CN205205777U - Fill emergent flood control dykes and dams of ability of swimming - Google Patents
Fill emergent flood control dykes and dams of ability of swimming Download PDFInfo
- Publication number
- CN205205777U CN205205777U CN201520936271.8U CN201520936271U CN205205777U CN 205205777 U CN205205777 U CN 205205777U CN 201520936271 U CN201520936271 U CN 201520936271U CN 205205777 U CN205205777 U CN 205205777U
- Authority
- CN
- China
- Prior art keywords
- water
- flood control
- dam
- filled bladder
- met
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/30—Flood prevention; Flood or storm water management, e.g. using flood barriers
Abstract
The utility model relates to a fill emergent flood control dykes and dams of ability of swimming, fill water pocket dam body, connecting device, clamp, fastening area and crab -bolt including the banding, the banding is filled the water pocket dam body and is included two and the above water pocket that fills, fills the water pocket side and is provided with the connector link, filling and connecting through the cluster rope between the water pocket, connecting device is including connecting the body, and these joint body both ends are provided with the attach fitting, the clamp includes rand, connecting rod and handle, the articulated connection between the three, the banding is filled the water pocket dam body and is connected on connecting device, locks through the clamp to fix on the ground by fastening area and crab -bolt, form the emergent flood control dykes and dams that fill the ability of swimming, the utility model discloses contrast traditional sand pocket formula flood dam, have the characteristics that response speed is fast, can dispose fast and perhaps at peripheries such as highway, railway, hospitals, save a large amount of manpower and materials along the line in rivers, lake.
Description
Technical field
The utility model belongs to hydraulic engineering field, is specifically related to a kind of can meeting an urgent need flood control dam by the Water installed of rapid deployment.
Background technology
China is the multiple country of a flood, and a lot of ground elevation in the relatively advanced region of social economy is all below flood level, is easily subject to dissimilar flood and threatens.Even dozens of kilometres is long to have the dykes and dams of the condition of a disaster hidden danger often to have several kilometers, adopt traditional mode of manually piling up sand pocket time-consuming, effort; Also it is loaded down with trivial details to there is assembled program in existing similar emergent dykes and dams, and efficiency is low, and dam body length is short, the problems such as poor reliability.
Utility model content
Technical problem to be solved in the utility model be to provide a kind of can the emergent flood control dam disposed of Fast Installation.
For solving the problem, the scheme that the utility model adopts is:
A kind of Water is met an urgent need flood control dam, comprises banded water-filled bladder dam body, linkage, clip, restraint zone and crab-bolt; Described banded water-filled bladder dam body comprises two and above water-filled bladder, and water-filled bladder side is provided with junction button, is connected between water-filled bladder by string rope through junction button; Described linkage comprises fittings body, and these fittings body two ends are provided with the jointing of band flowing water mouth, and top is provided with water filling port, and bottom is provided with discharge opening; Described clip comprises collar, connecting rod and handle, is articulated and connected between three; Banded water-filled bladder dam body is connected on linkage, by locked clip device, and is fixed on ground by restraint zone and crab-bolt.
Described water-filled bladder is flexible material.
Described linkage two ends are all connected with banded water-filled bladder dam body by jointing.
There is sealed groove at the jointing place at described linkage two ends, and arranged outside has sealing ring.
Described flowing water mouth, between water filling port and discharge opening by being arranged at the cross current of fittings body inside, and end is provided with capping.
Described water pipe place is provided with stop valve.
In described clip, connecting rod hinge spacing should be greater than handle hinge spacing.
The operating procedure of the utility model patent and operating principle are: exploration flood control field working conditions, and banded water-filled bladder dam body are mounted to the jointing of linkage end, then by locked clip device, repeat above-mentioned steps until dam body reaches required length.Open the stop valve in linkage, water-filling is carried out by the water filling port in linkage, closedown stop valve and capping after water-filling completes, and by restraint zone and crab-bolt, banded water-filled bladder dam body is fixed on ground, there is multiple segmentation water-filling dam body worked alone and assembled.Under gravity, bottom and ground are surface contact state to banded water-filled bladder dam body, make it have good sealing performance; The dam body be made up of multiple water-filled bladder, can keep emergent flood control dam to have higher stability and resistance to capsizing.
The utility model overcomes the deficiency of traditional sand pocket mode and existing emergent dykes and dams technology, provide a kind of can Fast Installation dispose emergent flood control dam.This Water flood control dam restrains flood with flood, utilizes the interim dykes and dams of flood rapid build, improve efficiency of providing rescue and relief for disasters and emergencies, environmental protection, reusable.
Accompanying drawing explanation
Accompanying drawing 1 is the utility model
a kind of Water is met an urgent need flood control damgeneral arrangement schematic;
Accompanying drawing 2 is Fig. 1 sectional schematic diagram;
Accompanying drawing 3 is the utility model
a kind of Water is met an urgent need flood control damlinkage structural representation;
Accompanying drawing 4 is the sectional view of Fig. 3;
Accompanying drawing 5 is the utility model yoke configurations schematic diagram.
Detailed description of the invention
Below in conjunction with embodiment, the utility model is described in further detail.
What the utility model disclosed is that a kind of Water is met an urgent need flood control dam, as shown in Figures 1 to 5, is preferred embodiment of the present utility model.Described Water is met an urgent need flood control dam, comprises banded water-filled bladder dam body (1), linkage (2), clip (3), restraint zone (4) and crab-bolt (5).Wherein:
Described banded water-filled bladder dam body (1) comprises two and above water-filled bladder (11), and water-filled bladder (11) side is provided with junction button (12), is connected between water-filled bladder (11) by string rope (13) through junction button (12); Described linkage (2) comprises fittings body (21), and this fittings body (21) two ends are provided with the jointing (23) of band flowing water mouth (22), and top is provided with water filling port (24), and bottom is provided with discharge opening (25); Described clip (3) comprises collar (31), connecting rod (32) and handle (33), is articulated and connected between three; Banded water-filled bladder dam body (1) is connected on linkage (2), by clip (3) locking, and is fixed on ground by restraint zone (4) and crab-bolt (5).
Described water-filled bladder (11) is flexible material.
Described linkage (2) two ends are all connected with banded water-filled bladder dam body (1) by jointing (23).
There is sealed groove at jointing (23) place at described linkage (2) two ends, and arranged outside has sealing ring (26).
Described flowing water mouth (22), to be communicated with by the water pipe (27) being arranged at fittings body (21) inner between water filling port (24) with discharge opening (25), and end is provided with capping (28).
Described water pipe (27) place is provided with stop valve (29).
In described clip (3), connecting rod (32) hinge spacing should be greater than handle (33) hinge spacing.
The operating procedure of the utility model patent and operating principle are: exploration flood control field working conditions, and banded water-filled bladder dam body (1) is mounted to the jointing (23) of linkage (2) end, then by clip (3) locking, above-mentioned steps is repeated until dam body reaches required length.Open the stop valve (29) in linkage (2), water-filling is carried out by the water filling port (24) in linkage (2), closedown stop valve (29) and capping (28) after water-filling completes, and by restraint zone (4) and crab-bolt (5), banded water-filled bladder dam body (1) being fixed on ground, the flood control dam of meeting an urgent need of the Water with multiple segmentation that can work independently has been assembled.Under gravity, bottom and ground are surface contact state to banded water-filled bladder dam body (1), make it have good sealing performance; The dam body be made up of multiple water-filled bladder (11), can keep emergent flood control dam to have higher stability and resistance to capsizing.
Above-described detailed description of the invention is exemplary, should not be understood as the restriction to the utility model protection domain.Therefore the change in every case done according to claim of the present utility model and manual or modification, all should fall within protection domain of the present utility model.
Claims (7)
1. Water is met an urgent need a flood control dam, comprises banded water-filled bladder dam body, linkage, clip, restraint zone and crab-bolt; Described banded water-filled bladder dam body comprises two and above water-filled bladder, and water-filled bladder side is provided with junction button, is connected between water-filled bladder by string rope through junction button; Described linkage comprises fittings body, and these fittings body two ends are provided with the jointing of band flowing water mouth, and top is provided with water filling port, and bottom is provided with discharge opening; Described clip comprises collar, connecting rod and handle, is articulated and connected between three; Banded water-filled bladder dam body is connected on linkage, by locked clip device, and is fixed on ground by restraint zone and crab-bolt.
2. a kind of Water according to claim 1 is met an urgent need flood control dam, it is characterized in that: described water-filled bladder is flexible material.
3. a kind of Water according to claim 1 is met an urgent need flood control dam, it is characterized in that: described linkage two ends are all connected with banded water-filled bladder dam body by jointing.
4. a kind of Water according to claim 1 is met an urgent need flood control dam, it is characterized in that: there is sealed groove at the jointing place at described linkage two ends, and arranged outside has sealing ring.
5. a kind of Water according to claim 1 is met an urgent need flood control dam, it is characterized in that: described flowing water mouth, between water filling port and discharge opening by being arranged at the cross current of fittings body inside, and end is provided with capping.
6. a kind of Water according to claim 5 is met an urgent need flood control dam, it is characterized in that: described water pipe place is provided with stop valve.
7. a kind of Water according to claim 1 is met an urgent need flood control dam, it is characterized in that: in described clip, connecting rod hinge spacing should be greater than handle hinge spacing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520936271.8U CN205205777U (en) | 2015-11-23 | 2015-11-23 | Fill emergent flood control dykes and dams of ability of swimming |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520936271.8U CN205205777U (en) | 2015-11-23 | 2015-11-23 | Fill emergent flood control dykes and dams of ability of swimming |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205205777U true CN205205777U (en) | 2016-05-04 |
Family
ID=55843505
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520936271.8U Withdrawn - After Issue CN205205777U (en) | 2015-11-23 | 2015-11-23 | Fill emergent flood control dykes and dams of ability of swimming |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205205777U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106436649A (en) * | 2016-07-04 | 2017-02-22 | 谢文玉 | Flow control technology and series equipment thereof |
CN106759094A (en) * | 2015-11-23 | 2017-05-31 | 湖北华舟重工应急装备股份有限公司 | A kind of Water is met an urgent need flood control dam |
DK201670489A1 (en) * | 2016-07-04 | 2018-01-29 | Env Solutions Aps | Portable flood barrier system and method of monitoring said system. |
CN107780382A (en) * | 2016-08-30 | 2018-03-09 | 黄俊强 | Dam is increased in the emergent flood control of Water |
-
2015
- 2015-11-23 CN CN201520936271.8U patent/CN205205777U/en not_active Withdrawn - After Issue
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106759094A (en) * | 2015-11-23 | 2017-05-31 | 湖北华舟重工应急装备股份有限公司 | A kind of Water is met an urgent need flood control dam |
CN106759094B (en) * | 2015-11-23 | 2018-12-14 | 湖北华舟重工应急装备股份有限公司 | A kind of Water emergency flood control dam |
CN106436649A (en) * | 2016-07-04 | 2017-02-22 | 谢文玉 | Flow control technology and series equipment thereof |
DK201670489A1 (en) * | 2016-07-04 | 2018-01-29 | Env Solutions Aps | Portable flood barrier system and method of monitoring said system. |
DK179214B1 (en) * | 2016-07-04 | 2018-02-05 | Env Solutions Aps | Portable flood barrier system and method of monitoring said system. |
US10662600B2 (en) | 2016-07-04 | 2020-05-26 | Environment Solutions Aps | Portable flood barrier system and method of monitoring said system |
CN107780382A (en) * | 2016-08-30 | 2018-03-09 | 黄俊强 | Dam is increased in the emergent flood control of Water |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205205777U (en) | Fill emergent flood control dykes and dams of ability of swimming | |
CN201762694U (en) | Dam flow guiding device | |
CN106759094B (en) | A kind of Water emergency flood control dam | |
CN107326869A (en) | A kind of dykes and dams rapid rescue repairing construction technique | |
CN104264636A (en) | Technology for using siphons to lower or control barrier lake level | |
CN206956669U (en) | A kind of attachment structure of cut-pff wall and concrete cover | |
CN103103970B (en) | Floating type drifter guide cleaning station | |
CN203487506U (en) | Water-absorbing rapid-hardening water retaining auxiliary dike | |
CN103774612B (en) | A kind of flood fighting rescue outfit | |
CN207597377U (en) | Water conservancy and hydropower lining for building discharge structure | |
CN214405174U (en) | Water conservancy and hydropower engineering's drain pipe reinforcement instrument | |
CN203144967U (en) | Connecting structure of high earth rock cofferdam anti-seepage earth material and concrete anti-seepage wall | |
CN202969357U (en) | Float type flotage guiding and cleaning station | |
CN204174577U (en) | The combined type blockwork of hydraulic engineering | |
CN203546671U (en) | Water filling type small rubber dike | |
CN106436649A (en) | Flow control technology and series equipment thereof | |
CN208416572U (en) | A kind of shield launching, the triple exclusion seal devices for receiving portal | |
CN206859244U (en) | A kind of waterproof immersed tube tunnel jointing | |
CN101725131A (en) | Flood-proof emergency bag | |
CN204511467U (en) | A kind of hole water-stopping structure | |
CN103215928B (en) | Resistance tide lock door | |
CN103103968A (en) | Floating type drifter guide cleaning station | |
CN205024640U (en) | Solid bag dams | |
CN205012965U (en) | Radial expansion gas drainage hole sealing device | |
CN204849682U (en) | Flood fighting water bag |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 430223 Sunshine Avenue, Jiangxia District, Wuhan, Hubei Province, No. 5 Patentee after: China Shipbuilding Heavy Industry Group emergency warning and rescue equipment Limited by Share Ltd Address before: 430223 Sunshine Avenue, Jiangxia District, Wuhan, Hubei Province, No. 5 Patentee before: Hubei China Harzone Industry Corp., Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20160504 Effective date of abandoning: 20181214 |
|
AV01 | Patent right actively abandoned |