CN205206963U - Teaching garden distributed energy resource station heat supply system ice system - Google Patents

Teaching garden distributed energy resource station heat supply system ice system Download PDF

Info

Publication number
CN205206963U
CN205206963U CN201521064758.8U CN201521064758U CN205206963U CN 205206963 U CN205206963 U CN 205206963U CN 201521064758 U CN201521064758 U CN 201521064758U CN 205206963 U CN205206963 U CN 205206963U
Authority
CN
China
Prior art keywords
steam
pipe road
pipeline
ice
teaching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521064758.8U
Other languages
Chinese (zh)
Inventor
黄挺
孙文龙
尹春明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Original Assignee
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd filed Critical China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Priority to CN201521064758.8U priority Critical patent/CN205206963U/en
Application granted granted Critical
Publication of CN205206963U publication Critical patent/CN205206963U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/27Relating to heating, ventilation or air conditioning [HVAC] technologies
    • Y02A30/274Relating to heating, ventilation or air conditioning [HVAC] technologies using waste energy, e.g. from internal combustion engine
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/14Combined heat and power generation [CHP]

Abstract

The utility model discloses a teaching garden distributed energy resource station heat supply system ice system, including between gas turbine, first generator, exhaust -heat boiler, system sledge, hot water preparation station and transformer substation. Gas turbine links to each other with the transformer substation through first generator. Gas turbine is equipped with flue gas output pipeline, and exhaust -heat boiler is equipped with flue gas input pipeline and first steam output pipeline. Flue gas input pipeline is linked together with flue gas output pipeline. Be equipped with first steam input pipeline between the system sledge, just a first steam input pipeline and a steam outputting pipe say and are linked together. Hot water preparation station is equipped with second steam input pipeline, and the pipeline is imported to second steam and steam outputting pipe way is linked together. The utility model discloses the heat energy that utilizes gas turbine's high temperature flue gas heats steam raising for exhaust -heat boiler, offers the system sledge to heat energy through steam and stands with the hot water preparation within a definite time, makes and prepares corresponding ice ability and the hot water heat energy of converting into of station ability with hot water between the sledge, can avoid energy wasting phenomenon.

Description

A kind of teaching garden distributed busbar protection heat supply ice-making system
Technical field
The utility model relates to a kind of distributed busbar protection heating system, especially relates to a kind of teaching garden distributed busbar protection heat supply ice-making system.
Background technique
No matter be power plant or energy source station, whether can utilize the energy to greatest extent, improve the utilization ratio of the energy, become the thing that many owner units very pay close attention to.Wherein, teaching garden distributed busbar protection is located near teaching garden, and its energy source station is mainly to the supply of teaching garden electric power, hot water or low-temperature receiver.But due to problem in season, the steam flow that distributed busbar protection produces has surplus.Particularly in summer, few winter in life thermal source demand annual summer is many, and the teachers and students that have a holiday or vacation in additional teaching garden leave school, and hot water demand's amount is just less, makes industrial heat load and hot water often have a large amount of surplus, causes the waste heat of exhaust heat boiler low pressure steam to make full use of.
Model utility content
Based on this, the utility model is the defect overcoming prior art, and provide a kind of teaching garden distributed busbar protection heat supply ice-making system, the heat energy that it can make teaching garden distributed busbar protection produce is fully utilized.
Its technological scheme is as follows: a kind of teaching garden distributed busbar protection heat supply ice-making system, and comprising: gas turbine and the first generator, described gas turbine is connected with described first generator, and described gas turbine is provided with flue gas exit pipe road; Exhaust heat boiler, described exhaust heat boiler is provided with flue gas input pipeline and the first steam output pipe, described flue gas input pipeline is connected with described flue gas exit pipe road, described exhaust heat boiler is used for the high-temperature flue gas entered from described flue gas input pipeline to heat to the boiler water of described exhaust heat boiler, produces steam after described boiler water is heated; Ice making workshop, described ice making workshop is provided with the first steam input pipe road, and described first steam input pipe road is connected with described first steam output pipe, and it is that low-temperature receiver is stored in ice cube that described ice making workshop is used for the thermal energy of steam; Hot water preparation station, described hot water is prepared station and is provided with the second steam input pipe road, and described second steam input pipe road is connected with described second steam output pipe, and described hot water preparation station is used for obtaining hot water according to the heat energy of steam; And electric substation, described first generator is connected with described electric substation.
Wherein in an embodiment, also comprise: take out condenser steam turbine and the second generator, described condenser steam turbine of taking out is connected with described second generator, described exhaust heat boiler is provided with the second steam output pipe, described condenser steam turbine of taking out is provided with the 3rd steam input pipe road, described second steam output pipe is connected with described 3rd steam input pipe road, described condenser steam turbine of taking out is for being mechanical kinetic energy by the thermal energy of steam and making the second electrical power generators, and described second generator is connected with described electric substation.
Wherein in an embodiment, the steam that described first steam output pipe exports is low pressure steam, the pressure range of described low pressure steam is: 0.4 ~ 0.8MPa, and the steam that described second steam output pipe exports is high pressure steam, and the pressure range of described high pressure steam is: 3 ~ 4MPa.
Wherein in an embodiment, described condenser steam turbine of taking out is provided with the 3rd steam output pipe, described ice making workshop is provided with the 4th steam input pipe road, described hot water is prepared station and is provided with the 5th steam input pipe road, and described 3rd steam output pipe is connected with described 4th steam input pipe road, the 5th steam input pipe road.
Wherein in an embodiment, the pressure range of the steam that described 3rd steam output pipe exports is: 0.4 ~ 0.8MPa.
Wherein in an embodiment, described 4th steam input pipe road is connected with described 3rd steam output pipe with after described 5th steam input pipe road parallel connection, and described first steam input pipe road is connected with described first steam output pipe with after described second steam input pipe road parallel connection.
Wherein in an embodiment, described exhaust heat boiler is provided with moisturizing pipeline, and described moisturizing pipeline one end is connected to boiler room, and the described moisturizing pipeline the other end connects running water pipe.
Wherein in an embodiment, described ice making workshop, described hot water are prepared station and are provided with steam condensate output pipeline, described exhaust heat boiler is provided with steam condensate input pipeline, described steam condensate output pipeline is connected with described steam condensate input pipeline, and described steam condensate input pipeline is communicated to boiler room.
Wherein in an embodiment, described ice making workshop is connected to freezer supply area, and described hot water is prepared station and is connected to domestic hot-water supply district.
Wherein in an embodiment, described ice making workshop is provided with several ammonia absorption type ice making units, and described ammonia absorption type ice making unit is connected with described first steam input pipe road.
Below in conjunction with technique scheme, principle of the present utility model, effect are further illustrated:
1, above-mentioned teaching garden distributed busbar protection heat supply ice-making system, the heat energy of the high-temperature flue gas of gas turbine is utilized to carry out heating and producing steam to the boiler water of exhaust heat boiler, by steam, heat energy is supplied to ice making workshop and hot water again to prepare and stand, ice making workshop and hot water are prepared to stand and are received steam according to self needing, and correspondingly can be converted to ice and can carry out storing or domestic hot-water is supplied to user.So visible, the utility model can realize rational use of energy, avoids energy waste phenomenon.
2, the high pressure steam that exhaust heat boiler produces is inputed to take out condenser steam turbine, by taking out condenser steam turbine, steam thermal energy is converted to electric energy, and the voltage steam Transportation produced by exhaust heat boiler is to ice making workshop or hot water preparation station, and correspondingly obtain low-temperature receiver or domestic hot-water, such steam that exhaust heat boiler can be made to produce can Appropriate application, realizes steam energy fully comparatively good utilisation.
Accompanying drawing explanation
Fig. 1 is garden distributed busbar protection heat supply ice-making system structural representation of imparting knowledge to students described in the utility model embodiment.
Description of reference numerals:
10, gas turbine, 11, flue gas exit pipe road, 20, first generator, 30, exhaust heat boiler, 31, flue gas input pipeline, 32, first steam output pipe, 33, second steam output pipe, 34, moisturizing pipeline, 35, steam condensate input pipeline, 40, ice making workshop, 41, first steam input pipe road, 42, steam condensate output pipeline, 43, 4th steam input pipe road, 50, hot water preparation station, 51, second steam input pipe road, 52, 5th steam input pipe road, 60, electric substation, 70, second generator, 80, take out condenser steam turbine, 81, 3rd steam input pipe road, 82, 3rd steam output pipe, 90, freezer supply area, 92, domestic hot-water supply district.
Embodiment
Below embodiment of the present utility model is described in detail:
As shown in Figure 1, distributed busbar protection heat supply ice-making system in teaching garden described in the utility model, comprising: gas turbine 10, first generator 20, exhaust heat boiler 30, ice making workshop 40, hot water prepare station 50 and electric substation 60.
Described gas turbine 10 is connected with described first generator 20, just can provide power that the first generator 20 is generated electricity after gas turbine 10 gas-firing.Wherein, described first generator 20 is connected with described electric substation 60, and the power delivery that institute's gas turbine 10 produces by the first generator 20 is to electric substation 60.
Described gas turbine 10 is provided with flue gas exit pipe road 11, and described exhaust heat boiler 30 is provided with flue gas input pipeline 31 and the first steam output pipe 32, and described flue gas input pipeline 31 is connected with described flue gas exit pipe road 11.The high-temperature flue gas that gas turbine 10 gas-firing produces enters into the flue gas input pipeline 31 of exhaust heat boiler 30 setting by the flue gas exit pipe road 11 that it is arranged.Exhaust heat boiler 30, for heating the high-temperature flue gas entered from described flue gas input pipeline 31 to the boiler water of described exhaust heat boiler 30, produces steam after described boiler water is heated.
Described ice making workshop 40 is provided with the first steam input pipe road 41, and described first steam input pipe road 41 is connected with described first steam output pipe 32.The high-temperature steam produced in exhaust heat boiler 30 through the first steam output pipe 32 out after, enter into the first steam input pipe road 41, then enter into ice making workshop 40.Described ice making workshop 40 is for being that low-temperature receiver is stored in ice cube by the thermal energy of steam, and ice making workshop 40 is connected to freezer supply area 90, uses produced low-temperature receiver to be supplied to user.
Described hot water is prepared station 50 and is provided with the second steam input pipe road 51, and described second steam input pipe road 51 is connected with described first steam output pipe 32.The high-temperature steam produced in exhaust heat boiler 30 through the first steam output pipe 32 out after, enter into the second steam input pipe road 51, then enter into hot water and prepare station 50.Described hot water is prepared station 50 and is heated to tap water by the steam that exhaust heat boiler 30 is sent, and hot water is prepared station 50 and is connected to domestic hot-water supply district 92, to provide user domestic hot-water.
Above-mentioned teaching garden distributed busbar protection heat supply ice-making system, the heat energy of the high-temperature flue gas of gas turbine 10 is utilized to carry out heating and producing steam to the boiler water of exhaust heat boiler 30, by steam, heat energy is supplied to ice making workshop 40 again and prepares station 50 with hot water, ice making workshop 40 and hot water are prepared station 50 and are received steam according to self needing, and the corresponding ice that be converted to of energy can carry out storing or domestic hot-water is supplied to user.So visible, the utility model can realize rational use of energy, avoids energy waste phenomenon.
Described teaching garden distributed busbar protection heat supply ice-making system also comprises takes out condenser steam turbine 80 and the second generator 70.Described condenser steam turbine 80 of taking out is connected with described second generator 70, takes out condenser steam turbine 80 for the thermal energy of steam being mechanical kinetic energy and making the second generator 70 generate electricity.Taking out condenser steam turbine 80 by the second generator 70 is electric energy by the thermal energy of steam, and by power delivery to electric substation 60.Wherein, described exhaust heat boiler 30 is provided with the second steam output pipe 33, described in take out condenser steam turbine 80 and be provided with the 3rd steam input pipe road 81.Described second steam output pipe 33 is connected with described 3rd steam input pipe road 81, and the steam that namely exhaust heat boiler 30 produces is exported by the second steam output pipe 33, then is inputed to by the 3rd steam input pipe road 81 and take out condenser steam turbine 80.
The steam that described first steam output pipe 32 exports is low pressure steam, and the pressure range of described low pressure steam is: 0.4 ~ 0.8MPa.The steam that described second steam output pipe 33 exports is high pressure steam, and the pressure range of described high pressure steam is: 03 ~ 4MPa.So, the high pressure steam that exhaust heat boiler 30 produces is inputed to and takes out condenser steam turbine 80, by taking out condenser steam turbine 80, steam thermal energy is converted to electric energy, and the voltage steam Transportation produced by exhaust heat boiler 30 prepares station 50 to ice making workshop 40 or hot water, and correspondingly obtain low-temperature receiver or domestic hot-water, such steam that exhaust heat boiler 30 can be made to produce can Appropriate application, realizes steam energy fully comparatively good utilisation.
Described condenser steam turbine 80 of taking out is provided with the 3rd steam output pipe 82.Described ice making workshop 40 is provided with the 4th steam input pipe road 43, and described hot water is prepared station 50 and is provided with the 5th steam input pipe road 52.Described 3rd steam output pipe 82 is connected with described 4th steam input pipe road 43, the 5th steam input pipe road 52.Wherein, the pressure range of the steam of described 3rd steam output pipe 82 output is: 0.4 ~ 0.8MPa.
Wherein, described 4th steam input pipe road 43 is connected with described 3rd steam output pipe 82 with after described 5th steam input pipe road 52 parallel connection.Be connected with described first steam output pipe 32 after described first steam input pipe road 41 is in parallel with described second steam input pipe road 51.
Described exhaust heat boiler 30 is provided with moisturizing pipeline 34.Described moisturizing pipeline 34 one end is connected to boiler room, and described moisturizing pipeline 34 the other end connects running water pipe.Described ice making workshop 40, described hot water are prepared station 50 and are provided with steam condensate output pipeline 42, and ice making workshop 40 and hot water are prepared the steam condensate produced in station 50 and exported by this steam condensate output pipeline 42.Described exhaust heat boiler 30 is provided with steam condensate input pipeline 35, and described steam condensate output pipeline 42 is connected with described steam condensate input pipeline 35, and described steam condensate input pipeline 35 is communicated to boiler room.
Described ice making workshop 40 is provided with several ammonia absorption type ice making units, and described ammonia absorption type ice making unit is connected with described first steam input pipe road 41.Ammonia absorption type ice making unit is in combined cooling, heat and power System, and low pressure steam can as driving heat source, and ammonia is refrigeration agent, and water is absorbing agent, can obtain the medium temperature of less than 0 DEG C.Such as, when steam source parameter: when pressure is 0.5MPa, temperature is 150 DEG C, the minimum evaporating temperature of ammonia can reach-30 DEG C.The steam of this Heat-Source Parameters is exhaust heat boiler 30 " used heat " that abandons under certain operating mode just, the utility model is then by inputing to ice making workshop 40 by the steam of this Heat-Source Parameters or hot water prepares station 50, make this low pressure steam Appropriate application, just can realize used heat and use again.
Each technical characteristics of the above embodiment can combine arbitrarily, for making description succinct, the all possible combination of each technical characteristics in above-described embodiment is not all described, but, as long as the combination of these technical characteristicss does not exist contradiction, be all considered to be the scope that this specification is recorded.
The above embodiment only have expressed several mode of execution of the present utility model, and it describes comparatively concrete and detailed, but therefore can not be interpreted as the restriction to utility model patent scope.It should be pointed out that for the person of ordinary skill of the art, without departing from the concept of the premise utility, can also make some distortion and improvement, these all belong to protection domain of the present utility model.Therefore, the protection domain of the utility model patent should be as the criterion with claims.

Claims (10)

1. a teaching garden distributed busbar protection heat supply ice-making system, is characterized in that, comprising:
Gas turbine and the first generator, described gas turbine is connected with described first generator, and described gas turbine is provided with flue gas exit pipe road;
Exhaust heat boiler, described exhaust heat boiler is provided with flue gas input pipeline and the first steam output pipe, described flue gas input pipeline is connected with described flue gas exit pipe road, described exhaust heat boiler is used for the high-temperature flue gas entered from described flue gas input pipeline to heat to the boiler water of described exhaust heat boiler, produces steam after described boiler water is heated;
Ice making workshop, described ice making workshop is provided with the first steam input pipe road, and described first steam input pipe road is connected with described first steam output pipe, and it is that low-temperature receiver is stored in ice cube that described ice making workshop is used for the thermal energy of steam;
Hot water preparation station, described hot water is prepared station and is provided with the second steam input pipe road, and described second steam input pipe road is connected with described first steam output pipe, and described hot water preparation station is used for obtaining hot water according to the heat energy of steam; And
Electric substation, described first generator is connected with described electric substation.
2. distributed busbar protection heat supply ice-making system in teaching garden according to claim 1, it is characterized in that, also comprise: take out condenser steam turbine and the second generator, described condenser steam turbine of taking out is connected with described second generator, described exhaust heat boiler is provided with the second steam output pipe, described condenser steam turbine of taking out is provided with the 3rd steam input pipe road, described second steam output pipe is connected with described 3rd steam input pipe road, described condenser steam turbine of taking out is for being mechanical kinetic energy by the thermal energy of steam, and make the second electrical power generators, described second generator is connected with described electric substation.
3. distributed busbar protection heat supply ice-making system in teaching garden according to claim 2, it is characterized in that, the steam that described first steam output pipe exports is low pressure steam, the pressure range of described low pressure steam is: 0.4 ~ 0.8MPa, the steam that described second steam output pipe exports is high pressure steam, and the pressure range of described high pressure steam is: 3 ~ 4MPa.
4. distributed busbar protection heat supply ice-making system in teaching garden according to claim 2, it is characterized in that, described condenser steam turbine of taking out is provided with the 3rd steam output pipe, described ice making workshop is provided with the 4th steam input pipe road, described hot water is prepared station and is provided with the 5th steam input pipe road, and described 3rd steam output pipe is connected with described 4th steam input pipe road, the 5th steam input pipe road.
5. distributed busbar protection heat supply ice-making system in teaching garden according to claim 4, is characterized in that, the pressure range of the steam that described 3rd steam output pipe exports is: 0.4 ~ 0.8MPa.
6. distributed busbar protection heat supply ice-making system in teaching garden according to claim 4, it is characterized in that, described 4th steam input pipe road is connected with described 3rd steam output pipe with after described 5th steam input pipe road parallel connection, and described first steam input pipe road is connected with described first steam output pipe with after described second steam input pipe road parallel connection.
7. distributed busbar protection heat supply ice-making system in teaching garden according to claim 1, it is characterized in that, described exhaust heat boiler is provided with moisturizing pipeline, and described moisturizing pipeline one end is connected to boiler room, and the described moisturizing pipeline the other end connects running water pipe.
8. the teaching garden distributed busbar protection heat supply ice-making system according to claim 1 or 7, it is characterized in that, described ice making workshop, described hot water are prepared station and are provided with steam condensate output pipeline, described exhaust heat boiler is provided with steam condensate input pipeline, described steam condensate output pipeline is connected with described steam condensate input pipeline, and described steam condensate input pipeline is communicated to boiler room.
9. the teaching garden distributed busbar protection heat supply ice-making system according to any one of claim 1 to 7, it is characterized in that, described ice making workshop is connected to freezer supply area, and described hot water is prepared station and is connected to domestic hot-water supply district.
10. the teaching garden distributed busbar protection heat supply ice-making system according to any one of claim 1 to 7, it is characterized in that, described ice making workshop is provided with several ammonia absorption type ice making units, and described ammonia absorption type ice making unit is connected with described first steam input pipe road.
CN201521064758.8U 2015-12-17 2015-12-17 Teaching garden distributed energy resource station heat supply system ice system Active CN205206963U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521064758.8U CN205206963U (en) 2015-12-17 2015-12-17 Teaching garden distributed energy resource station heat supply system ice system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521064758.8U CN205206963U (en) 2015-12-17 2015-12-17 Teaching garden distributed energy resource station heat supply system ice system

Publications (1)

Publication Number Publication Date
CN205206963U true CN205206963U (en) 2016-05-04

Family

ID=55844688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521064758.8U Active CN205206963U (en) 2015-12-17 2015-12-17 Teaching garden distributed energy resource station heat supply system ice system

Country Status (1)

Country Link
CN (1) CN205206963U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105443245A (en) * 2015-12-17 2016-03-30 中国能源建设集团广东省电力设计研究院有限公司 Teaching zone distributed power station heat supplying and ice making system
CN111649338A (en) * 2020-05-07 2020-09-11 浙江工业大学 Method for comprehensively treating marine organic solid waste

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105443245A (en) * 2015-12-17 2016-03-30 中国能源建设集团广东省电力设计研究院有限公司 Teaching zone distributed power station heat supplying and ice making system
CN111649338A (en) * 2020-05-07 2020-09-11 浙江工业大学 Method for comprehensively treating marine organic solid waste

Similar Documents

Publication Publication Date Title
Yang et al. Design and simulation of gas turbine-based CCHP combined with solar and compressed air energy storage in a hotel building
CN108960503B (en) Multi-scene optimization analysis method of comprehensive energy system based on interior point method
Li et al. An integrated system for thermal power generation, electrical energy storage and CO2 capture
Zhang et al. Waste heat recovery and water-saving modification for a water-cooled gas-steam combined cycle cogeneration system with absorption heat pump
CA2919753C (en) Thermal connection of a geothermal source to a district heating network
CN103778485B (en) A kind of distributed power generation energy supplying system and its optimization method
CN101285420A (en) Gas turbine cycle and heat pump integrated energy supply system and method
Assareh et al. Energy, exergy, exergoeconomic, exergoenvironmental, and transient analysis of a gas-fired power plant-driven proposed system with combined Rankine cycle: thermoelectric for power production under different weather conditions
US20150128557A1 (en) Microscale distributed energy cogeneration method and system
Li et al. Strategy analysis of demand side management on distributed heating driven by wind power
CN106051900A (en) Distribution type energy system
CN205206963U (en) Teaching garden distributed energy resource station heat supply system ice system
CN103364211B (en) A kind of Distribution of Natural formula energy supply comprehensive experimental device
CN104410171A (en) Energy storage method for smart power grid and apparatus adopted by method
CN203655375U (en) Comprehensive utilization system for power plant waste heat recovery
CN105443245A (en) Teaching zone distributed power station heat supplying and ice making system
Huang et al. Modeling of distributed energy system with multiple energy complementation
Rämä et al. Challenges on low heat density district heating network design
CN102494431A (en) Absorption type refrigeration air conditioner device using mixed energy of solar energy and biomass
Nardecchia et al. An alternative tool for the energy evaluation and the management of thermal networks: The exergy analysis
CN202328896U (en) Solar energy-biomass mixed absorption type refrigeration device
Daghsen et al. Energy, exergy and environment analyses of a hybrid PV-system district heating system for a new household settlement in Germany
CN204205725U (en) A kind of energy storage device for intelligent grid
CN209415569U (en) A kind of power plant heat accumulation power generation heating system
Yu et al. Energy efficiency of distributed energy system based on central heating network

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant