CN205074671U - Welding frock that welded tube and arc welded board - Google Patents

Welding frock that welded tube and arc welded board Download PDF

Info

Publication number
CN205074671U
CN205074671U CN201520825969.2U CN201520825969U CN205074671U CN 205074671 U CN205074671 U CN 205074671U CN 201520825969 U CN201520825969 U CN 201520825969U CN 205074671 U CN205074671 U CN 205074671U
Authority
CN
China
Prior art keywords
welded tube
welding
holder
welded
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520825969.2U
Other languages
Chinese (zh)
Inventor
袁源远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Bojin Precision Machinery Manufacturing Co Ltd
Original Assignee
Wuxi Bojin Precision Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Bojin Precision Machinery Manufacturing Co Ltd filed Critical Wuxi Bojin Precision Machinery Manufacturing Co Ltd
Priority to CN201520825969.2U priority Critical patent/CN205074671U/en
Application granted granted Critical
Publication of CN205074671U publication Critical patent/CN205074671U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The utility model relates to a welding frock that welded tube and arc welded board, including welded seat, the fastening screw through both sides among the welded seat installs the bottom electrode of vertical setting, and the top of bottom electrode is equipped with the electrode, the last fixing device that installs of welded seat, the welded tube of fixing device installation and arc weld the board and are located between electrode and the bottom electrode, fixing device is including dividing first fixing base and the second fixing base that occupy the bottom electrode both sides, the upper end of first fixing base is equipped with the first brace table of welded tube, and the tip locating plate of the side's of installing pipe end is rotated through the hinge in its side, installs the grip block that the arc welded the board between the terminal surface of first fixing base and the bottom electrode, has the centre gripping groove on the grip block, the upper end of second fixing base is equipped with the second brace table of welded tube, is equipped with the vertical vertical through -hole that runs through on the second brace table, runs through in the vertical through -hole and installs the pin, and the lower extreme of pin links firmly on welded seat, places the welded tube between the side of its upper end and second brace table.

Description

The welding tooling of welded tube and arc welding plate
Technical field
The utility model relates to welding technology field, particularly the welding tooling of shaped piece.
Background technology
The workpiece of required welding as shown in Figure 6, comprise a welded tube 8 and arc welding plate 9, together with needing the middle part weld part 801 of welded tube 8 to weld with the welding edges portion 901 of arc welding plate 9, the two ends of welded tube 8 are with square tube end 802, and the lower end of arc welding plate 9 is bent into a swash plate portion 902.Due to the special construction of welded tube 8 and arc welding plate 9, also do not have a kind of well positioning tool at present, can only adopt and help welding by hand, its welding efficiency is low, and welding quality is not high.
Utility model content
The applicant, for the above-mentioned shortcoming of prior art, carries out studying and designing, provides the welding tooling of a kind of welded tube and arc welding plate, for welding of auxiliary welded tube and arc welding plate, improves welding efficiency and quality.
In order to solve the problem, the utility model adopts following scheme:
The welding tooling of a kind of welded tube and arc welding plate, for welding between the middle part weld part of welded tube and the welding edges portion of arc welding plate, the two ends of welded tube are respectively square tube end, the lower end of arc welding plate is bent into a swash plate portion, described welding tooling comprises welding base, the bottom electrode vertically arranged is installed by the trip bolt of both sides in welding base, the top of bottom electrode is provided with top electrode, welding base is provided with fixture, and the welded tube that described fixture is installed and arc welding plate are between top electrode and bottom electrode; Described fixture comprises point the first holder occuping bottom electrode both sides and second holder; The upper end of the first holder is provided with the first brace table of welded tube, and its side is rotatablely equipped with the end location-plate of square tube end by hinge, is provided with the grip block of arc welding plate, with holding tank on grip block between the end face of the first holder and bottom electrode; The upper end of described second holder is provided with the second brace table of welded tube, second brace table is provided with the vertical through holes vertically run through, run through in vertical through holes and be provided with pin, the lower end of pin is fixed on welding base, places welded tube between the side of its upper end and the second brace table.
Further improvement as technique scheme:
The upper surface of described welding base is with the first mounting platform and the second mounting platform that are positioned at bottom electrode both sides, with mounting groove and the first fixing hole on first mounting platform, mounting groove matches with the fixing projection of the first holder lower surface, and the first holder is fixedly installed on the first mounting platform by the first vertical hold-down screw coordinated with the first fixing hole; Described second mounting platform is provided with the second fixing hole and described pin, and the second holder is fixedly installed on the second mounting platform by the second vertical hold-down screw coordinated with the second fixing hole.
With angular cut on described welding base, the root of angular cut is with the bearing diagonal face coordinated with the swash plate portion of arc welding plate.
On the location-plate of described end with the hinge hole coordinated with hinge, for limit square tube end end position positive stop end and by the spacing swinging end of the gear shaft on the first holder.
Described grip block is L-type structure, and its rear end is fixedly installed on the first holder by horizontal hold-down screw.
Technique effect of the present utility model is:
Welding tooling of the present utility model, designs according to the design feature of welded tube and curved weld plate, and the fixed position of reasonable Arrangement welded tube and arc welding plate, substantially increase welding efficiency and quality, have the advantages that structure is simple, easy for installation.
Accompanying drawing explanation
Fig. 1 is three-dimensional structure diagram of the present utility model.
Fig. 2 is another three-dimensional structure diagram of the present utility model.
Fig. 3 is decomposition chart of the present utility model.
Fig. 4 is another decomposition chart of the present utility model.
Fig. 5 is the three-dimensional structure diagram of welding base of the present utility model.
Fig. 6 be welded tube with arc welding plate weld schematic diagram.
Fig. 7 is the partial enlarged drawing at A place in Fig. 1.
In figure: 1, welding base; 101, the first mounting platform; 102, the second mounting platform; 103, angular cut; 104, mounting groove; 105, pin; 106, bearing diagonal face; 107, the first fixing hole; 108, the second fixing hole; 2, bottom electrode; 3, top electrode; 4, the first holder; 401, the first brace table; 402, hinge; 403, gear shaft; 404, fixing projection; 405, grip block; 406, holding tank; 407, horizontal hold-down screw; 408, the first vertical hold-down screw; 5, the second holder; 501, the second brace table; 502, vertical through holes; 503, the second vertical hold-down screw; 6, trip bolt; 7, end location-plate; 701, positive stop end; 702, swinging end; 703, hinge hole; 8, welded tube; 801, middle part weld part; 802, square tube end; 9, arc welding plate; 901, welding edges portion; 902, swash plate portion.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described further.
As shown in Figure 6, the welded tube of the present embodiment and the welding tooling of arc welding plate, for welding between the middle part weld part 801 of welded tube 8 and the welding edges portion 901 of arc welding plate 9, the two ends of welded tube 8 are respectively square tube end 802, and the lower end of arc welding plate 9 is bent into a swash plate portion 902.
As shown in Figure 1 and Figure 2, welding tooling comprises welding base 1, the bottom electrode 2 vertically arranged is installed by the trip bolt 6 of both sides in welding base 1, the top of bottom electrode 2 is provided with top electrode 3, welding base 1 is provided with fixture, and the welded tube 8 that fixture is installed and arc welding plate 9 are between top electrode 3 and bottom electrode 2;
As shown in Figure 3, Figure 4, fixture comprises point first holder 4 and second holder 5 occuping bottom electrode 2 both sides; The upper end of the first holder 4 is provided with the first brace table 401 of welded tube 8, its side is rotatablely equipped with the end location-plate 7 of square tube end 802 by hinge 402, the grip block 405 of arc welding plate 9 is installed, with holding tank 406 on grip block 405 between the end face of the first holder 4 and bottom electrode 2; The upper end of the second holder 5 is provided with the second brace table 501 of welded tube 8, second brace table 501 is provided with the vertical through holes 502 vertically run through, run through in vertical through holes 502 and pin 105 is installed, the lower end of pin 105 is fixed on welding base 1, places welded tube 8 between the side of its upper end and the second brace table 501.
If figure is as shown in Fig. 3, Fig. 4 and Fig. 5, the upper surface of welding base 1 is with the first mounting platform 101 and the second mounting platform 102 being positioned at bottom electrode 2 both sides, with mounting groove 104 and the first fixing hole 107 on first mounting platform 101, mounting groove 104 matches with the fixing projection 404 of the first holder 4 lower surface, and the first holder 4 is fixedly installed on the first mounting platform 101 by the first vertical hold-down screw 408 coordinated with the first fixing hole 107; Second mounting platform 102 is provided with the second fixing hole 108 and pin 105, second holder 5 is fixedly installed on the second mounting platform 102 by the second vertical hold-down screw 503 coordinated with the second fixing hole 108.
As shown in Figure 5, with angular cut 103 on welding base 1, the root of angular cut 103 is with the bearing diagonal face 106 coordinated with the swash plate portion 902 of arc welding plate 9.The setting of angular cut 103, is beneficial to placement and the installation of arc welding plate 9.
As shown in Fig. 4, Fig. 7, on end location-plate 7 with the hinge hole 703 coordinated with hinge 402, for limit square tube end 802 end position positive stop end 701 and by the spacing swinging end 702 of the gear shaft 403 on the first holder 4.
As shown in Figure 4, grip block 405 is in L-type structure, and its rear end is fixedly installed on the first holder 4 by horizontal hold-down screw 407.
When the utility model uses, on the first mounting platform 101 the first holder 4 and the second holder 5 being fixedly installed in welding base 1 and the second mounting platform 102, bottom electrode 2 is fixed on the center of welding base 1 by horizontal trip bolt 6; Welded tube 8 is placed on the first brace table 401 of the first holder 4 and the second brace table 501 of the second holder 5; End location-plate 7 is installed on the side of the first holder 4 by hinge 402 and gear shaft 403, and the positive stop end 701 of end location-plate 7 upper end props up square tube end 802, the swinging end of its lower end 702 and gear shaft 403 against; The welding edges portion 901 of the upper end of arc welding plate 9 is placed in the below of the middle part weld part 801 of welded tube 8, and its top is held in the holding tank 406 of grip block 405, and the swash plate portion 902 of its lower end is placed on the bearing diagonal face 106 of welding base 1; Coordinate with bottom electrode 2 after top electrode 3 declines and realize welding.
Above illustrated embodiment is better embodiment of the present utility model, only be used for conveniently the utility model being described, not any pro forma restriction is done to the utility model, have in any art and usually know the knowledgeable, if do not depart from the utility model carry in the scope of technical characteristic, utilize the utility model disclose the Equivalent embodiments changed or modify in the done local of technology contents, and do not depart from technical characteristic content of the present utility model, all still belong in the scope of the utility model technical characteristic.

Claims (5)

1. the welding tooling of a welded tube and arc welding plate, for welding between the middle part weld part (801) of welded tube (8) and the welding edges portion (901) of arc welding plate (9), the two ends of welded tube (8) are respectively square tube end (802), the lower end of arc welding plate (9) is bent into a swash plate portion (902), it is characterized in that: described welding tooling comprises welding base (1), the bottom electrode (2) vertically arranged is installed by the trip bolt (6) of both sides in welding base (1), the top of bottom electrode (2) is provided with top electrode (3), (1) is provided with fixture to welding base, the welded tube (8) that described fixture is installed and arc welding plate (9) are positioned between top electrode (3) and bottom electrode (2), described fixture comprises point the first holder (4) occuping bottom electrode (2) both sides and second holder (5), the upper end of the first holder (4) is provided with first brace table (401) of welded tube (8), its side is rotatablely equipped with the end location-plate (7) of square tube end (802) by hinge (402), the grip block (405) of arc welding plate (9) is installed, with holding tank (406) on grip block (405) between the end face of the first holder (4) and bottom electrode (2), the upper end of described second holder (5) is provided with second brace table (501) of welded tube (8), second brace table (501) is provided with the vertical through holes (502) vertically run through, run through in vertical through holes (502) and pin (105) is installed, the lower end of pin (105) is fixed on welding base (1), places welded tube (8) between the side of its upper end and the second brace table (501).
2. according to the welding tooling of welded tube according to claim 1 and arc welding plate, it is characterized in that: the upper surface of described welding base (1) is with the first mounting platform (101) and the second mounting platform (102) that are positioned at bottom electrode (2) both sides, with mounting groove (104) and the first fixing hole (107) on first mounting platform (101), mounting groove (104) matches with the fixing projection (404) of the first holder (4) lower surface, first holder (4) is fixedly installed on the first mounting platform (101) by the first vertical hold-down screw (408) coordinated with the first fixing hole (107), described second mounting platform (102) is provided with the second fixing hole (108) and described pin (105), and the second holder (5) is fixedly installed on the second mounting platform (102) by the second vertical hold-down screw (503) coordinated with the second fixing hole (108).
3. according to the welding tooling of welded tube according to claim 1 and arc welding plate, it is characterized in that: with angular cut (103) on described welding base (1), the root of angular cut (103) is with the bearing diagonal face (106) coordinated with the swash plate portion (902) of arc welding plate (9).
4., according to the welding tooling of welded tube according to claim 1 and arc welding plate, it is characterized in that: on described end location-plate (7) with the hinge hole (703) coordinated with hinge (402), for limit square tube end (802) end position positive stop end (701) and by the spacing swinging end (702) of the gear shaft (403) on the first holder (4).
5. according to the welding tooling of welded tube according to claim 1 and arc welding plate, it is characterized in that: described grip block (405) is in L-type structure, and its rear end is fixedly installed on the first holder (4) by horizontal hold-down screw (407).
CN201520825969.2U 2015-10-22 2015-10-22 Welding frock that welded tube and arc welded board Expired - Fee Related CN205074671U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520825969.2U CN205074671U (en) 2015-10-22 2015-10-22 Welding frock that welded tube and arc welded board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520825969.2U CN205074671U (en) 2015-10-22 2015-10-22 Welding frock that welded tube and arc welded board

Publications (1)

Publication Number Publication Date
CN205074671U true CN205074671U (en) 2016-03-09

Family

ID=55427109

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520825969.2U Expired - Fee Related CN205074671U (en) 2015-10-22 2015-10-22 Welding frock that welded tube and arc welded board

Country Status (1)

Country Link
CN (1) CN205074671U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105195884A (en) * 2015-10-22 2015-12-30 无锡博进精密机械制造有限公司 Welding tooling of welded tube and arc-shaped welded plate

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105195884A (en) * 2015-10-22 2015-12-30 无锡博进精密机械制造有限公司 Welding tooling of welded tube and arc-shaped welded plate

Similar Documents

Publication Publication Date Title
CN202106178U (en) Roof crossbeam installing and fixing device
CN104551492A (en) Novel engine bracket assembly welding fixture
CN205074671U (en) Welding frock that welded tube and arc welded board
CN205074711U (en) Welded tube and counter safety welding frock of welding board
CN205074708U (en) Take welded tube of tally function and welding frock that arc welded board
CN201455583U (en) Oil tank positioning clamp
CN202780342U (en) Welding locating tool for balance weight lamp shade of loading machine
CN205074662U (en) Welded tube welds frock with safety of welding board
CN202278422U (en) Auxiliary machining device used for welding steam chamber body of small steam turbine
CN204221330U (en) Buckle group founds special plane
CN102974932B (en) Electrode holders
CN203305097U (en) Adjustable hinged supporting structure
CN207289307U (en) A kind of welding fixture with damping device
CN105195950A (en) Welding tube and arc welding plate welding tool with counting function
CN204565679U (en) Piston mould pin core clamping device
CN205226638U (en) A adjustable bracket for pipe laying
CN105195884A (en) Welding tooling of welded tube and arc-shaped welded plate
CN205551861U (en) Door frame welding jig behind automobile
CN103464946B (en) A kind of rotary adjustment type alignment pin
CN205043404U (en) Coil and vertical welding jig who welds board
CN206794436U (en) A kind of correcting working table
CN105195878A (en) Safe welding tooling of welded tube and welded plate
CN203380876U (en) Storage device of fan blade
CN205043405U (en) Elastic clamping formula bent arc plate welding position frock
CN205551877U (en) Welding centre gripping frock of dysmorphism sheet metal component

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160309

Termination date: 20161022