CN205100210U - Building pile - Google Patents

Building pile Download PDF

Info

Publication number
CN205100210U
CN205100210U CN201520832769.XU CN201520832769U CN205100210U CN 205100210 U CN205100210 U CN 205100210U CN 201520832769 U CN201520832769 U CN 201520832769U CN 205100210 U CN205100210 U CN 205100210U
Authority
CN
China
Prior art keywords
stake
column jacket
cylindrical cavity
building
stanchion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520832769.XU
Other languages
Chinese (zh)
Inventor
叶阳
施泽淞
余志峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Euan construction Tsukito design Inc
Original Assignee
Shanghai Zhengyi Building Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhengyi Building Design Co Ltd filed Critical Shanghai Zhengyi Building Design Co Ltd
Priority to CN201520832769.XU priority Critical patent/CN205100210U/en
Application granted granted Critical
Publication of CN205100210U publication Critical patent/CN205100210U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model relates to the technical field of building materials, especially indicate a building pile, including the column jacket stake, column jacket stake low side is most advanced, be equipped with the cylindricality cavity in the column jacket stake, cylindricality cavity and the coincidence of column jacket stake central line, the last symmetrical level of column jacket stake is slipped and is had a plurality of spacing posts, be equipped with the slider in the cylindricality cavity, the slider length of inviting back the same with cylindricality cavity diameter, slider thickness is down reduced by last gradually. The utility model discloses an above -mentioned technical scheme's beneficial effect as follows: simple structure, the technique is reasonable, and low cost cooperatees through metal column jacket and concrete inner prop, has fine bearing capacity, through horizontal fixed spacing post, can be with firm the fixing on the ground of building pile to concreting forms the concrete inner prop in the metal column jacket, still plays the fixed action to spacing post in the time of reinforcing building pile's bearing capacity.

Description

The stake of a kind of building
Technical field
The utility model relates to building material technical field, refers to the stake of a kind of building especially.
Background technology
Showing under construction, building lot all needs to be made up of foundation pile, and its usual structure is, a cushion cap has been supported in the concrete column stake goed deep in soil by several jointly, to form a bearing unit of building.In the building process of building stake, basic building theory is, by building pile bearing building, makes building can not sedimentation, in current construction, stake holes is beaten to after enough dark, just can think, bottom stake holes, there is enough flintinesses, can building be supported, therefore, by perfusion or the mode of preformed pile, pile in stake holes, can construct building bearing unit.
Utility model content
The technical problems to be solved in the utility model is to provide the stake of a kind of building, is matched, have good supporting capacity by metal column jacket and concrete inner prop, and more firm by what set up that limited post makes building post fixing.
For solving the problems of the technologies described above, embodiment of the present utility model provides the stake of a kind of building, comprise outer stanchion, described outer stanchion low side is most advanced and sophisticated, is provided with cylindrical cavity in described outer stanchion, and described cylindrical cavity overlaps with column jacket pile center line, the upper symmetrical level of described outer stanchion is sliding some limited posts, be provided with slide block in described cylindrical cavity, institute's speed time its length is identical with cylindrical cavity diameter, and described slide block thickness reduces from top to bottom gradually.
As preferably, when described skid is to cylindrical cavity least significant end, shaping by interior stanchion by concreting in cylindrical cavity.
As preferably, the length of described limited post is slightly less than the radius of outer stanchion.
As preferably, described outer stanchion is metalline stake.
The beneficial effect of technique scheme of the present utility model is as follows: structure is simple, and technology is reasonable, with low cost, is matched, have good supporting capacity by metal column jacket and concrete inner prop; By laterally fixing limited post, building stake firmly can be fixed on ground, and in metal column jacket, concreting forms concrete inner prop, also plays fixation to limited post while strengthening the bearing capacity of building stake.
Accompanying drawing explanation
Fig. 1 is the utility model structural section figure.
Fig. 2 is the top view of Fig. 1.
Detailed description of the invention
For making the technical problems to be solved in the utility model, technical scheme and advantage clearly, be described in detail below in conjunction with the accompanying drawings and the specific embodiments.
The utility model provides the stake of a kind of building for existing deficiency, as depicted in figs. 1 and 2, comprise outer stanchion 3, described outer stanchion 3 low side is most advanced and sophisticated, and be provided with cylindrical cavity 2 in described outer stanchion 3, described cylindrical cavity 2 overlaps with outer stanchion 3 center line, the upper symmetrical level of described outer stanchion 3 is sliding some limited posts 4, be provided with slide block 1 in described cylindrical cavity 2, institute's speed time slide block 1 length is identical with cylindrical cavity 2 diameter, and described slide block 1 thickness reduces from top to bottom gradually.When described slide block 2 slides into cylindrical cavity 2 least significant end, shaping by interior stanchion by concreting in cylindrical cavity 2.The length of described limited post 4 is slightly less than the radius of outer stanchion 3.Described outer stanchion 3 is metalline stake.
Use principle of the present utility model, first outer stanchion 3 is knocked in ground, now limited post 4 is also in cylindrical cavity 2, then slide block 1 is knocked in bottom cylindrical cavity 2, because the thickness of slide block 1 increases from lower to upper gradually, so limited post 4 is pushed in the ground outside outer stanchion 3 to both sides while knocking in slide block 1, thus good fixation is played to building stake, then interior stanchion is formed to concreting in cylindrical cavity 2, thus enhance the bearing capacity of building stake, good fixation can also be played to limited post 4.
The above is preferred embodiment of the present utility model; should be understood that; for those skilled in the art; under the prerequisite not departing from principle described in the utility model; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (4)

1. building stake, comprise outer stanchion, described outer stanchion low side is most advanced and sophisticated, it is characterized in that, be provided with cylindrical cavity in described outer stanchion, described cylindrical cavity overlaps with column jacket pile center line, the upper symmetrical level of described outer stanchion is sliding some limited posts, be provided with slide block in described cylindrical cavity, institute's speed time its length is identical with cylindrical cavity diameter, and described slide block thickness reduces from top to bottom gradually.
2. one building according to claim 1 stake, is characterized in that, when described skid is to cylindrical cavity least significant end, shaping by interior stanchion by concreting in cylindrical cavity.
3. one building according to claim 1 stake, it is characterized in that, the length of described limited post is slightly less than the radius of outer stanchion.
4. one building according to claim 1 stake, it is characterized in that, described outer stanchion is metalline stake.
CN201520832769.XU 2015-10-26 2015-10-26 Building pile Active CN205100210U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520832769.XU CN205100210U (en) 2015-10-26 2015-10-26 Building pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520832769.XU CN205100210U (en) 2015-10-26 2015-10-26 Building pile

Publications (1)

Publication Number Publication Date
CN205100210U true CN205100210U (en) 2016-03-23

Family

ID=55516000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520832769.XU Active CN205100210U (en) 2015-10-26 2015-10-26 Building pile

Country Status (1)

Country Link
CN (1) CN205100210U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107119676A (en) * 2017-05-09 2017-09-01 成都市容德建筑劳务有限公司 pile
CN107190733A (en) * 2017-05-25 2017-09-22 成都市容德建筑劳务有限公司 It is a kind of to facilitate sized pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107119676A (en) * 2017-05-09 2017-09-01 成都市容德建筑劳务有限公司 pile
CN107190733A (en) * 2017-05-25 2017-09-22 成都市容德建筑劳务有限公司 It is a kind of to facilitate sized pile

Similar Documents

Publication Publication Date Title
CN205100210U (en) Building pile
CN207685849U (en) A kind of connection structure of concrete prefabricated cushion cap
CN207469454U (en) A kind of support construction of growing for mobile housing
CN206521941U (en) Pull-type single side formwork system in a kind of
CN104153374A (en) Combined foundation pit supporting structure with inclined strut and pull anchor
CN207377174U (en) Build combined type adjustable support frame
CN207829579U (en) A kind of electric pole
CN211103914U (en) Support storage device for cement prefabricated well lid
CN205100285U (en) Memory system is collected to rainwater
CN206189438U (en) Area separates ground of wet function
CN203639940U (en) Retaining wall for hydraulic engineering
CN207176667U (en) Groove profile push pipe row oozes device
CN206091524U (en) Anti -wind pole
CN206220631U (en) A kind of windproof concrete wire pole
CN205546710U (en) Strawberry fruit growth bracket
CN203452001U (en) Country foot bridge railing structure
CN211547701U (en) Building pile foundation
CN208934503U (en) A kind of silo top trestle supporting structure
CN203238624U (en) Novel steel tube cement pile
CN204960141U (en) Hollow cushion
CN207714311U (en) High stability bored concrete pile
CN204000891U (en) A kind of with diagonal brace and the combined type foundation pit supporting construction that draws anchor
CN209703499U (en) A kind of novel ground pile
CN204940256U (en) Spliced mixed earth stake
CN202000741U (en) 1.5-meter high climbable factory station plastic-soaked enclosing wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 200433, room 3, No. 273, Lane 101, National East Road, Shanghai, Yangpu District

Patentee after: Shanghai Yi construction Tsukito design Inc

Address before: 200433, room 3, No. 273, Lane 101, National East Road, Shanghai, Yangpu District

Patentee before: SHANGHAI ZHENGYI ARCHITECTURAL DESIGN CO., LTD.

CP03 Change of name, title or address

Address after: YOU'AN BUILDING, MIDDLE PLAZA, No. 1 Yingao Road, Baoshan District, Shanghai, 200439

Patentee after: Shanghai Euan construction Tsukito design Inc

Address before: Room 101, No. 3, Lane 273, Guoding East Road, Yangpu District, Shanghai, 2003

Patentee before: Shanghai Yi construction Tsukito design Inc

CP03 Change of name, title or address