CN205171426U - Central authorities keep apart guardrail - Google Patents

Central authorities keep apart guardrail Download PDF

Info

Publication number
CN205171426U
CN205171426U CN201520942083.6U CN201520942083U CN205171426U CN 205171426 U CN205171426 U CN 205171426U CN 201520942083 U CN201520942083 U CN 201520942083U CN 205171426 U CN205171426 U CN 205171426U
Authority
CN
China
Prior art keywords
column
sheer pole
guardrail
cross tube
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520942083.6U
Other languages
Chinese (zh)
Inventor
何永寿
何奎林
戴志军
张现陶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Albert Ho Sichuan public utilities Co., Ltd.
Original Assignee
Sichuan Hechuangweiye New Building Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Hechuangweiye New Building Material Co Ltd filed Critical Sichuan Hechuangweiye New Building Material Co Ltd
Priority to CN201520942083.6U priority Critical patent/CN205171426U/en
Application granted granted Critical
Publication of CN205171426U publication Critical patent/CN205171426U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a central authorities keep apart guardrail relates to communal facility technical field. The utility model discloses a base, stand and guardrail, the base is the base of compriseing the concrete, the stand interval sets up on the base, the guardrail includes horizontal pole, sheer pole and pole setting, go up the both ends of horizontal pole and fix the upper end at adjacent coexistence post respectively, the lower extreme at adjacent coexistence post is fixed respectively at the both ends of sheer pole, the pole setting sets up between last horizontal pole and sheer pole, pole setting one end is fixed on last horizontal pole, and the other end is fixed on the sheer pole. The utility model discloses simple structure, effectual, the outward appearance of anticollision are exquisite pleasing to the eye.

Description

Central authorities' isolation guardrail
Technical field
The utility model relates to communal facility technical field, more specifically to a kind of guardrail, and especially a kind of central isolation guardrail.
Background technology
In urban road major trunk roads section, pedestrian arbitrarily laterally crosses that street, vehicle are arbitrarily reversed end for end, to use the phenomenons such as object lanes comparatively general, therefore generally in the road road traffic isolation guardrail can be set central median, to prevent crosswalk road, and warn, force subtend motor vehicle to use Correct Lane, such traffic safety, unimpeded, orderly of ensureing, also can play certain protective action simultaneously.
Existing isolation guardrail many employings metal grid rod-type, basis adopts cast iron base, the equal inserted base of column of adjacent separation net, and adopt connector by adjacent cells column secure bond, to resist impact force when wind-force and personnel cross, but, adopt the guardrail of said structure, meet with high wind, personnel cross or vehicle collision time, be easy to topple over, and can evoke chain reaction after toppling over, the guardrail of a row all can be toppled over, do not have due protective action, bring certain trouble to surfaceman yet.
State Intellectual Property Office was on November 11st, 2015, disclosing a publication number is CN204753450U, name is called the utility model patent of " concrete anti-collision guard bar ", this utility model patent comprises: fence post, described fence post is double-decker, and internal layer is iron and steel cylinder, and skin is layer of concrete, described concrete layer encases described iron and steel cylinder, and described fence post is spaced apart and arranged in the middle of highway or both sides; Pedestal, described pedestal is made up of the casting of concrete one, and described pedestal has groove, inserts in described groove bottom described fence post; And guardrail board, described guardrail board is located at described fence post both sides or side, and at least two buffer bar are posted on described guardrail board surface, and described buffer bar is that elastomeric material is made; Wherein, described fence post can reciprocatingly slide back and forth in described groove, is provided with the first snubber, is connected between described guardrail board with described fence post by the second snubber between bottom described groove and described fence post.
For the guardrail of road center isolation in above-mentioned prior art, structure is comparatively complicated, and all inconvenient in installation process, the engineering time is longer.
Utility model content
In order to overcome above-mentioned problems of the prior art and defect, the utility model provides a kind of central isolation guardrail, goal of the invention of the present utility model is intended to solve road center isolation guardrail complex structure in prior art, inconvenience is installed, the problem of later maintenance difficulty, the utility model structure is simple, anti-collision effect good, outward appearance is exquisite attractive in appearance.
In order to solve above-mentioned the deficiencies in the prior art, the utility model is achieved through the following technical solutions:
Central authorities' isolation guardrail, comprise pedestal, column and guardrail, it is characterized in that: the pedestal that described pedestal is made up of concrete, described column is disposed on pedestal; Described guardrail comprises cross tube, sheer pole and vertical rod; The two ends of described cross tube are separately fixed at the upper end of two adjacent upright, the two ends of described sheer pole are separately fixed at the lower end of two adjacent upright, described vertical rod is arranged between cross tube and sheer pole, and described vertical rod one end is fixed on cross tube, and the other end is fixed on sheer pole.
Described cross tube two ends are provided with junction plate, and described junction plate is provided with installing hole, and on described column, the position of corresponding installing hole is provided with the through hole running through column, and one end of described cross tube is fixed on column through installing hole and through hole by screw rod.
Described sheer pole two ends are provided with junction plate, and described junction plate is provided with installing hole, and the position of the corresponding installing hole of described column lower end is provided with the through hole running through column, and one end of described sheer pole is fixed on column lower end by screw rod through installing hole and through hole.
Described vertical rod is arranged between cross tube and sheer pole.
On described pedestal, the position of corresponding column is fixedly installed installing plate, installing plate is provided with the fixing hole for fixedly mounting column.
Column, vertical rod, cross tube, sheer pole all post reflective membrane.
Compared with prior art, the useful technique effect that the utility model brings shows:
The utility model adopts concrete pedestal, add the stability of Guard fence base, column and cross bar are all run through fixing, add the stability of guardrail, and the fixed form that the utility model adopts does not need to weld, easy for installation, transport also more for convenience, save the engineering time, and the utility model structure is simple, outward appearance exquisiteness is attractive in appearance.
Accompanying drawing explanation
Fig. 1 is the utility model overall structure schematic diagram;
Fig. 2 is the structural representation of the utility model junction plate;
Reference numeral: 1, pedestal, 2, column, 3, guardrail, 4, cross tube, 5, sheer pole, 6, vertical rod, 7, junction plate, 8, installing hole, 9, installing plate.
Detailed description of the invention
Embodiment 1
As the utility model one preferred embodiment, with reference to Figure of description 1, present embodiment discloses:
Central authorities' isolation guardrail, comprise pedestal 1, column 2 and guardrail 3, the pedestal 1 that described pedestal 1 is made up of concrete, described column 2 is disposed on pedestal 1; Described guardrail 3 comprises cross tube 4, sheer pole 5 and vertical rod 6; The two ends of described cross tube 4 are separately fixed at the upper end of two adjacent upright 2, the two ends of described sheer pole 5 are separately fixed at the lower end of two adjacent upright 2, described vertical rod 6 is arranged between cross tube 4 and sheer pole 5, and described vertical rod 6 one end is fixed on cross tube 4, and the other end is fixed on sheer pole 5.
Embodiment 2
As the another preferred embodiment of the utility model, with reference to Figure of description 1 and 2, present embodiment discloses:
Central authorities' isolation guardrail, comprise pedestal 1, column 2 and guardrail 3, the pedestal 1 that described pedestal 1 is made up of concrete, described column 2 is disposed on pedestal 1; Described guardrail 3 comprises cross tube 4, sheer pole 5 and vertical rod 6; The two ends of described cross tube 4 are separately fixed at the upper end of two adjacent upright 2, the two ends of described sheer pole 5 are separately fixed at the lower end of two adjacent upright 2, described vertical rod 6 is arranged between cross tube 4 and sheer pole 5, and described vertical rod 6 one end is fixed on cross tube 4, and the other end is fixed on sheer pole 5; Described cross tube 4 two ends are provided with junction plate 7, described junction plate 7 is provided with installing hole 8, on described column 2, the position of corresponding installing hole 8 is provided with the through hole running through column 2, and one end of described cross tube 4 is fixed on column 2 through installing hole 8 and through hole by screw rod.
Embodiment 3
As the another preferred embodiment of the utility model, with reference to Figure of description 1 and 2, present embodiment discloses:
In the present embodiment, described cross tube 4 two ends are provided with junction plate 7, described junction plate 7 is provided with installing hole 8, and on described column 2, the position of corresponding installing hole 8 is provided with the through hole running through column 2, and one end of described cross tube 4 is fixed on column 2 by screw rod through installing hole 8 and through hole; Described sheer pole 5 two ends are provided with junction plate 7, described junction plate 7 is provided with installing hole 8, the position of the corresponding installing hole 8 in described column 2 lower end is provided with the through hole running through column 2, and one end of described sheer pole 5 is fixed on column 2 lower end by screw rod through installing hole 8 and through hole; Described vertical rod 6 is arranged between cross tube 4 and sheer pole 5.
Embodiment 4
As the another preferred embodiment of the utility model, with reference to Figure of description 1 and 2, present embodiment discloses:
In the present embodiment, central isolation guardrail, comprises pedestal 1, column 2 and guardrail 3, the pedestal 1 that described pedestal 1 is made up of concrete, and described column 2 is disposed on pedestal 1; Described guardrail 3 comprises cross tube 4, sheer pole 5 and vertical rod 6; The two ends of described cross tube 4 are separately fixed at the upper end of two adjacent upright 2, the two ends of described sheer pole 5 are separately fixed at the lower end of two adjacent upright 2, described vertical rod 6 is arranged between cross tube 4 and sheer pole 5, and described vertical rod 6 one end is fixed on cross tube 4, and the other end is fixed on sheer pole 5; Described cross tube 4 two ends are provided with junction plate 7, described junction plate 7 is provided with installing hole 8, on described column 2, the position of corresponding installing hole 8 is provided with the through hole running through column 2, and one end of described cross tube 4 is fixed on column 2 by screw rod through installing hole 8 and through hole; Described sheer pole 5 two ends are provided with junction plate 7, described junction plate 7 is provided with installing hole 8, the position of the corresponding installing hole 8 in described column 2 lower end is provided with the through hole running through column 2, and one end of described sheer pole 5 is fixed on column 2 lower end by screw rod through installing hole 8 and through hole; Described vertical rod 6 is arranged between cross tube 4 and sheer pole 5; On described pedestal 1, the position of corresponding column 2 is fixedly installed installing plate 9, installing plate 9 is provided with the fixing hole for fixedly mounting column 2; Column, vertical rod, cross tube, sheer pole all post reflective membrane.
Above-described embodiment is the utility model preferably embodiment; but embodiment of the present utility model is not restricted to the described embodiments; change, the modification done under other any does not deviate from Spirit Essence of the present utility model and principle, substitute, combine, simplify; all should be the substitute mode of equivalence, be included within protection domain of the present utility model.

Claims (6)

1. central isolation guardrail, comprises pedestal (1), column (2) and guardrail (3), it is characterized in that: the pedestal (1) that described pedestal (1) is made up of concrete, and described column (2) is disposed on pedestal (1); Described guardrail (3) comprises cross tube (4), sheer pole (5) and vertical rod (6); The two ends of described cross tube (4) are separately fixed at the upper end of two adjacent upright (2), the two ends of described sheer pole (5) are separately fixed at the lower end of two adjacent upright (2), described vertical rod (6) is arranged between cross tube (4) and sheer pole (5), described vertical rod (6) one end is fixed on cross tube (4), and the other end is fixed on sheer pole (5).
2. central isolation guardrail as claimed in claim 1, it is characterized in that: described cross tube (4) two ends are provided with junction plate (7), described junction plate (7) is provided with installing hole (8), the position of the upper corresponding installing hole (8) of described column (2) is provided with the through hole running through column (2), and one end of described cross tube (4) is fixed on column (2) through installing hole (8) and through hole by screw rod.
3. central isolation guardrail as claimed in claim 1 or 2, it is characterized in that: described sheer pole (5) two ends are provided with junction plate (7), described junction plate (7) is provided with installing hole (8), the position of the corresponding installing hole (8) in described column (2) lower end is provided with the through hole running through column (2), and one end of described sheer pole (5) is fixed on column (2) lower end by screw rod through installing hole (8) and through hole.
4. central isolation guardrail as claimed in claim 1 or 2, is characterized in that: described vertical rod (6) is arranged between cross tube (4) and sheer pole (5).
5. central isolation guardrail as claimed in claim 1, is characterized in that: the position of the upper corresponding column (2) of described pedestal (1) is fixedly installed installing plate (9), installing plate (9) is provided with the fixing hole for fixedly mounting column (2).
6. central isolation guardrail as claimed in claim 1 or 2, is characterized in that: column (2), vertical rod (6), cross tube (4) and sheer pole (5) all post reflective membrane.
CN201520942083.6U 2015-11-24 2015-11-24 Central authorities keep apart guardrail Expired - Fee Related CN205171426U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520942083.6U CN205171426U (en) 2015-11-24 2015-11-24 Central authorities keep apart guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520942083.6U CN205171426U (en) 2015-11-24 2015-11-24 Central authorities keep apart guardrail

Publications (1)

Publication Number Publication Date
CN205171426U true CN205171426U (en) 2016-04-20

Family

ID=55735433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520942083.6U Expired - Fee Related CN205171426U (en) 2015-11-24 2015-11-24 Central authorities keep apart guardrail

Country Status (1)

Country Link
CN (1) CN205171426U (en)

Similar Documents

Publication Publication Date Title
CN103726460B (en) Automatic separation type isolation guardrail in middle of road
CN202148503U (en) Saddle type combined guardrail structure
CN201581365U (en) Flower rack type detachable highway guardrail
CN205223919U (en) Road guardrail
CN205711868U (en) A kind of urban road environmental-protection hurdle
CN205171426U (en) Central authorities keep apart guardrail
CN206957356U (en) A kind of practical municipal guardrail net device
CN205276172U (en) Isolation barrier
CN109113000A (en) A kind of concrete protection column
CN109112996A (en) A kind of concrete guardian column
CN205804142U (en) A kind of steelframe overpass
CN103741590B (en) Bridge protection system
CN209227356U (en) A kind of piping lane foundation pit employment row suspension bridge
CN208441018U (en) A kind of municipal administration guardrail easy for installation
CN204212086U (en) A kind of highway safety guardrail
CN203700938U (en) Bridge protection system
CN204163016U (en) A kind of road traffic separation guardrail
CN209025015U (en) A kind of median of ecological, environmental protective
CN201649003U (en) Active powder concrete column and steel pipe combination rail structure
CN202543786U (en) Conveniently-mounted bridge-type lane
CN204125873U (en) A kind of glass fiber reinforced plastic highroad isolation guardrail
CN220246760U (en) Intelligent traffic safety barrier
CN202500085U (en) Noctilucent anti-collision bridge guardrail
CN211547518U (en) Hidden flexible traffic isolation guardrail for road
CN217378708U (en) Multipurpose municipal administration guardrail device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 636600 Industrial Zone, Bazhong Economic Development Zone, Sichuan, Xingwen

Patentee after: Albert Ho Sichuan public utilities Co., Ltd.

Address before: 636024 Industrial Zone, Bazhong Economic Development Zone, Sichuan, Xingwen

Patentee before: SICHUAN HECHUANGWEIYE NEW BUILDING MATERIAL CO., LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160420

Termination date: 20171124