CN205171756U - Quickly installed curtain wall for building - Google Patents

Quickly installed curtain wall for building Download PDF

Info

Publication number
CN205171756U
CN205171756U CN201420836212.9U CN201420836212U CN205171756U CN 205171756 U CN205171756 U CN 205171756U CN 201420836212 U CN201420836212 U CN 201420836212U CN 205171756 U CN205171756 U CN 205171756U
Authority
CN
China
Prior art keywords
bolt
curtain wall
keel
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420836212.9U
Other languages
Chinese (zh)
Inventor
罗旭兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DAOERSI BUILDING MATERIALS TECHNOLOGY (SUZHOU) Co Ltd
Original Assignee
DAOERSI BUILDING MATERIALS TECHNOLOGY (SUZHOU) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DAOERSI BUILDING MATERIALS TECHNOLOGY (SUZHOU) Co Ltd filed Critical DAOERSI BUILDING MATERIALS TECHNOLOGY (SUZHOU) Co Ltd
Priority to CN201420836212.9U priority Critical patent/CN205171756U/en
Application granted granted Critical
Publication of CN205171756U publication Critical patent/CN205171756U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a quickly installed curtain wall for building, including fossil fragments, a side -mounting curtain of fossil fragments, the curtain is improved level and is offered the fixed orifices, installation fixed loop in the fixed orifices, the fixed loop lies in one side that the fixed orifices is close to fossil fragments, construction bolt in the fixed loop, the head of bolt is regular hexagon, the lead screw middle part and the fixed loop cooperation of bolt, the screw is offered to one side of fossil fragments, mounting nut on the fossil fragments. The utility model provides a need not to use instrument such as spanner just can carry out the quickly installed curtain wall for building that installs to the building curtain.

Description

A kind of Fast Installation building curtain wall
Technical field
The utility model relates to a kind of curtain wall, more precisely a kind of Fast Installation building curtain wall.
Background technology
Curtain wall, is commonly called as " curtain wall ": the exterior wall enclosure being building, and not load-bearing, hangs up as curtain, therefore is also called " curtain wall ", is the modern large-scale Light Wall with decorative effect commonly used with highrise building.Be made up of panel and support system, opposing body structure can have certain displacement ability or self have certain deformability, do not bear building external envelope structure or the decorative structure of agent structure effect used.Existing building curtain wall needs to use the instruments such as spanner keel and building curtain wall to be fixed when mounted, and this installation process is very loaded down with trivial details, greatly reduces the installation rate of building curtain wall.
Utility model content
The purpose of this utility model is to provide a kind of Fast Installation building curtain wall, can solve the above problems.
The utility model for achieving the above object, is achieved through the following technical solutions:
A kind of Fast Installation building curtain wall, comprise keel, curtain wall is installed in the side of keel, on curtain wall, level offers fixing hole, in fixing hole, retainer ring is installed, retainer ring is positioned at the side of fixing hole near keel, erection bolt in retainer ring, the head of bolt is regular hexagon, coordinate with retainer ring in the middle part of the screw mandrel of bolt, screw is offered in the side of keel, mounting nuts on keel, nut is positioned at the side of screw, nut and screw coordinate with the screw mandrel end of bolt respectively, pressing plate installed by bolt, through hole is offered at the middle part of pressing plate, through hole coordinates with the screw mandrel of bolt, pressing plate is between retainer ring and the head of bolt, fixed block installed by bolt, holddown groove is offered in the side of fixed block, the cross section of holddown groove is regular hexagon, the head fits of holddown groove and bolt, the side mounting knob of fixed block.
In order to realize the purpose of this utility model further, can also by the following technical solutions: the several stiffener of parallel installation on described keel.The side of described curtain wall arranges overcoat.
The utility model has the advantage of: the utility model provides a kind of Fast Installation building curtain wall without the need to using the instruments such as spanner just can install building curtain wall.Bolt of the present utility model is provided with fixed block, fixed block is by the head fits of holddown groove and bolt, the cross section of holddown groove is that the head of regular hexagon and bolt is fitted, when rotating fixed block, bolt can be followed fixed block and be rotated, and fixed block is provided with handle, when building curtain wall installation personnel is installed building curtain wall, only need swing handle just can realize tightening of bolt, thus substantially increase the installation rate of building curtain wall.Fixed block of the present utility model can depart from bolt after bolt installation, avoids fixed block to hinder the use of building curtain wall.Nut of the present utility model can increase the bonding strength of keel and bolt, and avoid when screw damages, keel and curtain wall depart from.Retainer ring of the present utility model can make bolt be positioned at fixing hole inside after installation is complete, avoids bolt to expose and affects the aesthetic property of Fast Installation building curtain wall outside curtain wall.Pressing plate of the present utility model can increase the contact area of bolt and retainer ring, prevents bolt failure retainer ring.The utility model also has advantage compact, cheap for manufacturing cost and easy to use simple for structure.
Accompanying drawing explanation
Accompanying drawing is used to provide further understanding of the present utility model, and forms a part for manual, is used from explanation the utility model, does not form restriction of the present utility model with embodiment one of the present utility model.In the accompanying drawings: Fig. 1 is structural representation of the present utility model.
Mark parts: 1 keel 2 stiffener 3 nut 4 screw 5 retainer ring 6 pressing plate 7 through hole 8 fixed block 9 bolt 10 holddown groove 11 handle 12 overcoat 13 fixing hole 14 curtain wall.
Detailed description of the invention
Below in conjunction with accompanying drawing, preferred embodiment of the present utility model is described, should be appreciated that preferred embodiment described herein is only for instruction and explanation of the utility model, and be not used in restriction the utility model.
A kind of Fast Installation building curtain wall, as shown in Figure 1, comprise keel 1, curtain wall 14 is installed in the side of keel 1, on curtain wall 14, level offers fixing hole 13, in fixing hole 13, retainer ring 5 is installed, retainer ring 5 is positioned at the side of fixing hole 13 near keel 1, erection bolt 9 in retainer ring 5, the head of bolt 9 is regular hexagon, coordinate with retainer ring 5 in the middle part of the screw mandrel of bolt 9, screw 4 is offered in the side of keel 1, mounting nuts 3 on keel 1, nut 3 is positioned at the side of screw 4, nut 3 and screw 4 coordinate with the screw mandrel end of bolt 9 respectively, bolt 9 is installed pressing plate 6, through hole 7 is offered at the middle part of pressing plate 6, through hole 7 coordinates with the screw mandrel of bolt 9, pressing plate 6 is between retainer ring 5 and the head of bolt 9, bolt 9 is installed fixed block 8, holddown groove 10 is offered in the side of fixed block 8, the cross section of holddown groove 10 is regular hexagon, the head fits of holddown groove 10 and bolt 9, the side mounting knob 11 of fixed block 8.The utility model provides a kind of Fast Installation building curtain wall without the need to using the instruments such as spanner just can install building curtain wall.Bolt 9 of the present utility model is provided with fixed block 8, fixed block 8 is by the head fits of holddown groove 10 with bolt 9, the cross section of holddown groove 10 is that the head of regular hexagon and bolt 9 is fitted, when rotating fixed block 8, bolt 9 can be followed fixed block 8 and be rotated, and fixed block 8 is provided with handle 11, when building curtain wall installation personnel is installed building curtain wall, only need swing handle 11 just can realize tightening of bolt 9, thus substantially increase the installation rate of building curtain wall.Fixed block 8 of the present utility model can depart from bolt 9 after bolt 9 installation, avoids fixed block 8 to hinder the use of building curtain wall.Nut 3 of the present utility model can increase keel 1 and the bonding strength of bolt 9, avoids when screw 4 damages, and keel 1 and curtain wall 14 depart from.It is inner that retainer ring 5 of the present utility model can make bolt 9 be positioned at fixing hole 13 after installation is complete, avoids bolt 9 to expose and affect the aesthetic property of Fast Installation building curtain wall outside curtain wall 14.Pressing plate 6 of the present utility model can increase bolt 9 and the contact area of retainer ring 5, prevents bolt 9 from damaging retainer ring 5.
The several stiffener 2 of parallel installation on described keel 1.Stiffener 2 of the present utility model can increase the intensity of keel 1, avoids keel 1 due to stressed excessive and damage.
The side of described curtain wall 14 arranges overcoat 12.Overcoat 12 of the present utility model can prevent curtain wall 14 to be subject to the erosion of rainwater, substantially increases the intensity of curtain wall 14.
Last it is noted that the foregoing is only preferred embodiment of the present utility model, be not limited to the utility model, although be described in detail the utility model with reference to previous embodiment, for a person skilled in the art, it still can be modified to the technical scheme described in foregoing embodiments, or carries out equivalent replacement to wherein portion of techniques feature.All within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (3)

1. a Fast Installation building curtain wall, it is characterized in that: comprise keel (1), curtain wall (14) is installed in the side of keel (1), the upper level of curtain wall (14) offers fixing hole (13), in fixing hole (13), retainer ring (5) is installed, retainer ring (5) is positioned at the side of fixing hole (13) near keel (1), retainer ring (5) interior erection bolt (9), the head of bolt (9) is regular hexagon, coordinate with retainer ring (5) in the middle part of the screw mandrel of bolt (9), screw (4) is offered in the side of keel (1), the upper mounting nuts (3) of keel (1), nut (3) is positioned at the side of screw (4), nut (3) and screw (4) coordinate with the screw mandrel end of bolt (9) respectively, bolt (9) is installed pressing plate (6), through hole (7) is offered at the middle part of pressing plate (6), through hole (7) coordinates with the screw mandrel of bolt (9), pressing plate (6) is positioned between the head of retainer ring (5) and bolt (9), bolt (9) is installed fixed block (8), holddown groove (10) is offered in the side of fixed block (8), the cross section of holddown groove (10) is regular hexagon, the head fits of holddown groove (10) and bolt (9), the side mounting knob (11) of fixed block (8).
2. Fast Installation building curtain wall according to claim 1, is characterized in that: the upper several stiffener of parallel installation (2) of described keel (1).
3. Fast Installation building curtain wall according to claim 1, is characterized in that: the side of described curtain wall (14) arranges overcoat (12).
CN201420836212.9U 2014-12-22 2014-12-22 Quickly installed curtain wall for building Active CN205171756U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420836212.9U CN205171756U (en) 2014-12-22 2014-12-22 Quickly installed curtain wall for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420836212.9U CN205171756U (en) 2014-12-22 2014-12-22 Quickly installed curtain wall for building

Publications (1)

Publication Number Publication Date
CN205171756U true CN205171756U (en) 2016-04-20

Family

ID=55735759

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420836212.9U Active CN205171756U (en) 2014-12-22 2014-12-22 Quickly installed curtain wall for building

Country Status (1)

Country Link
CN (1) CN205171756U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104532992A (en) * 2014-12-22 2015-04-22 道尔斯建材科技(苏州)有限公司 Quickly installed curtain wall for building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104532992A (en) * 2014-12-22 2015-04-22 道尔斯建材科技(苏州)有限公司 Quickly installed curtain wall for building

Similar Documents

Publication Publication Date Title
CN205171756U (en) Quickly installed curtain wall for building
CN204143922U (en) A kind of cable cover(ing)
MX352550B (en) Reinforced hollow for a wind turbine tower.
CN103233535B (en) Mounting fixture for point-supported double-layer glass curtain wall
CN204989580U (en) Optical cable anti -drop fastener
CN204282602U (en) Reinforced curtain wall
CN205046711U (en) Quickly -mounted antirust building curtain wall
CN204187846U (en) The adjustable for height fixed support of a kind of water heater
CN104532992B (en) Quickly installed curtain wall for building
CN203964214U (en) A kind of air conditioner mounting bracket
CN211472999U (en) Cable type glass curtain wall clamp structure form
CN205116423U (en) Safe link device
CN103883103B (en) A kind of wallboard installing structure
CN106207519A (en) A kind of side connects cable mechanism
CN104481067A (en) Quickly-mounted antirust building curtain wall
CN205193353U (en) Endoscope head for engine
CN203856121U (en) Fastening piece for indoor suspended ceiling
CN205063040U (en) Built -in fitting of building gallows
CN204851934U (en) Anticreep screw fastening device
CN204728909U (en) A kind of composite window
CN204167688U (en) A kind of protection overhead guard for power distribution cabinet
CN204590790U (en) A kind of limiting plate of pressure alarm fence
CN203684677U (en) Quickly-disassembled self-sealing crossing bolt
CN207177123U (en) The wall fixed structure of PVC guardrails
CN203654748U (en) Saving type reusable building wall bolt assembly

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: DAOERSI BUILDING MATERIALS TECHNOLOGY (SUZHOU) Co.,Ltd. Person in charge of patents

Document name: payment instructions

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: DAOERSI BUILDING MATERIALS TECHNOLOGY (SUZHOU) Co.,Ltd. Person in charge of patents

Document name: Notice of Termination of Patent Rights