CN205141830U - Wind -powered electricity generation field monitoring device - Google Patents

Wind -powered electricity generation field monitoring device Download PDF

Info

Publication number
CN205141830U
CN205141830U CN201520843154.7U CN201520843154U CN205141830U CN 205141830 U CN205141830 U CN 205141830U CN 201520843154 U CN201520843154 U CN 201520843154U CN 205141830 U CN205141830 U CN 205141830U
Authority
CN
China
Prior art keywords
wind
turbine set
energy turbine
wind energy
management terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520843154.7U
Other languages
Chinese (zh)
Inventor
李非
刘梅
吴正人
靳超然
翟云雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Electric Power University
Original Assignee
North China Electric Power University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Electric Power University filed Critical North China Electric Power University
Priority to CN201520843154.7U priority Critical patent/CN205141830U/en
Application granted granted Critical
Publication of CN205141830U publication Critical patent/CN205141830U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/40Display of information, e.g. of data or controls

Landscapes

  • Wind Motors (AREA)

Abstract

The utility model provides a wind -powered electricity generation field monitoring device, control dispatch main website is connected with wind -powered electricity generation field integrated communication management terminal after looping through electric power dispatching data network and router, and wind -powered electricity generation field integrated communication management terminal adopts hub or switch to be connected with wind -powered electricity generation field local monitor machine, and wherein, every wind -powered electricity generation field local monitor machine corresponds a wind -powered electricity generation field integrated communication management terminal to realize that it carries out communication connection to manage the main website with the control, the utility model discloses a control dispatch main website controls, adopts wind -powered electricity generation field integrated communication management terminal to communicate, has improved the performance of the automatic control in wind -powered electricity generation field, simultaneously, the utility model discloses not only set up the video monitoring ware, but also increased aerogenerator power monitor, transformer substation's monitor soft breeze tower wind speed and direction monitor, realized that unified collection of different kinds of unit information is handled and control, provide the data basis for realizing wind -powered electricity generation field remote monitering system.

Description

A kind of device for monitoring wind power station
Technical field
The utility model relates to a kind of wind power plant technical field, is specially a kind of device for monitoring wind power station, belongs to wind power generation monitoring technique field.
Background technology
In recent years, along with the issuing and implementation of China's " Renewable Energy Law ", wind-powered electricity generation construction enters the high speed development stage, and a large amount of Wind turbines is grid-connected successively.Large mound wind energy turbine set total installation of generating capacity 240MW, install 160 FD77B/1.5MW wind turbine generator altogether, wind field scope is more than 100km 2.Although auxiliary construction many covers long distance control system, between wind energy turbine set, transformer station, anemometer tower, data do not realize sharing, each functional module works alone.What require along with system cloud gray model improves constantly, and the long distance control system making wind energy turbine set early stage cannot meet the service requirement of electrical network.The fluctuation of wind power output and uncontrollability, large-scale wind energy turbine set is made to concentrate construction and access electrical network certainly will run power system safety and stability and quality of power supply generation adverse influence, and lack organic connections as the long distance control system of wind energy turbine set and transformer station, bring problems to the management and running of electrical network.
Wind energy turbine set is built in remote districts more, and ripe experienced operation maintenance personnel are relatively less.Although achieve the configuration to simple function and the monitoring of single wind energy turbine set; but the relatively independent work of numerous supervisory control systems; the mode of reply wind energy turbine set active power dispatch still rests on the simple start and stop stage; then take in the long-term operational mode automatically of wind farm substation end for reactive power compensation; not yet unified access voltage power-less regulating system; its regulatory function cannot be given full play to, realize information effectively shared.Meanwhile, add the waste of labour intensity and investment, therefore, need to carry out upgrading for present situation to the supervisory control system of built wind energy turbine set, to realize the real-time monitoring to wind energy turbine set.
For solving above technical problem, the utility model provides a kind of device for monitoring wind power station, it adopts monitoring and scheduling main website to control, wind energy turbine set driven integrated communication management terminal is adopted to communicate, improve the performance of wind energy turbine set automatic monitoring, simultaneously, the utility model is not only provided with video monitor, but also add wind-driven generator power monitor, electrical substation monitoring device and wind tower wind speed and direction monitor, realizing unified acquisition process and the control of dissimilar unit information, providing data basis for realizing wind energy turbine set long distance control system.
Summary of the invention
For above-mentioned situation, for solving the defect of prior art, the object of the utility model just there is provided a kind of device for monitoring wind power station, it comprises monitoring and scheduling main website, power dispatch data network, router, wind energy turbine set driven integrated communication management terminal, hub or switch, wind energy turbine set local monitor machine, it is characterized in that, described monitoring and scheduling main website is connected with described wind energy turbine set driven integrated communication management terminal by after described power dispatch data network and router successively, described wind energy turbine set driven integrated communication management terminal adopts described hub or switch to be connected with described wind energy turbine set local monitor machine, wherein, the corresponding described wind energy turbine set driven integrated communication management terminal of each wind energy turbine set local monitor machine, to realize communicating to connect with described monitoring and scheduling main website, described monitoring and scheduling main website comprises data and Acquisition Processor, automatism voltage control device, sequence of events recording device, memory, alarm processor, graph curve maker, report form generator and display.
Further, as preferably, described wind energy turbine set driven integrated communication management terminal is provided with the input of two-way power of alterating and direct current, a 4-8 10M/100M self adaptation network interface, 2 RS232 interface 1-2 built-in dialing and 1-2 built-in special line, when described wind energy turbine set driven integrated communication management terminal supports main website pair or GPS couple time, the built-in memory capacity of described wind energy turbine set driven integrated communication management terminal is at least 4GB.
Further, as preferably, described wind energy turbine set local monitor machine comprises video monitor, wind-driven generator power monitor, electrical substation monitoring device and wind tower wind speed and direction monitor.
The beneficial effects of the utility model:
The utility model provides a kind of device for monitoring wind power station, it adopts monitoring and scheduling main website to control, wind energy turbine set driven integrated communication management terminal is adopted to communicate, improve the performance of wind energy turbine set automatic monitoring, simultaneously, the utility model is not only provided with video monitor, but also add wind-driven generator power monitor, electrical substation monitoring device and wind tower wind speed and direction monitor, realizing unified acquisition process and the control of dissimilar unit information, providing data basis for realizing wind energy turbine set long distance control system.
Accompanying drawing explanation
The structure chart of a kind of device for monitoring wind power station that Fig. 1 provides for the utility model;
Embodiment
Below in conjunction with accompanying drawing, the utility model is described further.
As shown in Figure 1, the utility model provides a kind of device for monitoring wind power station, it comprises monitoring and scheduling main website, power dispatch data network, router, wind energy turbine set driven integrated communication management terminal, hub or switch, wind energy turbine set local monitor machine, it is characterized in that, described monitoring and scheduling main website is connected with described wind energy turbine set driven integrated communication management terminal by after described power dispatch data network and router successively, described wind energy turbine set driven integrated communication management terminal adopts described hub or switch to be connected with described wind energy turbine set local monitor machine, wherein, the corresponding described wind energy turbine set driven integrated communication management terminal of each wind energy turbine set local monitor machine, to realize communicating to connect with described monitoring and scheduling main website, described monitoring and scheduling main website comprises data and Acquisition Processor, automatism voltage control device, sequence of events recording device, memory, alarm processor, graph curve maker, report form generator and display.
Wherein, wind energy turbine set driven integrated communication management terminal must meet the requirement of Operation of Electric Systems terminal standard, namely all meets standard-required by the full test of power industry power equipment and instrument quality inspection test center, terminating insulation performance, power supply impact, environmental influence, Electro Magnetic Compatibility, be continuously energized stability, function transmission protocol.Meanwhile, require that supporting communicates with 8 wind energy turbine set local monitoring systems simultaneously support OPCDA, OPCXMLDA, IEC6140025 standard; At least support that 3 main websites and master station communication support IEC608705101IEC60870-104IEC60870-5-102 stipulations; Support historical data and the hybrid transmit of real time data and the breakpoint transmission function of historical data; Support main website pair time or GPS couple time; Record terminal operating operating mode (comprise restart, power down, shutdown), with opc server communication abnormality, Power supply fault message, event, remote maintenance and the upgrading such as terminal logs in or log-off message, terminal parameter change.
In the present embodiment, described wind energy turbine set driven integrated communication management terminal is provided with the input of two-way power of alterating and direct current, a 4-8 10M/100M self adaptation network interface, 2 RS232 interface 1-2 built-in dialing and 1-2 built-in special line, when described wind energy turbine set driven integrated communication management terminal supports main website pair or GPS couple time, the built-in memory capacity of described wind energy turbine set driven integrated communication management terminal is at least 4GB.
Meanwhile, described wind energy turbine set local monitor machine comprises video monitor, wind-driven generator power monitor, electrical substation monitoring device and wind tower wind speed and direction monitor.
The utility model adopts monitoring and scheduling main website to control, wind energy turbine set driven integrated communication management terminal is adopted to communicate, improve the performance of wind energy turbine set automatic monitoring, simultaneously, the utility model is not only provided with video monitor, but also add wind-driven generator power monitor, electrical substation monitoring device and wind tower wind speed and direction monitor, realizing unified acquisition process and the control of dissimilar unit information, providing data basis for realizing wind energy turbine set long distance control system.

Claims (3)

1. a device for monitoring wind power station, it comprises monitoring and scheduling main website, power dispatch data network, router, wind energy turbine set driven integrated communication management terminal, hub or switch, wind energy turbine set local monitor machine, it is characterized in that, described monitoring and scheduling main website is connected with described wind energy turbine set driven integrated communication management terminal by after described power dispatch data network and router successively, described wind energy turbine set driven integrated communication management terminal adopts described hub or switch to be connected with described wind energy turbine set local monitor machine, wherein, the corresponding described wind energy turbine set driven integrated communication management terminal of each wind energy turbine set local monitor machine, to realize communicating to connect with described monitoring and scheduling main website, described monitoring and scheduling main website comprises data and Acquisition Processor, automatism voltage control device, sequence of events recording device, memory, alarm processor, graph curve maker, report form generator and display.
2. a kind of device for monitoring wind power station according to claim 1, it is characterized in that, described wind energy turbine set driven integrated communication management terminal is provided with the input of two-way power of alterating and direct current, a 4-8 10M/100M self adaptation network interface, 2 RS232 interfaces, a 1-2 built-in dialing and 1-2 built-in special lines, when described wind energy turbine set driven integrated communication management terminal supports main website pair or GPS couple time, the built-in memory capacity of described wind energy turbine set driven integrated communication management terminal is at least 4GB.
3. a kind of device for monitoring wind power station according to any one of claim 1-2, is characterized in that, described wind energy turbine set local monitor machine comprises video monitor, wind-driven generator power monitor, electrical substation monitoring device and wind tower wind speed and direction monitor.
CN201520843154.7U 2015-10-27 2015-10-27 Wind -powered electricity generation field monitoring device Expired - Fee Related CN205141830U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520843154.7U CN205141830U (en) 2015-10-27 2015-10-27 Wind -powered electricity generation field monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520843154.7U CN205141830U (en) 2015-10-27 2015-10-27 Wind -powered electricity generation field monitoring device

Publications (1)

Publication Number Publication Date
CN205141830U true CN205141830U (en) 2016-04-06

Family

ID=55627582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520843154.7U Expired - Fee Related CN205141830U (en) 2015-10-27 2015-10-27 Wind -powered electricity generation field monitoring device

Country Status (1)

Country Link
CN (1) CN205141830U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107257143A (en) * 2017-05-25 2017-10-17 陕西科技大学 Wind power forecasting and regulator control system and its control method
CN110417688A (en) * 2018-04-26 2019-11-05 广东电网有限责任公司 A kind of dispatch automated system multichannel message analysis processing system and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107257143A (en) * 2017-05-25 2017-10-17 陕西科技大学 Wind power forecasting and regulator control system and its control method
CN110417688A (en) * 2018-04-26 2019-11-05 广东电网有限责任公司 A kind of dispatch automated system multichannel message analysis processing system and method

Similar Documents

Publication Publication Date Title
CN103855721B (en) Wind farm monitoring system accesses system and the information switching method of power network dispatching system
CN103280814B (en) A kind of wind power plant reactive voltage complex control system and method
CN102999025B (en) Wind-powered electricity generation monitoring and fault diagnosis system
CN205945246U (en) Little electric wire netting power management system of intelligence
CN102427244A (en) Large-scale photovoltaic wind power information accessing system
CN202602375U (en) Wind power generation box type transformer cloud terminal
CN210422883U (en) Multi-wind-field fan electric centralized control system based on c/s framework
CN108173267B (en) Offshore wind power plant and island microgrid combined monitoring system
CN103670950A (en) Mobile wind power generating set state monitoring system
CN201433847Y (en) Novel machine set monitoring system of water-pumping and energy-storing power station
Sayed et al. Wind power plants control systems based on scada system
CN102854463A (en) Megawatt wind power simulation test system and test method
CN205141830U (en) Wind -powered electricity generation field monitoring device
CN103178618A (en) Integrated monitoring terminal for wind-electricity power generation unit
CN204553118U (en) A kind of novel Wind turbines condition monitoring system
CN116094144A (en) Wind farm backup power system
CN207261178U (en) A kind of wind-driven generator controls simulator
CN110632880A (en) Wind power plant master control system based on 5G cloud network transmission
CN203251140U (en) Monitoring system of photovoltaic power generation unit
CN203114528U (en) Wind power monitoring and fault diagnosis system
CN103727979A (en) Draught fan vibration on-line monitoring terminal
CN210531067U (en) Dehumidifier controller with network control function
CN114137890A (en) Device, remote IO module and method for realizing remote restart of offshore wind power equipment
CN113659704A (en) Remote monitoring system for new energy power station
CN201851269U (en) Megawatt-class wind power generation main control system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160406

Termination date: 20161027

CF01 Termination of patent right due to non-payment of annual fee