CN205113654U - Temporary fixing device - Google Patents
Temporary fixing device Download PDFInfo
- Publication number
- CN205113654U CN205113654U CN201520591765.7U CN201520591765U CN205113654U CN 205113654 U CN205113654 U CN 205113654U CN 201520591765 U CN201520591765 U CN 201520591765U CN 205113654 U CN205113654 U CN 205113654U
- Authority
- CN
- China
- Prior art keywords
- buoyancy tank
- base construction
- internal thread
- fastening device
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model provides a temporary fixing device for novel semi -submerged formula production platform is wet to be dragged between last flotation tank in transit and the lower flotation tank, has such characteristic, include: a plurality of base construction sets up above the deckhead of flotation tank down, bolt structure with the base construction one -to -one, sets up in the underdeck below of last flotation tank base construction's top, the side at base construction is fixed to lower part internal thread component, upper portion internal thread member is fixed in the side of last flotation tank, directly over the internal thread member of lower part, and stud, both ends respectively with lower part internal thread component and the mutual fixed connection of upper portion internal thread component, wherein, base construction, central authorities have the trompil, bolt structure inserts in the trompil.
Description
Technical field
The utility model relates to a kind of anchor fitting, particularly a kind of be applied to novel semisubmersible oil production platform wet haul defeated in temporary fastening device between two buoyancy tank.
Background technology
When semisubmersible oil production platform is after shipyard has been built, need to be transported to operation marine site, generally had two kinds of methods: for short range transport, can directly have been drawn to operation marine site by tugboat, namely wet and drag; For middle and long distance transport, be then first transported to the more shallow harbour of refuge of the depth of water near operation marine site (namely dry drag) by carrier, then be dragged to operation marine site by tugboat is wet.Visible, no matter which kind of method, wet and drag the process of being absolutely necessary.For conventional semisubmersible platform, its hull structure comprises column, buoyancy tank and stull, and these structures were closed up in the shipyard construction phase, and hull structure forms an entirety, can overall towage go out.In recent years, based on new engineering demand, domestic and international company proposes series of new semisubmersible platform concept, is generally increase accessory structure below conventional semi-submerged platform buoyancy tank, such as, hang down and swing plate, truss, second layer buoyancy tank etc.For reducing wave load, the drinking water of these accessory structures is comparatively dark, and is limited by the restriction (being generally no more than 14 meters) of shipyard harbour drinking water, and these accessory structures cannot be welding as one with main body when dispatching from the factory, and need to install to sea.
For unconditional stability equipped deep-draft floating production platform, together with in the middle part of it, annular buoyancy tank (namely going up buoyancy tank) and small bore column, base circle ballast tank (namely playing buoyancy tank) were not brought together in construction phase and towage stage, need to assemble again to sea.When the wet haul of platform is defeated, upper buoyancy tank will be placed on above lower buoyancy tank.After arriving job position, then the two is connected together by certain way.In order to reduce the construction operations such as afloat welding, application as far as possible, needing to adopt temporary fixing structure between upper buoyancy tank and lower buoyancy tank, the relative motion of both control in towage process, reducing the coating material breakage of colliding and causing, even structural damage.On the other hand, because offshore construction window is limited, the temporary fastening device adopted should be convenient to dismounting as much as possible.
Utility model content
The utility model carries out to solve the problem, and object is to provide a kind of different scale that is adapted to be connected with the buoyancy tank of shape, and structural safety reliability is high, and cost is low, the temporary fastening device that offshore construction is easy.
The temporary fastening device that the utility model provides, for novel semisubmersible oil production platform wet haul defeated in upper buoyancy tank and lower buoyancy tank between, there is such feature, comprising: several base constructions, above the flying deck being arranged on lower buoyancy tank; Latch structure, with base construction one_to_one corresponding, below the underdeck being arranged on buoyancy tank, the top of base construction; Lower internal thread component, is fixed on the side of base construction; Upper internal threaded component, is fixed on the side of buoyancy tank, directly over lower internal thread component; And thru-bolt, two ends are mutually permanently connected with lower internal thread component and upper internal threaded component respectively, and wherein, base construction, central authorities have perforate, and latch structure inserts in perforate.
The temporary fastening device that the utility model provides, also has such feature: wherein, and the size of perforate is greater than the size of latch structure.
The temporary fastening device that the utility model provides, also has such feature: wherein, and the shape of perforate can be square hole, circular hole, ellipse.
The temporary fastening device that the utility model provides, also has such feature: wherein, and thru-bolt can according to the distance free-extension between upper buoyancy tank and lower buoyancy tank.
Utility model effect
Temporary fastening device involved by the utility model, have employed the combination of traditional welding and mechanical mechanism connection mode, has higher technology maturity, cost is low; 2, only need remove the connection of thru-bolt side and platform at sea when the utility model is constructed, under-water operation is few, and operation is all outside buoyancy aid, and safety is high; 3, the utility model achieves the object be connected by upper and lower buoyancy tank by simple mechanism, and in towage process, between upper and lower buoyancy tank, relative motion obtains and suppresses constraint, ensure that transportation safety.4, the utility model Applicable scope is not by the restriction of the factors such as buoyancy tank shape, size, quantity, applied widely.In sum, the utility model has and can be adapted to different scale and be connected with the buoyancy tank of shape, structural safety reliability is high, cost is low, the advantages such as offshore construction is easy, can be widely used in comprising the platform pattern of temporary fixed many buoyancy aids in the needs towage at sea of novel semisubmersible oil production platform.
Accompanying drawing explanation
Fig. 1 is the front view of the utility model temporary fastening device in an embodiment;
Fig. 2 is the birds-eye view of the utility model A-A section in an embodiment;
Fig. 3 is the schematic diagram of the utility model base construction in an embodiment deployment scenarios on lower buoyancy tank flying deck;
Fig. 4 is the utility model construction location schematic diagram of the present utility model on " unconditional stability equipped deep-draft floating production platform " in an embodiment.
Detailed description of the invention
Referring to drawings and Examples, the temporary fastening device involved by the utility model is explained in detail.
Embodiment
Fig. 1 is the front view of the utility model temporary fastening device in an embodiment.
Fig. 2 is the birds-eye view of the utility model A-A section in an embodiment.
Fig. 3 is the schematic diagram of the utility model base construction in an embodiment deployment scenarios on lower buoyancy tank flying deck.
As shown in Figure 1, Figure 2 and Figure 3, temporary fastening device has: base construction 1, latch structure 2, lower internal thread component 3, upper internal threaded component 4 and thru-bolt 5.
Temporary fastening device be used for novel semisubmersible oil production platform wet haul defeated in upper buoyancy tank 7 and lower buoyancy tank 6 between.
Several base construction 1 central authorities have perforate 1-1 respectively.Base construction 1 is arranged in the flying deck outer edge of lower buoyancy tank 6, and is located on strong component or strong frame, does local strengthening under deck, can arrange multiple base construction 1, together with being welded to each other above the flying deck of lower buoyancy tank 6.
The size of perforate 1-1 is greater than the size of latch structure 2, has certain interval after latch structure 2 inserts perforate 1-1, ensures to install redundancy.The shape of perforate 1-1 can be the form that square hole, circular hole, ellipse etc. are easy to manufacture.
Latch structure 2 and base construction 1 one_to_one corresponding, quantity is identical with base construction 1, is arranged on the underdeck of buoyancy tank 7, does local strengthening under deck, should be arranged in the flying deck strong component place of buoyancy tank 7, the top of base construction 1 as far as possible, inserts in perforate 1-1.
Lower internal thread component 3 is welded on the side of each base construction 1 in advance, is positioned at outside lower buoyancy tank 6.
Upper internal threaded component 4 is arranged on the outside plate side of buoyancy tank 7, directly over lower internal thread component 3.
Lower internal thread component 3 is consistent with upper internal threaded component 4 quantity, appearance similar.
Thru-bolt 5 two ends are mutually permanently connected with lower internal thread component 3 and upper internal threaded component 4 respectively, for connecting lower internal thread component 3 and upper internal threaded component 4, the matching size of its size and upper buoyancy tank 7, lower buoyancy tank 6 spacing and lower internal thread component 3, upper internal threaded component 4 closes.
Thru-bolt 5 can according to the distance free-extension between upper buoyancy tank 7 and lower buoyancy tank 6.
Fig. 4 is the utility model construction location schematic diagram of the present utility model on " unconditional stability equipped deep-draft floating production platform " in an embodiment.
As shown in Figure 4, in figure, dashed circle place is construction location of the present utility model.
The effect of embodiment and effect
Temporary fastening device involved by the present embodiment, have employed the combination of traditional welding and mechanical mechanism connection mode, has higher technology maturity, cost is low; 2, only need remove the connection of thru-bolt side and platform at sea when the utility model is constructed, under-water operation is few, and operation is all outside buoyancy aid, and safety is high; 3, the utility model achieves the object be connected by upper and lower buoyancy tank by simple mechanism, and in towage process, between upper and lower buoyancy tank, relative motion obtains and suppresses constraint, ensure that transportation safety.4, the utility model Applicable scope is not by the restriction of the factors such as buoyancy tank shape, size, quantity, applied widely.In sum, the utility model has and can be adapted to different scale and be connected with the buoyancy tank of shape, structural safety reliability is high, cost is low, the advantages such as offshore construction is easy, can be widely used in comprising the platform pattern of temporary fixed many buoyancy aids in the needs towage at sea of novel semisubmersible oil production platform.
Above-mentioned embodiment is preferred case of the present utility model, is not used for limiting protection domain of the present utility model.
Claims (4)
1. a temporary fastening device, for novel semisubmersible oil production platform wet haul defeated in upper buoyancy tank and lower buoyancy tank between, it is characterized in that, comprising:
Several base constructions, above the flying deck being arranged on described lower buoyancy tank;
Latch structure, with described base construction one_to_one corresponding, below the underdeck being arranged on described upper buoyancy tank, the top of described base construction;
Lower internal thread component, is fixed on the side of described base construction;
Upper internal threaded component, is fixed on the side of described upper buoyancy tank, directly over described lower internal thread component; And
Thru-bolt, two ends are mutually permanently connected with described lower internal thread component and described upper internal threaded component respectively,
Wherein, described base construction, central authorities have perforate,
Described latch structure inserts in described perforate.
2. temporary fastening device according to claim 1, is characterized in that:
Wherein, the size of described perforate is greater than the size of described latch structure.
3. temporary fastening device according to claim 1, is characterized in that:
Wherein, the shape of described perforate can be square hole, circular hole, ellipse.
4. temporary fastening device according to claim 1, is characterized in that:
Wherein, described thru-bolt can according to the distance free-extension between described upper buoyancy tank and described lower buoyancy tank.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520591765.7U CN205113654U (en) | 2015-08-03 | 2015-08-03 | Temporary fixing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520591765.7U CN205113654U (en) | 2015-08-03 | 2015-08-03 | Temporary fixing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205113654U true CN205113654U (en) | 2016-03-30 |
Family
ID=55569288
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520591765.7U Expired - Fee Related CN205113654U (en) | 2015-08-03 | 2015-08-03 | Temporary fixing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205113654U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105083486A (en) * | 2015-08-03 | 2015-11-25 | 上海海洋大学 | Temporary fixing device and construction method thereof |
-
2015
- 2015-08-03 CN CN201520591765.7U patent/CN205113654U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105083486A (en) * | 2015-08-03 | 2015-11-25 | 上海海洋大学 | Temporary fixing device and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102227349B (en) | Semi-submersible offshore structure | |
CN102712348B (en) | The system of floatability on tension leg and stability is increased in by extending floating drum | |
CN107697238A (en) | A kind of dry tree semi-submerged platform of deep water floating type multifunctional and its offshore installation method | |
CN105129047B (en) | A kind of fixing device and fixing means of O-shaped outboard rubber fender peculiar to vessel | |
CN103381879A (en) | A docking device for facilitating a transfer between a vessel and an offshore structure | |
CN205418004U (en) | Buoy mooring system | |
CN105083486A (en) | Temporary fixing device and construction method thereof | |
JP2020172872A (en) | Semi-sub floating body and method for installing wind mill on ocean using semi-sub floating body | |
CN103770914B (en) | Mobile ocean resort hotel | |
CN205113654U (en) | Temporary fixing device | |
US20200317309A1 (en) | Platform for floating type offshore structure having protrusion member and semi-submersible offshore structure including the same | |
CN103921900A (en) | Overall offshore wind generating set conveying and mounting all-in-one ship with primary floating body and secondary floating body and overall conveying and mounting method | |
US20110219999A1 (en) | Deep Water Offshore Apparatus And Assembly Method | |
KR20140046681A (en) | Mooring system of tension leg platform | |
CN205213845U (en) | From tension leg type of hard and soft mating type of mooring box with a net | |
CN103921905B (en) | Semi-submersible module for combining into large-scale floating body on the water and assembling method thereof | |
KR101512692B1 (en) | Turret supporting structure for vessel type offshore structure and vessel type offshore structure including the same | |
Mansour | FHS semi: A semisubmersible design for dry tree applications | |
KR20150004186A (en) | Mooring apparatus for floating marine structure | |
CN109625178A (en) | A kind of side of a ship wall construction of anti-deformation tearing | |
CN106379488B (en) | The method for quickly carrying out marine floating support mounting platform | |
CN206337543U (en) | A kind of off-lying sea harbour | |
CN204750490U (en) | Vertical buoy base of square multilayer | |
CN105539725B (en) | Tension leg installation method | |
CN205116805U (en) | From lift -type li island hotel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160330 Termination date: 20160803 |
|
CF01 | Termination of patent right due to non-payment of annual fee |