CN205188394U - Plumbous device is put to anaerobic of metallic lead smelting furnace - Google Patents

Plumbous device is put to anaerobic of metallic lead smelting furnace Download PDF

Info

Publication number
CN205188394U
CN205188394U CN201520961089.8U CN201520961089U CN205188394U CN 205188394 U CN205188394 U CN 205188394U CN 201520961089 U CN201520961089 U CN 201520961089U CN 205188394 U CN205188394 U CN 205188394U
Authority
CN
China
Prior art keywords
plumbous
lead
putting
sleeve valve
puts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520961089.8U
Other languages
Chinese (zh)
Inventor
杨春明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu New Chunxing Resource Recycling Co Ltd
Original Assignee
Jiangsu New Chunxing Resource Recycling Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu New Chunxing Resource Recycling Co Ltd filed Critical Jiangsu New Chunxing Resource Recycling Co Ltd
Priority to CN201520961089.8U priority Critical patent/CN205188394U/en
Application granted granted Critical
Publication of CN205188394U publication Critical patent/CN205188394U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacture And Refinement Of Metals (AREA)
  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

The utility model provides a plumbous device is put to anaerobic of metallic lead smelting furnace, belongs to the anaerobic and puts plumbous device. The anaerobic is put plumbous device and is included: put plumbous chute, put the lead pipe, fixed limiting check ring, put the lead sleeve valve, put lead sleeve valve lifter, the lift, enter plumbous hole, go out plumbous hole and lifter pillar, the one end of putting plumbous chute links to each other for plumbous mouthful with putting of smelting furnace, puts the lead sleeve valve and is connected through fixing the spacing collar and putting plumbous chute, puts the lead sleeve valve and puts lead sleeve valve lifter and be connected, puts the lead sleeve valve barrel and connects outside putting the lead pipe, there are into plumbous hole and the plumbous hole of play on putting the lead pipe, put the lead pipe and be connected with the lift. The advantage: plumbous chute is put through putting plumbous mouthful of entering to plumbous liquid in the lead smelting furnace, opens the anaerobic and puts the plumbous package of the plumbous liquid stream income of plumbous device, can reduce high temperature lead liquid and contact with the air, avoids plumbous liquid oxidative slagging, has improved product quality, has reduced harmful gas such as putting the plumbous cigarette of plumbous in -process and to the injury that the human body produced, has protected the environment.

Description

A kind of anaerobic of metallic lead smelting furnace puts plumbous device
Technical field
The utility model relates to a kind of anaerobic and puts plumbous device, and particularly a kind of anaerobic of metallic lead smelting furnace puts plumbous device.
Background technology
Deslagging is needed to put lead after existing plumbum smelting fusion process completes.Usually put plumbous mouth and be positioned at smelting furnace side, plumbous liquid flows directly in sheath or lead pan by plumbous chute, plumbous liquid temp is generally more than 800 DEG C, the plumbous liquid putting plumbous whole process flowing is in atmosphere exposed, the liquid lead of high temperature very easily oxidative slagging produce a large amount of lead fumes in atmosphere, harm operator's is healthy, causes environmental pollution.
Utility model content
The purpose of this utility model to provide a kind of structure simple, and easy to operate, the anaerobic of reliable metallic lead smelting furnace puts plumbous device, solves and put plumbous liquid oxidation slag making in plumbous process and the problem producing a large amount of lead fume.
The purpose of this utility model is achieved in that anaerobic is put plumbous device and comprised: put plumbous chute, put lead pipe, fixing spacing back-up ring, put lead sleeve valve, put lead sleeve valve elevating lever, elevator, enter plumbous hole, go out plumbous hole and elevating lever pillar; The plumbous mouth of putting of the one end and smelting furnace of putting plumbous chute is connected, put lead sleeve valve by fixing spacing collar with put plumbous chute and be connected, put lead sleeve valve and put lead sleeve valve elevating lever and be connected, put lead sleeve valve pocket and be connected on and put outside lead pipe; Put and lead pipe has into plumbous hole and goes out plumbous hole, put lead pipe and be connected with elevator.
Described lead pipe of putting adopts high temperature resistant stainless steel pipe manufacturer; Described lead pipe upper end of putting is connected with elevator; Have at the middle part of putting lead pipe into plumbous hole boss, entering on the boss of plumbous hole to have into plumbous hole; The described plumbous hole that goes out is positioned at the bottom of putting lead pipe.
Described puts plumbous chute outside for box hat, inner lining refractory; Bottom arranges the pilot hole putting lead pipe, and pilot hole is corresponding with the bottom entering plumbous hole boss to be sealed; Pilot hole is connected with wear ring, and wear ring diameter of bore is greater than pilot hole diameter.
Described fixing spacing collar is greater than 2, is positioned at and puts plumbous chute, and one end is socketed in puts outside lead sleeve valve, and the other end is fixed on to be put on plumbous chute.
Described lead sleeve valve of putting adopts high temperature resistant stainless steel manufacture, being positioned at and putting plumbous chute, putting lead sleeve valve higher than putting plumbous chute, top with put lead sleeve valve elevating lever and be connected; Putting lead sleeve valve elevating lever puts on plumbous chute by the connection of elevating lever pillar; To put bottom lead sleeve valve as bell, be positioned at put plumbous chute inner bottom part wear ring on, and correspondingly with wear ring to seal.
Beneficial effect, owing to have employed such scheme, putting in plumbous process, in chute, plumbous liquid liquid level remains consistent with liquid level plumbous in smelting furnace, and plumbous liquid surface forms the stable oxide film of one deck, avoids the plumbous liquid of flowing and the contact of air.Plumbous liquid enters sheath from the plumbous hole that goes out of putting bottom lead pipe simultaneously; along with the rising of plumbous liquid; going out plumbous hole is immersed in plumbous liquid; plumbous liquid in sheath steadily rises; avoid plumbous liquid oxidation slag making to greatest extent; improve quality product, decrease and put the injury that in plumbous process, the obnoxious flavour such as lead fume produces human body, protect environment.Solve and put plumbous liquid oxidation slag making in plumbous process and the problem producing a large amount of lead fume, reach the purpose of this utility model.
Advantage: in plumbum smelting, plumbous liquid enters put plumbous chute by putting plumbous mouth; open anaerobic and put plumbous device plumbous liquid inflow sheath; high-temperature lead liquid can be reduced contact with air; avoid plumbous liquid oxidation slag making; improve quality product; decrease and put the injury that in plumbous process, the obnoxious flavour such as lead fume produces human body, protect environment.
Accompanying drawing explanation
Fig. 1 is structure iron of the present utility model.
Fig. 2 is that the utility model puts plumbous structure graph.
In figure, 1, put plumbous chute; 2, lead pipe is put; 3, lead sleeve valve is put; 4, plumbous hole is entered; 5, plumbous hole is gone out; 6, fixing spacing back-up ring; 7, lead sleeve valve elevating lever is put; 8, elevator; 9, sheath; 10, elevating lever pillar; 11, wear ring.
Embodiment
Below in conjunction with the drawings and the specific embodiments, the utility model is described in detail:
Embodiment 1: anaerobic is put plumbous device and comprised: put plumbous chute 1, put lead pipe 2, fixing spacing back-up ring 6, put lead sleeve valve 3, put lead sleeve valve elevating lever 7, elevator 8, enter plumbous hole 4, go out plumbous hole 5 and elevating lever pillar 10; The plumbous mouth of putting of the one end and smelting furnace of putting plumbous chute 1 is connected, put lead sleeve valve 3 by fixing spacing collar 6 with put plumbous chute 1 and be connected, put lead sleeve valve 3 and put lead sleeve valve elevating lever 7 and be connected, put lead sleeve valve 3 and be socketed in and put outside lead pipe 2; Put and lead pipe 2 has into plumbous hole 4 and goes out plumbous hole 5, put lead pipe 2 and be connected with elevator 8.
Described lead pipe 2 of putting adopts high temperature resistant stainless steel pipe manufacturer; Described lead pipe 2 upper end of putting is connected with elevator 8; Have at the middle part of putting lead pipe 2 into plumbous hole boss, entering on the boss of plumbous hole to have into plumbous hole 4; The described plumbous hole 5 that goes out is positioned at the bottom of putting lead pipe 2, goes out the bottom that plumbous hole 5 is positioned at sheath 9 when putting lead, after putting lead, will go out plumbous hole 5 and propose higher than sheath 9 suitable for reading.
Described puts plumbous chute 1 outside for box hat, inner lining refractory; Bottom is arranged puts the pilot hole of lead pipe 2, and pilot hole is corresponding with the bottom entering plumbous hole boss to be sealed, and during for putting lead, the plumbous liquid in plumbous chute 1 is put in shutoff, ensures that plumbous liquid can only pass through to put lead pipe 2 into the inflow of plumbous hole 4, and puts lead by putting lead pipe 2 enforcement; Pilot hole is connected with wear ring 11, and wear ring 11 diameter of bore is greater than pilot hole diameter.
Described fixing spacing collar 6 is greater than 2, is positioned at and puts plumbous chute 1, and one end is socketed in puts outside lead sleeve valve 3, and the other end is fixed on to be put on plumbous chute 1.
Described lead sleeve valve 3 of putting adopts high temperature resistant stainless steel manufacture, is positioned at and puts plumbous chute 1, puts lead sleeve valve 3 higher than putting plumbous chute 1, top with put lead sleeve valve elevating lever 7 and be connected; Putting lead sleeve valve elevating lever 7 puts on plumbous chute 1 by elevating lever pillar 10 connection; To put bottom lead sleeve valve 3 as bell, be positioned at put plumbous chute 1 inner bottom part wear ring 11 on, and correspondingly with wear ring 11 to seal, the plumbous liquid put in plumbous chute 1 for shutoff does not flow out.
After plumbum smelting fusion process completes, lead sleeve valve 3 is put by putting the closedown of lead sleeve valve elevating lever 7 before putting lead, sheath 9 is put to putting bottom lead pipe 2, shown in accompanying drawing 1, open smelting furnace and put plumbous mouth, plumbous liquid enters puts plumbous chute 1, when plumbous liquid reaches the height putting plumbous chute 1/2-2/3, by means of elevator 8, the plumbous hole 4 of entering of putting lead pipe is dropped to casing valve base plate, lead sleeve valve 3 is put in unlatching, shown in accompanying drawing 2, plumbous liquid puts lead pipe 2 through entering the inflow of plumbous hole 4, and flow into sheath 9 by putting lead pipe 2, when sheath completely after close put lead sleeve valve 3, lead pipe 2 is put in lifting, remove sheath 9, complete the plumbous process of single step of releasing, above operation is repeated again as lead need be put.
Putting in plumbous process, in chute, plumbous liquid liquid level remains consistent with liquid level plumbous in smelting furnace, and plumbous liquid surface forms the stable oxide film of one deck, avoids the plumbous liquid of flowing and the contact of air.Plumbous liquid enters sheath 9 from the plumbous hole 5 that goes out of putting bottom lead pipe 2 simultaneously; along with the rising of plumbous liquid; going out plumbous hole is immersed in plumbous liquid; plumbous liquid in sheath steadily rises; avoid plumbous liquid oxidation slag making to greatest extent; improve quality product, decrease and put the injury that in plumbous process, the obnoxious flavour such as lead fume produces human body, protect environment.
Above-described is only preferred example of the present utility model.Should be understood that for the person of ordinary skill of the art, under technology enlightenment provided by the utility model, other improvement or change can also be carried out, all can realize the purpose of this utility model, all should be considered as protection domain of the present utility model.

Claims (5)

1. the anaerobic of metallic lead smelting furnace puts a plumbous device, it is characterized in that: anaerobic is put plumbous device and comprised: put plumbous chute, put lead pipe, fixing spacing back-up ring, put lead sleeve valve, put lead sleeve valve elevating lever, elevator, enter plumbous hole, go out plumbous hole and elevating lever pillar; The plumbous mouth of putting of the one end and smelting furnace of putting plumbous chute is connected, put lead sleeve valve by fixing spacing collar with put plumbous chute and be connected, put lead sleeve valve and put lead sleeve valve elevating lever and be connected, put lead sleeve valve pocket and be connected on and put outside lead pipe; Put and lead pipe has into plumbous hole and goes out plumbous hole, put lead pipe and be connected with elevator.
2. the anaerobic of a kind of metallic lead smelting furnace according to claim 1 puts plumbous device, it is characterized in that: described lead pipe of putting adopts high temperature resistant stainless steel pipe manufacturer; Described lead pipe upper end of putting is connected with elevator; Have at the middle part of putting lead pipe into plumbous hole boss, entering on the boss of plumbous hole to have into plumbous hole; The described plumbous hole that goes out is positioned at the bottom of putting lead pipe.
3. the anaerobic of a kind of metallic lead smelting furnace according to claim 1 puts plumbous device, it is characterized in that: described puts plumbous chute outside for box hat, inner lining refractory; Bottom arranges the pilot hole putting lead pipe, and pilot hole is corresponding with the bottom entering plumbous hole boss to be sealed; Pilot hole is connected with wear ring, and wear ring diameter of bore is greater than pilot hole diameter.
4. the anaerobic of a kind of metallic lead smelting furnace according to claim 1 puts plumbous device, it is characterized in that: described fixing spacing collar is greater than 2, is positioned at and puts plumbous chute, and one end is socketed in puts outside lead sleeve valve, and the other end is fixed on to be put on plumbous chute.
5. the anaerobic of a kind of metallic lead smelting furnace according to claim 1 puts plumbous device, it is characterized in that: described lead sleeve valve of putting adopts high temperature resistant stainless steel manufacture, being positioned at and putting plumbous chute, putting lead sleeve valve higher than putting plumbous chute, top with put lead sleeve valve elevating lever and be connected; Putting lead sleeve valve elevating lever puts on plumbous chute by the connection of elevating lever pillar; To put bottom lead sleeve valve as bell, be positioned at put plumbous chute inner bottom part wear ring on, and correspondingly with wear ring to seal.
CN201520961089.8U 2015-11-28 2015-11-28 Plumbous device is put to anaerobic of metallic lead smelting furnace Withdrawn - After Issue CN205188394U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520961089.8U CN205188394U (en) 2015-11-28 2015-11-28 Plumbous device is put to anaerobic of metallic lead smelting furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520961089.8U CN205188394U (en) 2015-11-28 2015-11-28 Plumbous device is put to anaerobic of metallic lead smelting furnace

Publications (1)

Publication Number Publication Date
CN205188394U true CN205188394U (en) 2016-04-27

Family

ID=55781408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520961089.8U Withdrawn - After Issue CN205188394U (en) 2015-11-28 2015-11-28 Plumbous device is put to anaerobic of metallic lead smelting furnace

Country Status (1)

Country Link
CN (1) CN205188394U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105256149A (en) * 2015-11-28 2016-01-20 江苏新春兴再生资源有限责任公司 Oxygen-free lead discharging device for metal lead smelting furnace
WO2021136182A1 (en) * 2020-01-02 2021-07-08 江苏新春兴再生资源有限责任公司 Automatic oxygen-free lead discharge control device for lead smelting furnace

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105256149A (en) * 2015-11-28 2016-01-20 江苏新春兴再生资源有限责任公司 Oxygen-free lead discharging device for metal lead smelting furnace
CN105256149B (en) * 2015-11-28 2017-03-15 江苏新春兴再生资源有限责任公司 A kind of anaerobic of metal plumbum smelting puts lead device
WO2021136182A1 (en) * 2020-01-02 2021-07-08 江苏新春兴再生资源有限责任公司 Automatic oxygen-free lead discharge control device for lead smelting furnace

Similar Documents

Publication Publication Date Title
CN105256149B (en) A kind of anaerobic of metal plumbum smelting puts lead device
CN205188394U (en) Plumbous device is put to anaerobic of metallic lead smelting furnace
CN201858897U (en) Charge preheating and dust removing device of intermediate-frequency furnace
CN101380675B (en) Ladle nozzle casting conduction plug and use method thereof
CN203960253U (en) Spreader formula line feeding rifle for a kind of steel-making
CN105755211B (en) A kind of RH vacuum slot devices
CN205664662U (en) Copper alloy seals smelting furnace
CN209614226U (en) Floating type iron backpack cover
CN207002823U (en) A kind of anaerobic lead discharging device
CN208505636U (en) A kind of side-blowing bath smelting furnace spy slag sampler
CN201079832Y (en) Molten iron tank car and cover device
CN201296772Y (en) Electrode billet oxidation prevention device
CN204752786U (en) Optimize inner nozzle brick
CN210030764U (en) Flue gas trapping device for swing chute of blast furnace
CN205747991U (en) Holding furnace with oxidation
CN205796902U (en) A kind of copper smelting by pyrometallurgy smoke absorption tower of band water tank cooling
CN201265718Y (en) Aluminum silicate water gap washer
CN206131717U (en) Lead smelting furnace
CN205380262U (en) Ingot mould fills the argon protection casting structure
CN206591158U (en) A kind of anaerobic of metal plumbum smelting puts lead device
CN109579521A (en) A kind of plug-in type metal melting appartus
CN205188403U (en) Magnesium alloy protective gas melting equipment
CN206783740U (en) The telescopic slag device of magnesium metal smelt
CN213570666U (en) Crucible for lead smelting experimental furnace
CN208701170U (en) A kind of movable type ferrotungsten smelting furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20160427

Effective date of abandoning: 20171114