CN205224620U - Device is applyed to fibre cloth prestressing force - Google Patents

Device is applyed to fibre cloth prestressing force Download PDF

Info

Publication number
CN205224620U
CN205224620U CN201521116823.7U CN201521116823U CN205224620U CN 205224620 U CN205224620 U CN 205224620U CN 201521116823 U CN201521116823 U CN 201521116823U CN 205224620 U CN205224620 U CN 205224620U
Authority
CN
China
Prior art keywords
screw rod
stretch
fixture
energy
cloth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201521116823.7U
Other languages
Chinese (zh)
Inventor
谢建和
黄昆泓
薛凌峰
黄亮
张洹
赖浩成
黄睿鹏
曹杰
简振锷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong University of Technology
Original Assignee
Guangdong University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong University of Technology filed Critical Guangdong University of Technology
Priority to CN201521116823.7U priority Critical patent/CN205224620U/en
Application granted granted Critical
Publication of CN205224620U publication Critical patent/CN205224620U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Fiber Materials (AREA)

Abstract

The utility model relates to a device is applyed to fibre cloth prestressing force. Including fibre cloth, first anchor clamps, second anchor clamps, stretch -draw platform, jack, baffle, force transducer, lift rocker etc. End fixing that the screw rod penetrated the stretch -draw platform is respectively put more energy into on first support to first put more energy into screw rod and third, and the second is put more energy into screw rod and fourth and is put more energy into the screw rod and penetrate stretch -draw platform end fixing respectively on the second support, it makes the stretch -draw platform steadily raise to rotate the lift rocker, twine respectively on first steel roll and second steel roll at fibre cloth both ends, and on the second cushion cap was arranged in the tie of second anchor clamps, clamping screw was fixed in the second anchor clamps on the stretch -draw platform, on first cushion cap was arranged in first anchor clamps tie, the tentioning screw rod passed the stretch -draw platform and with baffle, the continuous stretch -draw end that forms of force transducer, utilizes the jack to withstand the baffle and give fibre cloth prestress application. The utility model discloses can provide great prestressing force, fibre charity power is even, can not cause the damage of fibre cloth, has solved the eccentric problem that the stretch -draw process appears.

Description

A kind of cloth prestress application device
Technical field
The utility model relates to the technical field utilizing fiber cloth reinforced Structural Engineering, particularly a kind of cloth prestress application device.
Background technology
Reinforced concrete structure obtains a wide range of applications in the field such as communications and transportation, industrial construction, and in order to eliminate due to overload, the potential safety hazard that the reasons such as fatigue are brought, must reinforce damaged structure component, extend its application life.
Fibre reinforced composites, because its volume is little, lightweight, intensity is high, corrosion resistance is good, fatigability is strong and the advantage such as easy construction, are widely used in concrete structure reinforcement engineering.But in traditional fibre cloth stabilization works, main employing pastes fiber cloth reinforced method, and this reinforcement means mainly exists following shortcoming: the damage that can not recover original structure in time, changes the distortion of original structure; Can not give full play to the high strength of cloth, integral reinforcing efficiency is low.Prestressed fiber cloth reinforced reinforced concrete structure combine with technique Building Strengthened by FRP Sheets technology and prestressing technique advantage separately, the shortcoming of traditional structure reinforcing technique can be overcome, play the high performance of fibre reinforced composites intensity better, improve the utilization rate of fibre reinforced composites, effectively improve static(al) and the fatigue behaviour of original structure, improve functional performance and the supporting capacity of damaged structure, control critical eigenvalue and distortion, extend its application life.
Indirect method and direct stretching method are mainly to the method for cloth Shi Hanzhang.Indirect method owing to can only provide less prestressing force, and needs specific device, is of little use at Practical Project; And existing direct tension technology construction equipment and construction technology shortcoming more: tensioning equipment is eccentric, and stretching process force is uneven, causes cloth in stretching process to damage, or jig Design is unreasonable, and in stretching process, cloth directly skids off.Generally speaking, existing apparatus and method technology is difficult to obtain the high-prestressed level of cloth, fails to give full play to the advantage of cloth.Therefore, need a kind of new cloth prestress application apparatus and method, larger stress distribution can either be obtained, uniform force application in stretching process, damage can not be caused to cloth, again can the cloth of anchoring very well, prevent stress distribution from losing.
Summary of the invention
The purpose of this utility model is consider the problems referred to above and provide a kind of cloth prestress application device.Uniform force application in the utility model stretching process, damage can not be caused to cloth, again can very well anchoring cloth, prevent stress distribution from losing, and the utility model can apply the more high-prestressed level of cloth, and solve the eccentricity issues of stretching process appearance.
The technical solution of the utility model is: the device that pre-stressed fiber cloth of the present utility model applies, comprise cloth, first fixture, second fixture, first bolt, second bolt, first steel rider, second steel rider, stretch-draw platform, standing screw, tensioning screw rod, first cushion cap, second cushion cap, jack, baffle plate, force snesor, first puts more energy into screw rod, second puts more energy into screw rod, 3rd puts more energy into screw rod, 4th puts more energy into screw rod, first bearing, second bearing, lifting rocking bar, wherein the first screw rod and the 3rd screw rod of putting more energy into of putting more energy into penetrates the end winding support of stretch-draw platform respectively on the first bearing, second screw rod and the 4th screw rod of putting more energy into of putting more energy into penetrates stretch-draw platform end respectively and is fixed on the second bearing, rotate lifting rocking bar carries out power transmission by transmission mechanism, stretch-draw platform is steadily risen, cloth two ends are wound on the first steel rider and the second steel rider respectively, clamp respectively with the first fixture and the second fixture, and clamp respectively with the first bolt, the second bolt, second fixture is flat on the second cushion cap, and the second fixture is fixed on stretch-draw platform by standing screw, first fixture is flat on the first cushion cap, and baffle plate, force snesor are connected to form stretching end through the reserved stretch-draw hole of stretch-draw platform by tensioning screw rod, utilize jack to withstand baffle plate to cloth Shi Hanzhang.
The utility model utilizes rectangular tube and U-shaped steel tank to build stretch-draw platform, its end is configured the screw rod of putting more energy into connected by driving chain, the two ends of cloth are wrapped on steel rider, between sandwiched two panels serrated face steel clamp tool, by high-strength bolt, the fixture of one end is fixed on stretch-draw platform, the fixture of the other end is combined into stretching end by two screw rods and baffle plate and force snesor, after utilizing lifting rocking bar to carry out leveling to stretch-draw platform, adopts jack pair cloth to carry out steady stretch-draw.The outside counter-force platform stretch-draw cloth of the utility model by can freely be elevated, prestressing force largely can be provided, the double-screw structure of stretching end makes cloth uniform force application, can not cause the damage of cloth, solves the eccentricity issues that stretching process occurs; Fixture serrated face and the better anchoring cloth of steel rider double action, decrease the loss of prestress that fixture reason causes dramatically.The utility model is a kind of exquisite composition, and performance is remarkable, the device of the cloth prestress application that side effect is little.
Accompanying drawing explanation
Fig. 1 is the structural representation that the utility model carries out cloth prestressed stretch-draw and anchoring in stretch-draw platform;
Fig. 2 is the A direction view of Fig. 1;
Fig. 3 is the B direction view of Fig. 1
Fig. 4 is the partial enlarged drawing of the stretching end fixture of Fig. 1.
Detailed description of the invention
Embodiment:
Structural representation of the present utility model as shown in Figure 1, the device that cloth method for applying prestressing force of the present utility model is used, comprise cloth 1, first fixture 2, second fixture 6, first bolt 3, second bolt 7, first steel rider 4, second steel rider 8, stretch-draw platform, standing screw 14, tensioning screw rod 15, first cushion cap 12, second cushion cap 13, jack 18, baffle plate 16, force snesor 17, first puts more energy into screw rod 19, second puts more energy into screw rod 20, 3rd puts more energy into screw rod 21, 4th puts more energy into screw rod 22, first bearing 23, second bearing 24, lifting rocking bar 25, wherein the first screw rod 19 and the 3rd screw rod 21 of putting more energy into of putting more energy into penetrates the end winding support of stretch-draw platform respectively on the first bearing 23, second screw rod 20 and the 4th screw rod 22 of putting more energy into of putting more energy into penetrates stretch-draw platform end respectively and is fixed on the second bearing 24, rotate lifting rocking bar 25 carries out power transmission by transmission mechanism, stretch-draw platform is steadily risen, cloth 1 two ends are wound on the first steel rider 4 and the second steel rider 8 respectively, clamp respectively with the first fixture 2 and the second fixture 6, and clamp respectively with the first bolt 3, second bolt 7, second fixture 6 is flat on the second cushion cap 13, and the second fixture 6 is fixed on stretch-draw platform by standing screw 14, first fixture 2 is flat on the first cushion cap 12, and baffle plate 16, force snesor 17 are connected to form stretching end through the reserved stretch-draw hole of stretch-draw platform by tensioning screw rod 15, utilizes jack 18 to withstand baffle plate 16 to cloth 1 Shi Hanzhang.
In the present embodiment, above-mentioned transmission mechanism is chain-drive mechanism, includes driving wheel 27, driving chain 26, follower 28, rotates lifting rocking bar 25 carries out power transmission by driving wheel 27, driving chain 26, follower 28.
In the present embodiment, above-mentioned stretch-draw platform includes the first rectangular tube 10, second rectangular tube 11, first steel tank 5, second steel tank 9; First steel tank 5, second steel tank 9 is arranged on the first rectangular tube 10 and the second rectangular tube 11 two ends composition stretch-draw platform that are parallel to each other respectively.Wherein the first steel tank 5 and the second steel tank 9 are U-shaped steel tanks.
In the present embodiment, above-mentioned first screw rod 19 and the 3rd screw rod 21 of putting more energy into of putting more energy into penetrates the end winding support of the second rectangular tube 11 and the first rectangular tube 10 respectively on the first bearing 23, and the second screw rod 20 and the 4th screw rod 22 of putting more energy into of putting more energy into penetrates the end winding support of the second rectangular tube 11 and the first rectangular tube 10 respectively on the second bearing 24.
In the present embodiment, the second fixture 6 is fixed on the first steel tank 5 of band preformed hole by above-mentioned standing screw 14; First fixture 2 is flat on the first cushion cap 12, and baffle plate 16, force snesor 17 are connected to form stretching end through the reserved stretch-draw hole of the second steel tank 9 by tensioning screw rod 15, utilizes jack 18 to withstand baffle plate 16 to cloth 1 Shi Hanzhang.
Above-mentioned first screw rod 19 and the 3rd screw rod 21, second screw rod 20 and the 4th screw rod 22 of putting more energy into of putting more energy into of putting more energy into of putting more energy into is connected with driving chain 26 respectively.
In addition, configure driving wheel 27 at the first screw rod 19 and the 4th screw rod 22 of putting more energy into of putting more energy into, configure follower 28 at the second screw rod 20 and the 3rd screw rod 21 of putting more energy into of putting more energy into.First put more energy into screw rod 19 and the 4th put more energy into screw rod 22 arrange respectively lifting rocking bar 25.Rotate lifting rocking bar 25 and rise stretch-draw platform, and carry out leveling.
In addition, above-mentioned first steel tank 5 is reserved with hole at the At The Height of corresponding first fixture 2, and the second steel tank 9 is reserved with hole at the At The Height of corresponding second fixture 6.Above-mentioned tensioning screw rod 15, standing screw 14 respectively have 2, are individually fixed in the both sides of the first fixture 2 and the second fixture 6, when making stretch-draw fixture with kept straight by the cloth 1 of stretch-draw, side can not be there is and move.
Interface between above-mentioned first fixture 2 and the second fixture about 6 two clamping plates is provided with many longitudinal sawtooth, and presets the groove placing steel rider first steel rider 4 and the second steel rider 8 respectively, prevents cloth from skidding off when stretch-draw.
The signal output part attachment force signal processing system of above-mentioned force snesor 17, for controlling stress distribution.
The method of the utility model cloth prestress application, embodiment in practice comprises following concrete step:
1) stretch-draw platform is installed.The first rectangular tube 10 utilizing the first steel tank 5, second steel tank 9 to be arranged on respectively to be parallel to each other and the second rectangular tube 11 two ends composition stretch-draw platform.
2) stretch-draw lifting platform functional configuration.Screw rod 19 and the 3rd of putting more energy into first screw rod 21 of putting more energy into penetrates the second rectangular tube 11 and the first rectangular tube 10 end respectively, be fixed on the first bearing 23, second screw rod 20 and the 4th screw rod 22 of putting more energy into of putting more energy into penetrates the second rectangular tube 11 and the first rectangular tube 10 end respectively, be fixed on the second bearing 24, screw rod 19 and second of putting more energy into first screw rod 20, the 3rd screw rod 21 and the 4th screw rod 22 of putting more energy into of putting more energy into of putting more energy into is connected with driving chain 26 respectively.Configure driving wheel 27 at the first screw rod 19 and the 3rd screw rod 21 of putting more energy into of putting more energy into, configure follower 28 at the second screw rod 45 and the 4th screw rod 22 of putting more energy into of putting more energy into.First put more energy into screw rod 19 and the 3rd put more energy into screw rod 21 arrange lifting rocking bar 25.
3) leveling stretch-draw platform.Rotation lifting rocking bar 25 rises stretch-draw platform and (containing the first rectangular tube 10, second rectangular tube 11 and the first steel tank 5, second steel tank 9, and carries out leveling.
4) gripping fibers cloth two ends.Cloth 1 two ends are wound in the first steel rider 4 and the second steel rider 8 by cutting cloth 1 respectively, and clamp respectively with the first fixture 2 and the second fixture 6, utilize the first bolt 3, second bolt 7 to make the first fixture 2 and the second fixture 6 clamp respectively; On fixture, the interface of lower plate is configured to zigzag, can form entirety after docking;
5) sectional fixture.Second fixture 6 is flat on the second cushion cap 13, utilizes standing screw 14 to be fixed on by second fixture 6 on second steel tank 9 of band preformed hole; First fixture 2 is flat on the first cushion cap 12, utilizes tensioning screw rod 15, through the reserved stretch-draw hole of the first steel tank 5, baffle plate 16, force snesor 17 are connected to form stretching end; Wherein the interface of the first fixture 2 and the second fixture 6 is in sustained height;
7) stretch-draw cloth.Utilize jack 18 to withstand baffle plate 16, pull tensioning screw rod 15, to cloth 1 Shi Hanzhang, control stress distribution according to force snesor.

Claims (10)

1. a cloth prestressing force tensioning device, it is characterized in that comprising cloth (1), first fixture (2), second fixture (6), first bolt (3), second bolt (7), first steel rider (4), second steel rider (8), stretch-draw platform, standing screw (14), tensioning screw rod (15), first cushion cap (12), second cushion cap (13), jack (18), baffle plate (16), force snesor (17), first puts more energy into screw rod (19), second puts more energy into screw rod (20), 3rd puts more energy into screw rod (21), 4th puts more energy into screw rod (22), first bearing (23), second bearing (24), lifting rocking bar (25), wherein the first screw rod (19) and the 3rd screw rod (21) of putting more energy into of putting more energy into penetrates the end winding support of stretch-draw platform respectively on the first bearing (23), second screw rod (20) and the 4th screw rod (22) of putting more energy into of putting more energy into penetrates stretch-draw platform end respectively and is fixed on the second bearing (24), rotate power is carried out in lifting rocking bar (25) transmission by transmission mechanism, stretch-draw platform is steadily risen, cloth (1) two ends are wound on the first steel rider (4) and the second steel rider (8) respectively, clamp respectively with the first fixture (2) and the second fixture (6), and clamp respectively with the first bolt (3), the second bolt (7), second fixture (6) is flat on the second cushion cap (13), and the second fixture (6) is fixed on stretch-draw platform by standing screw (14), first fixture (2) is flat on the first cushion cap (12), baffle plate (16), force snesor (17) are connected to form stretching end through the reserved stretch-draw hole of stretch-draw platform by tensioning screw rod (15), utilize jack (18) to withstand baffle plate (16) to cloth (1) Shi Hanzhang.
2. cloth prestressing force tensioning device according to claim 1, it is characterized in that above-mentioned transmission mechanism is chain-drive mechanism, include driving wheel (27), driving chain (26), follower (28), rotate power is carried out in lifting rocking bar (25) transmission by driving wheel (27), driving chain (26), follower (28).
3. cloth prestressing force tensioning device according to claim 1, is characterized in that above-mentioned stretch-draw platform includes the first rectangular tube (10), the second rectangular tube (11), the first steel tank (5), the second steel tank (9); First steel tank (5), the second steel tank (9) are arranged on the first rectangular tube (10) and the second rectangular tube (11) two ends composition stretch-draw platform that are parallel to each other respectively.
4. cloth prestressing force tensioning device according to claim 3, it is characterized in that the above-mentioned first screw rod (19) and the 3rd screw rod (21) of putting more energy into of putting more energy into penetrates the end winding support of the second rectangular tube (11) and the first rectangular tube (10) respectively on the first bearing (23), the second screw rod (20) and the 4th screw rod (22) of putting more energy into of putting more energy into penetrates the end winding support of the second rectangular tube (11) and the first rectangular tube (10) respectively on the second bearing (24).
5. cloth prestressing force tensioning device according to claim 3, is characterized in that the second fixture (6) is fixed on first steel tank (5) of band preformed hole by above-mentioned standing screw (14); First fixture (2) is flat on the first cushion cap (12), baffle plate (16), force snesor (17) are connected to form stretching end through the reserved stretch-draw hole of the second steel tank (9) by tensioning screw rod (15), utilize jack (18) to withstand baffle plate (16) to cloth (1) Shi Hanzhang.
6. cloth prestressing force tensioning device according to claim 3, it is characterized in that above-mentioned first steel tank (5) is reserved with hole at the At The Height of corresponding first fixture (2), the second steel tank (9) is reserved with hole at the At The Height of corresponding second fixture (6).
7. cloth prestressing force tensioning device according to claim 1, it is characterized in that above-mentioned tensioning screw rod (15), standing screw (14) respectively has 2, be individually fixed in the both sides of the first fixture (2) and the second fixture (6), when making stretch-draw fixture with kept straight by the cloth of stretch-draw (1), side can not be there is move, avoid eccentric tension.
8. cloth prestressing force tensioning device according to claim 1, is characterized in that above-mentioned first fixture (2) and the interface of the second fixture (6) up and down between two clamping plates are provided with many longitudinal sawtooth.
9. cloth prestressing force tensioning device according to claim 8, it is characterized in that above-mentioned first fixture (2) and the second fixture (6) preset the groove placing steel rider first steel rider (4) and the second steel rider (8) up and down between two clamping plates, prevent cloth from skidding off when stretch-draw.
10. the cloth prestressing force tensioning device according to any one of claim 1 to 9, is characterized in that the signal output part attachment force signal processing system of above-mentioned force snesor (17).
CN201521116823.7U 2015-12-25 2015-12-25 Device is applyed to fibre cloth prestressing force Withdrawn - After Issue CN205224620U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521116823.7U CN205224620U (en) 2015-12-25 2015-12-25 Device is applyed to fibre cloth prestressing force

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521116823.7U CN205224620U (en) 2015-12-25 2015-12-25 Device is applyed to fibre cloth prestressing force

Publications (1)

Publication Number Publication Date
CN205224620U true CN205224620U (en) 2016-05-11

Family

ID=55899695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521116823.7U Withdrawn - After Issue CN205224620U (en) 2015-12-25 2015-12-25 Device is applyed to fibre cloth prestressing force

Country Status (1)

Country Link
CN (1) CN205224620U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105569349A (en) * 2015-12-25 2016-05-11 广东工业大学 Fiber cloth prestress applying device and method
CN110029582A (en) * 2019-05-16 2019-07-19 中铁十五局集团第一工程有限公司 A kind of device and method for the double sunpender synchronous tensions of bowstring arch bridge

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105569349A (en) * 2015-12-25 2016-05-11 广东工业大学 Fiber cloth prestress applying device and method
CN105569349B (en) * 2015-12-25 2017-03-29 广东工业大学 A kind of fiber cloth prestress application apparatus and method
CN110029582A (en) * 2019-05-16 2019-07-19 中铁十五局集团第一工程有限公司 A kind of device and method for the double sunpender synchronous tensions of bowstring arch bridge
CN110029582B (en) * 2019-05-16 2024-06-11 中铁十五局集团第一工程有限公司 Device and method for synchronous tensioning of double suspenders of tied-arch bridge

Similar Documents

Publication Publication Date Title
CN203769342U (en) Rigid self-locking pre-stress carbon fiber plate anchoring system
CN204311761U (en) A kind of prestressed carbon cloth reinforced concrete column tensioning equipment
CN103334382B (en) High-strength fiber material wedge anchor device and construction method thereof
CN105569372A (en) Device and method for enhancing composite reinforced concrete through prestress fiber
CN203201146U (en) Spacers for column template reinforcement
CN205224620U (en) Device is applyed to fibre cloth prestressing force
CN101701497B (en) Method for strengthening concrete column by pre-stressed fiber cloth
CN105569349A (en) Fiber cloth prestress applying device and method
CN104775629B (en) The method and apparatus of autocontrol fiber cloth prestressed stretch-draw
CN102505858B (en) Pre-stressing carbon-cloth tension system and tension reinforcing method
CN201695706U (en) Tensioning device of prestress fiber cloth for reinforcing reinforced concrete column
CN103306495A (en) Wood structure cutting column reinforcing construction method
CN205840316U (en) Large span Zhongting hanging structure form bracing system
CN104790299A (en) Internal-span unsupported convenient construction support and method for bridge cast-in-place box beam
CN105064696A (en) Prestressed carbon fiber plate tensioning apparatus
CN202899638U (en) Support mechanism used for unloading of building structural member
CN209837123U (en) Pile foundation static load test device
CN203403683U (en) Double-layer rib penetrating device
CN204691276U (en) Autocontrol cloth prestress tensioning equipment
CN201217848Y (en) Flexible supporting pad iron connecting structure
CN204607381U (en) A kind of superimposed sheet Steel bar hanger
CN204920238U (en) Prestressing force carbon fiber plate's straining means
CN204728212U (en) Bridge cast-in-situ box-beam is across the convenient construction bracket of interior nothing supporting
CN207582676U (en) New steel structure support construction
CN203742197U (en) Pushing counter-force device for moving of building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20160511

Effective date of abandoning: 20170329

AV01 Patent right actively abandoned