CN205155350U CN201520977894.XU CN201520977894U CN205155350U CN 205155350 U CN205155350 U CN 205155350U CN 201520977894 U CN201520977894 U CN 201520977894U CN 205155350 U CN205155350 U CN 205155350U
Authority
CN
China
Prior art keywords
support
stull
pipeline
support tube
sleeve pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520977894.XU
Other languages
Chinese (zh)
Inventor
刘荣宽
刘洪丹
蔡峰
郑培龙
肖德顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China International Marine Containers Group Co Ltd
Haiyang CIMC Raffles Offshore Co Ltd
Original Assignee
China International Marine Containers Group Co Ltd
Haiyang CIMC Raffles Offshore Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China International Marine Containers Group Co Ltd, Haiyang CIMC Raffles Offshore Co Ltd filed Critical China International Marine Containers Group Co Ltd
Priority to CN201520977894.XU priority Critical patent/CN205155350U/en
Application granted granted Critical
Publication of CN205155350U publication Critical patent/CN205155350U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model provides a pipeline supports frock that support with location is provided for the piping erection on the ocean engineering equipment, include: the stull that two parallel arrangement's stay tube and both ends are connected with two spinal branch stay tubes respectively, the one end of each stay tube all is provided with the checkpost of taking the draw -in groove to it is solid on the panel that extra large frock is equipped with with stay tube detachably card through this draw -in groove, portable or the detachably of stull connects on the stay tube to thereby the position of messenger's stull on the stay tube is adjustable to adapt to the not support requirement of the pipeline of co -altitude position, utilize the utility model discloses, the panel that extra large frock is equipped with is damaged to the method that can avoid adopting welded fastening when providing the support of interim pipeline, reduces the loss that the solder welded the material, reduces intensity of labour, improves the work efficiency of job site.

Description

A kind of pipeline support frock
Technical field
The utility model relates to offshore engineering field, particularly a kind of supporting tool for temporary support pipeline.
Background technique
The rhythm of Modern Shipbuilding and ocean engineering is more and more faster, construction precision requires more and more higher.In pipeline construction project, in order to adapt to the topology layout of boats and ships or ocean engineering platform, guaranteeing the precision of pipeline construction in sectional making, usually needing special support of pipelines to carry out subsidiary conduit and installing.But the special support of pipeline is often delivered goods comparatively slow, and the pipeline laid in advance must adopt temporary support to fix.
Prior art generally adopts in segmentation, T profile panel, bulkhead welds the temporary pipeline supports such as a large amount of angle steel, flat iron bar, is used for replacing the special support of pipeline.
Adopt the falsework that welding manner is fixing, the sheet material as support can be caused, as T profile panel, bulkhead produce the phenomenon that unnecessary mother metal melts deformation damage, support also cannot be made to restore to the original state completely even if carry out grinding process after removing.Meanwhile, also waste of manpower, waste wlding.
Model utility content
The purpose of this utility model be to provide a kind of temporarily, to adopt cutting ferrule to fix pipeline support frock on the standby sheet material of extra large frock.Not only the mother metal supporting sheet material was damaged but also the problem of wasting manpower and material resources during to solve in prior art and to adopt and be welded and fixed.
For solving the problems of the technologies described above, the utility model adopts following technological scheme:
A kind of pipeline support frock, provides support with the Pipe installing thought on marine engineering equipment and locates, comprising: the stull that two support tubes be arranged in parallel are connected with two described support tubes respectively with two ends; One end of each support tube is provided with the clamp of band draw-in groove, removably to fix by this draw-in groove on the sheet material that extra large frock is standby by support tube; Described stull is removable or be removably connected on described support tube, to make the position of stull on support tube adjustable thus the support requirement of the pipeline of adaptation different heights position.
Further, the wallboard that described clamp comprises two clamping plate and is connected between two clamping plate, described draw-in groove is formed in the space that two clamping plate and wallboard surround, and wherein clamping plate is provided with clamp fastening threaded fastener on the sheet material that extra large frock is standby.
Further, described clamp is rotatably connected with described support tube and makes the installation position of support tube adjustable.
Further, described clamp has a plate, the end of described support tube has a rotor plate, described rotor plate is connected by an axis of rotation with described connecting plate, and rotor plate and connecting plate all arrange multiple concyclic lockhole centered by rotating shaft, with when support tube rotate in place by lockhole by support tube and clamp locked.
Further, described stull two ends are respectively arranged with the sleeve pipe be set on described support tube, and described stull can be moved along support tube by sleeve pipe and adjust setting height(from bottom), is provided with the latch stoping sleeve pipe movement between described sleeve pipe and described body.
Further, described latch is spring pin, and described support tube and described sleeve pipe be the multiple fixed hole of spread configuration all vertically, and described spring pin inserts in described support tube and described sleeve pipe fixed hole and the two locked.
Further, described latch is threaded fastener, and described sleeve pipe arranges at least one fixed hole, and described threaded fastener is screwed onto in fixed hole by nut, and the head end of threaded fastener is supported on support tube through fixed hole.
Further, the side of described stull is provided with adjustable for height fine adjustment screw, to be finely tuned the height of sleeve pipe by described fine adjustment screw and casing-contact or to carry out edge to sleeve pipe spacing.
Further, the side of described stull is fixed with multiple nut, and the axis being axially perpendicular to stull of nut, described fine adjustment screw is screwed onto in described nut.
Further, also deep bracket is provided with between described stull and described sleeve pipe; This deep bracket is set to orthogonal structure, and a wherein right angle side of described deep bracket is fixedly connected with described stull, and another right angle side of described deep bracket is fixedly connected with described sleeve pipe.
As shown from the above technical solution, advantage of the present utility model and good effect are: adopt scheme of the present utility model, can in sea works industry for pipeline carry out temporary support time, do not adopt the mode be welded and fixed can stable support yet.Avoid the manpower and materials loss of welding, it also avoid the damage to supporting sheet material, improve the efficiency of job site, reduce labor intensity, for site operation is provided convenience.
Accompanying drawing explanation
Fig. 1 is the basic structure schematic diagram of the utility model pipeline support frock;
Fig. 2 is the structural representation in Figure 1A-A direction;
Fig. 3 is the structural representation in Figure 1B-B direction;
Fig. 4 is that Fig. 3 carries out 90 degree of postrotational structural representations of clockwise direction;
Fig. 5 is the structural representation in Fig. 1 C-C direction.
Description of reference numerals is as follows: 1, support tube; 11, rotor plate; 2, stull; 21, latch; 22, fine adjustment screw; 3, clamp; 31, clamping plate; 32, wallboard; 33, connecting plate; 4, sleeve pipe; 41, fixed hole; 5, deep bracket; 6, lockhole.
Embodiment
The exemplary embodiment embodying the utility model feature & benefits will describe in detail in the following description.Be understood that the utility model can have various changes on different mode of executions, it neither departs from scope of the present utility model, and explanation wherein and to be shown in be use when explain in essence, and be not used to limit the utility model.
The utility model provides a kind of pipeline support frock for providing support for the Pipe installing on marine engineering equipment and locate, as Figure 1-3, the supporting tool of this embodiment comprises: the stull 2 that two support tubes be arranged in parallel 1 are connected with two support tubes 1 respectively with two ends.One end of each support tube 1 is provided with the clamp 3 of band draw-in groove, in order to removably to be fixed on the sheet material that extra large frock is standby by support tube 1, is convenient to for the pipeline through this sheet material region does temporary support.Stull 2 is removable or be removably connected between two support tubes 1, to make the position of stull 2 on support tube 1 adjustable, thus adapts to the support requirement of the pipeline of different heights position.Meanwhile, support tube 1 adopts draw-in groove to fix on sheet material, can avoid adopting in prior art that to be welded and fixed the sheet material that mode causes impaired, and the waste of the wlding loss before welding and a large amount of manpower and materials of the dismounting, cutting, polishing etc. after welding.
Concrete, as Figure 2-3, in the present embodiment, clamp 3 wallboard 32 that comprises two clamping plate 31 and be connected between two clamping plate 31, draw-in groove is formed in the space that two clamping plate 31 and wallboard 32 surround, and wherein clamping plate 31 is provided with and clamp 3 is fastened on threaded fastener on the standby sheet material of extra large frock.Support sheet material the connection between clamp 3 and sheet material can be made more firm by being screwed into threaded fastener.
In other embodiments, can also preset screw position in sheet material relevant position, threaded fastener being screwed into this screw can fix more firm by clamp 3, bears larger abutment pressure.
As shown in Figure 3-4, clamp 3 is rotatably connected with support tube 1 and makes the installation position of support tube 1 adjustable.Making supporting tool obtain larger support angle, being convenient to, when encountering the limited strong point, the pipeline passing through this supporting tool from different directions can be supported.
In order to enable supporting tool have good stability of strutting system when a strong point tackles the pipeline on different direction, an adjustable angle must be provided with and the rotating mechanism that can lock between clamp 3 and support tube 1.Concrete, clamp 3 has a plate 33, the end of support tube 1 has a rotor plate 11, rotor plate 11 is connected by an axis of rotation with connecting plate 33, and rotor plate 11 and connecting plate 33 all arrange multiple concyclic lockhole 6 centered by rotating shaft, with when support tube 1 rotate in place by lockhole 6 by support tube 1 and clamp 3 locked.The lockhole 6 in multiple garden altogether can angularly evenly be offered, and also can offer according to the special angle of supporting tool actual demand.
Stull 2 two ends are respectively arranged with the sleeve pipe 4 be set on support tube 1, and stull 2 can be moved along support tube 1 by sleeve pipe 4 and adjust setting height(from bottom), are provided with the latch 21 stoping sleeve pipe 4 movement between sleeve pipe 4 and body.For after suitable angle adjusted to by support tube 1, the height of further adjustment stull 2, to guarantee that pipeline obtains firm support, avoid namely locking because stull 2 height cannot adjust and causing the excessive pipeline that damages by pressure of holding strength, or insufficient height causes support illusory.
It should be noted that, the quantity of stull 2 is not limited to one.In other embodiments, between two support tubes 1, multiple stull 2 can be arranged with, to meet the support demand of many pipelines of different heights.
In certain embodiments, latch 21 can be spring pin, and as shown in Figure 1, for coordinating the fixing of spring pin, support tube 1 and sleeve pipe 4 be the multiple fixed hole 41 of spread configuration all vertically.When spring pin inserts in support tube 1 and sleeve pipe 4 fixed hole 41, the two is locked, the height namely after Absorbable organic halogens stull 2 adjustment.
In other embodiments, latch 21 also can be threaded fastener, such as, bolt, screw etc., as shown in Figure 5, fastening for matching thread fastening piece, sleeve pipe 4 is arranged at least one fixed hole 41, coaxial setting and the aperture nut identical with fixed hole 41 can be welded with on sleeve pipe 4 wall offering fixed hole 41, also can embed the outside dimension nut corresponding to the aperture of fixed hole 41 in fixed hole 41.Threaded fastener is screwed onto in fixed hole 41 by above-mentioned nut, and the head end of threaded fastener is supported on support tube 1 through fixed hole 41, gets final product the height of fixed adjustment rear cross member 2.
The side of stull 2 is provided with adjustable for height fine adjustment screw 22, finely tunes the height of sleeve pipe 4 or to carry out edge to sleeve pipe 4 spacing to be contacted with sleeve pipe 4 by fine adjustment screw 22.
As shown in Figure 1, the side of stull 2 is fixed with multiple nut, and the axis being axially perpendicular to stull 2 of nut, fine adjustment screw 22 is screwed onto in nut.When the gap be used between stull 2 and pipeline is less than the latch 21 adjustable distance on sleeve pipe 4, this fine adjustment screw 22 can be turned, the surface of contact of outstanding stull 2, fills up the micro-gap between stull 2 and pipeline, makes pipeline can obtain firm support.Meanwhile, when the quantity of pipeline is few, when cannot be booked the surface of contact of stull 2, turn the side that surface of contact that this fine adjustment screw 22 gives prominence to stull 2 blocks pipeline, can fixing tube further, avoid traversing in stull 2 of pipeline.
As shown in Figure 1, deep bracket 5 is also provided with between stull 2 and sleeve pipe 4; This deep bracket 5 is set to the polygon structure having a right angle at least, and a wherein right angle side of deep bracket 5 is fixedly connected with stull 2, and another right angle side of deep bracket 5 is fixedly connected with sleeve pipe 4.This is fixedly connected with and the mode of adhesion or welding can be adopted to complete.What connect between further reinforcement stull 2 and sleeve pipe 4 is firm.Make can bear larger pressure during stull 2 support tube 1 tunnel.
To sum up, by this supporting tool, can while guarantee pipeline can obtain temporary support, this supporting tool can not standby to extra large frock in sheet material cause irreversible damage, also avoid by being welded and fixed the wlding solder waste caused in prior art simultaneously, and a large amount of later maintenance cost when dismantling after finishing using.The efficiency of effective raising temporary support frock, reduces the labor intensity of job site, increases economic efficiency, for site operation is provided convenience.
Although describe the utility model with reference to several exemplary embodiment, should be appreciated that term used illustrates and exemplary and nonrestrictive term.Specifically can implement in a variety of forms due to the utility model and not depart from spirit or the essence of model utility, so be to be understood that, above-mentioned mode of execution is not limited to any aforesaid details, and explain widely in the spirit and scope that should limit in claim of enclosing, therefore fall into whole change in claim or its equivalent scope and remodeling and all should be claim of enclosing and contained.

Claims (10)

1. a pipeline support frock, provides support with the Pipe installing thought on marine engineering equipment and locates, it is characterized in that, comprising: the stull that two support tubes be arranged in parallel are connected with two described support tubes respectively with two ends; One end of each support tube is provided with the clamp of band draw-in groove, removably to fix by this draw-in groove on the sheet material that extra large frock is standby by support tube; Described stull is removable or be removably connected on described support tube, to make the position of stull on support tube adjustable thus the support requirement of the pipeline of adaptation different heights position.
2. pipeline support frock according to claim 1, it is characterized in that, the wallboard that described clamp comprises two clamping plate and is connected between two clamping plate, described draw-in groove is formed in the space that two clamping plate and wallboard surround, and wherein clamping plate is provided with clamp fastening threaded fastener on the sheet material that extra large frock is standby.
3. pipeline support frock according to claim 1, is characterized in that, described clamp is rotatably connected with described support tube and makes the installation position of support tube adjustable.
4. pipeline support frock according to claim 3, it is characterized in that, described clamp has a plate, the end of described support tube has a rotor plate, described rotor plate is connected by an axis of rotation with described connecting plate, and rotor plate and connecting plate all arrange multiple concyclic lockhole centered by rotating shaft, with when support tube rotate in place by lockhole by support tube and clamp locked.
5. pipeline support frock according to claim 1, it is characterized in that, described stull two ends are respectively arranged with the sleeve pipe be set on described support tube, described stull can be moved along support tube by sleeve pipe and adjust setting height(from bottom), is provided with the latch stoping sleeve pipe movement between described sleeve pipe and body.
6. pipeline support frock according to claim 5, it is characterized in that, described latch is spring pin, and described support tube and described sleeve pipe be the multiple fixed hole of spread configuration all vertically, and described spring pin inserts in described support tube and described sleeve pipe fixed hole and the two locked.
7. pipeline support frock according to claim 5, it is characterized in that, described latch is threaded fastener, and described sleeve pipe arranges at least one fixed hole, described threaded fastener is screwed onto in fixed hole by nut, and the head end of threaded fastener is supported on support tube through fixed hole.
8. pipeline support frock according to claim 1, is characterized in that, the side of described stull is provided with adjustable for height fine adjustment screw, to be finely tuned the height of pipeline by described fine adjustment screw and tube contacts or to carry out edge to sleeve pipe spacing.
9. pipeline support frock according to claim 8, is characterized in that, the side of described stull is fixed with multiple nut, and the axis being axially perpendicular to stull of nut, described fine adjustment screw is screwed onto in described nut.
10. pipeline support frock according to claim 5, is characterized in that, is also provided with deep bracket between described stull and described sleeve pipe; This deep bracket is set to orthogonal structure, and a wherein right angle side of described deep bracket is fixedly connected with described stull, and another right angle side of described deep bracket is fixedly connected with described sleeve pipe.
CN201520977894.XU 2015-11-30 2015-11-30 Pipeline supports frock Expired - Fee Related CN205155350U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520977894.XU CN205155350U (en) 2015-11-30 2015-11-30 Pipeline supports frock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520977894.XU CN205155350U (en) 2015-11-30 2015-11-30 Pipeline supports frock

Publications (1)

Publication Number Publication Date
CN205155350U true CN205155350U (en) 2016-04-13

Family

ID=55691042

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520977894.XU Expired - Fee Related CN205155350U (en) 2015-11-30 2015-11-30 Pipeline supports frock

Country Status (1)

Country Link
CN (1) CN205155350U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105697881A (en) * 2016-04-26 2016-06-22 成都高峰石油机械有限公司 Oil delivery pipe support structure being easy to position
CN106641454A (en) * 2017-01-18 2017-05-10 朱海斌 Bridge pipeline supporting structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105697881A (en) * 2016-04-26 2016-06-22 成都高峰石油机械有限公司 Oil delivery pipe support structure being easy to position
CN106641454A (en) * 2017-01-18 2017-05-10 朱海斌 Bridge pipeline supporting structure

Similar Documents

Publication Publication Date Title
CN204449766U (en) Welding tool setup
CN203197496U (en) Multi-direction adjustable oblique supporting device
CN205155350U (en) Pipeline supports frock
CN210849239U (en) Tee bend pipe fitting anchor clamps for machine tooling
CN105033539A (en) Fixture special for steel pipe flange welding
CN110775222A (en) Support rod piece for ship block construction
CN104047419A (en) Wall linking method of scaffold and wall-linking member used by scaffold
CN103406711A (en) Special tool for aligning butt joint of steel pipes
CN202825344U (en) Machine tool fixture
CN207348459U (en) A kind of concrete blinding piece regulating device
CN203875462U (en) Stud type positioning clamp
CN201688027U (en) Prefabricated pipeline platform and prefabricated pipeline
CN204954263U (en) Work piece location frock
CN209998668U (en) pipe group correction connecting tool
CN202592180U (en) Rust removal polishing device for large-aperture fire bending elbow pipe bevelling machine
CN103866770B (en) A kind of combined steel formwork and mounting method thereof
CN211519803U (en) Adjustable base for mounting ship building medium-sized equipment
CN211638859U (en) Pipe orifice alignment auxiliary device for adjacent pipelines
CN210976098U (en) Underground pipe gallery pre-buried support
CN218029007U (en) Shaped steel pipeline sleeve pipe is fixed and positioner
CN215880210U (en) Tool for threading of threaded opening of pipeline
CN201799846U (en) Tooling device for shaft alignment of equipment
CN205147893U (en) Machine anchor clamps are attacked to desk -top brill
CN202827992U (en) Device for fixing segment on-off ladder and used in shipbuilding process
CN204901075U (en) Pipeline positioner is laid on ground

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160413

Termination date: 20181130

CF01 Termination of patent right due to non-payment of annual fee