CN205195430U - Intelligence building becomes power distribution control system - Google Patents

Intelligence building becomes power distribution control system Download PDF

Info

Publication number
CN205195430U
CN205195430U CN201520968177.0U CN201520968177U CN205195430U CN 205195430 U CN205195430 U CN 205195430U CN 201520968177 U CN201520968177 U CN 201520968177U CN 205195430 U CN205195430 U CN 205195430U
Authority
CN
China
Prior art keywords
floor
low
distribution
power
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520968177.0U
Other languages
Chinese (zh)
Inventor
丁介平
候文学
王东
王政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MH Robot and Automation Co Ltd
Original Assignee
MH Robot and Automation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MH Robot and Automation Co Ltd filed Critical MH Robot and Automation Co Ltd
Priority to CN201520968177.0U priority Critical patent/CN205195430U/en
Application granted granted Critical
Publication of CN205195430U publication Critical patent/CN205195430U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/12Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages

Landscapes

  • Stand-By Power Supply Arrangements (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The utility model relates to an intelligence building becomes power distribution control system, its high voltage power distribution room and low -voltage distribution room and emergency generator group that includes control center and be located every building disposes floor block terminal, floor control box and cell controller respectively on each layer, cell controller and height, low -voltage distribution room, floor block terminal and floor control box and the communication connection of emergency generator group, cell controller passes through network communication module and control center communication connection, the electric power of high voltage power distribution room draws the net from high voltage power distribution, and the electric power of low -voltage distribution room draws from high voltage power distribution room or emergency generator group, the output electricity connection of low -voltage distribution room to the electric power input of each floor block terminal, the floor control box embeds has light control module, video control module and fire control control module. The utility model has the advantages of safe and reliable, control the convenience, the operation is stable, system architecture simple, the centralized management of being convenient for.

Description

Intelligent building becomes power distribution control system
Technical field
The utility model relates to intelligent building field, and a kind of intelligent building becomes power distribution control system specifically.
Background technology
Along with the development of electronic information technology, commodity intelligence degree is more and more higher.Along with the intelligentized development of building field, " intelligent building " is also put on the agenda gradually, and intelligent building is urban modernization, informationalized important symbol, the developing direction that intelligent building will be future architecture industry.Electric power dispensing is the basis of intelligent building, and the power utilization environment of safety and stability is the prerequisite ensureing intelligent building stable operation.Therefore, intelligent building needs the electric power system be equipped with will meet higher fail safe and stability requirement, and current transformation and distribution system lacks concentrated, unified management, and intelligence degree is higher, the development of serious restriction intelligent building.
Utility model content
The technical problems to be solved in the utility model be to provide a kind of safe and reliable, convenient, the stable and system architecture of manipulation is simple, be convenient to the intelligent building change power distribution control system of managing concentratedly.
For solving the problems of the technologies described above, the design feature that intelligent building of the present utility model becomes power distribution control system is the control centre and the high-tension distribution chamber of converting being positioned at Mei Dong building and low-voltage distribution room and standby generator sets that comprise for carrying out centralized management to Duo Dong building, each floor in Mei Dong building configures respectively floor distribution box and floor control cabinet; All configure a cell controller in Mei Dong building, this cell controller and high and low pressure switchgear house, floor distribution box and floor control cabinet and standby generator sets communicate to connect, and cell controller is communicated to connect by network communication module and control centre; The electric power of described high-tension distribution chamber of converting draws from high voltage distribution network, and the electric power of low-voltage distribution room draws from high-tension distribution chamber of converting or standby generator sets, and the output power of low-voltage distribution room is connected to the power input end of each floor distribution box; Described floor control cabinet is built-in with lighting control module, video control module and fire-fighting control module.
Described control centre comprise the network switch communicated to connect with each network communication module by wired or wireless network, the computer be connected with the network switch, for power to computer ups power, connect printer on computers and audio amplifier, computer is connected with can with the gsm communication module of each floor director mobile communication.
The video frequency output structure of described computer is connected with large LED screen, on the indoor hall that this large LED screen is arranged on control centre or exterior wall.
Described cell controller is connected with contactor, the power circuit between high-tension distribution chamber of converting and low-voltage distribution room is connected with contactor normally-closed contact, the power circuit between standby generator sets and low-voltage distribution room is connected with the normally opened contact of contactor.
Described high-tension distribution chamber of converting and low-voltage distribution indoor arrange high-tension transformer and low-tension transformer respectively, set temperature transducer and humidity sensor and anti-jump loop in transformer.
High and low pressure switchgear house and floor distribution box are built-in with current sensor, voltage sensor and protective circuit.
Load induction module and detection of electrical leakage module are also set in described floor distribution box.
The beneficial effects of the utility model are: adopt Dan Donglou to power separately, directly introduce electric power from high-voltage fence, are delivered to floor distribution box and use, ensure that the stability of electric power, avoid the mutual interference of electric power after high and low pressure transformation; Range site controller gathers the work state information of each switchgear house and transformer, and information is sent to control centre by wired or wireless network, achieve real-time monitoring, facilitate and feed back fault message in time, ensure that Supply Security and stability, utilize wired or wireless network transmission signal, transmission speed is fast and wiring is convenient; In floor, control cabinet is set separately, Long-distance Control can be carried out to the light of floor, video and fire-fighting equipment; Utilize gsm communication module can communicate with the mobile phone of each floor director, facilitate each floor director to understand confession power distribution information and the fault message of this layer in time; Utilize contactor often open and normally-closed contact realizes the switching between generating for subsequent use and main electrical network and interlocks controlling, when main grid cut-off, automatically starting standby generator sets is powered, when main power system restoration is powered, close standby generator sets, ensure that continuation and the reliability of power supply.In sum, the utility model have safe and reliable, convenient, stable, the system architecture of manipulation is simple, the advantage of being convenient to centralized management.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail:
Fig. 1 is overall structure schematic diagram of the present utility model.
Embodiment
With reference to accompanying drawing, this intelligent building becomes power distribution control system and comprises the control centre for carrying out centralized management to Duo Dong building and be positioned at the high-tension distribution chamber of converting 1 in Mei Dong building and low-voltage distribution room 2 and standby generator sets 3.Wherein, high-tension distribution chamber of converting is 10KV switchgear house, and low-voltage distribution room 2 is 400V switchgear house.Each floor in Mei Dong building configures respectively floor distribution box 4 and floor control cabinet 5, floor distribution box 4 is connected with the block terminal of floor Nei Ge resident family, also supplies corridor lamp, video monitoring apparatus and fire-fighting equipment etc. in This floor simultaneously.All configure a cell controller 6 in Mei Dong building, this cell controller 6 communicates to connect with high and low pressure switchgear house, floor distribution box 4 and floor control cabinet 5 and standby generator sets 3, and cell controller 6 is communicated to connect with control centre by network communication module 7.The electric power of high-tension distribution chamber of converting 1 draws from high voltage distribution network, and the electric power of low-voltage distribution room 2 draws from high-tension distribution chamber of converting 1 or standby generator sets 3, and the output power of low-voltage distribution room 2 is connected to the power input end of each floor distribution box 4.Floor control cabinet 5 is built-in with lighting control module, video control module and fire-fighting control module.
Wherein, in high-tension distribution chamber of converting 1 and low-voltage distribution room 2, high-tension transformer and low-tension transformer are set respectively, set temperature transducer and humidity sensor and anti-jump loop in transformer.High-tension distribution chamber of converting 1, low-voltage distribution room 2 and floor distribution box 4 are built-in with current sensor, voltage sensor and protective circuit, wherein, also arrange load induction module and detection of electrical leakage module in floor distribution box 4.
Control centre comprise the network switch 8 communicated to connect with each network communication module 7 by wired or wireless network, the computer 9 be connected with the network switch 8, for power to computer 9 ups power 10, be connected to printer 11 on computer 9 and audio amplifier 12, computer 9 is connected with can with the gsm communication module 13 of each floor director mobile communication.The video frequency output structure of computer 9 is connected with large LED screen 14, on the indoor hall that this large LED screen 14 is arranged on control centre or exterior wall.
With reference to accompanying drawing, cell controller 6 is connected with contactor KM, power circuit between high-tension distribution chamber of converting 1 and low-voltage distribution room 2 is connected with contactor normally-closed contact KM1, the power circuit between standby generator sets 3 and low-voltage distribution room 2 is connected with contactor normally opened contact KM2.Automatically starting diesel engine generator or Gas Turbine Generating Units when main power source power failure, stopping stand-by power supply when restoring electricity, achieve interlocking and coordinated signals.
In the utility model, adopt Dan Donglou to power separately, directly introduce electric power from high-voltage fence, after high and low pressure transformation, be delivered to floor distribution box 4 use, ensure that the stability of electric power, avoid the mutual interference of electric power.Range site controller 6 gathers the work state information of each switchgear house and transformer, and information is sent to control centre by wired or wireless network, achieve real-time monitoring, facilitate and feed back fault message in time, ensure that Supply Security and stability, utilize wired or wireless network transmission signal, transmission speed is fast and wiring is convenient.In floor, control cabinet is set separately, carries out Long-distance Control by the light of cell controller 6 pairs of floors, video and fire-fighting equipment.Utilize gsm communication module 13 can communicate with the mobile phone of each floor director, facilitate each floor director to understand confession power distribution information and the fault message of this layer in time.Utilize contactor often open and normally-closed contact realizes the switching between generating for subsequent use and main electrical network and interlocks controlling, when main grid cut-off, automatically starting standby generator sets is powered, when main power system restoration is powered, close standby generator sets 3, ensure that continuation and the reliability of power supply.
In sum, the utility model is not limited to above-mentioned embodiment.Those skilled in the art, under the prerequisite not departing from spirit and scope of the present utility model, can do some changes and modification.Protection range of the present utility model should be as the criterion with claim of the present utility model.

Claims (7)

1. an intelligent building becomes power distribution control system, it is characterized in that the control centre comprised for carrying out centralized management to Duo Dong building and the high-tension distribution chamber of converting (1) and low-voltage distribution room (2) and the standby generator sets (3) that are positioned at Mei Dong building, each floor in Mei Dong building configures respectively floor distribution box (4) and floor control cabinet (5); A cell controller (6) is all configured in Mei Dong building, this cell controller (6) communicates to connect with high and low pressure switchgear house, floor distribution box (4) and floor control cabinet (5) and standby generator sets (3), and cell controller (6) is communicated to connect with control centre by network communication module (7); The electric power of described high-tension distribution chamber of converting (1) draws from high voltage distribution network, the electric power of low-voltage distribution room (2) draws from high-tension distribution chamber of converting (1) or standby generator sets (3), and the output power of low-voltage distribution room (2) is connected to the power input end of each floor distribution box (4); Described floor control cabinet (5) is built-in with lighting control module, video control module and fire-fighting control module.
2. intelligent building as claimed in claim 1 becomes power distribution control system, it is characterized in that described control centre comprise the network switch (8) communicated to connect by wired or wireless network and each network communication module (7), the computer (9) be connected with the network switch (8), for power to computer (9) ups power (10), be connected to printer (11) on computer (9) and audio amplifier (12), computer (9) is connected with can with the gsm communication module (13) of each floor director mobile communication.
3. intelligent building as claimed in claim 2 becomes power distribution control system, and the video frequency output structure that it is characterized in that described computer (9) is connected with large LED screen (14), on the indoor hall that this large LED screen (14) is arranged on control centre or exterior wall.
4. intelligent building as claimed in claim 1 becomes power distribution control system, it is characterized in that described cell controller (6) is connected with contactor (KM), power circuit between high-tension distribution chamber of converting (1) and low-voltage distribution room (2) is connected with contactor normally-closed contact (KM1), the power circuit between standby generator sets (3) and low-voltage distribution room (2) is connected with contactor normally opened contact (KM2).
5. intelligent building as claimed in claim 1 becomes power distribution control system, it is characterized in that arranging high-tension transformer and low-tension transformer respectively in described high-tension distribution chamber of converting (1) and low-voltage distribution room (2), set temperature transducer and humidity sensor and anti-jump loop in transformer.
6. the intelligent building according to any one of claim 1-5 becomes power distribution control system, it is characterized in that all arranging current sensor, voltage sensor and protective circuit in high-tension distribution chamber of converting (1), low-voltage distribution room (2) and floor distribution box (4).
7. intelligent building as claimed in claim 6 becomes power distribution control system, it is characterized in that also arranging load induction module and detection of electrical leakage module in described floor distribution box (4).
CN201520968177.0U 2015-11-30 2015-11-30 Intelligence building becomes power distribution control system Active CN205195430U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520968177.0U CN205195430U (en) 2015-11-30 2015-11-30 Intelligence building becomes power distribution control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520968177.0U CN205195430U (en) 2015-11-30 2015-11-30 Intelligence building becomes power distribution control system

Publications (1)

Publication Number Publication Date
CN205195430U true CN205195430U (en) 2016-04-27

Family

ID=55788375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520968177.0U Active CN205195430U (en) 2015-11-30 2015-11-30 Intelligence building becomes power distribution control system

Country Status (1)

Country Link
CN (1) CN205195430U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108345247A (en) * 2018-02-26 2018-07-31 杭州智仁建筑工程有限公司 A kind of autocontrol method
CN108363371A (en) * 2018-02-26 2018-08-03 杭州智仁建筑工程有限公司 A kind of heavy construction combined control system
CN110488686A (en) * 2019-08-02 2019-11-22 合肥融庄电子科技有限公司 A kind of building intellectualization monitoring system that safety is good
CN113381500A (en) * 2021-06-08 2021-09-10 北京百度网讯科技有限公司 Power switching method, device and system and electronic equipment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108345247A (en) * 2018-02-26 2018-07-31 杭州智仁建筑工程有限公司 A kind of autocontrol method
CN108363371A (en) * 2018-02-26 2018-08-03 杭州智仁建筑工程有限公司 A kind of heavy construction combined control system
CN110488686A (en) * 2019-08-02 2019-11-22 合肥融庄电子科技有限公司 A kind of building intellectualization monitoring system that safety is good
CN113381500A (en) * 2021-06-08 2021-09-10 北京百度网讯科技有限公司 Power switching method, device and system and electronic equipment
CN113381500B (en) * 2021-06-08 2024-03-19 北京百度网讯科技有限公司 Power switching method, device and system and electronic equipment

Similar Documents

Publication Publication Date Title
CN204835083U (en) A smart jack for intelligent house
CN205195430U (en) Intelligence building becomes power distribution control system
CN202276194U (en) Online medium voltage switch cabinet monitoring device
CN102571514A (en) Intelligent power consumption cell system
CN104466736B (en) Intelligent domestic power distribution device with various electricity protection functions
CN201414021Y (en) Intelligent power distribution system for telecommunication room
CN206401786U (en) A kind of intelligent box substation
CN203415882U (en) Box type transformer station
CN103104532B (en) A kind of mining intelligent ventilator controller
CN206922507U (en) A kind of intelligent integrated switch board
CN110932254B (en) Multiple redundant power supply control system and method
CN203071657U (en) Distribution box applied to digital cinema projecting system
CN202018591U (en) Terminal controller for electricity using safety early warning system
CN107733072A (en) Intelligent vehicle-carried distribution system
CN203673020U (en) Intelligent outage alarm apparatus
CN203326904U (en) Intelligent high-frequency switching power supply system
CN107124039A (en) A kind of intelligent integrated switch board
CN207851171U (en) A kind of blackouts monitoring device
CN102493951A (en) Intelligent controlling and monitoring system for water pump
CN203301014U (en) Box type substation with self diagnosis LED display alarm system
CN201601529U (en) Power supply system for electric power communication computer room
CN205092446U (en) Rural power grids intelligent power distribution cabinet
CN206332455U (en) A kind of pole voltage power-less comprehensive compensating device towards urban power distribution network
CN105259874A (en) Distribution transformer real-time monitoring integrated system based on GPRS
CN203414803U (en) Novel mine centralized control center

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant