CN205062904U - Can automatic clear up overflow arrangement of cistern deposit - Google Patents

Can automatic clear up overflow arrangement of cistern deposit Download PDF

Info

Publication number
CN205062904U
CN205062904U CN201520821223.4U CN201520821223U CN205062904U CN 205062904 U CN205062904 U CN 205062904U CN 201520821223 U CN201520821223 U CN 201520821223U CN 205062904 U CN205062904 U CN 205062904U
Authority
CN
China
Prior art keywords
section
diameter
reservoir
overflow
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520821223.4U
Other languages
Chinese (zh)
Inventor
刘万
王文刚
金玉涛
赵雷
步彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangang Group Hanbao Iron and Steel Co Ltd
Original Assignee
Hangang Group Hanbao Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangang Group Hanbao Iron and Steel Co Ltd filed Critical Hangang Group Hanbao Iron and Steel Co Ltd
Priority to CN201520821223.4U priority Critical patent/CN205062904U/en
Application granted granted Critical
Publication of CN205062904U publication Critical patent/CN205062904U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Removal Of Floating Material (AREA)

Abstract

The utility model relates to a can automatic clear up overflow arrangement of cistern deposit belongs to plumbing equipment technical field, including the overflow pipe that comprises the section of absorbing water, drainage section and linkage segment, connecting period number in the overflow liquid level department of cistern, the section of absorbing water and drainage section are connected respectively to both ends, and the overflow mouth is offered on the linkage segment, and the end connection that the linkage segment was kept away from to the section of absorbing water has loudspeaker form water absorption device, and its horn mouth plane is close to the cistern bottom, the export of drainage section is less than the cistern bottom surface, when the 350mm <= section of absorbing water diameter < 1000mm, the overflow mouth diameter is 20mm, and when the section of absorbing water diameter >= 1000mm, the overflow mouth diameter is 0.02 times of the section of absorbing water diameter, the utility model discloses utilize siphon principle to realize arranging the overflow of cistern bottom deposit thing outward, stopped the waste of the high -quality water resource in cistern upper portion when guaranteeing the normal liquid level of cistern, effectively lengthen the unloading cleaning cycle of cistern bottom deposit thing, practiced thrift labour cost.

Description

The sedimental overflow mechanism of a kind of energy Automatic clearance reservoir
Technical field
The utility model relates to the sedimental overflow mechanism of a kind of energy Automatic clearance reservoir, belongs to plumbing equipment technical field.
Background technology
Industrial circle recirculating cooling water system is generally made up of reservoir, the water pump being arranged in reservoir, cooling tower or heat exchanger and the bleed off pipe that is fixed on reservoir inside; Reservoir is for ensureing normal water storage function, generally be provided with overflow liquid level, normal level and low liquid level three with reference to liquid level, as shown in Figure 1, overflow liquid level is the highest liquid level of reservoir, when reservoir water level is higher than overflow liquid level, by bleed off pipe, unnecessary water is discharged reservoir, to ensure the normal retaining of reservoir; Normal level is below overflow liquid level, more than low liquid level, and the height of normal level embodies the adjustment water reservation of reservoir; Low liquid level is the lowest limit liquid level of reservoir, when lower than low liquid level, water pump is easily caused not go up water, or cause the deposits such as columns base mud entered water system by water pump suction and cause device damage, it is general when liquid level is down near low liquid level, need termination of pumping or carry out water replenishment, maintaining reservoir liquid level more than low liquid level.
Existing reservoir defect is: bleed off pipe water inlet is generally positioned at top or the top of reservoir, usually be all undertaken by reservoir top to reservoir moisturizing, top water quality is better, when overflow occurs, the high-quality water on top enters sewer by bleed off pipe, and the silt and other sediment being arranged in columns base is still present in reservoir, cause the waste of high-quality water resource; Meanwhile, reservoir is in recycling for a long time, and basic sediment frequently must carry out emptying cleaning, and emptying cleaning needs shutdown operation, has a strong impact on normal rhythm of production, meanwhile, adds cleaning labour cost.
Utility model content
Technical problem to be solved in the utility model is to provide the sedimental overflow mechanism of a kind of energy Automatic clearance reservoir, by the improvement to bleed off pipe, deposit while utilizing siphon principle to realize reservoir overflow in suction outer row partial storage pond, prevent deposition to harden solidification, extend reservoir cleaning cycle, stable water supply water quality.
For solving the problems of the technologies described above, the technical solution of the utility model is as follows:
The sedimental overflow mechanism of a kind of energy Automatic clearance reservoir, comprise the bleed off pipe being fixed on reservoir inside, its improvements are: described bleed off pipe comprises water absorbing section, draining section and linkage section, linkage section is positioned at the overflow liquid level place of reservoir, two ends connect water absorbing section and draining section respectively, overfall is opened on linkage section, and water absorbing section is connected with horn-like water absorber away from the end of linkage section, and its horn mouth plane is near columns base; The outlet of draining section is lower than reservoir bottom surface; As 350mm≤water absorbing section diameter ﹤ 1000mm, overflow diameter is 20mm, and as water absorbing section diameter >=1000mm, overflow diameter is 0.02 times of water absorbing section diameter.
The above-mentioned sedimental overflow mechanism of one energy Automatic clearance reservoir, the horn mouth plane of described horn-like water absorber is parallel with reservoir bottom surface, and horn mouth plane is 300mm ~ 700mm to the vertical distance of reservoir bottom surface; Described draining section is exported to the vertical distance >=0.8m of reservoir bottom surface.
The above-mentioned sedimental overflow mechanism of one energy Automatic clearance reservoir, the most narrow diameter of junction closing in section of described horn-like water absorber and bleed off pipe water absorbing section is 0.6 ~ 0.8 times of water absorbing section diameter; Horn-like water absorber horn mouth diameter is 2 ~ 3 times of water absorbing section diameter; Draining section diameter is 1.2 ~ 1.5 times of water absorbing section diameter.
The course of work of the present utility model is: reservoir flooding velocity is less than reservoir moisturizing speed usually, when exceeding overflow liquid level to moisturizing in reservoir, overfall starts outer draining, now maintenance moisturizing, because the design of the utility model overflow diameter can ensure that overflow flow velocity is much smaller than moisturizing speed, when the water surface exceedes overfall height, realize the sealing of water liquid to overfall, when being full of water in overflow mechanism, the draining section of bleed off pipe, link and water absorbing section form syphon, due to the pressure differential that the absolute altitude at device two ends is formed, the silt and other sediment suction being positioned at columns base is realized to discharge reservoir, the horn-like water absorber adopting reducing to be connected with water absorbing section can improve the flow velocity of reducing junction, the vertical distance of horn-like water absorber horn mouth plane and reservoir bottom surface is that 300mm ~ 700mm can avoid occurring that silt " puies forward " phenomenon motionless, the outlet of draining section and the difference in height >=0.8m of horn-like water absorber ensure sedimentally to arrange outward smoothly, and draining section diameter is that 1.2 ~ 1.5 times of water absorbing section diameter can accelerate sedimental outer row, realize the quick decline of reservoir liquid level while siphon principle arranges basic sediment outside, when liquid level drops to overflow liquid level, overfall spills, and air enters bleed off pipe inside, and siphon drainage destroys, and draining stops.
The beneficial effects of the utility model are:
The utility model utilizes siphon principle to realize arranging the sedimental overflow of columns base outward, effectively prevent deposition to harden solidification, the waste of reservoir top high-quality water resource has been stopped while ensureing reservoir normal level, the sedimental emptying cleaning cycle of effective prolongation columns base, save labour cost, ensure that production direct motion; The utility model structure is simple, widely applicable, the cheap easily construction of transformation, and sludge discharge effects of drawing water is remarkable, effectively can control the content of sedimentation in reservoir during overflow, realizes stablizing of reservoir long-period stable operation and water supply quality excellent.
Accompanying drawing explanation
Fig. 1 is reservoir schematic diagram in prior art;
Fig. 2 is the utility model structural representation;
Be labeled as in figure: reservoir 1, overflow liquid level 2, normal level 3, low liquid level 4, bleed off pipe 5, water absorbing section 5-1, draining section 5-2, linkage section 5-3, overfall 6, horn-like water absorber 7.
Detailed description of the invention
Fig. 2 shows, the utility model comprises the bleed off pipe 5 being fixed on reservoir 1 inside, bleed off pipe 5 comprises water absorbing section 5-1, draining section 5-2 and linkage section 5-3, linkage section 5-3 is positioned at overflow liquid level 2 place of reservoir 1, two ends connect water absorbing section 5-1 and draining section 5-2 respectively, overfall 6 is opened on linkage section 5-3, and water absorbing section 5-1 is provided with horn-like water absorber 7 away from the end of linkage section 5-3, and the most narrow diameter of junction closing in section is 0.6 ~ 0.8 times of water absorbing section 5-1 diameter; Horn-like water absorber 7 horn mouth diameter is 2 ~ 3 times of water absorbing section 5-1 diameter; The diameter of draining section 5-2 is 1.2 ~ 1.5 times of water absorbing section 5-1 diameter; Horn-like water absorber 7 horn mouth plane is parallel with the bottom surface of reservoir 1, and the vertical distance apart from reservoir 1 bottom surface is 300mm ~ 700mm; The outlet of draining section 5-2 lower than the bottom surface of reservoir 1, apart from the vertical distance >=0.8m of reservoir 1 bottom surface; As 350mm≤water absorbing section 5-1 diameter ﹤ 1000mm, overfall 6 diameter is 20mm, and as water absorbing section 5-1 diameter >=1000mm, the diameter of overfall 6 is 0.02 times of water absorbing section 5-1 diameter.
The course of work of the present utility model is: the flooding velocity of reservoir 1 is less than the moisturizing speed of reservoir 1 usually, when exceeding overflow liquid level 2 to moisturizing in reservoir 1, overfall 6 starts outer draining, now maintenance moisturizing, diameter design due to the utility model overfall 6 can ensure that overflow flow velocity is much smaller than moisturizing speed, when the water surface exceedes the height of overfall 6, overflow mechanism is filled with water to full packages, the sealing of overfall 6, the draining section 5-2 of bleed off pipe 5, link 5-3 and water absorbing section 5-1 forms syphon, due to the pressure differential that the absolute altitude at device two ends is formed, being positioned at silt and other sediment bottom reservoir 1 due to siphon principle discharges reservoir 1 outward, the horn-like water absorber 7 adopting reducing to be connected with water absorbing section 5-1 can improve the flow velocity of reducing junction, the vertical distance of horn-like water absorber 7 horn mouth plane and reservoir 1 is that 300mm ~ 700mm can avoid occurring that silt " puies forward " phenomenon motionless, draining section 5-3 exports and can to ensure sedimental to arrange with the difference in height >=0.8m of horn-like water absorber 7 outward smoothly, and the diameter of draining section 5-2 is that 1.2 ~ 1.5 times of water absorbing section 5-1 diameter can accelerate sedimental outer row, realize the quick decline of reservoir 1 liquid level while siphon principle arranges basic sediment outside, when liquid level drops to overflow liquid level 2, overfall 6 spills, and air enters the inside of bleed off pipe 5, and siphon drainage destroys, and ensures the normal level of reservoir 1.

Claims (3)

1. the sedimental overflow mechanism of energy Automatic clearance reservoir, comprise and be fixed on the inner bleed off pipe (5) of reservoir (1), it is characterized in that: described bleed off pipe (5) comprises water absorbing section (5-1), draining section (5-2) and linkage section (5-3), linkage section (5-3) is positioned at overflow liquid level (2) place of reservoir (1), two ends connect water absorbing section (5-1) and draining section (5-2) respectively, overfall (6) is opened on linkage section (5-3), water absorbing section (5-1) is connected with horn-like water absorber (7) away from the end of linkage section (5-3), its horn mouth plane is near the bottom of reservoir (1), draining section (5-2) outlet is lower than the bottom surface of reservoir (1), as 350mm≤water absorbing section (5-1) diameter ﹤ 1000mm, overfall (6) diameter is 20mm, and as the diameter >=1000mm of water absorbing section (5-1), the diameter of overfall (6) is 0.02 times of water absorbing section (5-1) diameter.
2. the sedimental overflow mechanism of a kind of energy Automatic clearance reservoir as claimed in claim 1, it is characterized in that: the horn mouth plane of described horn-like water absorber (7) is parallel with the bottom surface of reservoir (1), horn mouth plane is 300mm ~ 700mm to the vertical distance of reservoir (1) bottom surface; Vertical distance >=the 0.8m being exported to reservoir (1) bottom surface of described draining section (5-2).
3. as claimed in claim 1 or 2 a kind of can the sedimental overflow mechanism of Automatic clearance reservoir, it is characterized in that: the most narrow diameter of the connection closing in section of described horn-like water absorber (7) and bleed off pipe water absorbing section (5-1) is 0.6 ~ 0.8 times of water absorbing section (5-1) diameter; The horn mouth diameter of horn-like water absorber (7) is 2 ~ 3 times of water absorbing section (5-1) diameter; Draining section (5-2) diameter is 1.2 ~ 1.5 times of water absorbing section (5-1) diameter.
CN201520821223.4U 2015-10-23 2015-10-23 Can automatic clear up overflow arrangement of cistern deposit Expired - Fee Related CN205062904U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520821223.4U CN205062904U (en) 2015-10-23 2015-10-23 Can automatic clear up overflow arrangement of cistern deposit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520821223.4U CN205062904U (en) 2015-10-23 2015-10-23 Can automatic clear up overflow arrangement of cistern deposit

Publications (1)

Publication Number Publication Date
CN205062904U true CN205062904U (en) 2016-03-02

Family

ID=55389479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520821223.4U Expired - Fee Related CN205062904U (en) 2015-10-23 2015-10-23 Can automatic clear up overflow arrangement of cistern deposit

Country Status (1)

Country Link
CN (1) CN205062904U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108998104A (en) * 2018-09-07 2018-12-14 山东京博众诚清洁能源有限公司 A kind of desulfurization regeneration system, desulphurization system and sulfur method
CN115387628A (en) * 2022-10-27 2022-11-25 永利物业管理海安有限公司 Outer wall anti-falling protection device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108998104A (en) * 2018-09-07 2018-12-14 山东京博众诚清洁能源有限公司 A kind of desulfurization regeneration system, desulphurization system and sulfur method
CN108998104B (en) * 2018-09-07 2020-08-18 山东京博众诚清洁能源有限公司 Desulfurization solution regeneration system, desulfurization system and desulfurization method
CN115387628A (en) * 2022-10-27 2022-11-25 永利物业管理海安有限公司 Outer wall anti-falling protection device
CN115387628B (en) * 2022-10-27 2023-02-17 永利物业管理海安有限公司 Anti-falling protection device for outer wall

Similar Documents

Publication Publication Date Title
JP3239131U (en) Demister rinse water recycling system
CN205062904U (en) Can automatic clear up overflow arrangement of cistern deposit
CN202017029U (en) Short-flow stuffy slag water returning device
CN215288028U (en) Quick acid pickling reaction equipment of quartz sand
CN208553278U (en) Filter device of the one kind for the production of -2 (3H) -one of 5- amino -1,3- benzoxazoles
CN207017416U (en) A kind of rain water drainage collection device automatically controlled
CN210596121U (en) Device for preventing sand deposition and hardening of blast furnace slag flushing water absorption tank
CN102251570A (en) Water-saving siphon type one-piece pedestal pan
CN103143238B (en) Pipe groove type liquid distributor applied to flue gas desulfurization tower
CN206603749U (en) A kind of overflow pipe and the dish-washing machine with the overflow pipe
CN201952289U (en) Partial cleaning prefilming device of circulating water cooling water system
CN202250783U (en) Self-floating type water pump platform
CN210559602U (en) Physical automatic defoaming system of nitrification tank
CN107338856A (en) A kind of rain water drainage collection device automatically controlled
CN103658610A (en) Casing die cooling water circulation system
CN203768465U (en) Degreasing fluid circulation tank in cleaning partition
CN203701248U (en) Comprehensive recycling device for waste water resource of thermal power plant
CN207553195U (en) A kind of hydrocone type rain water collecting system
CN202073164U (en) Water-saving siphon one-piece toilet
CN207307277U (en) A kind of inclined tube detention tank with cleaning device
CN205804564U (en) A kind of thermal power plant unit rhone
CN209194642U (en) A kind of horizontal water tank water supply sand removing device
CN103195719B (en) Slurry suction device for slurry pumping of slurry pump
CN203362224U (en) Main-auxiliary water tank for hanging scaffolds
CN205431345U (en) Water conservancy pipeline for water conservancy project

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160302

Termination date: 20181023

CF01 Termination of patent right due to non-payment of annual fee