled in the art, the utility model can have various modifications and variations.All within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (11)

1. a well head tapping equipment for SAGD producing well, SAGD producing well comprises sleeve pipe and is arranged on the discharging tube in described sleeve pipe, it is characterized in that, described well head tapping equipment comprises:
First pipeline (10), is communicated with described discharging tube;
Second pipeline (20), the first end of described second pipeline (20) is communicated with described sleeve pipe, and the second end of described second pipeline (20) is connected on described first pipeline (10);
Be arranged on the first throttle device (30) on described second pipeline (20), described first throttle device (30) comprises spaced one way valve (31) and the first valve (32), wherein, the conducting direction of described one way valve (31) is to the first end conducting of described second pipeline (20) by the second end of described second pipeline (20).
2. well head tapping equipment according to claim 1, is characterized in that, described first valve (32) is arranged on the upstream of described one way valve (31).
3. well head tapping equipment according to claim 1, is characterized in that, described well head tapping equipment also comprises:
3rd pipeline (40), the first end of described 3rd pipeline (40) is connected on described second pipeline (20), and the second end of described 3rd pipeline (40) is in communication with the outside;
Second throttling arrangement (50), is arranged on described 3rd pipeline (40),
Wherein, the first end of described 3rd pipeline (40) is relative to the second end of close described second pipeline (20) of described one way valve (31).
4. well head tapping equipment according to claim 1, is characterized in that, described well head tapping equipment also comprises:
3rd throttling arrangement (60), is arranged on described first pipeline (10);
First pressure tester (70), is arranged on described first pipeline (10), and described first pressure tester (70) is positioned at the downstream of described 3rd throttling arrangement (60),
Wherein, the second end of described second pipeline (20) is positioned at the downstream of described 3rd throttling arrangement (60) and described first pressure tester (70).
5. well head tapping equipment according to claim 4, is characterized in that, described first pressure tester (70) comprising:
4th pipeline (71), the first end of described 4th pipeline (71) is connected on described first pipeline (10), and described 4th pipeline (71) is provided with the 4th throttling arrangement (72);
First pressure meter (73), is arranged on the second end of described 4th pipeline (71);
5th pipeline (74), the first end of described 5th pipeline (74) is connected on described 4th pipeline (71), and the first end of described 5th pipeline (74) is positioned between described 4th throttling arrangement (72) and described first pressure meter (73), second end of described 5th pipeline (74) is in communication with the outside, and described 5th pipeline (74) is provided with the 5th throttling arrangement (75).
6. well head tapping equipment according to claim 4, is characterized in that, described well head tapping equipment also comprises:
6th throttling arrangement (80), is arranged on described first pipeline (10), and described 6th throttling arrangement (80) is positioned at the downstream of described first pressure tester (70),
Wherein, the second end of described second pipeline (20) is positioned at the downstream of described 6th throttling arrangement (80).
7. well head tapping equipment according to claim 2, is characterized in that, described well head tapping equipment also comprises:
7th throttling arrangement (90), is arranged on described second pipeline (20);
Second pressure tester (100), is arranged on described second pipeline (20), and described second pressure tester (100) is positioned at the downstream of described 7th throttling arrangement (90),
Wherein, described first throttle device (30) is positioned at the downstream of described 7th throttling arrangement (90) and described second pressure tester (100).
8. well head tapping equipment according to claim 7, is characterized in that, described second pressure tester (100) comprising:
6th pipeline (110), the first end of described 6th pipeline (110) is connected on described second pipeline (20), and described 6th pipeline (110) is provided with the 8th throttling arrangement (120);
Second pressure meter (130), is arranged on the second end of described 6th pipeline (110);
7th pipeline (140), the first end of described 7th pipeline (140) is connected on described 6th pipeline (110), and the first end of described 7th pipeline (140) is positioned between described 8th throttling arrangement (120) and described second pressure meter (130), second end of described 7th pipeline (140) is in communication with the outside, and described 7th pipeline (140) is provided with the 9th throttling arrangement (150).
9. well head tapping equipment according to claim 7, is characterized in that, described well head tapping equipment also comprises:
8th pipeline (200), the first end of described 8th pipeline (200) is connected on described second pipeline (20), and the first end of described 8th pipeline (200) is positioned between described first valve (32) and described 7th throttling arrangement (90), and the second end of described 8th pipeline (200) is in communication with the outside;
Protelum stream device (300), is arranged on described 8th pipeline (200).
10. well head tapping equipment according to claim 9, is characterized in that, the second end of described 8th pipeline (200) is provided with dismountable plug (400).
11. 1 kinds of SAGD dual horizontal well, comprise the well head tapping equipment of SAGD producing well, it is characterized in that, the well head tapping equipment of described well head tapping equipment according to any one of claim 1 to 10.
CN201520996959.5U 2015-12-03 2015-12-03 Two horizontal wells of SAGD and well head discharging equipment of producing well thereof Withdrawn - After Issue CN205225088U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520996959.5U CN205225088U (en) 2015-12-03 2015-12-03 Two horizontal wells of SAGD and well head discharging equipment of producing well thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520996959.5U CN205225088U (en) 2015-12-03 2015-12-03 Two horizontal wells of SAGD and well head discharging equipment of producing well thereof

Publications (1)

Publication Number Publication Date
CN205225088U true CN205225088U (en) 2016-05-11

Family

ID=55900162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520996959.5U Withdrawn - After Issue CN205225088U (en) 2015-12-03 2015-12-03 Two horizontal wells of SAGD and well head discharging equipment of producing well thereof

Country Status (1)

Country Link
CN (1) CN205225088U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106837189B (en) * 2015-12-03 2019-04-09 中国石油天然气股份有限公司 The well head tapping equipment and method for exhausting of SAGD producing well

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106837189B (en) * 2015-12-03 2019-04-09 中国石油天然气股份有限公司 The well head tapping equipment and method for exhausting of SAGD producing well

Similar Documents

Publication Publication Date Title
MX2014012981A (en) Hydropower and geothermal energy system and methods.
WO2015054984A1 (en) Method for enhanced fuel gas extraction by coal mine underground gas-liquid dual-phase alternating phase-driven fracturing of coal body
CN104481575B (en) A kind of vapours displacement gas improves the method for gas pumping efficiency
CN203081417U (en) Multifunctional integrated gas lift technique pipe column
CN203270527U (en) Device for preventing gas explosion after gate closing and plugging of diversion tunnel
CN204252964U (en) A kind of marine thermal recovery heat injection and production integration tubing string
CN105422164A (en) Efficient water injection method and device of hydraulic fracture permeability increase auxiliary coal seam
RU2262586C2 (en) Borehole plant for simultaneous separate and alternate operation of several formations by single well
CN106285561B (en) Downhole safety valve system
CN205225088U (en) Two horizontal wells of SAGD and well head discharging equipment of producing well thereof
CN201087714Y (en) Double-oil tube well mouth device
CN204492776U (en) A kind of on-line control separate zone production flow string
CN102392614A (en) Wellhead pressure suction assembly
CN104632195B (en) A kind of gaslift helps flowing water horizontal well searching pipe column and method
CN103410487A (en) Thickened oil thermal recovery decompression method and device
CN203145912U (en) Bypassing controller
CN110219610B (en) Shale gas horizontal well high-pressure pumping bridge plug device
CN210317259U (en) Gas lift device suitable for gas well full life cycle drainage gas production
CN208203251U (en) Low-permeability oil deposit CO_2 stimulation oil recovery integrated apparatus
CN106837189B (en) The well head tapping equipment and method for exhausting of SAGD producing well
CN205297464U (en) Gas injection well head device
CN209430180U (en) It is layered de-plugging tubular column structure
CN203050641U (en) Drivepipe gas automatic recovery device
CN106837270B (en) Device and process for preventing gas channeling of carbon dioxide flooding oil extraction wellhead
CN205225205U (en) Oil recovery well

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20160511

Effective date of abandoning: 20190409

AV01 Patent right actively abandoned