CN205139207U - Metering tank - Google Patents

Metering tank Download PDF

Info

Publication number
CN205139207U
CN205139207U CN201520967472.4U CN201520967472U CN205139207U CN 205139207 U CN205139207 U CN 205139207U CN 201520967472 U CN201520967472 U CN 201520967472U CN 205139207 U CN205139207 U CN 205139207U
Authority
CN
China
Prior art keywords
wire
protective jacket
notch part
batch meter
breach
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520967472.4U
Other languages
Chinese (zh)
Inventor
余谦
赵立新
何彦彬
刘勇
贾孟丹
高梦雅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201520967472.4U priority Critical patent/CN205139207U/en
Application granted granted Critical
Publication of CN205139207U publication Critical patent/CN205139207U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Transformers For Measuring Instruments (AREA)

Abstract

The utility model provides a metering tank, including box (10) and the circuit structure of setting in box (10), circuit structure includes transformer (20) and current transformer (30), current transformer (30) are connected through first wire (40) and transformer (20) electricity, be connected with second wire (50) on current transformer (30), second wire (50) have the user connection end of keeping away from current transformer (30), the switch switch has on first wire (40), breach portion (51) has on second wire (50), the sinle silk of locating second wire (50) in breach portion (51) exposes. The technical scheme of the utility model the metering tank process when changing current transformer that can solve effectively among the prior art is loaded down with trivial details and frequently operate the problem that the drop -out protector leads to its damage easily.

Description

Batch meter
Technical field
The utility model relates to batch meter technical field, in particular to a kind of batch meter.
Background technology
At present, when changing the current transformer of batch meter, needing the falling fuses device by closing high voltage side of transformer to carry out power-off to transformer, and by transformer grounding, ensureing handling safety with this.Said process is comparatively loaded down with trivial details, and the labour intensity of operating personnel is large, and short time consumption is longer.Meanwhile, all need to close falling fuses device when each replacing current transformer, and frequent operation falling fuses device easily causes it to damage.
Utility model content
Fundamental purpose of the present utility model is to provide a kind of batch meter, loaded down with trivial details and frequent operation falling fuses device easily causes its problem damaged to solve batch meter of the prior art process when changing current transformer.
To achieve these goals, the utility model provides a kind of batch meter, comprise casing and be arranged on the circuit structure in casing, circuit structure comprises transformer summation current transformer, and current transformer is electrically connected with transformer by the first wire, current transformer is connected with the second wire, second wire has the subscriber connection away from current transformer, first wire has chopper switch, the second wire has notch part, expose at the core of notch part place second wire.
Further, batch meter also comprises breach protector, and breach protector is removably disposed in notch part place, breach protector have block notch part block position and dodge notch part dodge position.
Further, breach protector is breach protective jacket, and breach protective jacket is set on the notch part of the second wire, the sidewall of breach protective jacket has the opening for installing the second wire.
Further, the breach protective jacket disassembling operations portion that there is protective jacket main body and be connected with protective jacket main body.
Further, opening is positioned in protective jacket main body and along the axial direction of protective jacket main body and arranges.
Further, disassembling operations portion is arranged on the end of protective jacket main body.
Further, disassembling operations portion tilts along the direction deviating from the second wire away from one end of protective jacket main body.
Further, gap portions is in the middle part of the second wire.
Further, the distance between notch part and current transformer is less than the distance between notch part and subscriber connection.
Further, circuit structure is multiple.
Application the technical solution of the utility model, the second wire arranges notch part, exposes at the core of notch part place second wire.Before needs are changed current transformer; first the chopper switch on the first wire is closed; carry out ground protection (metering changed show exclusively wire clamp, on notch part, ground wire is connected with the core exposed) again at notch part place, then carry out the operation of replacing current transformer.Said structure, without the need to carrying out power-off by closing falling fuses device to transformer, decreasing the frequent operation to falling fuses device, avoiding fuse cutout to damage, and simple to operate, can alleviate the labour intensity of staff.
Accompanying drawing explanation
The Figure of description forming a application's part is used to provide further understanding of the present utility model, and schematic description and description of the present utility model, for explaining the utility model, is not formed improper restriction of the present utility model.In the accompanying drawings:
Fig. 1 shows the structural representation of the embodiment according to batch meter of the present utility model; And
Fig. 2 shows the structural representation of the breach protective jacket of the batch meter of Fig. 1.
Wherein, above-mentioned accompanying drawing comprises the following drawings mark:
10, casing; 20, transformer; 30, current transformer; 40, the first wire; 50, the second wire; 51, notch part; 60, breach protective jacket; 61, protective jacket main body; 62, disassembling operations portion.
Embodiment
It should be noted that, when not conflicting, the embodiment in the application and the feature in embodiment can combine mutually.Below with reference to the accompanying drawings and describe the utility model in detail in conjunction with the embodiments.
As shown in Figure 1, the batch meter of the present embodiment circuit structure that comprises casing 10 and be arranged in casing 10.Circuit structure comprises transformer 20 summation current transformer 30.Current transformer 30 is electrically connected with transformer 20 by the first wire 40.Current transformer 30 is connected with the second wire 50.Described first wire 40 has chopper switch.Second wire 50 has the subscriber connection away from current transformer 30.Second wire 50 has notch part 51.Expose at the core of notch part 51 place second wire 50.
The batch meter of application the present embodiment, the second wire 50 arranges notch part 51, exposes at the core of notch part 51 place second wire 50.Before needs are changed current transformer 30; first the chopper switch on the first wire 40 is closed; carry out at notch part 51 place again ground protection (metering is changed show exclusively wire clamp on notch part 51; ground wire is connected with the core exposed), then carry out replacing current transformer 30 and operate.Said structure, without the need to carrying out power-off by closing falling fuses device to transformer 20, decreasing the frequent operation to falling fuses device, avoiding fuse cutout to damage, and simple to operate, can alleviate the labour intensity of staff.
As shown in Figure 1, in the batch meter of the present embodiment, circuit structure is three.Three second wires 50 of three circuit structures are respectively the zero line, live wire and the ground wire that connect user.
As depicted in figs. 1 and 2, in the batch meter of the present embodiment, batch meter also comprises breach protector.Breach protector is removably disposed in notch part 51 place.Breach protector have block notch part 51 block position and dodge notch part 51 dodge position.In the present embodiment, breach protector is breach protective jacket 60.Breach protective jacket 60 is set on the notch part 51 of the second wire 50.The sidewall of breach protective jacket 60 has the opening for installing the second wire 50.Opening is positioned in protective jacket main body 61 and along the axial direction of protective jacket main body 61 and arranges.When current transformer 30 changed by needs, breach protective jacket 60 is in and dodges position, namely take off breach protective jacket 60; When batch meter normally runs, breach protective jacket 60 is in and blocks position, be set in by breach protective jacket 60 on the notch part 51 of the second wire 50, make it cover the core exposed completely.When can ensure so normally to run, the corrosion resistance of the second wire 50 and insulativity, accomplish safety, stable power-supplying.
As shown in Figure 2, in the batch meter of the present embodiment, the disassembling operations portion 62 that breach protective jacket 60 has protective jacket main body 61 and is connected with protective jacket main body 61.Disassembling operations portion 62 is arranged on the end of protective jacket main body 61.Disassembling operations portion 62 tilts along the direction deviating from the second wire 50 away from one end of protective jacket main body 61.Dismounting breach protective jacket 60 is convenient in above-mentioned disassembling operations portion 62 more.
As shown in Figure 1, in the batch meter of the present embodiment, the distance between notch part 51 and current transformer 30 is less than the distance between notch part 51 and subscriber connection, so more convenient operation.Certainly, the setting position of notch part 51 is not limited thereto, and in other embodiments unshowned in the drawings, notch part can be positioned at the middle part of the second wire.
The foregoing is only preferred embodiment of the present utility model, be not limited to the utility model, for a person skilled in the art, the utility model can have various modifications and variations.All within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (10)

1. a batch meter, the circuit structure comprising casing (10) and be arranged in described casing (10), described circuit structure comprises transformer (20) summation current transformer (30), described current transformer (30) is electrically connected with described transformer (20) by the first wire (40), described current transformer (30) is connected with the second wire (50), described second wire (50) has the subscriber connection away from described current transformer (30), it is characterized in that, described first wire (40) has chopper switch, described second wire (50) has notch part (51), described in described notch part (51) place, the core of the second wire (50) exposes.
2. batch meter according to claim 1, it is characterized in that, described batch meter also comprises breach protector, described breach protector is removably disposed in described notch part (51) place, described breach protector have block described notch part (51) block position and dodge described notch part (51) dodge position.
3. batch meter according to claim 2, it is characterized in that, described breach protector is breach protective jacket (60), described breach protective jacket (60) is set on the described notch part (51) of described second wire (50), the sidewall of described breach protective jacket (60) has the opening for installing described second wire (50).
4. batch meter according to claim 3, is characterized in that, the disassembling operations portion (62) that described breach protective jacket (60) has protective jacket main body (61) and is connected with described protective jacket main body (61).
5. batch meter according to claim 4, is characterized in that, described opening is positioned at the upper and axial direction along described protective jacket main body (61) of described protective jacket main body (61) and arranges.
6. batch meter according to claim 4, is characterized in that, described disassembling operations portion (62) is arranged on the end of described protective jacket main body (61).
7. batch meter according to claim 6, is characterized in that, described disassembling operations portion (62) tilts along the direction deviating from described second wire (50) away from one end of described protective jacket main body (61).
8. batch meter according to claim 1, is characterized in that, described notch part (51) is positioned at the middle part of described second wire (50).
9. batch meter according to claim 1, is characterized in that, the distance between described notch part (51) and described current transformer (30) is less than the distance between described notch part (51) and described subscriber connection.
10. batch meter according to claim 1, is characterized in that, described circuit structure is multiple.
CN201520967472.4U 2015-11-27 2015-11-27 Metering tank Expired - Fee Related CN205139207U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520967472.4U CN205139207U (en) 2015-11-27 2015-11-27 Metering tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520967472.4U CN205139207U (en) 2015-11-27 2015-11-27 Metering tank

Publications (1)

Publication Number Publication Date
CN205139207U true CN205139207U (en) 2016-04-06

Family

ID=55624987

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520967472.4U Expired - Fee Related CN205139207U (en) 2015-11-27 2015-11-27 Metering tank

Country Status (1)

Country Link
CN (1) CN205139207U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105388341A (en) * 2015-11-27 2016-03-09 国网北京市电力公司 Metering box

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105388341A (en) * 2015-11-27 2016-03-09 国网北京市电力公司 Metering box

Similar Documents

Publication Publication Date Title
CN103424588B (en) Electric energy meter connection terminal kit
CN201490118U (en) Electric-shock protection structure for residual current circuit breakers and moulded case circuit breakers
CN205139207U (en) Metering tank
CN203294949U (en) Portable and telescopic ground wire box
CN206878459U (en) A kind of electric-power metering comprehensive protection device
CN203588779U (en) Portable resistance box
CN204289317U (en) A kind of novel fuse
CN106505415A (en) A kind of power supply row cabinet
CN105388341A (en) Metering box
CN204258129U (en) A kind of High-voltage Incoming Cabinet
CN203193272U (en) Convenient-to-dismount dual-protection surge protection device
CN204258208U (en) The split type bus-tapping case of Large Copacity
CN203339066U (en) Solid-state relay
CN203481157U (en) Plug-in single-phase breaker
CN201584679U (en) Voltage transformer cabinet
CN206225792U (en) A kind of power supply row cabinet
CN206441998U (en) A kind of new power distribution cabinet channel design containing cover plate
WO2015051579A1 (en) Safe dc combiner box
CN105162183B (en) A kind of micro-base station covering integration power-supply system
CN204332888U (en) Fuse fixture
CN205050008U (en) A novel power adapter for notebook computer
CN207705138U (en) A kind of protective device being used for transmission line
CN202602279U (en) Power over ethernet (POE) device with lightning protection circuit of data extractor
CN203434111U (en) Bridge connection fuse
CN202004241U (en) Universal whole line protection socket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160406