CN205062587U - Fastening systems for tram - Google Patents

Fastening systems for tram Download PDF

Info

Publication number
CN205062587U
CN205062587U CN201520455920.2U CN201520455920U CN205062587U CN 205062587 U CN205062587 U CN 205062587U CN 201520455920 U CN201520455920 U CN 201520455920U CN 205062587 U CN205062587 U CN 205062587U
Authority
CN
China
Prior art keywords
gauge apron
backing plate
rail
pedestal
screw spike
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520455920.2U
Other languages
Chinese (zh)
Inventor
孙海富
郑贺民
伍卫凡
高增增
王伟华
王会永
曾华亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Design Corp
Original Assignee
Third Railway Survey and Design Institute Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Railway Survey and Design Institute Group Corp filed Critical Third Railway Survey and Design Institute Group Corp
Priority to CN201520455920.2U priority Critical patent/CN205062587U/en
Application granted granted Critical
Publication of CN205062587U publication Critical patent/CN205062587U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a fastening systems for tram, wherein, screw spike pass plain washer, bullet strip, gauge apron with pre -buried in concrete sleeper buried sleeve be connected, screw spike compresses tightly the bullet strip at gauge apron and groove rail structural, the base keeps off the shoulder for the right angle, base bottom surface and concrete contact, gauge apron's the outside and the inboard in close contact with of base, gauge apron is close to the lateral surface and rail contact of rail side, installs the backing plate between rail bottom and the base. The beneficial effects are that: because the cover was intraductal during screw spike stretched into concrete sleeper, made things convenient for the later stage to lay and keeped in repair with the maintenance, gauge apron realizes great roll adjustment ability, and the non - rubber of backing plate part adopts the macromolecular material, causes that the fastener resistance is higher than the problem of ordinary fastener on the contrary after avoiding existing composite backing plate to get rusty, sets up different height -adjusting cushion plate and the whole backing plate, greatly increased elevation setting of improving under the backing plate, the fastener part is less, is non -metallic material mostly moreover, has prolonged fastener life.

Description

A kind of tram fastener system
Technical field
The utility model belongs to urban track traffic fastener field, and particularly relating to a kind of tram elasticity has bolt fastening system regardless of open type.
Background technology
Modern tram, as the important component part of urban track traffic, is developed rapidly.Fastener is the important composition parts of track structure, and its effect is fixing location of rail, stops the vertical and horizontal displacement of rail, prevents tumbling of rail, can also provide necessary elasticity and insulating properties simultaneously.
Modern tram has its particularity, for flush type track structure, orbital maintenance difficulty, thus require that rail fastening keeps in repair or maintenance-free less, the quantity of component should be reduced during fastener design as far as possible, reduce maintenance workload, there is higher anti-rust and corrosionproperties simultaneously, existing railway and underground railway track system all adopt groove-shape rail, and its fastener system is not suitable for the demand that current street railway is laid.
Two classes are mainly divided into for the current tram fastener system of the problems referred to above, elasticity separated rail fastening is made up of height adjusting cushion plate, railway rail pad, spring washer, Insulation rail distance keeper etc. under spring, plain washer, T-shaped bolt, anchor bolt, nut and service sleeve, insulating pad, heightening base plate under iron base plate, iron chair, rail usually, component are various, structure is more complicated, lateral force is by the little shoulder block transmission of iron chair both sides, shoulder arrangement is comparatively weak, the spring that dislocation is arranged and anchor bolt connector require that sleeper surface is comparatively large, cause sleeper cost higher.In addition, rail tramway structure multidigit is in greening location, and fastener system is in wet environment for a long time, especially coastal area, and this type of fastener ironware is more, and street railway is embedded in underground after laying, and is unfavorable for the antirust, anti-corrosive of fastener.
Fig. 1 and Fig. 2 be existing elasticity regardless of open type oblique shoulder block fastener schematic diagram, nonseparated rail fastening structure is relatively simple, maintenance of being more convenient for, but the component in Fig. 1 are many, and structure is comparatively complicated, mainly transmits lateral force by bolt, is unfavorable for the stressed of bolt; Fastener in Fig. 2 is heightened limited in one's ability, can not meet rto request.
Summary of the invention
Technical problem to be solved in the utility model is, overcomes above-mentioned prior art defect, provides that a kind of structure is simple, easy construction, maintenance amount be little, the fastener system that fastener adaptive faculty is strong.
The technical scheme that the utility model adopts is: a kind of tram fastener system, comprise, screw spike, plain washer, spring, service sleeve, gauge apron, backing plate and pedestal, described screw spike is through plain washer, spring, gauge apron be embedded in service sleeve in concrete sleeper and be connected, spring is pressed in gauge apron and grooved rail structure by screw spike, described pedestal shoulder block is right angle, base bottom surface contacts with concrete, close contact inside the outside of described gauge apron and pedestal, the lateral surface of gauge apron near rail side contacts with rail, between rail foot and pedestal, backing plate is installed.
The head of a nail of described screw spike is turret head, and screw spike main body is formed with circular arc type ridge; Two circles are formed protruding outside described sleeve upper end.
Between described screw spike and described spring, plain washer is set.
Described gauge apron is made up of macromolecular material; Gauge apron is formed with the gear platform raised up near rail side, limit location of rail; Gauge apron both sides form diagonal rib, increase baffle plate intensity; Groove is provided with, location spring on rear side of gauge apron; Lateral outer side away from rail side gauge apron afterbody is formed with convex shoulder, and the shoulder block shape of described convex shoulder and pedestal is suitable, and constraint gauge apron lateral displacement, gauge apron afterbody is right angle, matches, and do circular arc process with pedestal right angle shoulder block.
The material of described pedestal is macromolecular material or cast iron materials; Pedestal both lateral sides is formed with the right angle shoulder block raised up.
Described backing plate is rubber mat plate or compound backing plate, and the nonrubber part of described compound backing plate is macromolecular material; Rail is set between backing plate and pedestal and lowers high backing plate.
Lower height adjusting cushion plate and overall height adjusting cushion plate are set between described backing plate and pedestal.
The beneficial effects of the utility model are: stretch into due to screw spike in the service sleeve in concrete sleeper, facilitate laying and the maintenance in later stage; Gauge apron realizes larger roll adjustment ability, backing plate nonrubber part adopts macromolecular material, avoid the fastener resistance that causes after existing compound backing plate gets rusty on the contrary higher than the problem of common fastener, different height adjusting cushion plates and overall raising backing plate are set under backing plate, greatly increase elevation adjustment amount; Fastener component is less, and is mostly nonmetals, extends fastener application life.
Accompanying drawing explanation
Fig. 1 is existing elasticity separated rail fastening schematic diagram;
Fig. 2 is existing elasticity nonseparated rail fastening schematic diagram;
Fig. 3 is the structural representation of the utility model tram fastener;
Fig. 4 is the top view of the utility model tram fastener;
Fig. 5 is the elevation of bolt in the utility model tram fastener;
Fig. 6 be in the utility model tram fastener service sleeve partly cut open figure;
Fig. 7 be in the utility model tram fastener gauge apron partly cut open figure and top view;
Fig. 8 be in the utility model tram fastener compound backing plate partly cut open figure;
Fig. 9 is the top view of overall height adjusting cushion plate in the utility model tram fastener;
Figure 10 is elevation and the top view of pedestal in the utility model tram fastener.
In figure:
1. screw spike 2. plain washer 3. spring 4. service sleeve 5. gauge apron
6. the overall height adjusting cushion plate of height adjusting cushion plate 8. under backing plate 7. rail
9. pedestal.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail:
As Fig. 3, Fig. 4, shown in Fig. 8, the utility model tram fastener system, comprise, screw spike 1, plain washer 2, spring 3, service sleeve 4, gauge apron 5, backing plate 6, height adjusting cushion plate 7 under rail, overall height adjusting cushion plate 8 and pedestal 9, described screw spike 1 is through plain washer 2, spring 3, gauge apron 5 be embedded in service sleeve 4 in concrete sleeper 9 and be connected, spring 3 is pressed in gauge apron 5 and grooved rail structure by screw spike, described pedestal 9 is formed with right angle shoulder block, base bottom surface contacts with concrete, close contact inside the outside of described gauge apron 5 and pedestal 9, the lateral surface of gauge apron 5 near rail side contacts with rail, backing plate 6 is installed between rail foot and pedestal 9.When the fastener of tram needs elevation to adjust, the maximum adjustment amount 10mm of height adjusting cushion plate 7(under backing plate 6 times mounting rails), or under described rubber mat plate or compound backing plate 6 times simultaneously mounting rail height adjusting cushion plate 7 and the maximum adjustment amount 30mm of overall height adjusting cushion plate 8().
As shown in Fig. 5, Fig. 6, Fig. 8, screw spike 1 stretches in the service sleeve 4 in concrete sleeper, be easy to laying and the maintenance in later stage, the head of a nail of screw spike 1 is turret head 1a, screw spike 1 has circular arc type ridge 1b, canine tooth is optimized, reduces transportation and collide with to the damage of bolt thread; Sleeve upper end arranged outside two encloses protruding 4a, prevents sleeve upper end use procedure Fracture from coming off; Plain washer 2 is set between screw spike 1 and spring 3, plays the effect of protection screw spike 1 and spring 3; Backing plate 6 is rubber mat plate or compound backing plate, backing plate provides elasticity for fastener system, rubber mat plate take natural rubber as material, compound backing plate with natural rubber and macromolecular material for material, during compound backing plate 6 nonrubber part employing macromolecular material 6a, the fastener resistance caused after avoiding existing compound backing plate to get rusty is on the contrary higher than the problem of common fastener.
As shown in figures 7 and 9, gauge apron 5 arranges the gear platform 5a raised up, and limits location of rail; Gauge apron both sides arrange diagonal rib 5b, increase baffle plate intensity; Groove 5c is provided with, location spring on rear side of gauge apron; The lateral outer side of gauge apron afterbody has convex shoulder 5d, this convex shoulder 5d and concrete sleeper shoulder block shape suitable, constraint gauge apron lateral displacement, gauge apron afterbody is right angle 5e, matches, and do circular arc process with pedestal 9 right angle shoulder block 9a.During tram fastener system gauge adjustment, adopt the gauge apron 5 of different model, gauge adjustment amount+8mm ~-12mm.The material of gauge apron 5 is macromolecular material.
The simple component of the utility model tram fastener system structure are few, can greatly save fastener material therefor, reduce tram construction cost, easy construction, and heighten with roll adjustment ability comparatively large, maintenance work amount is little; By the gauge apron of different model, realize roll adjustment ability; Height adjusting cushion plate and overall height adjusting cushion plate under rail are set under rubber mat plate, realize elevation adjustment; Except spring and bolt, all adopt nonmetals, extend fastener application life.Screw spike stretches in the service sleeve in concrete sleeper, be easy to laying and the maintenance in later stage, screw spike circular arc type ridge can reduce transportation and collide with to the damage of bolt thread, sleeve upper end arranged outside two encloses projection, can prevent sleeve upper end use procedure Fracture from coming off.During compound backing plate nonrubber part employing macromolecular material, the fastener resistance caused after avoiding existing compound backing plate to get rusty is on the contrary higher than the problem of common fastener, and adopt overall height adjusting cushion plate, the amount of heightening improves greatly; This fastener in-site installation is convenient, late maintaining maintenance load is little, and strong adaptability, can be widely used in streetcar track system.
Above-described embodiment, only for technical conceive of the present utility model and feature are described, its object is to allow the technology personage being familiar with this field can understand the utility model content and be implemented, can not limit protection domain of the present utility model with this.All within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (7)

1. a tram fastener system, it is characterized in that, comprise, screw spike (1), plain washer (2), spring (3), service sleeve (4), gauge apron (5), backing plate (6) and pedestal (9), described screw spike (1) is through plain washer (2), spring (3), gauge apron (5) be embedded in concrete sleeper (9) interior service sleeve (4) and be connected, spring (3) is pressed in gauge apron (5) and grooved rail structure by screw spike (1), described pedestal (9) shoulder block is right angle, base bottom surface contacts with concrete, the outside of described gauge apron (5) and pedestal (9) inner side close contact, the lateral surface of gauge apron (5) near rail side contacts with rail, backing plate (6) is installed between rail foot and pedestal (9).
2. tram fastener system according to claim 1, is characterized in that, the head of a nail of described screw spike (1) is turret head (1a), and screw spike (1) main body is formed with circular arc type ridge (1b); Two circle projections (4a) are formed outside described sleeve pipe (4) upper end.
3. tram fastener system according to claim 1, is characterized in that, arranges plain washer (2) between described screw spike (1) and described spring (3).
4. tram fastener system according to claim 1, is characterized in that, described gauge apron (5) is made up of macromolecular material; Gauge apron (5) is formed with near rail side the gear platform (5a) raised up, and limits location of rail; Gauge apron both sides form diagonal rib (5b), increase baffle plate intensity; Groove (5c) is provided with, location spring on rear side of gauge apron; Lateral outer side away from rail side gauge apron afterbody is formed with convex shoulder (5d), described convex shoulder (5d) is suitable with the shoulder block shape of pedestal (9), constraint gauge apron lateral displacement, gauge apron afterbody is right angle (5e), match with pedestal (9) right angle shoulder block (9a), and do circular arc process.
5. tram fastener system according to claim 1, is characterized in that, the material of described pedestal (9) is macromolecular material or cast iron materials; Pedestal (9) both lateral sides is formed with the right angle shoulder block (9a) raised up.
6. tram fastener system according to claim 1, is characterized in that, described backing plate (6) is rubber mat plate or compound backing plate, and the nonrubber part of described compound backing plate is macromolecular material; Rail is set between backing plate (6) and pedestal (9) and lowers high backing plate (7).
7. tram fastener system according to claim 1, is characterized in that, arranges lower height adjusting cushion plate (7) and overall height adjusting cushion plate (8) between described backing plate (6) and pedestal (9).
CN201520455920.2U 2015-06-29 2015-06-29 Fastening systems for tram Active CN205062587U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520455920.2U CN205062587U (en) 2015-06-29 2015-06-29 Fastening systems for tram

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520455920.2U CN205062587U (en) 2015-06-29 2015-06-29 Fastening systems for tram

Publications (1)

Publication Number Publication Date
CN205062587U true CN205062587U (en) 2016-03-02

Family

ID=55389165

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520455920.2U Active CN205062587U (en) 2015-06-29 2015-06-29 Fastening systems for tram

Country Status (1)

Country Link
CN (1) CN205062587U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114232394A (en) * 2021-12-28 2022-03-25 中铁第四勘察设计院集团有限公司 Fastener system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114232394A (en) * 2021-12-28 2022-03-25 中铁第四勘察设计院集团有限公司 Fastener system
CN114232394B (en) * 2021-12-28 2024-04-02 中铁第四勘察设计院集团有限公司 Fastener system

Similar Documents

Publication Publication Date Title
CN205134109U (en) Go up hasp type shock attenuation fastening systems
CN105544318B (en) A kind of double-layer vibration damping fastener of administrative region of a city railway
CN203546533U (en) Rail component for gauntleted rail lines
CN202323578U (en) Fastening piece for auxiliary rail
CN205062586U (en) Tram is with directly keeping off shoulder buckle spare system
CN205205589U (en) Be used for orbital light -duty fastener of tram
CN205062587U (en) Fastening systems for tram
CN201660813U (en) Low-noise flexible track fixing device
CN204959483U (en) Tram ballastless track is short sleeper of concrete for system
CN205062588U (en) Tram is with keeping off shoulder buckle spare system to one side
CN207159716U (en) A kind of tramcar fastener system
CN206289471U (en) A kind of rail fastener system
CN206109885U (en) Novel tram elasticity nonseparated rail fastening
CN205443810U (en) Quick bullet strip has tiny fragments of stone, coal, etc. track fastening systems
CN209227291U (en) A kind of Novel steel sleeper
CN104480808A (en) Tramcar fastener with improved insulating track gauge blocks
CN205874858U (en) There is pillow not have not modern tram fastener of split of shelves shoulder elasticity
CN205188720U (en) Be used for urban streetcar concrete separated rail fastening
CN210420731U (en) Modern tram fastener system
CN104452492A (en) Tram fastener with non-metal base
CN212955979U (en) Track fastener for cement pillow of mountain region track traffic
CN205399095U (en) Elasticity split tram is screw spike for fastener
CN103437260B (en) Cover plate structure of flangeway for reinforced concrete paved crossing
CN211547092U (en) Self-adaptive ballast overturning sleeper
CN205088535U (en) Bury formula tram fastener damping system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 300142 Hebei District, Zhongshan Road, No. 10,

Patentee after: China Railway Design Group Limited

Address before: 300142 Hebei District, Zhongshan Road, No. 10,

Patentee before: China Railway Third Survey and Design Institute Group Ltd.

CP01 Change in the name or title of a patent holder