CN205186048U - Pipeline ribbon - Google Patents

Pipeline ribbon Download PDF

Info

Publication number
CN205186048U
CN205186048U CN201521076047.2U CN201521076047U CN205186048U CN 205186048 U CN205186048 U CN 205186048U CN 201521076047 U CN201521076047 U CN 201521076047U CN 205186048 U CN205186048 U CN 205186048U
Authority
CN
China
Prior art keywords
pipeline
tie body
shell fragment
band according
draw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521076047.2U
Other languages
Chinese (zh)
Inventor
孙丰超
张艳楠
孟胥里
李荫荣
汪振兴
王春芝
Original Assignee
Anhui Jianghuai Automobile Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Jianghuai Automobile Group Corp filed Critical Anhui Jianghuai Automobile Group Corp
Priority to CN201521076047.2U priority Critical patent/CN205186048U/en
Application granted granted Critical
Publication of CN205186048U publication Critical patent/CN205186048U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a pipeline fixation technology field discloses a pipeline ribbon, include the ribbon body and be fixed in the joint head of ribbon body one end, be equipped with multiunit parallel arrangement's draw -in groove on the ribbon body along its extending direction, the joint head includes a plurality of installation departments, every all be equipped with in the installation department with the shell fragment of draw -in groove joint, just the ribbon body passes arbitrary adjacent two in proper order all form pipeline locking space behind the installation department. This pipeline ribbon has more firm locking effect to the pipeline to the convenient while is gone on fixedly respectively to many root canals line.

Description

A kind of pipeline band
Technical field
The utility model relates to pipeline technique for fixing field, particularly relates to a kind of pipeline band.
Background technology
Vehicle pipeline, through whole vehicle body, is the key components and parts of car load, and pipeline is fixed and the reliability direct relation that protects the safe and reliable of car load.Pipeline band is the pipeline fixing part of comparatively normal employing at present, conventional pipeline band structure as shown in Figure 1, comprise tie body 1' and clamping joint 2', the card in described clamping joint 2' and the pocket matches clamping on described tie body 1', be locked to pipeline.But this fixed form, under the effect of pipeline gravity, easily occurs the phenomenon that clamping was lost efficacy, make pipeline get loose, fixing reliability is low.In addition, this band structure only can be fixed a pipeline or carry out integral binding type to many pipelines and be fixed, and uses inconvenient for moving towards different pipelines.
Utility model content
The purpose of this utility model is to provide a kind of pipeline band, to improve the reliability be locked to pipeline, and is beneficial to many pipelines and fixes respectively.
To achieve these goals, the utility model provides following technical scheme:
A kind of pipeline band, comprise tie body and the clamping joint being fixed on described tie body one end, described tie body is provided with the many groups of draw-in grooves be arranged in parallel along its bearing of trend, described clamping joint comprises multiple installation portion, be equipped with the shell fragment with described draw-in groove clamping in each described installation portion, and described tie body is successively through all forming pipeline locking space after two described installation portions of arbitrary neighborhood.
Preferably, the direction that the described installation portion of many groups extends along described tie body be arranged in parallel.
Preferably, with the center-point between adjacent two described installation portions for center of symmetry, adjacent two described shell fragments that these two described installation portions are corresponding are centrosymmetric setting.
Preferably, described shell fragment is provided with the right-angled trapezium latch coordinating clamping with draw-in groove, and the oblique waist limit of described right-angled trapezium latch on described installation portion band penetrate end.
Preferably, described shell fragment is also provided with projection in the side of described right-angled trapezium latch, between described projection with described right-angled trapezium latch, forms the supplementary card angle abutted with described tie body.
Preferably, be provided with between the madial wall of described shell fragment and the described installation portion corresponding with it to the top of described shell fragment to the prepsetting gap of downward-extension.
Preferably, relative with face, described draw-in groove place in described tie body side is provided with bellows segment.
Preferably, in the one end away from described clamping, the both sides of described tie body are provided with chamfering section.
Preferably, described pipeline band is the band of PA66 material.
Preferably, described pipeline band is integrated injection mo(u)lding structure.
The beneficial effects of the utility model are:
The pipeline band provided in the utility model, by multiple setting being provided with the installation portion of shell fragment, make tie body between any two installation portions, form pipeline locking space, conveniently with a band, many pipelines are fixed respectively, be convenient to the separation between different pipeline, be beneficial to the trend adapting to pipeline.And tie body is fixed by multiple clip clamping, improve the fastness that band is fixing, effectively prevent pipeline and get loose.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present application or technical scheme of the prior art, being briefly described to the accompanying drawing used required in embodiment below, and will being described in further detail specific embodiment of the utility model by reference to the accompanying drawings, wherein
The structural representation of pipeline band in Fig. 1 prior art;
The deployed condition schematic diagram of the pipeline band that Fig. 2 provides for the utility model embodiment;
The locking state schematic diagram of the pipeline band that Fig. 3 provides for the utility model embodiment;
Fig. 4 is the cross sectional drawing of clamping joint in the utility model embodiment;
Fig. 5 is pipeline band using state schematic diagram in the utility model embodiment;
Fig. 6 is the cutaway view of the main apparent direction of Fig. 5.
Label declaration wherein in above-mentioned accompanying drawing is as follows:
1'-tie body, 2'-clamping joint;
1-tie body, 2-clamping joint, 3-pipeline locking space;
11-draw-in groove, 12-bellows segment, 13-chamfering section; 21-installation portion, 22-shell fragment, 23-prepsetting gap;
221-right-angled trapezium latch, 222-is protruding;
A-first pipeline, B-second pipeline.
Detailed description of the invention
In order to make those skilled in the art understand the technical solution of the utility model better, do to introduce in detail further to this programme below in conjunction with specific embodiment.
With reference to figure 2 ~ 4, the pipeline band that the utility model embodiment provides, comprise tie body 1 and the clamping joint 2 being fixed on described tie body 1 one end, described tie body 1 is provided with the many groups of draw-in grooves be arranged in parallel 11 along its bearing of trend, wherein, described clamping joint 2 comprises multiple installation portion 21, is equipped with the shell fragment 22 with the clamping of described draw-in groove 11 in each described installation portion 21, and described tie body 1 is successively through all forming pipeline locking space 3 after two described installation portions 21 of arbitrary neighborhood.This pipeline band is locked by multiple interface arrangment, improves the fixing fixing of pipeline.Further, a band can form multiple pipeline locking space 3, is conveniently fixed respectively many pipelines simultaneously, improves the comformability of the wire harness to difference trend.
In the utility model embodiment specific implementation process, arbitrarily angledly can connect between adjacent described installation portion 21, fix to facilitate the pipeline of different trend.In the present embodiment, in order to ensure that structure is simple, easy to process, and the fixing rear band uniform force of pipeline, many groups of described installation portions 21 preferably be arranged in parallel along the direction of described tie body 1 extension, and the described pipeline locking space 3 of formation can in the homonymy of described installation portion 21 or the both sides splitting described installation portion 21.
On the basis of the utility model embodiment technique scheme, adjacent two described shell fragments 22 are centrosymmetric setting, and center of symmetry is the center-point between two described installation portions 21 that shell fragment 22 described with two is corresponding.Such setting, the adjacent described pipeline locking space 3 that described pipeline band is formed is placed in the both sides of described installation portion 22, is in position one on the other, and arranges on cornerwise direction.With reference to figure 5 and Fig. 6, after the first pipeline A and the second pipeline B is fixing in adjacent two described pipeline locking spaces 3 respectively, two pipelines produce application force to band respectively, but because adjacent two described pipeline locking spaces 3 are in above-mentioned arrangement, the force direction suffered by described shell fragment 22 be between two described pipeline locking spaces 3 is contrary, be beneficial to application force to reduce even to offset, thus reduce the distortion of shell fragment 22 described herein, reduce the risk that described shell fragment 22 damages.
Further, as shown in Figure 4, described shell fragment 22 is provided with the right-angled trapezium latch 221 coordinating clamping with draw-in groove 11, and the oblique waist limit of described right-angled trapezium latch 221 on described installation portion 21 band penetrate end, setting party's toilet on oblique waist limit is stated tie body 1 and is inserted, and is convenient to described shell fragment 22 and the clamping of described draw-in groove 11.
With reference to figure 6, after the first pipeline A and the second pipeline B is fixing in adjacent two described pipeline locking spaces 3, if the application force of the first pipeline A to the described shell fragment 22 between two pipelines is larger, then described shell fragment 22 has relative to described pipeline body 1 trend moved downward, but be subject to the spacing of waist limit, described right-angled trapezium latch 221 right angle owing to moving downward, resistance is large, not easily relative motion occurs.If the application force of the second pipeline B to the described shell fragment 22 between two pipelines is larger, described shell fragment 22 has the trend of upward movement, described right-angled trapezium latch 221 can along sliding on its oblique waist limit, and after upper cunning with on a draw-in groove 11 engage, but due to the restriction of the first pipeline A, distance sliding on described shell fragment 22 is limited, even can not slide.And being in the described shell fragment 22 of the second pipeline B opposite side, it is subject to the effect of the second pipeline B lower pulling force, spacing equally due to waist limit, described right-angled trapezium latch 221 right angle, and within the scope of the holding capacity of design, it can not be moved.Therefore, the latch of the right-angled trapezium designed in the present embodiment is also beneficial to and improves the fixing fixing of pipeline.
Understandably, described right-angled trapezium latch 221 also can select other shapes such as rectangular teeth, lance tooth.
Further, described shell fragment 22 is also provided with protruding 222 in the side adjacent with described right-angled trapezium latch 221, between described protruding 222 with described latch 221, forms the supplementary card angle abutted with described tie body 1.After described right-angled trapezium latch 221 connects and fixes with described draw-in groove 11, described supplementary card angle abuts with the edge of described tie body 1, plays effect spacing further.
In the utility model embodiment, be provided with between the madial wall of described shell fragment 22 and the described installation portion 21 corresponding with it to the top of described shell fragment 22 to the prepsetting gap 23 of downward-extension.Insert or extract in the process of described installation portion 21 in described tie body 1, due to the existence of described prepsetting gap 23, be beneficial to described shell fragment 22 and deform, make described tie body 1 insert or extract conveniently.Wherein, described protruding 222, in described tie body 1 withdrawal process, also play the effect conveniently pulling described shell fragment 22.
With reference to figure 3, side relative with described draw-in groove 11 in described tie body 1 is provided with bellows segment 12, to increase the friction force between described tie body 1 and described installation portion 21, fixedly plays effect fastening further to pipeline.
In addition, in the one end away from described clamping joint 2, the both sides of described tie body 1 are provided with chamfering section 13, facilitate described tie body 1 to insert in described clamping joint 2, and described chamfering section 13 is general from termination.
Described pipeline band in the utility model embodiment is preferably the band of PA66 material, and preferred integrated injection molding, easy to process, intensity is reliable.
Structure of the present utility model, feature and action effect is described in detail above according to the embodiment shown in diagram; the foregoing is only preferred embodiment of the present utility model; but the utility model does not limit practical range with shown in drawing; every change done according to conception of the present utility model; or be revised as the Equivalent embodiments of equivalent variations; do not exceed yet specification sheets with diagram contain spiritual time, all should at protection domain of the present utility model.

Claims (10)

1. a pipeline band, comprise tie body (1) and be fixed on the clamping joint (2) of described tie body (1) one end, described tie body (1) is provided with the many groups of draw-in grooves be arranged in parallel (11) along its bearing of trend, it is characterized in that, described clamping joint (2) comprises multiple installation portion (21), the shell fragment (22) with described draw-in groove (11) clamping is equipped with in each described installation portion (21), and described tie body (1) all forms pipeline locking space (3) through after two described installation portions (21) of arbitrary neighborhood successively.
2. pipeline band according to claim 1, is characterized in that, the direction that the described installation portion of many groups (21) extend along described tie body (1) be arranged in parallel.
3. pipeline band according to claim 2, it is characterized in that, with the center-point between adjacent two described installation portions (21) for center of symmetry, adjacent two described shell fragments (22) corresponding to these two described installation portions (21) are centrosymmetric setting.
4. pipeline band according to claim 3, it is characterized in that, described shell fragment (22) is provided with the right-angled trapezium latch (221) coordinating clamping with draw-in groove (11), and the oblique waist limit of described right-angled trapezium latch (221) penetrates end near the upper band of described installation portion (21).
5. pipeline band according to claim 4, it is characterized in that, described shell fragment (22) is also provided with projection (222) in the side of described right-angled trapezium latch (221), between described projection (222) with described right-angled trapezium latch (221), forms the supplementary card angle abutted with described tie body (1).
6. pipeline band according to claim 5, it is characterized in that, be provided with between the madial wall of described shell fragment (22) and the described installation portion (21) corresponding with it to the top of described shell fragment (22) to the prepsetting gap (23) of downward-extension.
7. pipeline band according to claim 1, is characterized in that, the upper side relative with described draw-in groove (11) face, place of described tie body (1) is provided with bellows segment (12).
8. pipeline band according to claim 1, is characterized in that, in the one end away from described clamping joint (2), the both sides of described tie body (1) are provided with chamfering section (13).
9. pipeline band according to claim 1, is characterized in that, it is the band of PA66 material.
10. pipeline band according to claim 9, is characterized in that, it is integrated injection mo(u)lding structure.
CN201521076047.2U 2015-12-17 2015-12-17 Pipeline ribbon Expired - Fee Related CN205186048U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521076047.2U CN205186048U (en) 2015-12-17 2015-12-17 Pipeline ribbon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521076047.2U CN205186048U (en) 2015-12-17 2015-12-17 Pipeline ribbon

Publications (1)

Publication Number Publication Date
CN205186048U true CN205186048U (en) 2016-04-27

Family

ID=55779071

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521076047.2U Expired - Fee Related CN205186048U (en) 2015-12-17 2015-12-17 Pipeline ribbon

Country Status (1)

Country Link
CN (1) CN205186048U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107804249A (en) * 2017-10-31 2018-03-16 安徽江淮汽车集团股份有限公司 A kind of wire harness pipe fixing device
CN109301779A (en) * 2018-12-03 2019-02-01 安徽江淮汽车集团股份有限公司 A kind of ABS harness pipe clamp
WO2023130256A1 (en) * 2022-01-05 2023-07-13 宁德时代新能源科技股份有限公司 Flexible tie, electrical connection structure, and battery

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107804249A (en) * 2017-10-31 2018-03-16 安徽江淮汽车集团股份有限公司 A kind of wire harness pipe fixing device
CN109301779A (en) * 2018-12-03 2019-02-01 安徽江淮汽车集团股份有限公司 A kind of ABS harness pipe clamp
CN109301779B (en) * 2018-12-03 2019-11-05 安徽江淮汽车集团股份有限公司 A kind of ABS harness pipe clamp
WO2023130256A1 (en) * 2022-01-05 2023-07-13 宁德时代新能源科技股份有限公司 Flexible tie, electrical connection structure, and battery

Similar Documents

Publication Publication Date Title
CN205186048U (en) Pipeline ribbon
JP6096322B2 (en) Clip for clamping panel to support and resulting assembly
CN105539315A (en) Pipeline fixing ribbon
HK1154925A1 (en) Device for attaching two add-on parts to a carrier part
GB2469886B (en) Wire etc, connectors
CN101268298A (en) Device for retaining at least one elongate article
CN202189960U (en) Socket capable of preventing plugs from loosening
CN105370995B (en) A kind of pipeline mount cable-tie assembly
US20110302746A1 (en) Binding device
WO2009014794A3 (en) Funnel system and method
CN202818549U (en) Head band and earphone allowing rapid assembling of cushion
WO2011063789A3 (en) Guide device having a combined decelerating and accelerating device
CN205226641U (en) Ribbon is fixed to pipeline
CN104427814A (en) Wire arranging device and electronic device provided with same
CN204025916U (en) Pipeline housing clip, pipeline fixing device and vehicle
CN202673899U (en) Vehicle cresting strip buckle and vehicle
TW200743427A (en) Fastening assembly for DIMM riser card
CN107369507A (en) A kind of band resistance device being easily installed
CN204015440U (en) A kind of key case
CN213621304U (en) Bolt ribbon
CN205489388U (en) Wedge -shaped strain wire clamp
CN204178269U (en) The heat radiation bluff piece structure of memory modules
CN205693303U (en) A kind of rotary type conductor spacer
CN203189447U (en) Plug-in type furniture connection buckle
KR200422974Y1 (en) Fixing clip

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 230601 Anhui Province, Hefei City Industrial Park, the Peach Blossom Road No. 669

Patentee after: Anhui Jianghuai Automobile Group Limited by Share Ltd

Address before: 230601 Anhui Province, Hefei City Industrial Park, the Peach Blossom Road No. 669

Patentee before: Anhui Jianghuai Automotive Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160427

Termination date: 20191217