CN205088277U - Hot change converter tapping hole structure of ability accurate positioning - Google Patents

Hot change converter tapping hole structure of ability accurate positioning Download PDF

Info

Publication number
CN205088277U
CN205088277U CN201520879480.3U CN201520879480U CN205088277U CN 205088277 U CN205088277 U CN 205088277U CN 201520879480 U CN201520879480 U CN 201520879480U CN 205088277 U CN205088277 U CN 205088277U
Authority
CN
China
Prior art keywords
layer
steel
tapping hole
tapping
brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520879480.3U
Other languages
Chinese (zh)
Inventor
吴仕慈
杨文军
崔辉
张建国
牛玉宏
李海洋
沈武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Iron and Steel Co Ltd
Original Assignee
Wuhan Iron and Steel Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Iron and Steel Group Corp filed Critical Wuhan Iron and Steel Group Corp
Priority to CN201520879480.3U priority Critical patent/CN205088277U/en
Application granted granted Critical
Publication of CN205088277U publication Critical patent/CN205088277U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Carbon Steel Or Casting Steel Manufacturing (AREA)

Abstract

The utility model provides a hot change converter tapping hole structure of ability accurate positioning, by tapping oral siphon brick layer, the molten steel passageway, the connecting plate that tapping oral siphon brick layer one end is connected, tapping hole brick cup layer, the furnace body flange of connecting on tapping hole brick cup layer, connect the annular steel sheet on one section stay tube of tapping hole collar extension, fire resistant infilling layer between tapping hole brick cup layer and the tapping oral siphon brick layer is formed, it is connected with two cardboards relatively on the neighbouring connecting plate of annular steel sheet, be equipped with the wedge groove on every cardboard, insert tangible form matched with wedge in the wedge groove, tapping side on the connecting plate of neighbouring annular steel sheet is equipped with two at least locating pins, be equipped with asbestos washer between connecting plate and annular steel sheet. The utility model discloses an enable the tapping hole and fix a position fast, firm in connection, the clearance sealing performance between panel and the connecting plate is good, can not make the tapping hole structure lead to the fact damage, low in labor strength when just changing.

Description

The pinpoint hot replacing steel outlet structure of converter of a kind of energy
Technical field
The utility model relates to a kind of steel-making tap hole, specifically belongs to the pinpoint hot replacing steel outlet structure of converter of a kind of energy.
Background technology
All kinds of converter (especially mammoth conveter) conventional steel tapping hole replacement method is normally: in hot situation, first drilling machine is adopted to clean out old tap hole, new tap hole is put in bored furnace lining hole, the mode being welded to connect iron plate is adopted to fix external orifice of steel-tapping hole panel, again converter is shaken to stove, finally fill with from tap hole internal orifice and spray into fire-resistant stopping composition among new steel-tapping hole tube brick with the gap of furnace lining brick cup, make it to sinter.
When fixing new tap hole, because tap hole is heavier, the method that external orifice of steel-tapping hole hand-stuff is sintered to fix can not meet tap hole firmly and the requirement of accurate positioning, easily cause tap hole fixed effect poor, even produce and come off or be shifted, and also increase labour intensity, length consuming time, namely generally need about 30 minutes.Also the mode adopting and to be welded on by external orifice of steel-tapping hole panel on tap hole root plate is had, although tap hole can be fixed by preferably, but the gap between panel and web plate can not tight closure, easily cause and Lou expect, therefore refractory mortar leak stopping must be replenished in gap, consuming timely like this need 15-20 minute, and each steel tapping hole replacement is complete, all can remain overlap and remaining connection iron plate on tap hole web plate.When after a few stove of use, the panel of disassembling furnace machine tool process tap hole need be used, from and the damage of steel-tapping hole tube brick collar extension can be caused, affect the work-ing life of tap hole, steel stream time serious, also can be made to disperse, cause burning out tap hole root board device and cause the accident.
Utility model content
The deficiency that the utility model exists for prior art, a kind of tap hole energy quick position is provided, be connected firmly, the clearance seal performance between panel and web plate is good, and tapping mouth structure can not be made to cause the pinpoint hot replacing steel outlet structure of converter of the energy of damage.
Realize the technical measures of above-mentioned purpose:
The pinpoint hot replacing steel outlet structure of converter of a kind of energy, by steel-tapping hole tube brick layer, the molten steel channel formed by steel-tapping hole tube brick layer, the web plate that steel-tapping hole tube brick layer one end connects, the tap hole brick cup layer of steel-tapping hole tube brick layer overcoat dress, the body of heater flange that tap hole brick cup layer is connected with one end with the web plate in steel-tapping hole tube brick layer, be connected to the doughnut-shaped steel plate on external orifice of steel-tapping hole one section of supporting tube, fire resistant infilling layer between tap hole brick cup layer and steel-tapping hole tube brick layer forms, it is: on the web plate that doughnut-shaped steel plate is contiguous, be relatively connected with two clamps, each clamp is provided with webge slot, the wedge that tangible shape matches is inserted in webge slot, tapping side on the web plate of adjacent rings steel plate is provided with at least two steady braces, asbestos washer is provided with between web plate and doughnut-shaped steel plate.
Feature of the present utility model: tap hole energy quick position, is connected firmly, the clearance seal performance between panel and web plate is good, and tapping mouth structure can not be made to cause damage, and when changing, labour intensity is low.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the right TV structure schematic diagram of Fig. 1;
In figure: 1-steel-tapping hole tube brick layer, 2-molten steel channel, 3-web plate, 4-tap hole brick cup layer, 5-body of heater flange, 6-doughnut-shaped steel plate, 7-fire resistant infilling layer, 8-clamp, 9-webge slot, 10-wedge, 11-steady brace, 12-asbestos washer.
Embodiment
Be described further below in conjunction with accompanying drawing:
The pinpoint hot replacing steel outlet structure of converter of a kind of energy, by steel-tapping hole tube brick layer 1, the molten steel channel 2 formed by steel-tapping hole tube brick layer 1, the web plate 3 that steel-tapping hole tube brick layer 1 one end connects, the tap hole brick cup layer 4 of the outer suit of steel-tapping hole tube brick layer 1, the body of heater flange 5 that tap hole brick cup layer 4 is connected with one end with the web plate 3 in steel-tapping hole tube brick layer 1, be connected to the doughnut-shaped steel plate 6 on external orifice of steel-tapping hole one section of supporting tube, fire resistant infilling layer 7 between tap hole brick cup layer 4 and steel-tapping hole tube brick layer 1 forms, it adopts welding or bolt relatively to connect two clamps 8 on the web plate 3 that doughnut-shaped steel plate 6 is contiguous, each clamp 8 is processed with webge slot 9, the wedge 10 that tangible shape matches is inserted in webge slot 9, tapping side on the web plate 3 of adjacent rings steel plate 6 is provided with three or four steady braces 11, asbestos washer 12 is housed between web plate 3 and doughnut-shaped steel plate 6.
During replacing, first lay tap hole to direction in stove along propelling movement along furnace lining hole, and guarantee that the doughnut-shaped steel plate 6 of tap hole end rests on steady brace 11 completely, doughnut-shaped steel plate 6 and asbestos washer 12 is compressed after tap hole places, wedge 10 is wedged on clamp 8 again and be processed with webge slot 9 li, thus tap hole is fixed, fixing complete employing stopping composition is by stifled for the gap between doughnut-shaped steel plate 6 and web plate 3 good.
After tilting converter to stove, spray into fire-resistant stopping composition from the filling of tap hole internal orifice and form fire resistant infilling layer 7 between steel-tapping hole tube brick layer 1 and the gap of tap hole brick cup layer 4, and sinter.Under the dual function that asbestos washer 12 and fire resistant infilling layer 7 seal, the fire-resistant stopping composition poured into can not spill, and ensure that material spray effect.
This embodiment is only the best and exemplifies, the restricted enforcement not to technical solutions of the utility model.

Claims (1)

1. the pinpoint hot replacing steel outlet structure of converter of energy, by steel-tapping hole tube brick layer, the molten steel channel formed by steel-tapping hole tube brick layer, the web plate that steel-tapping hole tube brick layer one end connects, the tap hole brick cup layer of steel-tapping hole tube brick layer overcoat dress, the body of heater flange that tap hole brick cup layer is connected with one end with the web plate in steel-tapping hole tube brick layer, be connected to the doughnut-shaped steel plate on external orifice of steel-tapping hole one section of supporting tube, fire resistant infilling layer between tap hole brick cup layer and steel-tapping hole tube brick layer forms, it is characterized in that: on the web plate that doughnut-shaped steel plate is contiguous, be relatively connected with two clamps, each clamp is provided with webge slot, the wedge that tangible shape matches is inserted in webge slot, tapping side on the web plate of adjacent rings steel plate is provided with at least two steady braces, asbestos washer is provided with between web plate and doughnut-shaped steel plate.
CN201520879480.3U 2015-11-06 2015-11-06 Hot change converter tapping hole structure of ability accurate positioning Expired - Fee Related CN205088277U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520879480.3U CN205088277U (en) 2015-11-06 2015-11-06 Hot change converter tapping hole structure of ability accurate positioning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520879480.3U CN205088277U (en) 2015-11-06 2015-11-06 Hot change converter tapping hole structure of ability accurate positioning

Publications (1)

Publication Number Publication Date
CN205088277U true CN205088277U (en) 2016-03-16

Family

ID=55478982

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520879480.3U Expired - Fee Related CN205088277U (en) 2015-11-06 2015-11-06 Hot change converter tapping hole structure of ability accurate positioning

Country Status (1)

Country Link
CN (1) CN205088277U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107858478A (en) * 2017-12-20 2018-03-30 马鞍山钢铁股份有限公司 A kind of converter taphole sleeve brick positioner and installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107858478A (en) * 2017-12-20 2018-03-30 马鞍山钢铁股份有限公司 A kind of converter taphole sleeve brick positioner and installation method

Similar Documents

Publication Publication Date Title
CN108570524B (en) Detection and diagnosis process for refractory material of blast furnace hot blast stove pipeline lining
CN102912051A (en) Method for exchanging cooling wall of blast furnace taphole online
CN104141021B (en) A kind of method of blast furnace open hole and blast furnace open hole device systems
CN205088277U (en) Hot change converter tapping hole structure of ability accurate positioning
JP2009062601A (en) Molten pig iron tapping hole structure in melting furnace, and repairing method therefor
CN204108250U (en) There is the smelting ladle of molten bath thickness on-line intelligence warning function
CN101892337B (en) Method for maintaining blast furnace taphole
CN207659475U (en) A kind of online quickly improvement iron mouth spraying and splashing facility
CN200984639Y (en) Nozzle brick device for aluminium casting capable of easy changing
CN105671244A (en) Spherical hinge support replacement method for 120-ton or above converter
CN210765382U (en) Novel converter furnace cap lining masonry structure
CN101619373B (en) Method for sealing external orifice of steel-tapping hole of converter
CN213232363U (en) Converter tapping hole structure
JP3894502B2 (en) Gas injection nozzle for molten metal and method of using the same
CN211897018U (en) Iron notch structure of full pouring
CN100528414C (en) Vacuum pouring honeycomb duct
CN201567345U (en) Steel outlet structure of converter convenient to be replaced
CN209873002U (en) Converter tapping hole connecting and fixing device
CN103924016B (en) A kind of method changing the large cover of cinder monkey
CN207987277U (en) A kind of converter taphole sleeve brick positioning device
CN204874583U (en) Repair converter tapping hole instrument fast
CN216972586U (en) Converter tapping hole structure
CN205242870U (en) Gutter intercommunication anti -overflow water structure of metal roofing
CN204329576U (en) Titanium slag furnace combination stove mouth structure
CN206033792U (en) Long -life RH stove dip pipe integrated configuration

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170711

Address after: 430083 Qingshan District, Hubei, Wuhan factory before the door No. 2

Patentee after: Wuhan iron and Steel Company Limited

Address before: 430080 Wuhan, Hubei Friendship Road, No. 999, Wuchang

Patentee before: Wuhan Iron & Steel (Group) Corp.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160316

Termination date: 20201106

CF01 Termination of patent right due to non-payment of annual fee