CN205062991U CN201520754859.1U CN201520754859U CN205062991U CN 205062991 U CN205062991 U CN 205062991U CN 201520754859 U CN201520754859 U CN 201520754859U CN 205062991 U CN205062991 U CN 205062991U
Authority
CN
China
Prior art keywords
ditch body
ditch
delivery port
inspection shaft
finished product
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520754859.1U
Other languages
Chinese (zh)
Inventor
马克尧
冯科成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui HEMMI new materials Co. Ltd.
Original Assignee
Wuhu Chi Ke Adrainage Material Trade Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhu Chi Ke Adrainage Material Trade Co Ltd filed Critical Wuhu Chi Ke Adrainage Material Trade Co Ltd
Priority to CN201520754859.1U priority Critical patent/CN205062991U/en
Application granted granted Critical
Publication of CN205062991U publication Critical patent/CN205062991U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to an escape canal technical field, in particular to combination formula inspection shaft in finished product escape canal, the top edge department that takes the ditch body both sides of branch pipe delivery port installs the ditch body and increases the board, the internal lining of ditch is installed to U type ditch inslot, year thing basket of taking the mesh is installed to the lower part of the internal lining of ditch. The utility model discloses based on the ditch body of taking the branch pipe delivery port, the ditch body of increasing board umbilical cord branch pipe delivery port through the ditch body reduces certain height for whole escape canal to the internal lining of ditch that carries the thing basket through the internal installation belt of the ditch taking the branch pipe delivery port repacks it into inspection shaft. Improved the range of application of the ditch body of taking the branch pipe delivery port, the ditch body is increased the board and also can be applied to the whole in escape canal alone and increase. To this combination formula inspection shaft, only need design the internal lining of ditch alone and carry a thing basket, and the internal lining of ditch and the mould manufacturing cost that carries the thing basket and former NULL all are less than an independent inspection shaft, greatly reduced the cost of finished product escape canal manufacturer.

Description

A kind of combined inspection shaft of finished product gutter
Technical field
The utility model relates to gutter technical field, particularly a kind of combined inspection shaft of finished product gutter.
Background technology
Under existing municipal engineering land used, webmaster manhole mostly is brick concrete inspection well, and it mainly exists following shortcoming: first intensity is low, and the support strength of brickwork construction is low, and the brickwork construction reducing reducing part especially near road surface is easily subsided because active force impacts; Secondly well body construction cycle is long, and construction is complicated, owing to must piling up at manual scene, high to civil engineering requirement, and standardization, generalization, seriation degree are poor, by hand and materials number be the key factor affecting quality; Exist in addition and can not change, easily break and seepage and the defect such as to pollute, need frequent maintenance, and, cumbersome for fishing for of the mud in traditional manhole or other foreign material, mainly operated with special workpiece by sanitationman, cause inconvenience to the work of sanitationman.
Along with the continuous popularization that HDPE material is applied in finished product gutter, finished product gutter replaces conventional discharge ditch gradually, and finished product gutter includes the ditch body of support pipe free delivery port, the ditch body of band arm delivery port and manhole composition according to the design of drainage system.The ditch body of support pipe free delivery port and the ditch body of band arm delivery port are linear pattern gutter, and substantially identical from structure, its both ends are respectively arranged with splicing buckle or splicing slot.Ditch body unlike band arm delivery port is provided with union at sidepiece and bottom, for connecting other pipelines.And manhole structure from the ditch body of support pipe free delivery port and be with the ditch body of arm delivery port obviously different, when laying gutter, needs arrange one according to drainage situation every several meters or tens meters.
Utility model content
The purpose of this utility model is for the deficiencies in the prior art, a kind of combined inspection shaft of finished product gutter is provided, this combined inspection shaft is based on the ditch body being with arm delivery port, and install ditch body additional on the top of its both sides and increase plate, the both ends that this ditch body increases plate arrange the splicing buckle and splicing slot that can be connected with the ditch body buckle of support pipe free delivery port respectively.When the ditch body that ditch body increases plate and support pipe free delivery port splices, the ditch body of band arm delivery port just can reduce downwards certain height relative to whole gutter.The ditch body liner of band U-type groove is installed in the ditch body due to this band arm delivery port, the bottom of this ditch body liner is provided with grooved seal plate, this grooved seal plate by ditch body liner to seal down to region more than U-shaped head groove, and between grooved seal plate, the material carrying basket of a band mesh is provided with two, ditch body liner bottom, this loading may be used for depositing the foreign material that flow in gutter and filters it.Wherein, in the splicing of gutter, the splicing buckle at ditch body liner two ends and splicing slot participate in the splicing in whole gutter, namely splice with the counter structure on the ditch body of support pipe free delivery port, the U-type groove of having spliced rear ditch body liner can be docked with the U-shaped groove of the ditch body of support pipe free delivery port, can not produce the drop of current when ensureing that current pass through in the stitching portion of ditch body liner.
For achieving the above object, the utility model provides following technical scheme:
A kind of combined inspection shaft of finished product gutter, comprise the ditch body of band arm delivery port, U-shaped groove is provided with in the ditch body of described band arm delivery port, its rear and front end portion is respectively equipped with splicing buckle and splicing slot, and the upper edge of the ditch body both sides of described band arm delivery port is provided with ditch body and increases plate; Ditch body liner is installed in described U-shaped groove; The bottom of described ditch body liner is provided with the material carrying basket of band mesh.
Further, described ditch body liner comprises the liner body of band U-type groove; The bottom, two ends of described liner body is equipped with grooved seal plate; The middle part of the U-type groove of described liner body is provided with the counterbore for installing material carrying basket; Described material carrying basket two is between grooved seal plate.
Further, position-limited edge is provided with in described counterbore; The upper edge of described material carrying basket is provided with the rib coordinated with position-limited edge.
Further, the both ends of described liner body are also provided with splicing buckle and splicing slot; Described grooved seal plate is the U-shaped sealing plate that profile and U-shaped trench wall are fitted; The edge that described liner body is provided with the grooved seal plate of splicing slot one end is provided with splicing buckle.
Further, described liner body and grooved seal plate are equipped with reinforcing rib.
Further, the both sides of the edge place of the ditch body of described band arm delivery port is provided with the first safe edge; The upper surface of described first safe edge is provided with installation draw-in groove; The ditch body inside of described band arm delivery port is provided with the first supporting surface perpendicular to the first safe edge; Described first supporting surface is provided with square groove and insert installing hole; Metal inserted piece with threaded hole is inlaid with in described insert installing hole.
Further, the bottom that described ditch body increases plate is provided with the lower support face contacting with the first supporting surface and coordinate; Described lower support face is provided with the positioning convex coordinated with the square groove on the first supporting surface; The lower outside that described ditch body increases plate is provided with the positioning step coordinated with the first safe edge; Described positioning step is provided with the installation buckle with installing card slot fit on the first safe edge.
Further, the upper outside that described ditch body increases plate is provided with second safe edge parallel with the first safe edge; The upper surface of described second safe edge is also provided with installation draw-in groove; The top that described ditch body increases plate is also provided with the upper supporting surface parallel with the first supporting surface; Described upper supporting surface is also provided with square groove and insert installing hole.
Further, the both ends that described ditch body increases plate are also respectively equipped with splicing buckle and splicing slot.
Beneficial effect: the combined inspection shaft in a kind of finished product gutter of the present utility model, this combined inspection shaft is based on the ditch body being with arm delivery port, the ditch body being increased plate and support pipe free delivery port by ditch body is spliced, make the ditch body of band arm delivery port reduce certain height relative to whole gutter, and repacked into manhole by the ditch body liner of mounting strap material carrying basket in the ditch body of band arm delivery port.This combined inspection shaft structure is simple, improves the range of application of the ditch body of band arm delivery port, and ditch body is increased the entirety that plate also can be applied to separately gutter and increased.For this combined inspection shaft, only need design ditch body liner and material carrying basket separately, and the die manufacturing cost of ditch body liner and material carrying basket and raw material usage are all less than an independently manhole, greatly reduce the cost of finished product gutter manufacturer.
Accompanying drawing explanation
Fig. 1 is the perspective view that application has gutter of the present utility model;
Fig. 2 is the decomposition texture schematic diagram that application has gutter of the present utility model;
Fig. 3 is the enlarged diagram at A place in Fig. 2;
Fig. 4 is the mounting structure schematic diagram of material carrying basket in the utility model;
Fig. 5 is the perspective view one of liner body in the utility model;
Fig. 6 is the perspective view two of liner body in the utility model;
Fig. 7 is the perspective view three of liner body in the utility model;
Fig. 8 is the perspective view four of liner body in the utility model;
Fig. 9 is the sectional structure schematic diagram of liner body in the utility model;
Figure 10 is the perspective view of material carrying basket in the utility model;
Figure 11 is the perspective view one that in the utility model, ditch body increases plate;
Figure 12 is the perspective view two that in the utility model, ditch body increases plate;
Description of reference numerals: ditch body 1, the first safe edge 1a of band arm delivery port, the first supporting surface 1b, installs draw-in groove 1c, square groove 1d, insert installing hole 1e, the ditch body 2 of support pipe free delivery port, splicing buckle 3, splicing slot 4, ditch body increases plate 5, lower support face 5a, positioning convex 5b, positioning step 5c, buckle 5d is installed, the second safe edge 5e, upper supporting surface 5f, ditch body liner 6, liner body 6a, grooved seal plate 6b, counterbore 6c, position-limited edge 6d, reinforcing rib 6e, material carrying basket 7, mesh 7a, rib 7b.
Detailed description of the invention
Below in conjunction with Figure of description and embodiment, specific embodiment of the utility model is described in further detail:
Referring to figs. 1 through the combined inspection shaft in a kind of finished product gutter shown in Figure 12, comprise the ditch body 1 of band arm delivery port, U-shaped groove is provided with in the ditch body 1 of described band arm delivery port, its rear and front end portion is respectively equipped with splicing buckle 3 and splicing slot 4, and the upper edge of ditch body 1 both sides of described band arm delivery port is provided with ditch body and increases plate 5; Ditch body liner 6 is installed in described U-shaped groove; The bottom of described ditch body liner 6 is provided with the material carrying basket 7 of band mesh 7a.
Described ditch body liner 6 comprises the liner body 6a of band U-type groove; The bottom, two ends of described liner body 6a is equipped with grooved seal plate 6b; The middle part of the U-type groove of described liner body 6a is provided with the counterbore 6c for installing material carrying basket 7; Described material carrying basket 7 two is between grooved seal plate 6b.
Owing to being with the ditch body 1 of arm delivery port after having installed ditch body additional and having increased plate 5 by certain altitude in entire lowering.Therefore, there is tomography between the U-shaped groove of ditch body 1 of band arm delivery port and the U-shaped groove of the ditch body 2 of support pipe free delivery port, therefore needed by grooved seal plate 6b, the two ends of the ditch body 1 of band arm delivery port to be sealed.
Position-limited edge 6d is provided with in described counterbore 6c; The upper edge of described material carrying basket 7 is provided with the rib 7b coordinated with position-limited edge 6d.
The both ends of described liner body 6a are also provided with splicing buckle 3 and splicing slot 4; Described grooved seal plate 6b is the U-shaped sealing plate that profile and U-shaped trench wall are fitted; The edge that described liner body 6a is provided with the grooved seal plate 6b of splicing slot 4 one end is provided with splicing buckle 3.
Two ends due to liner body 6a are also provided with splicing buckle 3 and splicing slot 4, therefore the U-type groove replacement of liner body 6a is with the U-shaped groove of ditch body 1 of arm delivery port and the U-shaped groove of the ditch body 2 of support pipe free delivery port to splice, the groove in composition gutter, when current are through the U-type groove of liner body 6a time, foreign material can be dropped in material carrying basket 7 by counterbore 6c.
Described liner body 6a and grooved seal plate 6b is equipped with reinforcing rib 6e.
The both sides of the edge place of the ditch body 1 of described band arm delivery port is provided with the first safe edge 1a; The upper surface of described first safe edge 1a is provided with installs draw-in groove 1c; Ditch body 1 inside of described band arm delivery port is provided with the first supporting surface 1b perpendicular to the first safe edge 1a; Described first supporting surface 1b is provided with square groove 1d and insert installing hole 1e; Metal inserted piece with threaded hole is inlaid with in described insert installing hole 1e.
The bottom that described ditch body increases plate 5 is provided with the lower support face 5a contacting with the first supporting surface 1b and coordinate; Described lower support face 5a is provided with the positioning convex 5b coordinated with the square groove 1d on the first supporting surface 1b; The lower outside that described ditch body increases plate 5 is provided with the positioning step 5c coordinated with the first safe edge 1a; Described positioning step 5c is provided with and the installation buckle 5d the first safe edge 1a installing draw-in groove 1c and coordinate.
The upper outside that described ditch body increases plate 5 is provided with the second safe edge 5e parallel with the first safe edge 1a; The upper surface of described second safe edge 5e is also provided with installs draw-in groove 1c; The top that described ditch body increases plate 5 is also provided with the upper supporting surface 5f parallel with the first supporting surface 1b; Described upper supporting surface 5f is also provided with square groove 1d and insert installing hole 1e.
It should be noted that, ditch body increases plate 5 not only for the ditch body 1 of band arm delivery port is transformed into combined inspection shaft.If when the degree of depth of ditch body excavation being greater than the projected depth of single ditch body when laying gutter, can all installing ditch body additional on the ditch body 2 of the ditch body 1 and support pipe free delivery port of being with arm delivery port and increasing plate 5, to increase the entire depth in finished product gutter.
Comprehensively above-mentioned, this combined inspection shaft is based on the ditch body 1 being with arm delivery port, and install ditch body additional on the top of its both sides and increase plate 5, the both ends that this ditch body increases plate 5 arrange the splicing buckle 3 and splicing slot 4 that can be connected with ditch body 2 buckle of support pipe free delivery port respectively, when the ditch body 2 that ditch body increases plate 5 and support pipe free delivery port splices, the ditch body 1 of band arm delivery port just can reduce downwards certain height relative to whole gutter.Be provided with in ditch body 1 due to this band arm delivery port band U-type groove ditch body liner 6, the bottom of this ditch body liner 6 is provided with grooved seal plate 6b, this grooved seal plate 6b by ditch body liner 6 to seal down to region more than U-shaped head groove.Wherein, the splicing buckle 3 on grooved seal plate 6b carries out buckle with the splicing slot 4 on the ditch body 1 of band arm delivery port and is connected, and ensures ditch body liner 6 and be with between the ditch body 1 of arm delivery port to be connected firmly.And between grooved seal plate 6b, the material carrying basket 7 of a band mesh 7a is provided with two, ditch body liner 6 bottom, this loading may be used for depositing the foreign material that flow in gutter and filters it.Wherein, in the splicing of gutter, the splicing buckle 3 at ditch body liner 6 two ends and splicing slot 4 participate in the splicing in whole gutter, namely splice with the counter structure on the ditch body 2 of support pipe free delivery port, the U-type groove of having spliced rear ditch body liner 6 can be docked with the U-shaped groove of the ditch body 2 of support pipe free delivery port, can not produce the drop of current when ensureing that current pass through in the stitching portion of ditch body liner 6.
The above, it is only preferred embodiment of the present utility model, not any restriction is made to technical scope of the present utility model, therefore every above embodiment is done according to technical spirit of the present utility model any trickle amendment, equivalent variations and modification, all still belong in the scope of the technical solution of the utility model.

Claims (9)

1. the combined inspection shaft in a finished product gutter, comprise the ditch body (1) of band arm delivery port, U-shaped groove is provided with in the ditch body (1) of described band arm delivery port, its rear and front end portion is respectively equipped with splicing buckle (3) and splicing slot (4), it is characterized in that: the upper edge of ditch body (1) both sides of described band arm delivery port is provided with ditch body and increases plate (5); Ditch body liner (6) is installed in described U-shaped groove; The bottom of described ditch body liner (6) is provided with the material carrying basket (7) of band mesh (7a).
2. the combined inspection shaft in a kind of finished product gutter according to claim 1, is characterized in that: described ditch body liner (6) comprises the liner body (6a) of band U-type groove; The bottom, two ends of described liner body (6a) is equipped with grooved seal plate (6b); The middle part of the U-type groove of described liner body (6a) is provided with the counterbore (6c) for installing material carrying basket (7); Described material carrying basket (7) two is positioned between grooved seal plate (6b).
3. the combined inspection shaft in a kind of finished product gutter according to claim 2, is characterized in that: be provided with position-limited edge (6d) in described counterbore (6c); The upper edge of described material carrying basket (7) is provided with the rib (7b) coordinated with position-limited edge (6d).
4. the combined inspection shaft in a kind of finished product gutter according to claim 2, is characterized in that: the both ends of described liner body (6a) are also provided with splicing buckle (3) and splicing slot (4); The U-shaped sealing plate that described grooved seal plate (6b) is fitted for profile and U-shaped trench wall; The edge that described liner body (6a) is provided with the grooved seal plate (6b) of splicing slot (4) one end is provided with splicing buckle (3).
5. the combined inspection shaft in a kind of finished product gutter according to claim 2, is characterized in that: described liner body (6a) and grooved seal plate (6b) are equipped with reinforcing rib (6e).
6. the combined inspection shaft in a kind of finished product gutter according to claim 1, is characterized in that: the both sides of the edge place of the ditch body (1) of described band arm delivery port is provided with the first safe edge (1a); The upper surface of described first safe edge (1a) is provided with installs draw-in groove (1c); Ditch body (1) inside of described band arm delivery port is provided with the first supporting surface (1b) perpendicular to the first safe edge (1a); Described first supporting surface (1b) is provided with square groove (1d) and insert installing hole (1e); Metal inserted piece with threaded hole is inlaid with in described insert installing hole (1e).
7. the combined inspection shaft in a kind of finished product gutter according to claim 6, is characterized in that: the bottom that described ditch body increases plate (5) is provided with the lower support face (5a) contacting with the first supporting surface (1b) and coordinate; Described lower support face (5a) is provided with the positioning convex (5b) coordinated with the square groove (1d) on the first supporting surface (1b); The lower outside that described ditch body increases plate (5) is provided with the positioning step (5c) coordinated with the first safe edge (1a); Described positioning step (5c) is provided with draw-in groove upper with the first safe edge (1a) and installs the installation coordinated and install buckle (5d).
8. the combined inspection shaft in a kind of finished product gutter according to claim 6, is characterized in that: the upper outside that described ditch body increases plate (5) is provided with second safe edge (5e) parallel with the first safe edge (1a); The upper surface of described second safe edge (5e) is also provided with installs draw-in groove (1c); The top that described ditch body increases plate (5) is also provided with the upper supporting surface (5f) parallel with the first supporting surface (1b); Described upper supporting surface (5f) is also provided with square groove (1d) and insert installing hole (1e).
9. the combined inspection shaft in a kind of finished product gutter according to claim 6, is characterized in that: the both ends that described ditch body increases plate (5) are also respectively equipped with splicing buckle (3) and splicing slot (4).
CN201520754859.1U 2015-09-25 2015-09-25 Combination formula inspection shaft in finished product escape canal Withdrawn - After Issue CN205062991U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520754859.1U CN205062991U (en) 2015-09-25 2015-09-25 Combination formula inspection shaft in finished product escape canal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520754859.1U CN205062991U (en) 2015-09-25 2015-09-25 Combination formula inspection shaft in finished product escape canal

Publications (1)

Publication Number Publication Date
CN205062991U true CN205062991U (en) 2016-03-02

Family

ID=55389566

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520754859.1U Withdrawn - After Issue CN205062991U (en) 2015-09-25 2015-09-25 Combination formula inspection shaft in finished product escape canal

Country Status (1)

Country Link
CN (1) CN205062991U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297873A (en) * 2015-09-25 2016-02-03 芜湖弛科排水材料贸易有限公司 Combined inspection well of finished drainage ditch
CN108412014A (en) * 2018-03-19 2018-08-17 王俊铎 A kind of fast-assembling and anti-block sewer

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297873A (en) * 2015-09-25 2016-02-03 芜湖弛科排水材料贸易有限公司 Combined inspection well of finished drainage ditch
CN108412014A (en) * 2018-03-19 2018-08-17 王俊铎 A kind of fast-assembling and anti-block sewer

Similar Documents

Publication Publication Date Title
CN102758451B (en) Concrete cable channel construction process
CN205062991U (en) Combination formula inspection shaft in finished product escape canal
CN205051281U (en) Pre -buried location structure of shear force wall line box
CN103835263A (en) Prefabricated ditch
CN101434476A (en) Sealing plugging material and use thereof in shield break-in and break-out construction
CN105297873A (en) Combined inspection well of finished drainage ditch
CN104541643A (en) Land rectification method for coal mining subsidence areas in plain areas
CN204098061U (en) Wall led by steel plate
CN207988406U (en) A kind of Side fascia connector
CN209494575U (en) A kind of push pipe portal sealing device under low Water And Earth Pressures
CN204940503U (en) A kind of finished product gutter of the variable ditch body degree of depth
CN204538630U (en) Novel cable ditch
CN204940484U (en) A kind of easy structure manhole of finished product gutter
CN207074836U (en) A kind of building chase
CN204424846U (en) Pre-fabricated electric cables ditch
CN204662346U (en) Shallowly above a kind of shield tunnel cover bed stabilization structure
CN105155662B (en) A kind of finished product gutter of variable ditch body depth
CN210066987U (en) Concatenation formula sump pit
CN211446883U (en) Underground continuous wall antiseep connection structure
CN210797480U (en) A concatenation formula ditch for field irrigation
CN204163055U (en) A kind of chute of water conservancy
CN209211487U (en) A kind of breast boards structure
CN209323504U (en) A kind of continuous underground wall structure
CN202712778U (en) Novel wire box
CN204551705U (en) A kind of finished product gutter, HDPE right angle

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160427

Address after: Yangheroad Wuhu high tech Industrial Development Zone, Anhui Province, No. 20 241003

Patentee after: Anhui HEMMI new materials Co. Ltd.

Address before: 241003 Anhui city of Wuhu province science and Technology Park Innovation Service Outsourcing Park Building No. 4 East Building Room 1211

Patentee before: Wuhu Chi Ke adrainage material trade Co., Ltd

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20160302

Effective date of abandoning: 20170405