CN205164479U - Secondary desulfurization dust pelletizing system of boiler - Google Patents

Secondary desulfurization dust pelletizing system of boiler Download PDF

Info

Publication number
CN205164479U
CN205164479U CN201520918159.1U CN201520918159U CN205164479U CN 205164479 U CN205164479 U CN 205164479U CN 201520918159 U CN201520918159 U CN 201520918159U CN 205164479 U CN205164479 U CN 205164479U
Authority
CN
China
Prior art keywords
water tank
dust
deduster
proof water
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520918159.1U
Other languages
Chinese (zh)
Inventor
赵引康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Golden Shield Garden Shanxi Building Materials Co Ltd
Original Assignee
Golden Shield Garden Shanxi Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Golden Shield Garden Shanxi Building Materials Co Ltd filed Critical Golden Shield Garden Shanxi Building Materials Co Ltd
Priority to CN201520918159.1U priority Critical patent/CN205164479U/en
Application granted granted Critical
Publication of CN205164479U publication Critical patent/CN205164479U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Separation Of Particles Using Liquids (AREA)

Abstract

The utility model discloses secondary desulfurization dust pelletizing system of boiler belongs to industrial production environmental protection equipment technical field, the technical problem that will solve provides a secondary desulfurization dust pelletizing system of boiler, reinforcing environmental protection effect, simple structure, low in cost, the technical scheme who adopts is: the entry of dust remover passes through pipeline intercommunication production line exhaust system, the desulfurization water tank is installed to one side of dust remover, the intussuseption of desulfurization water tank is filled with to the gaseous desulfurated buck that adds in the dust remover, install draught fan and dust removal water tank on the upper end export pipeline of dust remover, the draught fan is installed between dust remover and dust removal water tank, the dust removal water tank flows the board including sealed box with keeping off, crisscross a plurality of fenders stream board that sets up about the seal box is internal, and interior notes of the water tank that removes dust has with the buck, the top one end of sealed box is equipped with the air -supply line and the other end is equipped with out the tuber pipe, the air -supply line is connected with the draught fan, air -out pipeline and chimney intercommunication, the utility model is suitable for an in all industrial production's the dust pelletizing system, promote industry environmental protection quality.

Description

The secondary desulfuration dust pelletizing system of boiler
Technical field
The secondary desulfuration dust pelletizing system of the utility model boiler, belongs to industrial production technical field of environment protection equipment.
Background technology
Along with the raising of industrial production efficiency, industrial pollution becomes increasing, especially pollution speed very surprising that produce of dust, and this must be equipped with deduster equipment and carry out desulfurization and dedusting to discharge gas.At present, industrial production line uses deduster and blower fan cooperation to carry out dedusting usually, and desulfurized effect is not good, and dust removing effects is also not ideal enough.
Utility model content
The utility model overcomes the deficiency that prior art exists, and technical problem to be solved is to provide a kind of secondary desulfuration dust pelletizing system of boiler, strengthens environment protecting, and structure is simple, cheap.
In order to solve the problems of the technologies described above, the technical scheme that the utility model adopts is: the secondary desulfuration dust pelletizing system of boiler, comprise deduster, desulfurization water tank, air-introduced machine and dust-proof water tank, the entrance of deduster is by pipeline communication production line gas extraction system, the upper end outlet pipeline of deduster is provided with air-introduced machine, the side of deduster is provided with desulfurization water tank, in the promising deduster of the interior filling of desulfurization water tank, gas sweetening adds buck, the upper end outlet pipeline of deduster is also provided with dust-proof water tank, and described air-introduced machine is arranged between deduster and dust-proof water tank;
Described dust-proof water tank comprises seal case and flow-stopping plate, be crisscross arranged in seal case multiple flow-stopping plate up and down, and be marked with in dust-proof water tank and add buck, the top, one end of seal case is provided with blast pipe and its other end top is provided with discharge pipe, described blast pipe is connected with air-introduced machine, and described wind pipe is communicated with chimney.
Described blast pipe lower end extends to adding under buck liquid level in dust-proof water tank.
Described dust-proof water tank side is provided with clearing and retrieving groove, and described clearing and retrieving trench bottom is communicated with completely with bottom dust-proof water tank, and the height of clearing and retrieving groove is lower than adding buck liquid level in dust-proof water tank.
The beneficial effect that the utility model is compared with the existing technology had is: after traditional cleaner, add a dust-proof water tank, enter in dust-proof water tank through the industrial gasses of one-time dedusting and carry out secondary desulfuration dedusting, environmental protection more, and structure is simple, with low cost; The flow-stopping plate be crisscross arranged up and down in dust-proof water tank can extend industrial gasses adding the operating path in buck, strengthens the effect of equipment desulfurization and dedusting; Arrange outside dust-proof water tank one with its bottom full communicating clearing and retrieving groove, the flyash be retained in water enters clearing and retrieving groove from bottom under gas shock effect, be convenient to reclaim cleaning flyash, and interpolation or replacing add buck also by the operation of clearing and retrieving groove, easy to use.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in further detail.
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the perspective view that in the utility model, dust-proof water tank and clearing and retrieving slot fit are installed.
Fig. 3 is the internal structure schematic diagram of dust-proof water tank in the utility model.
In figure: 1 is deduster, 2 is desulfurization water tank, and 3 is air-introduced machine, and 4 is dust-proof water tank, and 5 is seal case, and 6 is flow-stopping plate, and 7 is blast pipe, and 8 is discharge pipe, and 9 is clearing and retrieving groove.
Detailed description of the invention
As Figure 1-3, the secondary desulfuration dust pelletizing system of the utility model boiler, comprise deduster 1, desulfurization water tank 2, air-introduced machine 3 and dust-proof water tank 4, the entrance of deduster 1 is by pipeline communication production line gas extraction system, the upper end outlet pipeline of deduster 1 is provided with air-introduced machine 3, the side of deduster 1 is provided with desulfurization water tank 2, in the promising deduster 1 of the interior filling of desulfurization water tank 2, gas sweetening adds buck, the upper end outlet pipeline of deduster 1 is also provided with dust-proof water tank 4, and described air-introduced machine 3 is arranged between deduster 1 and dust-proof water tank 4;
Described dust-proof water tank 4 comprises seal case 5 and flow-stopping plate 6, be crisscross arranged in seal case 5 multiple flow-stopping plate 6 up and down, and be marked with in dust-proof water tank 4 and add buck, the top, one end of seal case 5 is provided with blast pipe 7 and its other end top is provided with discharge pipe 8, described blast pipe 7 is connected with air-introduced machine 3, and described wind pipe 8 is communicated with chimney.
Described blast pipe 7 lower end extends to adding under buck liquid level in dust-proof water tank 4.
Described dust-proof water tank side is provided with clearing and retrieving groove 9, is communicated with completely bottom described clearing and retrieving groove 9 with bottom dust-proof water tank 4, and the height of clearing and retrieving groove 9 is lower than adding buck liquid level in dust-proof water tank 4.
The course of work:
The industrial gasses that boiler produces are extracted by air-introduced machine 3 and make it flow through deduster 1, and carry out the process of first step desulfurization and dedusting by the cooperation of deduster 1 and desulfurization water tank 2, air-introduced machine 3 continues extracting gases again and is introduced into and adds under buck liquid level in dust-proof water tank 4, gas high speed circulation in dust-proof water tank 4 is also constantly changed course by flow-stopping plate 6, with add buck and carry out growing distance and contact, add buck the flyash in gas to be stayed in water, reach good desulfurization and dedusting treatment effect; Air-flow is advanced and the flyash of bottom precipitation can be dispelled the clearing and retrieving groove 9 making it enter bottom connection in water, and through after a period of time, workman's flyash that can pick up in clearing and retrieving groove 9 carries out drying recycling.

Claims (3)

1. the secondary desulfuration dust pelletizing system of boiler, comprise deduster (1), desulfurization water tank (2), air-introduced machine (3) and dust-proof water tank (4), the entrance of deduster (1) is by pipeline communication production line gas extraction system, the upper end outlet pipeline of deduster (1) is provided with air-introduced machine (3), it is characterized in that: the side of deduster (1) is provided with desulfurization water tank (2), that fills promising deduster (1) interior gas sweetening in desulfurization water tank (2) adds buck, the upper end outlet pipeline of deduster (1) is also provided with dust-proof water tank (4), described air-introduced machine (3) is arranged between deduster (1) and dust-proof water tank (4),
Described dust-proof water tank (4) comprises seal case (5) and flow-stopping plate (6), be crisscross arranged in seal case (5) multiple flow-stopping plate (6) up and down, and be marked with in dust-proof water tank (4) and add buck, the top, one end of seal case (5) is provided with blast pipe (7) and its other end top is provided with discharge pipe (8), described blast pipe (7) is connected with air-introduced machine (3), and described wind pipe (8) is communicated with chimney.
2. the secondary desulfuration dust pelletizing system of boiler according to claim 1, is characterized in that: described blast pipe (7) lower end extends to adding under buck liquid level in dust-proof water tank (4).
3. the secondary desulfuration dust pelletizing system of boiler according to claim 1 and 2, it is characterized in that: described dust-proof water tank side is provided with clearing and retrieving groove (9), described clearing and retrieving groove (9) bottom is communicated with completely with bottom dust-proof water tank (4), and the height of clearing and retrieving groove (9) is lower than adding buck liquid level in dust-proof water tank (4).
CN201520918159.1U 2015-11-18 2015-11-18 Secondary desulfurization dust pelletizing system of boiler Active CN205164479U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520918159.1U CN205164479U (en) 2015-11-18 2015-11-18 Secondary desulfurization dust pelletizing system of boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520918159.1U CN205164479U (en) 2015-11-18 2015-11-18 Secondary desulfurization dust pelletizing system of boiler

Publications (1)

Publication Number Publication Date
CN205164479U true CN205164479U (en) 2016-04-20

Family

ID=55728518

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520918159.1U Active CN205164479U (en) 2015-11-18 2015-11-18 Secondary desulfurization dust pelletizing system of boiler

Country Status (1)

Country Link
CN (1) CN205164479U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106731338A (en) * 2016-12-31 2017-05-31 德清华梦木制品有限公司 A kind of purifier for the treatment of coating equipment dust flue gas

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106731338A (en) * 2016-12-31 2017-05-31 德清华梦木制品有限公司 A kind of purifier for the treatment of coating equipment dust flue gas

Similar Documents

Publication Publication Date Title
CN105087946B (en) Method for recycling arsenic from copper smelting smoke dust
CN204637929U (en) A kind of compound lector desulphurization plant
CN205164479U (en) Secondary desulfurization dust pelletizing system of boiler
CN203668309U (en) Device for recycling water vapor of coke quenching tower subjected to wet coke quenching and removing dust
CN203494397U (en) Spray water bath dust removal desulfurization tower
CN202538566U (en) Dust and sulfur removing device for tail gas
CN202376875U (en) Coal-fired flue gas foam dust collection device
CN205517040U (en) Boiler desulfurization dust collector
CN205225320U (en) Explosion -proof updraft ventilator is used in pit in colliery
CN204952542U (en) Novel frit stove flue gas dust removal device
CN203525486U (en) Wet type dust collector
CN207031344U (en) Tamping coke oven coal-charging dust arrester
CN202516441U (en) Novel environment-friendly boiler dust collector for removing dust
CN206570029U (en) A kind of hydrogen gas recovering device in industrial waste gas
CN202860961U (en) Non-pressure type dust collecting device
CN201055749Y (en) Water immersion type flue gas dust wiper
CN204051320U (en) A kind of desulfurating dust-removing equipment
CN204973544U (en) Multistage desulfurizing tower of exhaust fume gas
CN204051424U (en) Control the sulfur dioxide of waste incineration generation and the system of hydrogen chloride
CN205235717U (en) Air drying equipment
CN205235718U (en) Gaseous water trap
CN103980918A (en) High-efficiency environment-friendly coke oven dust-removal smoke guiding equipment
CN206434987U (en) Binary channel boiler flue gas dust remover
CN218221819U (en) High-efficient desulfurization system of boiler flue gas
CN205392106U (en) Industrial flue gas dust removal system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 044205 Ronghe chemical industry park, Wanrong County, Yuncheng City, Shanxi Province

Patentee after: Shanxi jinwankang New Material Co., Ltd

Address before: 044205, Shanxi province Yuncheng County, Wanrong Province Rong town chemical industry park

Patentee before: SHANXI JINDUN YUAN BUILDING MATERIALS Co.,Ltd.

CP03 Change of name, title or address