CN205038044U - Testboard of PV valve cracking pressure and leakproofness test - Google Patents

Testboard of PV valve cracking pressure and leakproofness test Download PDF

Info

Publication number
CN205038044U
CN205038044U CN201520815468.6U CN201520815468U CN205038044U CN 205038044 U CN205038044 U CN 205038044U CN 201520815468 U CN201520815468 U CN 201520815468U CN 205038044 U CN205038044 U CN 205038044U
Authority
CN
China
Prior art keywords
test
pressure
valve
valve seat
gas cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520815468.6U
Other languages
Chinese (zh)
Inventor
丁莉丽
王振中
赵雯晴
王洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Qingdao Safety Engineering Institute
Original Assignee
China Petroleum and Chemical Corp
Sinopec Qingdao Safety Engineering Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Qingdao Safety Engineering Institute filed Critical China Petroleum and Chemical Corp
Priority to CN201520815468.6U priority Critical patent/CN205038044U/en
Application granted granted Critical
Publication of CN205038044U publication Critical patent/CN205038044U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Examining Or Testing Airtightness (AREA)

Abstract

本实用新型属于环保技术领域,具体涉及一种P/V阀开启压力和密封性测试的测试台。测试台包括引流单元、压力测试单元和测试阀座,所述引流单元和测试阀座通过快速接头连接,所述压力测试单元和测试阀座通过快速接头连接,其中所述引流单元包括高压气瓶、流量计和缓冲罐,所述高压气瓶通过管道连接流量计,所述流量计与缓冲罐之间的管道上串接有针形阀和旁通阀,所述缓冲罐通过快速接头与所述测试阀座连接,所述测试阀座连接被测P/V阀和其他检测设备的管道,所述测试阀座通过快速接头连接所述压力测试单元。本实用新型可直观有效的检测P/V阀开启压力和其泄漏情况,人工操作简单便捷,检测设备易维护且耗能小。

The utility model belongs to the technical field of environmental protection, in particular to a test bench for testing the opening pressure and sealing performance of a P/V valve. The test bench includes a drainage unit, a pressure test unit and a test valve seat, the drainage unit and the test valve seat are connected by a quick joint, the pressure test unit and the test valve seat are connected by a quick joint, wherein the drainage unit includes a high-pressure gas cylinder , a flow meter and a buffer tank, the high-pressure gas cylinder is connected to the flow meter through a pipeline, a needle valve and a bypass valve are connected in series on the pipeline between the flow meter and the buffer tank, and the buffer tank is connected to the buffer tank through a quick connector The test valve seat is connected, the test valve seat is connected to the pipeline of the tested P/V valve and other testing equipment, and the test valve seat is connected to the pressure test unit through a quick joint. The utility model can intuitively and effectively detect the opening pressure of the P/V valve and its leakage situation, the manual operation is simple and convenient, the detection equipment is easy to maintain and consumes little energy.

Description

The test board of a kind of P/V valve opening pressure and performing leak test
Technical field
The utility model belongs to environmental technology field, is specifically related to a kind of test board about P/V valve (pressure/vacuum) opening pressure and performing leak test, particularly for the P/V valve that refuelling station's gas outlet of petroleum vapor recovery is installed.
Background technology
In recent years along with the formulation of the appearance of national policy and all standard, index, gas station oil gas reclaims development rapidly, and China's oil gas recovery system of gas station requires that oil tank is strictly airtight, and the maximum tank pressure without oil tank during after-treatment device is controlled by P/V valve, guarantee safety.In fact, the strict leakproofness of tank system is the engineering problem that an exception is difficult, if P/V valve is poorly sealed, along with the pressure differential of tank pressure and ambient atmosphere changes, the oil gas reclaimed in oil-gas space after exceeding certain pressure is slowly emitted because of leakage, reduce petroleum vapor recovery efficiency, pollutant atmosphere.In addition, GB50156-2012 6.3.10 specifies: when refuelling station adopts gas recovery system for oil, the snorkel mouth of pipe of gasoline cistern, except installing except spark arrester, still should establish vacuum pressure valve.The work malleation of vacuum pressure valve is 2kpa ~ 3kpa, and work negative pressure is preferably 1.5kpa ~ 2kpa.Therefore, P/V valve before the mounting, through strict test with guaranteed performance, and regularly need need be opened and inspect the P/V valve in using, clean and safeguard, ensures that it meets opening pressure requirement, sealing property requirement.
Utility model content
The utility model provides the test board of a kind of P/V valve opening pressure and performing leak test, this test board can be used for opening and inspecting in the factory inspection of P/V valve or use procedure, gas outlet with reference to oil tank is equipped with associated assay devices, intuitively effectively can detect P/V valve opening pressure and its leakage situation, manual operation is simple and convenient, checkout equipment easy care and consume energy little.
The technical scheme that the utility model adopts is:
The test board of a kind of P/V valve opening pressure and performing leak test, test board comprises drainage unit, pressure test unit and test valve seat, described drainage unit is connected by rapid-acting coupling with test valve seat, described pressure test unit is connected by rapid-acting coupling with test valve seat, wherein said drainage unit comprises gas cylinder, flowmeter and surge tank, described gas cylinder is by pipeline connection traffic meter, pipeline between described flowmeter and surge tank is serially connected with needle valve and by-pass valve, described surge tank is connected with described test valve seat by rapid-acting coupling, described test valve seat connects the pipeline of tested P/V valve and other checkout equipments, described test valve seat connects described pressure test unit by rapid-acting coupling.
Wherein surge tank can be pressurized or be evacuated down to certain working pressure and maintain steady state (SS), for testing opening pressure on demand; Flowmeter is for measuring the leakage flow of test period; Needle valve should be the high-accuracy needle valve of corresponding test specification, flow needed for the test accurate adjustment of opening pressure and sealing; By-pass valve is used for arranging the required flow of test, and need not give the pressurization of P/V valve, setting required flow when namely opening, and has set rear valve-off and has made fluid flow into following device to measure P/V valve opening pressure.
Preferably, described pressure test unit is tensimeter, and described tensimeter is connected to the side of described test valve seat by rapid-acting coupling.
Preferably, described tensimeter is electronic pressure meter, maximum/little pressure of described tensimeter record test period valve.
Preferably, described flow counts mass flowmeter.
Preferably, described gas cylinder, with pressure control valve, can be the air-flow that test provides different pressures.
Preferably, described gas cylinder is built with air or nitrogen.
The utility model is the impermeability of checkout device and the correctness of assembling before use, is vertically mounted on test board by tested P/V valve as requested.
During leak-testing: (1) uses vacuum pump pressurize to surge tank (or whole proving installation) or be evacuated down to flowmeter minimum operating pressures that and maintain steady state (SS); (2) open gas cylinder, make air or nitrogen flow into proving installation; (3) needle valve of drainage unit is slowly opened, until pressure stability is on malleation (or negative pressure) original pressure of regulation; (4) pressure remained steady after certain hour (namely the change of tensimeter upward pressure reading is no more than 10pa), observes meter readings and closes the operation valve of gas cylinder; (5) repeat three malleation (or negative pressure) leak-testings, record data and calculating mean value; (6) high-pressure gas cylinder valve is closed.
During opening pressure test: (1) uses vacuum pump pressurize to surge tank (or whole proving installation) or be evacuated down to flowmeter minimum operating pressures that and maintain steady state (SS); (2) open by-pass valve, open gas cylinder, make air or nitrogen flow into proving installation; (3) slowly open needle valve, make nitrogen form malleation (or negative pressure) flow of regulation; (4) close by-pass valve after stability of flow, allow fluid flow into proving installation below; (5) observe the pressure reading on tensimeter, malleation (or negative pressure) opening pressure should in specialized range, and during unlatching, reading has a mxm., and pressure declines to some extent afterwards, records this peak value and opens by-pass valve; (6) repeat three malleation (or negative pressure) opening pressure tests, record data and calculating mean value; (7) high-pressure gas cylinder valve is closed.
Wherein, between twice opening pressure test, must disconnect and with the connection of rapid-acting coupling, tensimeter being made zero.
Compared with prior art, advantage of the present utility model and good effect are:
The utility model proving installation compact conformation, manual operation is simple and convenient, and test result is intuitively effective; The utility model good test effect, energy is simulated operation operating mode preferably; The utility model checkout equipment easy care and consume energy little.
Accompanying drawing explanation
Below in conjunction with drawings and embodiments, the utility model is described in further detail:
Fig. 1 is the test board connection diagram of P/V valve opening pressure of the present utility model and performing leak test.
In figure, 1 is gas cylinder, and 2 is flowmeter, and 3 is needle valve, and 4 is by-pass valve, and 5 is surge tank, and 6 is rapid-acting coupling, and 7 is tested P/V valve, and 8 is tensimeter, and 9 is test valve seat.
Embodiment
Embodiment
As shown in Figure 1, the test board of a kind of P/V valve opening pressure and performing leak test, test board comprises drainage unit, pressure test unit and test valve seat 9, described drainage unit is connected by rapid-acting coupling 6 with test valve seat, described pressure test unit is connected by rapid-acting coupling 6 with test valve seat 9, wherein said drainage unit comprises gas cylinder 1, flowmeter 2 and surge tank 5, described flowmeter 2 is mass flowmeter, described gas cylinder 1 is by pipeline connection traffic meter 2, described gas cylinder 1 is with pressure control valve, can be the air-flow that test provides different pressures, described gas cylinder 1 is built with air or nitrogen, pipeline between described flowmeter 2 and surge tank 5 is serially connected with needle valve 3 and by-pass valve 4, described surge tank 5 is connected with described test valve seat 9 by rapid-acting coupling 6, described test valve seat 9 connects the pipeline of tested P/V valve 7 and other checkout equipments, described test valve seat 9 connects described pressure test unit by rapid-acting coupling 6.
Wherein surge tank 5 can be pressurized or be evacuated down to certain working pressure and maintain steady state (SS), for testing opening pressure on demand; Mass flowmeter is for measuring the leakage flow of test period; Needle valve 3 should be the high-accuracy needle valve of corresponding test specification, flow needed for the test accurate adjustment of opening pressure and sealing; By-pass valve 4 for arranging the required flow of test, and need not give the pressurization of P/V valve, setting required flow when namely opening, and has set rear valve-off and has made fluid flow into following device to measure P/V valve opening pressure.
Described pressure test unit is electronic pressure meter 8, and described tensimeter 8 is connected to the side of described test valve seat 9 by rapid-acting coupling 6, and described tensimeter 8 records maximum/little pressure of test period valve.
Method of testing of the present utility model is: correctly assemble proving installation according to Fig. 1, and the end cap using fluid sealant or raw material band to install a corresponding size on test valve seat screw thread replaces P/V valve, carries out the air tightness test of proving installation:
(1) vacuum pump is used to pressurize to surge tank (or whole proving installation) or be evacuated down to mass flowmeter minimum operating pressures that and maintain steady state (SS); (2) open gas cylinder, make air or nitrogen flow into proving installation; (3) needle valve of drainage unit is slowly opened, until pressure stability is on the positive pressure pressure (being taken as 500pa) of regulation; (4) after the pressure stability of 10s, observe mass flowmeter reading and close the pressure control valve of gas cylinder.If the leakage flow recorded is less than the permission leakage flow (being taken as 2ml/min) of regulation, then represents proving installation No leakage, can following test operation be carried out.
After testing fixture impermeability is good, remove end cap, tested P/V valve be vertically connected on test valve seat, carry out following operation successively:
Malleation leak-testing:
(1) open gas cylinder, close by-pass valve, make air or nitrogen flow into proving installation;
(2) slowly needle valve is opened, until pressure stability is on the malleation original pressure (being taken as 500pa) of regulation;
(3) after the pressure stability of 10s, observe mass flowmeter reading and close the pressure control valve of gas cylinder;
(4) repeat three malleation leak-testings, record data and calculating mean value.
Malleation opening pressure is tested:
(1) open gas cylinder, open by-pass valve, slowly regulate needle valve, make air or nitrogen form the malleation flow (being taken as 120ml/min) of regulation;
(2) close by-pass valve after stability of flow, allow fluid flow into proving installation below;
(3) observe the pressure reading on tensimeter, malleation opening pressure should in GB50156 specialized range, and recording manometer peak-peak also opens by-pass valve;
(4) repeat three malleation opening pressure tests, record data and calculating mean value;
(5) high-pressure gas cylinder valve is closed.
Negative pressure leakage is tested, and setting malleation original pressure is changed into setting negative pressure original pressure (being taken as-1000pa), other operations are identical with malleation leak-testing, draw negative pressure leakage flow mean value;
Negative pressure opening pressure is tested, and setting malleation flow is changed into setting negative pressure flow (being taken as 200ml/min), other operations are tested identical with malleation opening pressure, draw negative pressure opening pressure mean value.
Obviously, above-described embodiment of the present utility model is only for the utility model example is clearly described, and is not the restriction to embodiment of the present utility model.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.Here cannot give exhaustive to all embodiments.Every belong to the technical solution of the utility model the apparent change of amplifying out or variation be still in the row of protection domain of the present utility model.

Claims (6)

1.一种P/V阀开启压力和密封性测试的测试台,其特征在于:测试台包括引流单元、压力测试单元和测试阀座,所述引流单元和测试阀座通过快速接头连接,所述压力测试单元和测试阀座通过快速接头连接,其中所述引流单元包括高压气瓶、流量计和缓冲罐,所述高压气瓶通过管道连接流量计,所述流量计与缓冲罐之间的管道上串接有针形阀和旁通阀,所述缓冲罐通过快速接头与所述测试阀座连接,所述测试阀座连接被测P/V阀和其他检测设备的管道,所述测试阀座通过快速接头连接所述压力测试单元。1. A test bench for P/V valve opening pressure and tightness test, characterized in that: the test bench includes a drainage unit, a pressure test unit and a test valve seat, and the drainage unit and the test valve seat are connected by a quick connector, so The pressure test unit and the test valve seat are connected through a quick connector, wherein the drainage unit includes a high-pressure gas cylinder, a flow meter and a buffer tank, and the high-pressure gas cylinder is connected to the flow meter through a pipeline, and the flow meter and the buffer tank are connected. A needle valve and a bypass valve are connected in series on the pipeline, and the buffer tank is connected to the test valve seat through a quick connector, and the test valve seat is connected to the pipeline of the tested P/V valve and other testing equipment. The valve seat is connected to the pressure testing unit through a quick connector. 2.根据权利要求1所述的P/V阀开启压力和密封性测试的测试台,其特征在于:所述压力测试单元为压力表,所述压力表通过快速接头连接在所述测试阀座的一侧。2. The test bench for P/V valve cracking pressure and tightness test according to claim 1, characterized in that: the pressure test unit is a pressure gauge, and the pressure gauge is connected to the test valve seat through a quick connector side. 3.根据权利要求2所述的P/V阀开启压力和密封性测试的测试台,其特征在于:所述压力表为电子式压力表。3. The test bench for the cracking pressure and tightness test of the P/V valve according to claim 2, wherein the pressure gauge is an electronic pressure gauge. 4.根据权利要求1所述的P/V阀开启压力和密封性测试的测试台,其特征在于:所述流量计为质量流量计。4. The test bench for cracking pressure and tightness test of the P/V valve according to claim 1, characterized in that: the flow meter is a mass flow meter. 5.根据权利要求1所述的P/V阀开启压力和密封性测试的测试台,其特征在于:所述高压气瓶带有压力控制阀,可为测试提供不同压力的气流。5. The test bench for cracking pressure and sealing of P/V valve according to claim 1, characterized in that: said high-pressure gas cylinder has a pressure control valve, which can provide airflow of different pressures for testing. 6.根据权利要求5所述的P/V阀开启压力和密封性测试的测试台,其特征在于:所述高压气瓶内装有空气或氮气。6 . The test bench for cracking pressure and tightness test of the P/V valve according to claim 5 , wherein air or nitrogen is contained in the high-pressure gas cylinder. 7 .
CN201520815468.6U 2015-10-20 2015-10-20 Testboard of PV valve cracking pressure and leakproofness test Expired - Lifetime CN205038044U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520815468.6U CN205038044U (en) 2015-10-20 2015-10-20 Testboard of PV valve cracking pressure and leakproofness test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520815468.6U CN205038044U (en) 2015-10-20 2015-10-20 Testboard of PV valve cracking pressure and leakproofness test

Publications (1)

Publication Number Publication Date
CN205038044U true CN205038044U (en) 2016-02-17

Family

ID=55296940

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520815468.6U Expired - Lifetime CN205038044U (en) 2015-10-20 2015-10-20 Testboard of PV valve cracking pressure and leakproofness test

Country Status (1)

Country Link
CN (1) CN205038044U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108444656A (en) * 2018-03-12 2018-08-24 盾安(芜湖)中元自控有限公司 Globe valve first-line sealing gas inspection tool
CN110095239A (en) * 2019-05-29 2019-08-06 深圳市宝利联合科技有限公司 Refrigerator refrigerant non-return valve air-tightness detection device and detection method
CN110398327A (en) * 2019-02-21 2019-11-01 杭州戴雷科技有限公司 A PE saddle-type bypass pipe fittings airtightness testing machine

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108444656A (en) * 2018-03-12 2018-08-24 盾安(芜湖)中元自控有限公司 Globe valve first-line sealing gas inspection tool
CN110398327A (en) * 2019-02-21 2019-11-01 杭州戴雷科技有限公司 A PE saddle-type bypass pipe fittings airtightness testing machine
CN110398327B (en) * 2019-02-21 2020-12-08 杭州知淞智能科技有限公司 A PE saddle type bypass pipe fittings air tightness testing machine
CN110095239A (en) * 2019-05-29 2019-08-06 深圳市宝利联合科技有限公司 Refrigerator refrigerant non-return valve air-tightness detection device and detection method

Similar Documents

Publication Publication Date Title
CN202471374U (en) Multifunctional airtightness detection apparatus
CN202994396U (en) Air tightness detection device for air-tight door of nuclear power station under constant pressure
CN207741927U (en) A kind of breather valve calibration equipment
CN204694421U (en) Valve leak detection proving installation
CN201159691Y (en) Air filter performance testing equipment
CN108107355A (en) A kind of SF6And SF6Mixed gas density monitor calibration equipment and method
CN100585359C (en) Test device for gas pressure regulator
CN205038044U (en) Testboard of PV valve cracking pressure and leakproofness test
CN105699021A (en) Vehicle fuel evaporation system air tightness detection method
CN103267618B (en) Protection airtight unit airtight performance proving installation and method of testing thereof
CN105241616A (en) Civil defense door airtightness detection apparatus with protection function
CN202748203U (en) Automobile air inlet system component integrated testing apparatus
CN201331421Y (en) Engine cylinder cover air tightness detection device
CN206362505U (en) A kind of industrial valve device for detecting sealability
CN203231877U (en) Apparatus for testing sealing performance of protection enclosed unit
CN205262555U (en) Gas flow detection device
CN202994400U (en) Box gas leakage detector
CN203688152U (en) Novel gas pressure reducer verifying device
CN203275038U (en) Integrated safety tester for pen type stationery products
CN109949951A (en) A double-shell type nuclear power plant shell concrete leakage rate measuring device
CN219640041U (en) Special gas supply high-pressure leak detection compensation equipment
CN209354723U (en) For detecting the pneumatic pressure transmitter of highly pressurised liquid
CN105277322A (en) Civil air defence door airtightness detection device
CN219015633U (en) A Closed Cycle Test System for Nuclear Vacuum Equipment
CN217230232U (en) Gas recovery on-line monitoring system calibrating device of filling station

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20160217

CX01 Expiry of patent term