CN205067556U - Multi -functional installation template of electric energy meter case - Google Patents

Multi -functional installation template of electric energy meter case Download PDF

Info

Publication number
CN205067556U
CN205067556U CN201520805240.9U CN201520805240U CN205067556U CN 205067556 U CN205067556 U CN 205067556U CN 201520805240 U CN201520805240 U CN 201520805240U CN 205067556 U CN205067556 U CN 205067556U
Authority
CN
China
Prior art keywords
hole
meter case
plate body
hole clipping
outlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520805240.9U
Other languages
Chinese (zh)
Inventor
蒋文泳
陈伟强
巢文伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Changzhou Power Supply Co of Jiangsu Electric Power Co
Original Assignee
State Grid Corp of China SGCC
Changzhou Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Changzhou Power Supply Co of Jiangsu Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN201520805240.9U priority Critical patent/CN205067556U/en
Application granted granted Critical
Publication of CN205067556U publication Critical patent/CN205067556U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model provides a multi -functional installation template of electric energy meter case, package rubbing board personally experiences sth. Part of the body, puts forth effort handle, spirit level and high indicator scale, the plate body is rectangular plate body spare, 2 individually put forth effort the handle each fixedly sets up 1 respectively at the middle part of the left and right sides of the preceding terminal surface of plate body, the fixed middle part upside that sets up at the preceding terminal surface of plate body of spirit level, high indicator scale setting is the below in the left side of plate body, be equipped with inlet wire pipe strap punch combination on the plate body, the pipe strap punch combination of being qualified for the next round of competitions, three -phase table case punch combination, first single -phase table case punch combination and the single -phase table case punch combination of second, inlet wire pipe strap punch combination includes firstly to fourth inlet wire pipe strap hole, the pipe strap punch combination of being qualified for the next round of competitions includes firstly to the 9th pipe strap hole of being qualified for the next round of competitions, each is shown the case punch combination and includes A, B, C hole. The utility model discloses simple structure, cost are lower, easily the construction carry, be convenient for promote in the industry, the location is simple, quick during the use, saves the engineering time by a wide margin to the installation quality of electric energy meter case and PVC pipe accords with technical standard completely.

Description

The multi-functional installation form of a kind of electric energy metering box
Technical field
The utility model relates to electric energy metering box and installs the auxiliary Work tool in location, is specifically related to the multi-functional installation form of a kind of electric energy metering box.
Background technology
Electric energy meter installation is an important process of power supply enterprise.According to the requirement of installing electric energy meter in power supply enterprise's " below 0.4kV connects (entering) family line, metering and harvester Construction Technology specification ", before at the scene electric energy meter being installed, first to install in order to hold, the table case of wiring and protection electric energy meter meter, its technical standard comprises: be 1. security consideration, and bottom table case, overhead height must not lower than 1.8 meters (getting 1.8 meters); 2. casing will install level; 3. line protective casing (described is below pvc pipe) all will reach 5 ㎝ apart from table case left and right side edge, will reach 7 ㎝ bottom table case.Power supply department needs to construct according to above-mentioned standard when mounted, owing to lacking effective aid, usually needs 12 concrete steps when electric energy metering box is installed: the 1. height 1.8 meters that need install of meter case; 2. left and right moves up and down, and makes table case level by range estimation; 3. the position, hole of marking pen label table case is used; 4. at control hole position electric hammer punching; 5. in hole, bulged tube is hammered into; 6. self-tapping screw fixed table case is used; 7. determine pipe clamp position by measurement and mark position, pipe clamp hole (pipe clamp is the device in order to fixing PVC pipe, determines that pvc pipe position can be determined in pipe clamp position) with marking pen; 8. at control hole position electric hammer punching; 9. in hole, bulged tube is hammered into; 10. pipe clamp is fixed with self-tapping screw; (11) fixing PVC pipe; (12) show case installation.
From aforementioned, owing to lacking effective aid, the installation of electric energy metering box is wasted time and energy, for skilled labor's construction with all strength, average every only table case is installed and is needed about 25 minutes used time; In practice of construction process, some workmen causes the electric energy metering box of installation can not reach the requirement of technical standard to accelerate speed of application, cause the electric energy metering box installed exist highly not up to standard, casing is crooked, pvc pipe to casing apart from the variety of problems such as not up to standard.
Utility model content
The purpose of this utility model is: for problem involved in background technology, can increase substantially the electric energy metering box multi-functional installation form that electric energy metering box installs effect when providing that a kind of structure is simple, cost is lower, easy to use and use.
The technical solution of the utility model is: the multi-functional installation form of electric energy metering box of the present utility model, and its design feature is: comprise plate body, put forth effort handle, level meter and height indicator scale;
Above-mentioned plate body is rectangular plate body part; Put forth effort handle and be provided with 2, put forth effort handle for these 2 and be respectively fixedly installed 1 respectively at the middle part of the left and right sides of the front end face of plate body; Level meter is fixedly installed on the upside of the middle part of the front end face of plate body; Height indicator scale is arranged on below in the left side of plate body;
Plate body is provided with inlet wire pipe hole clipping group, outlet-pipe hole clipping group, three-phase meter case hole group, the first single-phase meter case hole group and the second single-phase meter case hole group;
Above-mentioned inlet wire pipe hole clipping group comprises the first inlet wire pipe hole clipping, the second inlet wire pipe hole clipping, the 3rd inlet wire pipe hole clipping and the 4th inlet wire pipe hole clipping;
Outlet-pipe hole clipping group comprises the first outlet-pipe hole clipping, the second outlet-pipe hole clipping, the 3rd outlet-pipe hole clipping, the 4th outlet-pipe hole clipping, the 5th outlet-pipe hole clipping, the 6th outlet-pipe hole clipping, the 7th outlet-pipe hole clipping, the 8th outlet-pipe hole clipping and the 9th outlet-pipe hole clipping;
Three-phase meter case hole group comprises three-phase meter case A hole, three-phase meter case B hole and three-phase meter case C hole;
First single-phase meter case hole group comprises the first single-phase meter case A hole, the first single-phase meter case B hole and the first single-phase meter case C hole;
Second single-phase meter case hole group comprises the second single-phase meter case A hole, the second single-phase meter case B hole and the second single-phase meter case C hole.
Further scheme is: above-mentioned level meter preferably adopts the Simple spirit level of lucite pipe contained liquid bubble.
Further scheme also has: above-mentioned height indicator scale is made up of plummet, vertical line and wrapping post, wrapping post is fixedly installed on below in the left side of plate body, vertical line not the used time around on wrapping post, the lower end of vertical line is connected with plummet, during use, when vertical line is all decontroled, during the lower end kiss the earth of plummet, now the lower end of plate body and the height on ground are 1.8 meters.
The utility model has positive effect: the multi-functional installation form of (1) electric energy metering box of the present utility model, and structure is simple, cost is lower, is easy to construction and carries, be convenient to promote in the industry.(2) the multi-functional installation form of electric energy metering box of the present utility model, it by arranging level meter, height indicator scale and pilot hole group on plate body, and all Kong Weijun meet the technical standards, make it can save in use in prior art and use tape measure to locate the link in electric energy metering box hole and PVC line pipe clamp hole respectively, location is simple, quick, significantly save the engineering time, and the installation quality of electric energy metering box and pvc pipe meets the technical standards completely, standard is unified, technique is attractive in appearance.
Accompanying drawing explanation
Fig. 1 is planar structure schematic diagram of the present utility model.
Reference numeral in above-mentioned accompanying drawing is as follows:
Plate body 1, puts forth effort handle 2, level meter 3, height indicator scale 4;
Inlet wire pipe hole clipping group 5, first inlet wire pipe hole clipping 51, second inlet wire pipe hole clipping the 52, three inlet wire pipe hole clipping the 53, four inlet wire pipe hole clipping 54,
Outlet-pipe hole clipping group 6, first outlet-pipe hole clipping 61, second outlet-pipe hole clipping the 62, three outlet-pipe hole clipping 63,4th outlet-pipe hole clipping the 64, five outlet-pipe hole clipping the 65, six outlet-pipe hole clipping 66,7th outlet-pipe hole clipping the 67, eight outlet-pipe hole clipping the 68, nine outlet-pipe hole clipping 69;
Hole 73, hole 72, three-phase meter case C, three-phase meter case hole group 7, three-phase meter case A hole 71, three-phase meter case B;
First single-phase meter case C hole, single-phase meter case B hole 82, first, group 8, first single-phase meter case A hole 81, first, single-phase meter case hole 83;
Second single-phase meter case C hole, single-phase meter case B hole 92, second, group 9, second single-phase meter case A hole 91, second, single-phase meter case hole 93.
Embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
(embodiment 1)
See Fig. 1, the multi-functional installation form of electric energy metering box of the present embodiment, its primarily of plate body 1, put forth effort handle 2, level meter 3 and height indicator scale 4 form.
Plate body 1 is rectangular plate body part.
Put forth effort handle 2 and be provided with 2, put forth effort handle 2 for these 2 and be respectively fixedly installed 1 respectively at the middle part of the left and right sides of the front end face of plate body 1.
Level meter 3 is fixedly installed on the upside of the middle part of the front end face of plate body 1; The Simple spirit level of lucite pipe contained liquid bubble is preferably adopted in level meter 3 the present embodiment.
Height indicator scale 4 is made up of plummet, vertical line and wrapping post, wrapping post is fixedly installed on below in the left side of plate body 1, vertical line not the used time around on wrapping post, the lower end of vertical line is connected with plummet, during use, when vertical line is all decontroled, during the lower end kiss the earth of plummet, then now the lower end of plate body 1 and the height on ground are 1.8 meters.
Plate body 1 is provided with inlet wire pipe hole clipping group 5, outlet-pipe hole clipping group 6, three-phase meter case hole group 7, first single-phase meter case hole group 8 and the second single-phase meter case hole group 9.
Inlet wire pipe hole clipping group 5 comprises the first inlet wire pipe hole clipping 51, second inlet wire pipe hole clipping 52, the 3rd inlet wire pipe hole clipping 53 and the 4th inlet wire pipe hole clipping 54.
Outlet-pipe hole clipping group 6 comprises the first outlet-pipe hole clipping 61, second outlet-pipe hole clipping 62, the 3rd outlet-pipe hole clipping 63, the 4th outlet-pipe hole clipping 64, the 5th outlet-pipe hole clipping 65, the 6th outlet-pipe hole clipping 66, the 7th outlet-pipe hole clipping 67, the 8th outlet-pipe hole clipping 68 and the 9th outlet-pipe hole clipping 69.
Three-phase meter case hole group 7 comprises three-phase meter case A hole 71, three-phase meter case B hole 72 and three-phase meter case C hole 73.
First single-phase meter case hole group 8 comprises the first single-phase meter case B hole, single-phase meter case A hole 81, first 82 and the first single-phase meter case C hole 83.
Second single-phase meter case hole group 9 comprises the second single-phase meter case B hole, single-phase meter case A hole 91, second 92 and the second single-phase meter case C hole 93.
The position setting of above-mentioned each pilot hole on plate body 1, according in power supply enterprise's " below 0.4kV connects (entering) family line, metering and harvester Construction Technology specification ", the technical standard that electric energy meter and electric energy metering box are installed is determined, after being positioned by above-mentioned each pilot hole, the installation quality that the mark position staying metope can make corresponding electric energy metering box and corresponding PVC pass in and out spool meets the technical standards requirement.Plate body 1 all there is corresponding text prompt (not shown in figure 1), with convenient construction human users to each pilot hole.
The multi-functional installation form of electric energy metering box of the present embodiment, it can be used for the installation quick position of three-phase electric energy meter box, single phase electric energy meter case and 2 phase electric energy meter cases and respective corresponding PVC turnover spool thereof, is specifically summarized as follows in use:
During use, first the rear end face of plate body 1 is affixed on metope, height of observation indicator scale 4, bottom the plummet of height indicator scale 4 just kiss the earth time, then represent and overhead highly reach 1.8 meters bottom electric energy metering box, then keep form height constant, eye-level instrument 3, mobile plate body 1 is finely tuned, when the bubble in level meter 3 is in middle position, display plate body 1 is up to the standard, and shows that electric energy metering box is up to the standard; At this moment the position of plate body 1 reaches standard-required, then according to installed electric energy metering box be three-phase electric energy meter box, single phase electric energy meter case or 2 phase electric energy meter cases, three kinds of situations carry out the selection of position, hole and mark:
The first situation: when need install three-phase electric energy meter box, is made a mark by the three-phase meter case A hole 71 of three-phase electric energy meter box hole group 7, three-phase meter case B hole 72 and three-phase meter case C hole 73 with marking pen on metope; Made a mark on metope by the first outlet-pipe hole clipping 61 of the first inlet wire pipe hole clipping 51, second inlet wire pipe hole clipping 52 of inlet wire pipe hole clipping group 5, the 3rd inlet wire pipe hole clipping 53 and outlet-pipe hole clipping group 6, the 4th outlet-pipe hole clipping 64 and the 5th outlet-pipe hole clipping 65 simultaneously, remove plate body 1 again, now metope leaves visible marking, implements punching and follow-up installation procedure installation three-phase electric energy meter box and corresponding PVC thereof pass in and out spool to mark position.
The second situation: when need install single phase electric energy meter case, is made a mark by the first single-phase meter case B hole, single-phase meter case A hole 81, first 82 of the first single-phase meter case hole group 8 and the first single-phase meter case C hole 83 with marking pen on metope; Made a mark on metope by the second outlet-pipe hole clipping 62 of the first inlet wire pipe hole clipping 51, second inlet wire pipe hole clipping 52 of inlet wire pipe hole clipping group 5 and the 3rd inlet wire pipe hole clipping 53 and outlet-pipe hole clipping group 6, the 4th outlet-pipe hole clipping 64 and the 5th outlet-pipe hole clipping 65 simultaneously, remove plate body 1 again, now metope leaves visible marking, implements punching and follow-up installation procedure installation three-phase electric energy meter box and corresponding PVC thereof pass in and out spool to mark position.
The third situation: when need install 2 phase electric energy meter cases, is made a mark by the first single-phase meter case B hole, single-phase meter case A hole 81, first 82 of the first single-phase meter case hole group 8 and the second single-phase meter case B hole, single-phase meter case A hole 91, second 92 of the first single-phase meter case C hole 83 and the second single-phase meter case hole group 9 and the second single-phase meter case C hole 93 with marking pen on metope; Made a mark on metope by the 3rd outlet-pipe hole clipping 63 of the first inlet wire pipe hole clipping 51, second inlet wire pipe hole clipping 52 of inlet wire pipe hole clipping group 5 and the 4th inlet wire pipe hole clipping 54 and outlet-pipe hole clipping group 6, the 6th outlet-pipe hole clipping 66, the 7th outlet-pipe hole clipping 67, the 8th outlet-pipe hole clipping 68 and the 9th outlet-pipe hole clipping 69 simultaneously, remove plate body 1 again, now metope leaves visible marking, implements punching and follow-up installation procedure installation three-phase electric energy meter box and corresponding PVC thereof pass in and out spool to mark position.
Above embodiment is the explanation to embodiment of the present utility model; but not to restriction of the present utility model; person skilled in the relevant technique is not when departing from spirit and scope of the present utility model; can also make various conversion and change and obtain corresponding equivalent technical scheme, therefore all equivalent technical schemes all should be included into scope of patent protection of the present utility model.

Claims (1)

1. the multi-functional installation form of electric energy metering box, is characterized in that: comprise plate body (1), put forth effort shake hands (2), level meter (3) and height indicator scale (4);
Described plate body (1) is rectangular plate body part; Put forth effort handle (2) and be provided with 2, put forth effort handle (2) for these 2 and be respectively fixedly installed 1 respectively at the middle part of the left and right sides of the front end face of plate body (1); Level meter (3) is fixedly installed on the upside of the middle part of the front end face of plate body (1); Height indicator scale (4) is arranged on below in the left side of plate body (1);
Plate body (1) is provided with inlet wire pipe hole clipping group (5), outlet-pipe hole clipping group (6), three-phase meter case hole group (7), the first single-phase meter case hole group (8) and the second single-phase meter case hole group (9);
Described inlet wire pipe hole clipping group (5) comprises the first inlet wire pipe hole clipping (51), the second inlet wire pipe hole clipping (52), the 3rd inlet wire pipe hole clipping (53) and the 4th inlet wire pipe hole clipping (54);
Outlet-pipe hole clipping group (6) comprises the first outlet-pipe hole clipping (61), the second outlet-pipe hole clipping (62), the 3rd outlet-pipe hole clipping (63), the 4th outlet-pipe hole clipping (64), the 5th outlet-pipe hole clipping (65), the 6th outlet-pipe hole clipping (66), the 7th outlet-pipe hole clipping (67), the 8th outlet-pipe hole clipping (68) and the 9th outlet-pipe hole clipping (69);
Three-phase meter case hole group (7) comprises three-phase meter case A hole (71), three-phase meter case B hole (72) and three-phase meter case C hole (73);
First single-phase meter case hole group (8) comprises the first single-phase meter case A hole (81), the first single-phase meter case B hole (82) and the first single-phase meter case C hole (83);
Second single-phase meter case hole group (9) comprises the second single-phase meter case A hole (91), the second single-phase meter case B hole (92) and the second single-phase meter case C hole (93).
CN201520805240.9U 2015-10-13 2015-10-13 Multi -functional installation template of electric energy meter case Expired - Fee Related CN205067556U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520805240.9U CN205067556U (en) 2015-10-13 2015-10-13 Multi -functional installation template of electric energy meter case

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520805240.9U CN205067556U (en) 2015-10-13 2015-10-13 Multi -functional installation template of electric energy meter case

Publications (1)

Publication Number Publication Date
CN205067556U true CN205067556U (en) 2016-03-02

Family

ID=55394093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520805240.9U Expired - Fee Related CN205067556U (en) 2015-10-13 2015-10-13 Multi -functional installation template of electric energy meter case

Country Status (1)

Country Link
CN (1) CN205067556U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106066467A (en) * 2016-07-19 2016-11-02 卢敏 A kind of outdoor electrical energy meter fault checks terminal automatically
CN108916183A (en) * 2018-09-13 2018-11-30 小狗电器互联网科技(北京)股份有限公司 Paster and installation method are installed

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106066467A (en) * 2016-07-19 2016-11-02 卢敏 A kind of outdoor electrical energy meter fault checks terminal automatically
CN106066467B (en) * 2016-07-19 2019-08-27 周瑞芳 It is a kind of outdoor electrical energy meter fault examine terminal automatically
CN108916183A (en) * 2018-09-13 2018-11-30 小狗电器互联网科技(北京)股份有限公司 Paster and installation method are installed

Similar Documents

Publication Publication Date Title
CN205067556U (en) Multi -functional installation template of electric energy meter case
CN203132530U (en) Multifunctional distance measuring instrument
CN204346523U (en) A kind of water meter panel
CN202795133U (en) Financial accounting teaching abacus
CN205061432U (en) Over -and -under type electric energy meter case mounting bracket
CN203203701U (en) Panel for electronic scale
CN203731052U (en) Form board for hanging and mounting liquid-crystal television
CN202110194U (en) Electric energy meter user display device capable of being conveniently disassembled
CN205287413U (en) Body -building apparatus transmission system protective housing
CN206194938U (en) Landscape tower
CN201455940U (en) Scale dust prevention cover equipped with electric drill
CN209785429U (en) A female tablet for installing multiple security ring marks tablet
CN204495261U (en) Portable study plot arranges try square
CN204517307U (en) Curved crane span structure in one
CN204906908U (en) Multipurpose plant hangers
CN204760832U (en) Flower hole support mounting instrument
CN202155872U (en) Freely combined toolbox for electricity room
CN204418628U (en) A kind of building machinery engineering Hanging Basket
CN203928994U (en) A kind of for measuring the movable lug chi of structure verticality
CN208421034U (en) A kind of electric energy meter improving display screen mounting means
CN204759868U (en) Chemistry teaching panel frame
CN207501930U (en) A kind of intelligent electric meter installation punching positioning device
CN202048920U (en) Simple position determiner for vertical scutcheon
CN211992611U (en) Plate positioning tool based on three-point positioning
CN204740278U (en) Sign directly prints formula meter shell body

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160302

CF01 Termination of patent right due to non-payment of annual fee