CN205062776U - 一种河床式水电站枢纽布置结构 - Google Patents
一种河床式水电站枢纽布置结构 Download PDFInfo
- Publication number
- CN205062776U CN205062776U CN201520780674.8U CN201520780674U CN205062776U CN 205062776 U CN205062776 U CN 205062776U CN 201520780674 U CN201520780674 U CN 201520780674U CN 205062776 U CN205062776 U CN 205062776U
- Authority
- CN
- China
- Prior art keywords
- monolith
- sluice
- power station
- clipping room
- river channel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Abstract
本实用新型公开了一种河床式水电站枢纽布置结构,属于水利水电工程技术领域,包括泄洪闸坝段、主厂房坝段、主机间、安装间和若干泄洪闸闸墩,所述泄洪闸坝段位于各泄洪闸闸墩之间,所述泄洪闸坝段与主厂房坝段相邻布置,所述安装间和主机间位于泄洪闸坝段和主厂房坝段顶上。本技术方案充分利用了枢纽的上部空间,缩短了枢纽的整体宽度,从而有效避免或减少了河床两岸的占地和开挖范围,减小了水电工程的工程量,同时降低了工程对两岸居民的影响,也减小了对环境造成的不利影响。
Description
技术领域
本实用新型属于水利水电工程技术领域,涉及河床式水电工程,具体是涉及一种河床式水电站枢纽布置结构。
背景技术
河床式水电站是指水电站厂房位于河床内的水电站,这种水电站厂房本身起到挡水作用,成为集中水头的挡水建筑物之一,一般多见于河流中、下游,这种水电站的特点是水头较低,流量较大。典型河床式水电站有湖北宜昌葛洲坝水电站、四川大渡河深溪沟水电站、沙坪二级水电站等。
河床式水电站枢纽布置一般是由泄洪闸坝段、主厂房坝段、安装间坝段并排布置而成,各坝段均占据一定的河道宽度,总长度较长,又受河床宽度限制,往往需要进行两岸开挖,使得工程量较大,影响两岸居民正常生活,并对两岸的生态环境造成破坏。
实用新型内容
为了解决上述问题,本实用新型提供了一种河床式水电站枢纽布置结构,从而达到缩短枢纽总长度,节省河床位置的效果。
本实用新型是通过如下技术方案予以实现的。
一种河床式水电站枢纽布置结构,包括泄洪闸坝段、主厂房坝段、主机间、安装间和若干泄洪闸闸墩,所述泄洪闸坝段位于各泄洪闸闸墩之间,所述泄洪闸坝段与主厂房坝段相邻布置,所述安装间和主机间位于泄洪闸坝段和主厂房坝段顶上。
进一步地,所述安装间和/或主机间位于泄洪闸坝段顶上时,通过泄洪闸闸墩支撑。
进一步地,所述安装间和主机间分别对应位于泄洪闸坝段和主厂房坝段顶上。
进一步地,所述安装间和主机间的边墙在同一条直线上。
本实用新型的有益效果是:
本实用新型所述的一种河床式水电站枢纽布置结构,充分利用了枢纽的上部空间,缩短了枢纽的整体宽度,从而有效避免或减少了河床两岸的占地和开挖范围,减小了水电工程的工程量,同时降低了工程对两岸居民的影响,也减小了对环境造成的不利影响;尤其对于河床宽度较小的水电工程,具有很好的实用价值。
附图说明
图1为本实用新型的平面布置图;
图2为本实用新型的立面图。
图中:1-泄洪闸坝段,2-主厂房坝段,3-泄洪闸闸墩,4-主机间,5-安装间。
具体实施方式
下面结合附图进一步描述本实用新型的技术方案,但要求保护的范围并不局限于所述。
如图1、图2所示,本实用新型所述的一种河床式水电站枢纽布置结构,包括泄洪闸坝段1、主厂房坝段2、主机间4、安装间5和若干泄洪闸闸墩3,所述泄洪闸坝段1位于各泄洪闸闸墩3之间,所述泄洪闸坝段1与主厂房坝段2相邻布置,所述安装间5和主机间4位于泄洪闸坝段1和主厂房坝段2顶上。
所述安装间5和/或主机间4位于泄洪闸坝段1顶上时,通过泄洪闸闸墩3支撑,以避免安装间5和/或主机间4的重量直接作用在泄洪闸坝段1,对泄洪闸产生不利影响,同时避免安装间5增加额外的坝段布置。
一般情况下,所述安装间5位于泄洪闸坝段1顶上,主机间4位于主厂房坝段2顶上,且所述安装间5和主机间4的边墙在同一条直线上,以方便机电设备在安装间5和主机间4内通过桥机进行安装及检修。
实施例
本技术方案已运用于大渡河枕头坝二级水电站枢纽布置中,枢纽在垂直河床方向的占地宽度仅取决于泄洪闸坝段1的宽度和主厂房坝段2的宽度;按照传统设计,枕头坝二级泄洪闸宽度114m,主机间宽度126.2m,安装间宽度52m,枢纽总宽度292.2m;将安装间5布置到泄洪闸坝段1顶上后,枢纽总宽度减小为240.2m,两岸基本不再进行开挖,移民征地范围缩小,在河床宽度范围内即可完成枢纽布置,河床两岸的生态环境基本不会受到影响。
Claims (4)
1.一种河床式水电站枢纽布置结构,包括泄洪闸坝段(1)、主厂房坝段(2)、主机间(4)、安装间(5)和若干泄洪闸闸墩(3),所述泄洪闸坝段(1)位于各泄洪闸闸墩(3)之间,其特征在于:所述泄洪闸坝段(1)与主厂房坝段(2)相邻布置,所述安装间(5)和主机间(4)位于泄洪闸坝段(1)和主厂房坝段(2)顶上。
2.根据权利要求1所述的一种河床式水电站枢纽布置结构,其特征在于:所述安装间(5)和/或主机间(4)位于泄洪闸坝段(1)顶上时,通过泄洪闸闸墩(3)支撑。
3.根据权利要求1所述的一种河床式水电站枢纽布置结构,其特征在于:所述安装间(5)和主机间(4)分别对应位于泄洪闸坝段(1)和主厂房坝段(2)顶上。
4.根据权利要求1所述的一种河床式水电站枢纽布置结构,其特征在于:所述安装间(5)和主机间(4)的边墙在同一条直线上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520780674.8U CN205062776U (zh) | 2015-10-10 | 2015-10-10 | 一种河床式水电站枢纽布置结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520780674.8U CN205062776U (zh) | 2015-10-10 | 2015-10-10 | 一种河床式水电站枢纽布置结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205062776U true CN205062776U (zh) | 2016-03-02 |
Family
ID=55389352
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520780674.8U Active CN205062776U (zh) | 2015-10-10 | 2015-10-10 | 一种河床式水电站枢纽布置结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205062776U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108487200A (zh) * | 2018-05-04 | 2018-09-04 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种用于水电站厂房的尾水闸墩系统 |
-
2015
- 2015-10-10 CN CN201520780674.8U patent/CN205062776U/zh active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108487200A (zh) * | 2018-05-04 | 2018-09-04 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种用于水电站厂房的尾水闸墩系统 |
CN108487200B (zh) * | 2018-05-04 | 2024-03-19 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种用于水电站厂房的尾水闸墩系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210975715U (zh) | 一种防冲水利堤坝 | |
CN202323895U (zh) | 用于阶梯式水利枢纽的尾水渠结构 | |
CN104863101A (zh) | 一种水电站减水河段鱼类栖息地保护系统 | |
CN103882839B (zh) | 一种低水头河床式枢纽电站进水口的排沙系统 | |
CN203320497U (zh) | 一种电站的尾水检修闸门 | |
CN204825802U (zh) | 一种复合线型溢流堰 | |
CN205062776U (zh) | 一种河床式水电站枢纽布置结构 | |
CN204185835U (zh) | 水电站明满流尾水系统 | |
CN104179159A (zh) | 水电站明满流尾水系统 | |
CN204212126U (zh) | 位于泥石流冲沟的跨沟引水隧洞拦挡防护结构 | |
CN203429610U (zh) | 改善尾水管进口最小压力和减小尾水调压室的布置结构 | |
CN205000309U (zh) | 一种适用于低水头溢流坝的过鱼装置 | |
CN204644995U (zh) | 一种消能防冲大坝 | |
CN204551377U (zh) | 一种水电站上的导流式护坡 | |
CN202718071U (zh) | 降低库区淤沙的拦河坝结构 | |
CN105002863A (zh) | 一种基于下游水库调度的生态流量保障方法 | |
CN204000796U (zh) | 河床式水电站结构 | |
CN204608736U (zh) | 一种布置在溶洞内的发电厂房 | |
CN204385701U (zh) | 适用于宽浅河道多孔闸坝的面流底流联合消能工及水利枢纽工程 | |
CN204163061U (zh) | 水电泄水沟消能结构 | |
CN202401431U (zh) | 冲沙闸弧形工作闸门的支铰布置结构 | |
CN208899441U (zh) | 用于水利发电工程的发电厂房布置结构 | |
CN104452723B (zh) | 一种自平衡式双向升船机 | |
CN202626933U (zh) | 一种曲线型束水分沙导流墙 | |
CN203347993U (zh) | 节能连环式发电机组 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |