CN205221782U - A conveyer that is used for extrusion's high temperature copper pipe - Google Patents
A conveyer that is used for extrusion's high temperature copper pipe Download PDFInfo
- Publication number
- CN205221782U CN205221782U CN201521004131.3U CN201521004131U CN205221782U CN 205221782 U CN205221782 U CN 205221782U CN 201521004131 U CN201521004131 U CN 201521004131U CN 205221782 U CN205221782 U CN 205221782U
- Authority
- CN
- China
- Prior art keywords
- copper pipe
- high temperature
- conveyer
- conduction chain
- temperature copper
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Pusher Or Impeller Conveyors (AREA)
Abstract
The utility model relates to a conveyer that is used for extrusion's high temperature copper pipe, its include drive gear with the conduction chain, the conduction chain is through establishing ties the conduction piece and form with the connection piece, drive gear install in inside the conduction chain, drive the conduction chain rotates. Through the utility model discloses a copper pipe surface damage that is used for the conveyer of high temperature copper pipe, can effectively avoid because of the friction between copper pipe and the conveyer surface leads to to the good straightness of copper pipe can be effectively kept, can any adverse effect not be caused to the transfer rate of high temperature copper pipe simultaneously.
Description
Technical field
The utility model relates to a kind of conveyer of high temperature copper pipe, particularly a kind of conveyer of the high temperature copper pipe for extrusion forming.
Background technology
Need to send to destination in time with the copper pipe that hot extrusion technique obtains by hot extrusion stove, to ensure that the copper pipe extruding of next batch can be carried out smoothly.Usually, the exit position of hot extrusion stove is provided with live roller, realizing using the friction force between high temperature copper pipe and live roller as power rubbing drives, and arrives destination to drive high temperature copper pipe.
But just the copper pipe surface hardness of hot extrusion molding is very little, even less friction force is also easy to cause the surface of copper pipe to occur scratching; Roller transmission simultaneously easily causes the high temperature copper pipe generation serpentine bend extruded.At present, the counter-measure taked mainly contains the speed reducing live roller, the roughness of surface reducing live roller, waits for that copper pipe is reduced to uniform temperature at fire door and transmits or carry out the measures such as surface treatment after there is surface damage.If but excessively reduce the roughness of surface of live roller, be difficult to provide sufficient friction force, cause high temperature copper pipe " skidding "---live roller rotates, and high temperature copper pipe does not advance.No matter and be reduce live roller speed or waiting for that copper pipe temperature reduces all certainly can have a strong impact on work progress.Take measures again after there is surface damage, copper pipe serpentine bend to carry out remedying, not only affect work progress, and add extra cost, also worth choosing.
Utility model content
Utility model problem to be solved
Contriver of the present utility model technical matters in view of the above, in order to avoid the traditional damage of live roller load mode to high temperature copper pipe and the generation of serpentine bend, keep the surface finish of copper pipe and straight degree, propose a kind of conveyer of the high temperature copper pipe for extrusion forming, it conduction chain comprising two transmission gears and driven by described two transmission gears, described conduction chain to be one another in series by connecting strap by multiple conductive sheet and to be formed, and described connecting strap has for the symmetrical lock-joint of two of installing described conductive sheet; Described transmission gear is installed on the two ends of described conduction chain inside thus drives described conduction chain to rotate.
According to an embodiment of the present utility model, provide a kind of conveyer of the high temperature copper pipe for extrusion forming, wherein, described connecting strap is oval.
According to an embodiment of the present utility model, provide a kind of conveyer of the high temperature copper pipe for extrusion forming, wherein, the length of described conduction chain carries out adjusting according to the distance apart from destination.
According to an embodiment of the present utility model, provide a kind of conveyer of the high temperature copper pipe for extrusion forming, wherein, the number of described transmission gear is according to the length of conduction chain or carries out adjusting apart from the distance of destination.
According to the utility model detailed description of the invention, provide a kind of method for transmitting high temperature copper pipe, it adopts the conveyer of the high temperature copper pipe for extrusion forming of any one as above to carry out the transmission of high temperature copper pipe, wherein conveyer is arranged at the exit position of hot extrusion stove, and when transmitting high temperature copper pipe, by identical for the speed that the speed of the described conduction chain of described conveyer is set to extrude with hot extrusion stove copper pipe.
According to the method for an embodiment of the present utility model, wherein, the speed of described conduction chain is adjusted by adjusting described transmission gear.
Utility model effect
By the conveyer for high temperature copper pipe of the present utility model, the copper pipe surface caused because of the friction between copper pipe and conveyer surface effectively can be avoided to damage, any adverse effect can not be caused to the transfer rate of high temperature copper pipe simultaneously.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the conveyer for high temperature copper pipe of the present utility model;
Fig. 2 is the partial enlarged drawing of Fig. 1;
Fig. 3 is the schematic diagram of connecting strap.
Description of reference numerals
1, transmission gear;
2, chain is conducted;
3, connecting strap
4, conductive sheet
5, lock-joint
6, connecting pin
Below in conjunction with Fig. 1,2 and 3, the structure of high temperature copper pipe conveyer of the present utility model is described, but the following stated is only more preferably embodiment of the present utility model, is only illustrative rather than definitive thereof the utility model.
Detailed description of the invention
As shown in Figure 3, connecting strap 3 is up and down linearly, and the sheetmetal that the left and right sides is curved, this sheetmetal is preferably steel, is arranged at symmetrical two through holes wherein, i.e. lock-joint 5.As shown in Figure 2, conductive sheet 4 has the connecting pin 6 being arranged at its lower end.When needs connection conductive sheet 4 obtains conduction chain 2, by the aligned in position of the connection location of connecting pin 6 end and the lock-joint 5 of connecting strap 3, then bearing pin (not shown) is adopted to insert in the lock-joint 5 of connecting strap 3, thus conductive sheet 4 and connecting strap 3 are engaged, engage successively in this way, the conduction chain 2 of Len req can be obtained.Then the tooth of transmission gear 1 is embedded the space between the adjacent tabs 3 conducting chain 2, the conveyer of high temperature copper pipe of the present utility model can be obtained thus.
According to an embodiment of the present utility model, the length of described conduction chain 2 is adjustable, namely when the destination far away that need transmit, method as above can be adopted to extend the length of conduction chain 2.
According to an embodiment of the present utility model, the number of described transmission gear 1 can adjust according to the length of conduction chain.That is, when destination is comparatively far away, when the length of conduction chain 2 is longer, in order to maintain conduction steadily, preventing copper pipe from moving on conduction chain 2, the number of transmission gear 1 can be set up.
Particularly, the method for operation of high temperature copper pipe conveyer of the present utility model is as follows:
High temperature copper pipe conveyer is placed in the outlet of hot extrusion stove, the rotating speed of adjustment transmission gear 1, makes the velocity of rotation of conduction chain 2 identical with the speed that copper pipe is extruded from hot extrusion stove, and thus, high temperature copper pipe is static relative to conduction chain 2 and forward.
Practicality in industry
By the conveyer for high temperature copper pipe of the present utility model, the copper pipe surface caused because of the friction between copper pipe and conveyer surface can be effectively avoided to damage, and effectively can keep the good straight degree of copper pipe, any adverse effect can not be caused to the transfer rate of high temperature copper pipe simultaneously.Therefore, the utility model has broad application prospects.
Claims (4)
1. the conveyer for the high temperature copper pipe of extrusion forming, it is characterized in that, the conduction chain comprising two transmission gears and driven by described two transmission gears, described conduction chain to be one another in series by connecting strap by multiple conductive sheet and to be formed, and described connecting strap has for the symmetrical lock-joint of two of installing described conductive sheet; Described transmission gear is installed on the two ends of described conduction chain inside thus drives described conduction chain to rotate.
2. the conveyer of the high temperature copper pipe for extrusion forming according to claim 1, is characterized in that, described connecting strap is oval.
3. the conveyer of the high temperature copper pipe for extrusion forming according to claim 1, is characterized in that, the length of described conduction chain carries out adjusting according to the distance apart from destination.
4. the conveyer of the high temperature copper pipe for extrusion forming according to claim 1 and 2, is characterized in that, the number of described transmission gear is according to the length of conduction chain or carries out adjusting apart from the distance of destination.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521004131.3U CN205221782U (en) | 2015-12-07 | 2015-12-07 | A conveyer that is used for extrusion's high temperature copper pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521004131.3U CN205221782U (en) | 2015-12-07 | 2015-12-07 | A conveyer that is used for extrusion's high temperature copper pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205221782U true CN205221782U (en) | 2016-05-11 |
Family
ID=55896859
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201521004131.3U Active CN205221782U (en) | 2015-12-07 | 2015-12-07 | A conveyer that is used for extrusion's high temperature copper pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205221782U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105383859A (en) * | 2015-12-07 | 2016-03-09 | 苏州富瑞合金科技股份有限公司 | Conveying device for extrusion molding high-temperature copper pipe |
CN111390637A (en) * | 2020-04-30 | 2020-07-10 | 绍兴圣万特热流道有限公司 | Multifunctional chip removal machine based on hot runner production and processing |
-
2015
- 2015-12-07 CN CN201521004131.3U patent/CN205221782U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105383859A (en) * | 2015-12-07 | 2016-03-09 | 苏州富瑞合金科技股份有限公司 | Conveying device for extrusion molding high-temperature copper pipe |
CN111390637A (en) * | 2020-04-30 | 2020-07-10 | 绍兴圣万特热流道有限公司 | Multifunctional chip removal machine based on hot runner production and processing |
CN111390637B (en) * | 2020-04-30 | 2021-06-29 | 绍兴圣万特热流道有限公司 | Multifunctional chip removal machine based on hot runner production and processing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205221782U (en) | A conveyer that is used for extrusion's high temperature copper pipe | |
CN103990744B (en) | A kind of laminated type bar straightener | |
CN106276077A (en) | A kind of double-chain conveyor | |
CN204644126U (en) | A kind of glass tempering furnace compound bending shaping mechanism | |
CN105383859A (en) | Conveying device for extrusion molding high-temperature copper pipe | |
CN104369523A (en) | Waterproof roll material tempering stress relieving device | |
CN202045294U (en) | Feeding device of long U pipe bender | |
CN201626726U (en) | Strip-shaped profile conveying device | |
CN201385091Y (en) | Electric wire casing pipe expanding machine | |
CN202878673U (en) | Elbow device of plastic pipe | |
CN206462305U (en) | One kind plus roller send face machine automatically | |
CN203695644U (en) | Forming machine for hot rolling and rolling online forming of seamless special pipe | |
CN204842456U (en) | Cold tandem mill | |
CN207258527U (en) | A kind of steel pipe market machine | |
CN203820859U (en) | Quenching line for thermal treatment of steel ball | |
CN102909854B (en) | Bending unit for plastic tubes | |
CN202430265U (en) | Stokehole power carrier roller of galvanizing production line | |
CN203265831U (en) | Wear-resistant bearing track | |
CN204644125U (en) | A kind of glass tempering furnace compound bending shaping mechanism | |
CN201990707U (en) | Annealing and pre-straightening device of cold drawn seamless steel tube | |
CN204135080U (en) | A kind of device utilizing Steel wire roll brush to remove hot rolled strip iron scale | |
CN205575931U (en) | Hyperboloid toughened glass equipment roll table transmission system | |
CN220591466U (en) | Gear forging conveying device convenient for gear cooling | |
CN104368610A (en) | Device and method for removing hot rolled steel strip oxide scale through steel wire roller brushes | |
CN202655351U (en) | Feeding device of planetary tube rolling mill |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |