CN205206018U - Sediment device is received to drainage tunnel face - Google Patents
Sediment device is received to drainage tunnel face Download PDFInfo
- Publication number
- CN205206018U CN205206018U CN201521048260.2U CN201521048260U CN205206018U CN 205206018 U CN205206018 U CN 205206018U CN 201521048260 U CN201521048260 U CN 201521048260U CN 205206018 U CN205206018 U CN 205206018U
- Authority
- CN
- China
- Prior art keywords
- open drain
- sides
- slag
- recovering box
- slag recovering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a sediment device is received to drainage tunnel face, including spaning the electric block on the open drain, it receives the sediment case to be equipped with one in the open drain of this electric block below, it is equipped with a screening grid to be located receipts sediment case rear in this open drain, these both sides of receiving the sediment case are near the open drain right bank and left bank, and receive the baffle of sediment case front end for not being higher than 2MM, the rear end is the sieve in belt screen hole, this both sides and bottom surface of receiving the sediment case is the not whole board in belt screen hole, the both sides of this receipts sediment case respectively set up a set of electric block of being convenient for and connect and will receive the sediment case and hang toward the rings of scarfing cinder department. Each step of open drain both sides has a set of fixed block of stone, is equipped with a draw -in groove in the middle of the fixed block of stone of every group, screening grid fixes in the fixed block of stone draw -in groove on open drain both sides, forms second way screen cloth. The utility model discloses follow the various sediment matter that rivers go out in effectively driving the drainage tunnel, and convenient operation is swift, the security has reduced return water treatment process's the degree of difficulty than having very big improvement in manual cleaning.
Description
Technical field
The utility model relates to a kind of outlet tunnel mouth being applicable to bargh and receives slag device.
Background technology
Bargh will realize zero discharge of industrial waste water, certainly will require to reuse water in Tailings Dam.Domestic bargh generally adopts reserved catch pit that the flood in Tailings Dam and unnecessary primary water are imported outlet tunnel, and import back water treatment building again from outlet tunnel, after time water treatment building process is up to standard, the mode recycled is carried out in pumping recycle-water place.Water place is used because recycle-water need be sent to pumping mode, therefore require not containing other impurity such as bulky grain slag and trees to the water of discharging in outlet tunnel, during rainy season, in storehouse, the water yield increases, and a large amount of slag flows out from outlet tunnel with current, in addition The turbulent river crashes its way through, artificial inconvenience cleaning, and there is certain danger, be thus necessary that designing a kind of outlet tunnel mouth receives slag device.
Utility model content
Technical problem to be solved in the utility model is, not enough for prior art, a kind of outlet tunnel mouth is provided to receive slag device, its danger existed when can overcome slag in labor cleaning's outlet tunnel and inconvenience, and can effectively remove with the various slags that water flows out in outlet tunnel, for follow-up backwater treatment process provides good condition.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is: a kind of outlet tunnel mouth receives slag device, comprise the electric block be across on open drain, a slag recovering box is provided with in open drain below this electric block, be positioned at slag recovering box rear in this open drain and be provided with a diagrid, the both sides of this slag recovering box are near two sides, open drain, and slag recovering box front end is not higher than the baffle plate of 2MM, rear end is the sieve plate of band sieve aperture, the both sides of this slag recovering box and bottom surface are the whole plate not with sieve aperture, the both sides of this slag recovering box respectively arrange one group and are convenient to electric block and connect and slag recovering box hung the suspension ring toward scarfing cinder place.
Being improved to further of such scheme, both sides, open drain have respectively been built one group and have been fixed the stone pier, and be often provided with a draw-in groove in the middle of the fixing stone pier of group, described diagrid is fixed in the fixing stone pier draw-in groove on both sides, open drain, forms second screen cloth.
Described slag recovering box rear end screen size is φ 15mm, and sieve aperture arrangement is that plum blossom-shaped is arranged.Described diagrid screen size is φ 10mm, and sieve aperture arrangement is that plum blossom-shaped is arranged.Like this, current are introduced into slag recovering box after flowing out from outlet tunnel, after utilizing slag recovering box to be removed most of slag, current, through diagrid, utilize diagrid to remove slag in water body further, finally enter reuse pool to process, process up to standard after utilize submersible pump to be pumped to use water place.
Slag recovering box front end is set to not high higher than 20mm baffle plate by the utility model, slag in slag recovering box is no longer flow backwards away, also unlikelyly draining is affected, this slag recovering box front and back end abuts against the two sides of open drain, make it to be fixed in open drain, and this slag recovering box front and back end respectively arranges one group of suspension ring, when in slag recovering box, slag is more, these suspension ring of available steel wire penetrating, utilize electric block that this slag recovering box is winched to scarfing cinder place.
The utility model can effectively be removed in outlet tunnel with the various slags that water flows out, and it is convenient to operation, safety compares to labor cleaning great raising, reduce the difficulty of backwater treatment process, for subsequent production brings better effect, and improve operating efficiency, reduce the possibility that environmental protection accident occurs, also saved entreprise cost to a certain extent.
Accompanying drawing explanation
Fig. 1 is that the utility model plane arranges state diagram.
Fig. 2 is the lateral view of the utility model slag recovering box.
The elevation of the utility model slag recovering box of Fig. 3.
Fig. 4 is side-looking state diagram of the present utility model.
Detailed description of the invention
As Figure 1-Figure 4, the utility model outlet tunnel mouth receives slag device, comprise the electric block 2 be across on open drain 1, a slag recovering box 3 is provided with in open drain 1 below this electric block 2, the rear being positioned at slag recovering box 3 in this open drain 1 is provided with a diagrid 4, the both sides of this slag recovering box 3 are near two sides, open drain 1, and slag recovering box 3 front end is not higher than the baffle plate 31 of 2MM, rear end is the sieve plate 32 of band sieve aperture, the both sides of this slag recovering box 3 and bottom surface are the whole plate 33 not with sieve aperture, the both sides of this slag recovering box 3 respectively arrange one group and are convenient to electric block 2 and connect and slag recovering box 3 hung the suspension ring 6 toward scarfing cinder place 5.Both sides, open drain 1 have respectively been built one group and have been fixed the stone pier 7, and be often provided with a draw-in groove in the middle of the fixing stone pier 7 of group, diagrid 4 is fixed in the fixing stone pier draw-in groove on both sides, open drain 1, forms second screen cloth.
Wherein, the long 1m of this slag recovering box, wide 2m, right flank height 1m, left surface baffle plate height 20mm, screen size is φ 15mm, and sieve aperture arrangement is that plum blossom-shaped is arranged.This diagrid height 1m, wide 2m, screen size is φ 10mm, and sieve aperture arrangement is that plum blossom-shaped is arranged.
Claims (5)
1. an outlet tunnel mouth receives slag device, it is characterized in that comprising the electric block be across on open drain, a slag recovering box is provided with in open drain below this electric block, be positioned at slag recovering box rear in this open drain and be provided with a diagrid, the both sides of this slag recovering box are near two sides, open drain, and slag recovering box front end is not higher than the baffle plate of 2MM, rear end is the sieve plate of band sieve aperture, the both sides of this slag recovering box and bottom surface are the whole plate not with sieve aperture, and the both sides of this slag recovering box respectively arrange one group and are convenient to electric block and connect and slag recovering box hung the suspension ring toward scarfing cinder place.
2. a kind of outlet tunnel mouth according to claim 1 receives slag device, it is characterized in that, these both sides, open drain have respectively been built one group and have been fixed the stone pier, are often provided with a draw-in groove in the middle of the fixing stone pier of group, described diagrid is fixed in the fixing stone pier draw-in groove on both sides, open drain, forms second screen cloth.
3. a kind of outlet tunnel mouth according to claim 1 receives slag device, and it is characterized in that, described slag recovering box rear end screen size is φ 15mm, and sieve aperture arrangement is that plum blossom-shaped is arranged.
4. a kind of outlet tunnel mouth according to claim 1 receives slag device, and it is characterized in that, described diagrid screen size is φ 10mm, and sieve aperture arrangement is that plum blossom-shaped is arranged.
5. a kind of outlet tunnel mouth according to claim 1 receives slag device, and it is characterized in that, the long 1m of this slag recovering box, wide 2m, right flank height 1m, left surface baffle plate height 20mm, screen size is φ 15mm, and sieve aperture arrangement is that plum blossom-shaped is arranged; This diagrid height 1m, wide 2m, screen size is φ 10mm, and sieve aperture arrangement is that plum blossom-shaped is arranged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521048260.2U CN205206018U (en) | 2015-12-16 | 2015-12-16 | Sediment device is received to drainage tunnel face |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521048260.2U CN205206018U (en) | 2015-12-16 | 2015-12-16 | Sediment device is received to drainage tunnel face |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205206018U true CN205206018U (en) | 2016-05-04 |
Family
ID=55843744
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201521048260.2U Expired - Fee Related CN205206018U (en) | 2015-12-16 | 2015-12-16 | Sediment device is received to drainage tunnel face |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205206018U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106012639A (en) * | 2016-05-30 | 2016-10-12 | 许昌中亚工业智能装备股份有限公司 | Novel rough screening device for papermaking |
-
2015
- 2015-12-16 CN CN201521048260.2U patent/CN205206018U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106012639A (en) * | 2016-05-30 | 2016-10-12 | 许昌中亚工业智能装备股份有限公司 | Novel rough screening device for papermaking |
CN106012639B (en) * | 2016-05-30 | 2018-05-29 | 许昌中亚工业智能装备股份有限公司 | A kind of novel papermaking scalping equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203891097U (en) | Riverway cleaning ship for water conservancy projects | |
CN201240865Y (en) | Arced solid-liquid separation sieve for water treatment | |
CN204325008U (en) | A kind of cascade filtration sewage disposal device | |
CN205206018U (en) | Sediment device is received to drainage tunnel face | |
CN207294243U (en) | A kind of dissolved gas floatator | |
CN205189031U (en) | High pressure rivers wash mud device clearly | |
CN103121741A (en) | Treatment method of filter backwash wastewater | |
CN207891178U (en) | A kind of novel production wastewater treatment device | |
CN207988125U (en) | A kind of sewage disposal spoil disposal pond immersible pump | |
CN103896429B (en) | A kind of algae water separation device and method being applicable to lake treatment | |
CN203247149U (en) | Underground sewage disposal and recycling system for mine | |
CN203048620U (en) | Backwashing water system device of continuous casting machine | |
CN205575832U (en) | Give backwashing water recycling system of water factory | |
CN203253210U (en) | Power plant wastewater recycling and reusing device | |
CN204656149U (en) | A kind of for the pretreated grid setting pot that dams of domestic sewage in rural areas | |
CN204051231U (en) | Sludge water separating and treating apparatus | |
CN106698623A (en) | Flocculation and sedimentation device for sewage | |
CN204973305U (en) | Washing shaking table system for recycling water | |
CN207918582U (en) | A kind of ecological film water treatment system applied to high-quality water quality river | |
CN204848509U (en) | Mud water processing system | |
CN203420316U (en) | Water-volume-balancing gas-steam combined cycle reclaimed water reuse system | |
CN202671233U (en) | Sewage slag removing machine | |
CN204550232U (en) | The slag bath system of scum silica frost can be stopped | |
CN104649452A (en) | Slag bath system capable of blocking scummings | |
CN204039149U (en) | The device that a kind of reverse osmosis concentrated water is recycled |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160504 Termination date: 20201216 |