CN205206317U - Sheathed tube fixing device is reserved to floor - Google Patents

Sheathed tube fixing device is reserved to floor Download PDF

Info

Publication number
CN205206317U
CN205206317U CN201520845040.6U CN201520845040U CN205206317U CN 205206317 U CN205206317 U CN 205206317U CN 201520845040 U CN201520845040 U CN 201520845040U CN 205206317 U CN205206317 U CN 205206317U
Authority
CN
China
Prior art keywords
reserved
fastening devices
stop part
sleeve pipe
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520845040.6U
Other languages
Chinese (zh)
Inventor
于海申
裴鸿斌
苏亚武
刘鹏
高辉
柯子平
唐祖锡
刘加伟
王凯峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201520845040.6U priority Critical patent/CN205206317U/en
Application granted granted Critical
Publication of CN205206317U publication Critical patent/CN205206317U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a sheathed tube fixing device is reserved to floor, fixing device includes: wear to locate reserve the sheathed tube connecting rod, the connecting rod includes to be worn to establish out the template wear to establish the end and for wear to establish the end, expose in reserve sheathed tube exposed end, connect in wear to establish the end and backstop in the first stop part of template, connect in exposed end's connection external member, and connect in the second stop part of connecting the external member outside, the both ends backstop of second stop part in the floor upper surface. The utility model provides a reservation sleeve pipe have in the work progress that the location is inaccurate, the come -up scheduling problem.

Description

The fastening devices of sleeve pipe reserved by floor
Technical field
The utility model relates to construction engineering technical field, is specifically related to the fastening devices that sleeve pipe reserved by a kind of floor.
Background technology
In high-story house work progress, according to the needs of each architectural characteristic and convenient construction, constantly perfect along with building function, in construction, reserved sleeve pipe must be set, but reserved often because of reasons such as vibrating in concreting process, there is location inaccurate, the FAQs such as floating.
Utility model content
For overcoming the defect existing for prior art, now providing a kind of floor to reserve the fastening devices of sleeve pipe, in work progress, there is the problems such as location is inaccurate, floating to solve reserved sleeve pipe.
For solving the problem, the fastening devices of sleeve pipe reserved by a kind of floor, described fastening devices comprises: the connecting rod being arranged in described reserved sleeve pipe, described connecting rod comprise wear out described template wear end and relative to the described bared end wearing end, be exposed to described reserved sleeve pipe; Wear described in being connected to end and backstop in the first stop part of described template; Be connected to the connectivity kit of described bared end; And the second stop part be connected to outside described connectivity kit, the two ends backstop of described second stop part is in described floor upper surface.
The further improvement that the fastening devices of sleeve pipe reserved by the utility model floor is, described connecting rod is screw rod, and described connectivity kit comprises the branch sleeve being sheathed on described bared end, and described branch sleeve is provided with internal thread.
The further improvement that the fastening devices of sleeve pipe reserved by the utility model floor is, described second stop part is to be welded in outside described branch sleeve and length is greater than the upper reinforcement of the radical length of described reserved sleeve pipe.
The further improvement that the fastening devices of sleeve pipe reserved by the utility model floor is, the quantity of described upper reinforcement is two, and two described upper reinforcements are welded in the both sides of described branch sleeve side by side respectively.
The further improvement that the fastening devices of sleeve pipe reserved by the utility model floor is, described first stop part is be welded in the bottom reinforcement bars bottom described screw rod.
The further improvement that the fastening devices of sleeve pipe reserved by the utility model floor is, described connecting rod is screw rod, and described connectivity kit comprises the sleeve that is sheathed on described bared end and is screwed together in described bared end and is positioned at the clamp nut above described sleeve.
The further improvement that the fastening devices of sleeve pipe reserved by the utility model floor is, described second stop part is to be welded in outside described sleeve and length is greater than the upper reinforcement of the radical length of described reserved sleeve pipe.
The further improvement that the fastening devices of sleeve pipe reserved by the utility model floor is, the quantity of described upper reinforcement is two, and two described upper reinforcements are welded in the both sides of described sleeve side by side respectively.
The further improvement that the fastening devices of sleeve pipe reserved by the utility model floor is, described first stop part is be welded in the bottom reinforcement bars bottom described screw rod.
The further improvement that the fastening devices of sleeve pipe reserved by the utility model floor is, also comprises the shutter being covered in the described reserved cannula tip mouth of pipe, and described shutter is provided with the perforating worn for described connecting rod.
The beneficial effects of the utility model are, by arranging the first stop part bottom the template of placing reserved sleeve pipe, first stop part is connected with connecting rod, the bared end of connecting rod is fixedly connected with connectivity kit, second stop part is connected to outside described connectivity kit, first stop part backstop is bottom described template, the two ends backstop of the second stop part is in described floor upper surface, fixedly ensure that the location of reserved sleeve between first stop part and the second stop part, solve reserved sleeve pipe in work progress, there is the problems such as location is inaccurate, floating.
Accompanying drawing explanation
Fig. 1 is the fastening devices sectional view in a first embodiment that sleeve pipe reserved by the utility model floor.
Fig. 2 is the fastening devices top view in a first embodiment that sleeve pipe reserved by the utility model floor.
Fig. 3 is the fastening devices sectional view in a second embodiment that sleeve pipe reserved by the utility model floor.
Fig. 4 is the fastening devices sectional view in the third embodiment that sleeve pipe reserved by the utility model floor.
Detailed description of the invention
Below by way of specific instantiation, embodiment of the present utility model is described, those skilled in the art the content disclosed by this manual can understand other advantages of the present utility model and effect easily.The utility model can also be implemented or be applied by detailed description of the invention different in addition, and the every details in this manual also can based on different viewpoints and application, carries out various modification or change not deviating under spirit of the present utility model.
It should be noted that, structure, ratio, size etc. that this manual institute accompanying drawings illustrates, content all only in order to coordinate manual to disclose, understand for person skilled in the art scholar and read, and be not used to limit the enforceable qualifications of the utility model, therefore the not technical essential meaning of tool, the adjustment of the modification of any structure, the change of proportionate relationship or size, do not affecting under effect that the utility model can produce and the object that can reach, still all should drop on technology contents that the utility model discloses and obtain in the scope that can contain.Simultaneously, quote in this manual as " on ", D score, "left", "right", " centre " and " one " etc. term, also only for ease of understanding of describing, and be not used to limit the enforceable scope of the utility model, the change of its relativeness or adjustment, under changing technology contents without essence, when being also considered as the enforceable category of the utility model.
First embodiment
Please refer to Fig. 1, Fig. 1 is the fastening devices sectional view in a first embodiment that sleeve pipe reserved by the utility model floor.As shown in Figure 1, the utility model provides the fastening devices that sleeve pipe reserved by a kind of floor, reserved sleeve pipe 1 is positioned in the template 3 bottom floor 2, described fastening devices comprises: the connecting rod 4 being arranged in reserved sleeve pipe 1, connecting rod 4 comprise wear out template 3 wear end 40 and relative to wearing end 40, being exposed to the bared end 41 of reserved sleeve pipe 1; Be connected to wear end 40 and backstop in the first stop part 5 of template 3; Be connected to the connectivity kit of bared end 41; And the two ends backstop being connected to the second stop part 7, second stop part 7 outside described connectivity kit is in floor 2 upper surface.In a first embodiment, connecting rod 4 is screw rod, and described connectivity kit comprises the branch sleeve 6 being sheathed on bared end 41, is provided with the internal thread corresponding with described screw rod in branch sleeve 6.
Below said modules is described in detail.
As shown in Figure 1, reserved sleeve pipe 1 is positioned in the template 3 bottom floor 2, and template 3 place that bottom reserved sleeve pipe 1, the mouth of pipe is corresponding is provided with through hole, and the end 40 that wears of connecting rod 4 is arranged in described through hole in template 3.First stop part 5 be welded in wear end 40 and backstop bottom template 3.First stop part 5 can for being welded in the bottom reinforcement bars bottom described screw rod, and the length of described bottom reinforcement bars is greater than the radical length of described through hole; First stop part 5 also can for being welded in the shaped steel bottom described screw rod, and the length of described shaped steel is greater than the radical length of described through hole.
As depicted in figs. 1 and 2, Fig. 2 is the fastening devices top view in a first embodiment that sleeve pipe reserved by the utility model floor, and the bared end 41 of connecting rod 4 is exposed to the mouth of pipe at reserved sleeve pipe 1 top, and branch sleeve 6 is sheathed on bared end 41.Second stop part 7 can be welded in the upper reinforcement outside branch sleeve 6, the length of described upper reinforcement is greater than the radical length of reserved sleeve pipe 1, described upper reinforcement backstop is in the mouth of pipe at reserved sleeve pipe 1 top, after floor 2 has been built, as depicted in figs. 1 and 2, the two ends backstop of described upper reinforcement is in floor 2 upper surface.As shown in Figure 2, preferably, the quantity of described upper reinforcement is two, and two described upper reinforcements are welded in the both sides of branch sleeve 6 side by side respectively.
After there is said structure feature, composition graphs 1 and Fig. 2, the utility model can by following implementation Process: first, the template 3 bottom floor 2 offers described through hole, and reserved sleeve pipe 1 is positioned in template 3, the corresponding described through hole of the mouth of pipe bottom reserved sleeve pipe 1; Then, the end 40 that wears of connecting rod 4 is arranged in described through hole in template 3, and wears end 40 using being welded in as the described bottom reinforcement bars of the first stop part 5; Then, branch sleeve 6 is sheathed on the bared end 41 of connecting rod 4; Finally, the both sides of branch sleeve 6 will be welded in side by side respectively as two described upper reinforcements of the second stop part 7, described upper reinforcement backstop is in the mouth of pipe at reserved sleeve pipe 1 top, and after floor 2 has been built, the two ends backstop of described upper reinforcement is in floor 2 upper surface.
Second embodiment
Please refer to Fig. 3, Fig. 3 is the fastening devices sectional view in a second embodiment that sleeve pipe reserved by the utility model floor.As shown in Figure 3, the utility model provides the fastening devices that sleeve pipe reserved by a kind of floor, reserved sleeve pipe 1a is positioned on the template 3a bottom floor 2a, described fastening devices comprises: the connecting rod 4a being arranged in reserved sleeve pipe 1a, connecting rod 4a comprise wear out template 3a wear end 40a and relative to wearing end 40a, being exposed to the bared end 41a of reserved sleeve pipe 1a; Be connected to wear end 40a and backstop in the first stop part 5a of template 3a; Be connected to the connectivity kit of bared end 41a; And the two ends backstop of the second stop part 7a be connected to outside described connectivity kit, the second stop part 7a is in floor 2a upper surface.Connecting rod 4a is screw rod, is with the difference of the first embodiment, and in a second embodiment, described connectivity kit comprises the sleeve 6a that is sheathed on bared end 41a and is screwed together in bared end 41a and is positioned at the clamp nut 8a above sleeve 6a.
As shown in Figure 1, first stop part 5a can for being welded in the bottom reinforcement bars bottom described screw rod, second stop part 7a is welded in the upper reinforcement outside sleeve 6a, the length of described upper reinforcement is greater than the radical length of reserved sleeve pipe 1a, described upper reinforcement backstop is in the mouth of pipe at reserved sleeve pipe 1a top, after floor 2a has built, the two ends backstop of described upper reinforcement is in floor 2a upper surface.The utility model in a second embodiment can by following implementation Process: first, the template 3a bottom floor 2a offers through hole, and be positioned on template 3a by reserved sleeve pipe 1a, the corresponding described through hole of the mouth of pipe bottom reserved sleeve pipe 1a; Then, the end 40a that wears of connecting rod 4a is arranged in described through hole on template 3a, and wears end 40a using being welded in as the described bottom reinforcement bars of the first stop part 5a; Then, the both sides of sleeve 6a will be welded in side by side respectively as two described upper reinforcements of the second stop part 7a; Then, sleeve 6a is sheathed on the bared end 41a of connecting rod 4a, afterwards, sleeve 6a slides down along connecting rod 4a, length due to described upper reinforcement is greater than the radical length of reserved sleeve pipe 1a, and after sleeve 6a slips down to certain position, described upper reinforcement backstop is in the mouth of pipe at reserved sleeve pipe 1a top; Then last, clamp nut 8a be sheathed on bared end 41a and down turn, until clamp nut 8a is posted by sleeve 6a top; Finally, water build floor 2a, after floor 2a has built, the two ends backstop of described upper reinforcement is in floor 2a upper surface.
3rd embodiment
Please refer to Fig. 4, Fig. 4 is the fastening devices sectional view in the third embodiment that sleeve pipe reserved by the utility model floor.As shown in Figure 4, the difference of the 3rd embodiment and the first embodiment is, the reserved sleeve pipe 1b top mouth of pipe is coated with shutter 9b, and shutter 9b is provided with the perforating worn for connecting rod 4b.After shutter 9b wears connecting rod 4b by described perforating, fall within the reserved sleeve pipe 1b top mouth of pipe, now branch sleeve 6b is sheathed on the bared end 41b of connecting rod 4b, the second stop part 7b backstop is in shutter 9b upper surface.By arranging shutter 9b, making floor 2b when building, not having foreign material to fall in reserved sleeve pipe 1b.
The beneficial effects of the utility model are:
By arranging the first stop part bottom the template of placing reserved sleeve pipe, first stop part is connected with connecting rod, the bared end of connecting rod is fixedly connected with connectivity kit, second stop part is connected to outside described connectivity kit, first stop part backstop is bottom described template, the two ends backstop of the second stop part, in described floor upper surface, fixedly ensure that the location of reserved sleeve between the first stop part and the second stop part, solve reserved sleeve pipe in work progress, there is the problems such as location is inaccurate, floating.
Below embodiment has been described in detail the utility model by reference to the accompanying drawings, and those skilled in the art can make many variations example to the utility model according to the above description.Thus, some details in embodiment should not formed restriction of the present utility model, the utility model by the scope that defines using appended claims as protection domain.

Claims (10)

1. a fastening devices for sleeve pipe reserved by floor, and reserved sleeve pipe is positioned in the template of floor slab bottoms, it is characterized in that, described fastening devices comprises:
Be arranged in the connecting rod of described reserved sleeve pipe, described connecting rod comprise wear out described template wear end and relative to the described bared end wearing end, be exposed to described reserved sleeve pipe;
Wear described in being connected to end and backstop in the first stop part of described template;
Be connected to the connectivity kit of described bared end; And
Be connected to the second stop part outside described connectivity kit, the two ends backstop of described second stop part is in described floor upper surface.
2. fastening devices according to claim 1, is characterized in that, described connecting rod is screw rod, and described connectivity kit comprises the branch sleeve being sheathed on described bared end, and described branch sleeve is provided with internal thread.
3. fastening devices according to claim 2, is characterized in that, described second stop part is to be welded in outside described branch sleeve and length is greater than the upper reinforcement of the radical length of described reserved sleeve pipe.
4. fastening devices according to claim 3, is characterized in that, the quantity of described upper reinforcement is two, and two described upper reinforcements are welded in the both sides of described branch sleeve side by side respectively.
5. fastening devices according to claim 2, is characterized in that, described first stop part is be welded in the bottom reinforcement bars bottom described screw rod.
6. fastening devices according to claim 1, is characterized in that, described connecting rod is screw rod, and described connectivity kit comprises the sleeve that is sheathed on described bared end and is screwed together in described bared end and is positioned at the clamp nut above described sleeve.
7. fastening devices according to claim 6, is characterized in that, described second stop part is to be welded in outside described sleeve and length is greater than the upper reinforcement of the radical length of described reserved sleeve pipe.
8. fastening devices according to claim 7, is characterized in that, the quantity of described upper reinforcement is two, and two described upper reinforcements are welded in the both sides of described sleeve side by side respectively.
9. fastening devices according to claim 6, is characterized in that, described first stop part is be welded in the bottom reinforcement bars bottom described screw rod.
10. fastening devices according to claim 1, is characterized in that, also comprises the shutter being covered in the described reserved cannula tip mouth of pipe, and described shutter is provided with the perforating worn for described connecting rod.
CN201520845040.6U 2015-10-28 2015-10-28 Sheathed tube fixing device is reserved to floor Expired - Fee Related CN205206317U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520845040.6U CN205206317U (en) 2015-10-28 2015-10-28 Sheathed tube fixing device is reserved to floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520845040.6U CN205206317U (en) 2015-10-28 2015-10-28 Sheathed tube fixing device is reserved to floor

Publications (1)

Publication Number Publication Date
CN205206317U true CN205206317U (en) 2016-05-04

Family

ID=55844043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520845040.6U Expired - Fee Related CN205206317U (en) 2015-10-28 2015-10-28 Sheathed tube fixing device is reserved to floor

Country Status (1)

Country Link
CN (1) CN205206317U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223611A (en) * 2016-07-22 2016-12-14 中铁城建集团第三工程有限公司 Standpipe hole presetting mold and construction method thereof
CN107939047A (en) * 2017-12-28 2018-04-20 中冶天工集团天津有限公司 Formwork anti-floating system and method in a kind of cassette ceiling
CN110424601A (en) * 2019-07-29 2019-11-08 中国十七冶集团有限公司 A kind of fabricated construction laminated floor slab concreting anti-floating system and implementation method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223611A (en) * 2016-07-22 2016-12-14 中铁城建集团第三工程有限公司 Standpipe hole presetting mold and construction method thereof
CN107939047A (en) * 2017-12-28 2018-04-20 中冶天工集团天津有限公司 Formwork anti-floating system and method in a kind of cassette ceiling
CN110424601A (en) * 2019-07-29 2019-11-08 中国十七冶集团有限公司 A kind of fabricated construction laminated floor slab concreting anti-floating system and implementation method

Similar Documents

Publication Publication Date Title
CN205206317U (en) Sheathed tube fixing device is reserved to floor
CN204781970U (en) Template fixing device with adjustable
CN208971093U (en) The accurate fixed structure of terminal box for building
CN205654090U (en) Entrance to a cave strutting arrangement is reserved to floor
EP2525107A3 (en) Scaffolding anchoring device
CN204571123U (en) A kind of stair and stair connector thereof
CN209353707U (en) Shearing wall sleeve location structure is worn in aluminum dipping form construction
CN209353509U (en) Filling wall builds tension rib and exempts to plant pre-embedded device
CN206076879U (en) Being exclusively used in PVC20 pipes and PVC40 pipes carries out 45 degree of cross pipe-line devices of the dark compress line of floor
CN205734967U (en) A kind of robot exclusive control device
CN207526144U (en) A kind of docking structure of the electrical set aside pre-embedded pipeline of assembled
CN205591357U (en) Telescopic is connecting device for construction
CN102086699B (en) Anti-drop clamping apparatus for connecting assembled steel large formwork with dorsal bar
CN105064620B (en) A kind of application process of rebar connector
CN204199449U (en) drip structure
CN216042746U (en) Building pipeline sleeve processing design mould
CN207988454U (en) A kind of floor tile seam highness change card
CN203654787U (en) Building wall body construction line support fork
CN103883594A (en) Connecting block of roll-coating device
CN207405878U (en) A kind of spiral
CN203222724U (en) Technological square brick joint control tool
CN204402062U (en) A kind of concrete column external corner protection tool
CN208039762U (en) A kind of construction pointer
CN206942170U (en) A kind of jointing instrument
CN202485594U (en) Toothing measuring scale

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160504

Termination date: 20201028