CN205134948U - Ground plate brick of shower room floor drain department inlays construction - Google Patents

Ground plate brick of shower room floor drain department inlays construction Download PDF

Info

Publication number
CN205134948U
CN205134948U CN201520692381.4U CN201520692381U CN205134948U CN 205134948 U CN205134948 U CN 205134948U CN 201520692381 U CN201520692381 U CN 201520692381U CN 205134948 U CN205134948 U CN 205134948U
Authority
CN
China
Prior art keywords
floor drain
plate brick
ground
cut
bolck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520692381.4U
Other languages
Chinese (zh)
Inventor
刘海东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shang Shang Decoration (beijing) Co Ltd
Original Assignee
Shang Shang Decoration (beijing) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shang Shang Decoration (beijing) Co Ltd filed Critical Shang Shang Decoration (beijing) Co Ltd
Priority to CN201520692381.4U priority Critical patent/CN205134948U/en
Application granted granted Critical
Publication of CN205134948U publication Critical patent/CN205134948U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Abstract

The utility model discloses a ground plate brick of shower room floor drain department inlays construction, including cement mortar spread to paste the layer, plate brick surface course, floor drain outlet border smear into the arcwall face, plate brick four sides, floor drain the brick is arranged to the position of shower room floor drain, should make a whole brick center place the floor drain center in, when inlaying the ground plate brick of floor drain department, the line of cut is finished to position according to floor drain location plate brick, again with this place plate brick four corners and floor drain line of centres, be cut into four piece along line of centres with ground plate brick with the cutting machine, determine the floor drain position according to the line of cut block -by -block, cement mortar shop layer is smeared to peripheral the shop on floor drain outlet ground, require four bricks to put the slope once more to floor drain department when inlaying, the drainage slope is 5 percent, limit handing -over department is all around developed, 4 (are cut into to 1 level land plate brick to outer high interior hanging down, it is under construction to inlay becomes to have the drain cup of the flashing slope), guarantee that the four sides adjacent with the floor drain lie in the minimum on whole ground. Smear into smooth arcwall face, stabilizing with sealed when being convenient for the floor drain installation with floor drain outlet border use cement mortar at last. The ground plate brick of this floor drain department inlays construction and can thoroughly get rid of shower sewage totally, effectively solves the impounded surface water phenomenon, reaches the purpose of not depositing water.

Description

Shower house ground leak wood floor bolck edge pastes construction
Technical field
The utility model relates to a kind of building decoration technology field, and particularly a kind of shower house ground leak wood floor bolck edge pastes construction.
Background technology
Modem ceramic tile product fully meets the requirement of people to aesthetic feeling and function as the common main material of finishing, multiplex at kitchen guarding's metope and the ground space such as ground and parlor, the expressive force of room outward appearance more can be emphasized through well-designed ceramic tile paving method, be easy to allow people realize the joyful and comfortable of stylization, but also bring new problem thereupon, as: kitchen, washroom and other utilize the flooring of floor drain draining, the square wood floor bolck of most employing is as architectural surface, but because the surface of wood floor bolck is plane, and ground leak needs the ground lower than surrounding, be beneficial to draining, if the subsides of floor tile edge are improper herein, often easily there is seeping phenomenon.At present, acceptable to all and measure that is that extensively adopt is: according to position row's brick of indoor floor drain, make floor drain in one piece of full sized brick position, carry out cover to wood floor bolck to cut and dig out floor drain position, the construction aesthetic feeling of unilateral concern ground leak wood floor bolck, does not take into full account that ground leak needs the ground lower than surrounding, weakens drain function, cause excess surface water, sewage cannot be realized and thoroughly get rid of clean technique effect.
Therefore, how to solve when ground leak wood floor bolck edge pastes and again put slope, ensure that four limits adjacent with floor drain are positioned at the minimum point on whole ground, the problem effectively solving excess surface water has become current people's problem demanding prompt solution.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, a kind of shower house ground leak wood floor bolck edge is provided to paste construction, this ground leak wood floor bolck edge pastes construction and shower water thoroughly can be got rid of totally, effectively solves excess surface water phenomenon, reaches the object of not water.
The technical scheme that the utility model provides is: a kind of shower house ground leak wood floor bolck edge pastes construction, comprise cement mortar paving layer, wood floor bolck surface layer, camber face is smeared in floor drain outfall border, wood floor bolck four limit, floor drain, one piece of full sized brick center is made to be placed in floor drain center described, line of cut is finished by the position of floor drain place wood floor bolck, ground leak wood floor bolck is cut into four pieces, edge requires that four pieces of bricks put slope again to ground leak when pasting, ensure that four limits adjacent with floor drain are positioned at the minimum point on whole ground, effective solution excess surface water phenomenon, reach the object of not water.
Further, described shower house ground leak wood floor bolck edge pastes construction, cement mortar paving layer is smeared floor drain outfall ground periphery paving, edge requires that four pieces of bricks put slope again to ground leak when pasting, drainage grade is 5 ﹪, junction, surrounding is developed, high outside and low outside, ensure that four limits adjacent with floor drain are positioned at the minimum point on whole ground.
Further, describedly use cement mortar to smear into smooth arcwall face floor drain outfall border, be convenient to firm and sealing when floor drain is installed.
Further, described floor drain panel a little less than wood floor bolck four limit 1 ~ 2mm, and is less than 2mm to coincideing with wood floor bolck four side seam gap.
Compared with prior art, shower house ground provided by the utility model leak wood floor bolck edge pastes construction, reaches following technique effect:
Shower house ground provided by the utility model leak wood floor bolck edge pastes construction by making one piece of full sized brick center be placed in floor drain center, line of cut is finished by the position of floor drain place wood floor bolck, ground leak wood floor bolck is cut into four pieces, edge requires that four pieces of bricks put slope again to ground leak when pasting, drainage grade is 5 ﹪, ensure that four limits adjacent with floor drain are positioned at the minimum point on whole ground, effectively solve excess surface water phenomenon, reach the object of not water.
Accompanying drawing explanation
Fig. 1 is the plan view that in the utility model embodiment one, shower house ground leak wood floor bolck edge pastes construction.
Fig. 2 is the sectional drawing that in the utility model embodiment one, shower house ground leak wood floor bolck edge pastes construction.
Fig. 3 is the profile node figure that in the utility model embodiment one, shower house ground leak wood floor bolck edge pastes construction.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing, the utility model is described in further detail, but embodiment of the present utility model is not limited thereto.
The utility model provides a kind of and smears cement mortar paving layer 1 floor drain outfall 4 ground periphery paving, edge requires that four pieces of bricks 2 put slope again to floor drain 6 place when pasting, drainage grade is 5 ﹪, junction, surrounding is developed, high outside and low outside, ensure that four limits 3 adjacent with floor drain 6 are positioned at the minimum point on whole ground, cement mortar is used to smear into smooth arcwall face 5 floor drain outfall border 4, be convenient to firm and sealing when floor drain 6 is installed, floor drain panel 6 is a little less than wood floor bolck four limit 31 ~ 2mm, and be less than 2mm to coincideing with gap, wood floor bolck four limit 3, as figure mono-, two, shown in three, shower house ground leak wood floor bolck edge pastes to construct mainly to comprise and one piece of full sized brick is cut into four pieces of bricks 2, cement mortar paving layer 1, edge requires that four pieces of bricks 2 put slope again to floor drain 6 place when pasting, drainage grade is 5 ﹪, four limits 3 adjacent with floor drain 6 are positioned at the minimum point on whole ground, cement mortar is used to smear into smooth arcwall face 5 floor drain outfall border 4, floor drain panel 6 is a little less than wood floor bolck four limit 31 ~ 2mm.
Particularly, in a preferred embodiment, at the position of shower house floor drain row's brick, one piece of full sized brick center should be made to be placed in floor drain center, when edge pastes the wood floor bolck of ground leak, line of cut is finished by the position of floor drain place wood floor bolck, again with this wood floor bolck corner and the floor drain line of centres, with cutting machine centrally line wood floor bolck is cut into four pieces, according to line of cut block-by-block, floor drain position is determined, cement mortar paving layer 1 is smeared floor drain outfall 4 ground periphery paving, edge requires that four pieces of bricks 2 put slope again to floor drain 6 place when pasting, drainage grade is 5 ﹪, junction, surrounding is developed, high outside and low outsidely (1 piece of flat wood floor bolck is cut into 4 pieces, edge pastes the water drain funnel being constructed into the flashing gradient), ensure that four limits 3 adjacent with floor drain 6 are positioned at the minimum point on whole ground, cement mortar is used to smear into smooth arcwall face 5 floor drain outfall border 4, be convenient to firm and sealing when floor drain 6 is installed, floor drain panel 6 is a little less than wood floor bolck four limit 31 ~ 2mm, and be less than 2mm to coincideing with gap, wood floor bolck four limit 3.

Claims (1)

1. a shower house ground leak wood floor bolck edge pastes construction, it is characterized in that: comprise cement mortar paving layer, wood floor bolck surface layer, camber face is smeared in floor drain outfall border, wood floor bolck four limit, floor drain, one piece of full sized brick center is made to be placed in floor drain center described, line of cut is finished by the position of floor drain place wood floor bolck, again with this wood floor bolck corner and the floor drain line of centres, with cutting machine centrally line wood floor bolck is cut into four pieces, according to line of cut block-by-block, floor drain position is determined, edge requires that four pieces of bricks put slope again to ground leak when pasting, 1 piece of flat wood floor bolck has been processed into the outfall drip pan that 4 pieces have slope, ensure that four limits adjacent with floor drain are positioned at the minimum point on whole ground.
CN201520692381.4U 2015-09-08 2015-09-08 Ground plate brick of shower room floor drain department inlays construction Active CN205134948U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520692381.4U CN205134948U (en) 2015-09-08 2015-09-08 Ground plate brick of shower room floor drain department inlays construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520692381.4U CN205134948U (en) 2015-09-08 2015-09-08 Ground plate brick of shower room floor drain department inlays construction

Publications (1)

Publication Number Publication Date
CN205134948U true CN205134948U (en) 2016-04-06

Family

ID=55620755

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520692381.4U Active CN205134948U (en) 2015-09-08 2015-09-08 Ground plate brick of shower room floor drain department inlays construction

Country Status (1)

Country Link
CN (1) CN205134948U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184208A (en) * 2018-08-28 2019-01-11 上海市建筑装饰工程集团有限公司 A kind of construction method of floor drain floor tile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184208A (en) * 2018-08-28 2019-01-11 上海市建筑装饰工程集团有限公司 A kind of construction method of floor drain floor tile

Similar Documents

Publication Publication Date Title
CN205171922U (en) Box of split type waterproof end
CN104295009A (en) Deformation joint structure of planted roof
CN205134948U (en) Ground plate brick of shower room floor drain department inlays construction
CN203113446U (en) Floor drain structure
CN204510737U (en) A kind of toilet floor drain not ponding discharge structure
CN202380527U (en) Bathroom drainage structure
CN205918005U (en) Construction structures drips in parapet keeps warm
CN208219809U (en) A kind of toilet waterproofing structure
CN204023978U (en) A kind of floor ceramic tile installing floor drain
CN204826153U (en) Floor drain specially used for washing machine
CN211447585U (en) Dampproofing building ceramic tile
CN204645456U (en) waterproof wall tile structure
CN206205117U (en) Water-bound under a kind of Quick drainage
CN206828909U (en) A kind of novel water permeable brick
CN202148593U (en) High flow rate hidden-type floor drain
CN205822359U (en) Water floor heating toilet floor drain discharge outlet anti-seepage construction constructs
CN205421780U (en) Corner ceramic tile
CN214941985U (en) Decorative drainage structure
CN203373922U (en) Stairway water drip construction structure
CN205153160U (en) Bathroom waterproof construction and water catch bowl
CN217232536U (en) Shower room pedal
CN204645476U (en) A kind of waterproof suspended ceiling decorative plate
CN209260863U (en) A kind of kitchen surface structure
CN206512836U (en) A kind of civic building combined type water falling groove
CN209260864U (en) A kind of ground structure in open kitchen

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant