CN205036092U - Device of erection stage internal force can release steel shotcrete - Google Patents

Device of erection stage internal force can release steel shotcrete Download PDF

Info

Publication number
CN205036092U
CN205036092U CN201520675180.3U CN201520675180U CN205036092U CN 205036092 U CN205036092 U CN 205036092U CN 201520675180 U CN201520675180 U CN 201520675180U CN 205036092 U CN205036092 U CN 205036092U
Authority
CN
China
Prior art keywords
support
internal force
erection stage
release
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520675180.3U
Other languages
Chinese (zh)
Inventor
朱忠义
袁林华
卜龙瑰
周忠发
陈一
张琳
徐金蓓
王毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Institute of Architectural Design Group Co Ltd
Original Assignee
Beijing Institute of Architectural Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Institute of Architectural Design Group Co Ltd filed Critical Beijing Institute of Architectural Design Group Co Ltd
Priority to CN201520675180.3U priority Critical patent/CN205036092U/en
Application granted granted Critical
Publication of CN205036092U publication Critical patent/CN205036092U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to a device of erection stage internal force can release steel shotcrete, the device supports the connecting plate including the nodal connection board, internal force releasing mechanism with support axial deformation mechanism, the nodal connection board be used for with the main structure on the connection plate be connected, support the connecting plate and support end connection, internal force releasing mechanism will the nodal connection board reaches it connects into whole to support the connecting plate to support the load of undertakeing at the erection stage through autoregulation release, support its edge of axial deformation mechanism support the setting of connecting plate axial, the axial deformation when releasing internal force is supported in release. Adopt above -mentioned device to solve and support the load that to bear at the erection stage among the high -rise steel structure installation, make it mainly bear the problem of lateral load in the installation, both guaranteed the security of erection stage structure, guaranteed antidetonation and anti -wind efficiency that the use stage supported again. But the wide application is in high -rise steel structure installation engineering.

Description

The device of erection stage internal force can be discharged to bracing members
Technical field
The utility model relates to a kind of Installation Technology of Steel Structure field, particularly relates to agent structure and the auxiliary installation device supported in installation process in a kind of high-rise steel structure.
Background technology
For improving the anti-side rigidity of high building structure, strengthening the ability of structure opposing horizontal loading, general meeting is arranged and is supported in many, high-rise steel structure, form various types of Bracing Systems, support as arranged in steel frame to form steel frame-central support structure, steel frame-eccentrically braces structure or arrange to support at the elevator barrel of highrise building or stair cylinder region and form support tube body structure.In addition, for improving in-plane stiffness and the globality of large-span structure, also need in large-span structure, arrange the component etc. supporting or play a supporting role.Supporting form can be common bracing members or buckling restrained brace.
Vertical member such as the frame column of multi-story and high-rise building structure mainly bears vertical load, supports and mainly bears the horizontal loading such as wind load, seismic load, assume responsibility for larger vertical load, support may be made to surrender too early, affect structure lateral resistant ability if supported.Therefore should reduce the internal force that vertical load produces in support as far as possible.
In multistory building, anti-side rigidity as supported the pre-structure of installation can resist the wind load in work progress, just after agent structure installation, can install support again, reduces to support the vertical load born, make support mainly bear transverse load, give full play to the anti-side effect of support.And in the construction stage that is high-rise and super highrise building, as do not install support, structure anti-side rigidity less, wind load cannot be resisted time, support must or basic synchronization synchronous with agent structure be installed.In such cases, if do not taken measures, release is supported on the internal force of construction stage generation, supports and may bear larger vertical load, support may be made to surrender too early, affect wind resistance and the anti-seismic performance of structure when wind load or earthquake.In the large-span structure of some type, be simplified design, support only according to mode determination member section and the bearing capacity of increase in-plane stiffness, transferring structure face internal loading, therefore more need to reduce its vertical load born.
And the connected mode of existing support and agent structure has three kinds, the first supports 13 and is arranged on main structure (position of steel column 12 and girder steel 14 angle) as shown in Figure 1, and it directly realizes being connected with main structure with the junction plate that main structure angle portion presets by bolt; The second connected mode as shown in Figure 2, supports 13 and directly realizes being connected with main structure with the junction plate that main structure angle portion presets by weld seam 16; The third connected mode as shown in Figure 3, supports 13 and directly realizes being connected with main structure with the junction plate that main structure angle portion presets by bearing pin 17.Above-mentioned connected mode, as synchronous with agent structure in support or basic synchronization is installed, then install after terminating and cannot discharge the internal force supporting erection stage; After agent structure installation, then support is installed, then supports and cannot bear the effects such as the wind load of construction stage.
Utility model content
In view of the foregoing, the utility model provides a kind of device that can discharge erection stage internal force to bracing members, its objective is the ability that required anti-side rigidity can be provided laterally to act on to resist wind load etc. in erection stage support by the realization of special erecting device, ensure the structural safety in work progress, after agent structure installation, simultaneously by the adjustment to device, the internal force eliminating erection stage support makes to be supported on operational phase and mainly bears horizontal effect.
For achieving the above object, the utility model adopts following technical scheme:
A device for erection stage internal force can be discharged bracing members, it is characterized in that: comprise,
Node junction plate, is connected with the gusset plate in main structure;
Support and connection plate, is connected with supporting base end portion;
Release of internal force mechanism, described node junction plate and described support and connection plate are connected into entirety by it, and are discharged the load being supported on erection stage and bearing by self-regulation;
Back shaft is to deformation mechanism, and it is axially arranged along described support and connection plate.
Particularly, described release of internal force mechanism comprises securing member and flexible piece, described securing member is by described gusset plate, described support and connection plate, described support axial force relieving mechanism and described flexible piece fixed bit one, realize supporting with the jointly stressed of main structure by tightening or loosening securing member or realize radial release of internal force, described flexible piece controls the pressure between described node junction plate and support and connection plate.
Particularly, described back shaft is slotted hole on described support and connection plate to deformation mechanism.
Further, described securing member is bolt, and screw rod and the described slotted hole of described bolt are slidably connected, and it can slide and realize supporting axial deformation release in described slotted hole.
Further, the length of described slotted hole need meet back shaft to deformation requirements.
Particularly, described flexible piece is butterfly spring.
Compared with prior art the utility model has following characteristics and beneficial effect:
By supporting the device adopting in installation process and can discharge erection stage internal force to bracing members in the application, the internal force being supported on erection stage can be discharged, it is made mainly to bear horizontal effect after installation is complete, both ensure that the safety of erection stage structure, in turn ensure that the validity that operational phase supports.
The device of erection stage internal force can be discharged to bracing members, support and connection plate arranges slotted hole, slotted hole meets the requirement of construction stage supporting rod uninstall process Axial Deformation, avoid the release of internal force stage due to axial deformation can not get release destroy connected node.
Can discharge in the device of erection stage internal force to bracing members, securing member is provided with flexible piece, by controlling the compressive strain of flexible piece, between node junction plate and support and connection plate, obtaining pressure and the frictional force of setting, be the controlling value of construction stage bearing capacity.In the process loosening securing member, bolt is reduce gradually to the precompression that junction plate contact surface produces, therefore support unloading process steadily, safety.
In work progress, after support has been unloaded, tighten butterfly spring and bolt combination device immediately at every turn, made structure have necessary anti-side rigidity, to resist the wind load in work progress, ensure the structural safety of work progress.
After whole support unloading is completed, support and connection plate is welded with gusset plate part in agent structure installation, then (can reuse) is removed by release of internal force mechanism, finally will remain support and connection plate and weld with gusset plate, support final installation.
The advantages such as the utility model has that structure is simple, power transmission is clear and definite, can reuse, applied widely, damper or the structural element that can be widely used in support and connection in high-rise steel structure (as common support, buckling restrained brace etc.) and other type are installed.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in more detail.
Fig. 1 is the connected mode one of existing support and agent structure;
Fig. 2 is the connected mode two of existing support and agent structure;
Fig. 3 is the connected mode three of existing support and agent structure;
Fig. 4 is the device sectional view that can discharge erection stage internal force to bracing members;
Fig. 5 is a device exploded view that can discharge erection stage internal force to bracing members;
Fig. 6 is that supporting installation device installs support schematic diagram;
Reference numeral: 1-node junction plate, 2-support and connection plate, 201-slotted hole, 3-node junction plate, 4-bolt, 5-backing plate, 6-loaded plate, 7-disc spring backing plate, 8-butterfly spring, 9-disc spring backing plate, 10-packing ring, 11-bolt backing plate, 12-steel column, 13-support, 14-girder steel, 15-bolt, 16-weld seam, 17-bearing pin.
detailed description of the invention
For describing the technical solution of the utility model in detail, provide specific embodiment below in conjunction with accompanying drawing.
Core concept of the present utility model is, in support installation process, make support first jointly bear vertical load and wind load etc. with main structure laterally to act on, guarantee the structural safety of construction stage, when being supported on the internal force of construction stage generation after installation by specific device release, avoid supporting and because larger load can be born, operational phase may be caused under wind load or geological process, support to be surrendered too early, affect wind resistance and the anti-seismic performance of structure.
Under the guide of above-mentioned core concept, by the following device realization that can discharge erection stage internal force to bracing members.Describedly can comprise node junction plate, support and connection plate to the device that bracing members discharges erection stage internal force, vertical load release of internal force mechanism and back shaft are to deformation mechanism, and node junction plate is for being connected with the gusset plate in main structure; Support and connection plate is connected with supporting base end portion; Described node junction plate and described support and connection plate are connected into entirety by release of internal force mechanism, and are discharged the load being supported on erection stage and bearing by self-regulation; To deformation mechanism, it is axially arranged along described support and connection plate back shaft, and release supports axial deformation during release internal force.
The specific embodiment of technique scheme is see Fig. 4 and Fig. 5, and wherein, Fig. 4 is the sectional view after the device that can discharge erection stage internal force to bracing members has been assembled; Fig. 5 is the device exploded view that can discharge erection stage internal force to bracing members.A kind of device to bracing members release erection stage internal force comprises the node junction plate 1 of pair of parallel setting, 3, be arranged on node junction plate 1, support and connection plate 2 between 3, bolt 4 and butterfly spring 8, support and connection plate 2 offers the slotted hole 201 realizing release back shaft internal force, the screw rod of bolt 4 is successively through node junction plate 1, support and connection plate 2, node junction plate 3, and slotted hole 201 position of self-supporting junction plate 2 is passed, screw rod section between node junction plate 1 and nut overlaps and has butterfly spring 8, disc spring backing plate 9 is had between butterfly spring 8 and node junction plate 1, disc spring backing plate 7 is arranged at butterfly spring 8 top, bolt backing plate 5 is lined with between loaded plate 6 and nut, packing ring 10 and bolt backing plate 11 is lined with between node junction plate 3 and bolt 4 termination.
Said structure is a concrete embodiment, and when other are implemented, the other types spring that butterfly spring 8 can have certain deflection by other replaces.
In other embodiments, the setting position of butterfly spring 8 can be arranged by the screw rod section between node junction plate 3 and bolt 4 termination or between node junction plate 1 and nut simultaneously.
The concrete steps adopting the above-mentioned device that can discharge erection stage internal force to bracing members specifically to carry out when high-rise steel structure supports are as follows:
Step one, the device that bracing members discharges erection stage internal force can be fixedly connected with support and main structure, to realize supporting or basic synchronization synchronous with agent structure and construct, the structure stress of support participation erection stage; Structure after bracing members is connected with agent structure, see Fig. 6, is with the difference that prior art is maximum, adopts the device A that can discharge erection stage internal force to bracing members to realize support 13 and be connected with agent structure (steel column 12 and girder steel 14) in this node.The device that bracing members discharges erection stage internal force can be fixedly connected with support and main structure, installation process is particularly: constantly tightened by the nut of bolt 4 and butterfly spring 8 is compressed, butterfly spring after compression 8 pairs of node junction plates 1 and node junction plate 3 produce precompression, prestressed size can be designed by the rigidity of stroke stubborn in nut and butterfly spring 8, and then between node junction plate 1 and support and connection plate 2, and produce frictional force between support and connection plate 2 and node junction plate 3, this frictional force can resist the internal force that the construction stage produces in support, ensure that the safety of structure in work progress.
Step 2, the agent structure installation of a construction stage (floor or a construction flowing water section), according to the result of work progress checking computations and the bearing capacity of this device, determine the timing node discharging internal force for support.
Step 3, release internal force for support, first looser a bolt, the frictional force between node junction plate and support and connection plate reduces gradually, and screw rod can move release along slotted hole and support axial deformation, and support unloading, eliminates this construction stage internal force for support.In internal force for support dispose procedure, owing to being provided with butterfly spring, the precompression that junction plate contact surface produces reduces gradually, and support unloading process is steady, safety.
Step 4, after support unloading completes, the nut tighted a bolt immediately, makes the compressive strain of butterfly spring return to original state, supports and again participates in work, for structure provides anti-side rigidity.
Step 5, after whole support unloading is completed, support and connection plate to be welded with node junction plate part in agent structure installation, then release of internal force mechanism is removed, finally will remain support and connection plate and weld with node junction plate, support final installation.
The embodiment that above-described embodiment content just adopts for the ease of understanding the technical solution of the utility model, is not intended to limit the utility model.Technician in any the utility model art; under the prerequisite not departing from the core technology scheme that the utility model discloses; any amendment and change can be made in the form implemented and details; but the protection domain that the utility model limits, the scope that still must limit with appending claims is as the criterion.

Claims (6)

1. can discharge a device for erection stage internal force to bracing members, it is characterized in that: comprise,
Node junction plate, is connected with the gusset plate in main structure;
Support and connection plate, is connected with supporting base end portion;
Release of internal force mechanism, described node junction plate and described support and connection plate are connected into entirety by it, and are discharged the load being supported on erection stage and bearing by self-regulation;
Back shaft is to deformation mechanism, and it is axially arranged along described support and connection plate.
2. the device that can discharge erection stage internal force to bracing members according to claim 1, it is characterized in that: described release of internal force mechanism comprises securing member and flexible piece, described gusset plate, described support and connection plate, described support axial force relieving mechanism and described flexible piece are fixed as one by described securing member, realize supporting with the jointly stressed of main structure by tightening or loosening securing member or realize radial release of internal force, described flexible piece controls the pressure between described node junction plate and support and connection plate.
3. the device that can discharge erection stage internal force to bracing members according to claim 2, is characterized in that: described back shaft is the slotted hole on described support and connection plate to deformation mechanism.
4. the device that can discharge erection stage internal force to bracing members according to claim 3, it is characterized in that: described securing member is bolt, screw rod and the described slotted hole of described bolt are slidably connected, and it can slide and realize supporting axial deformation release in described slotted hole.
5. the device that can discharge erection stage internal force to bracing members according to claim 3, is characterized in that: the length of described slotted hole need meet back shaft to deformation requirements.
6. the device that can discharge erection stage internal force to bracing members according to claim 2, is characterized in that: described flexible piece is butterfly spring.
CN201520675180.3U 2015-09-02 2015-09-02 Device of erection stage internal force can release steel shotcrete Active CN205036092U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520675180.3U CN205036092U (en) 2015-09-02 2015-09-02 Device of erection stage internal force can release steel shotcrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520675180.3U CN205036092U (en) 2015-09-02 2015-09-02 Device of erection stage internal force can release steel shotcrete

Publications (1)

Publication Number Publication Date
CN205036092U true CN205036092U (en) 2016-02-17

Family

ID=55295001

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520675180.3U Active CN205036092U (en) 2015-09-02 2015-09-02 Device of erection stage internal force can release steel shotcrete

Country Status (1)

Country Link
CN (1) CN205036092U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133843A (en) * 2015-09-02 2015-12-09 北京市建筑设计研究院有限公司 Device capable of releasing installation-stage internal force of steel support and installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133843A (en) * 2015-09-02 2015-12-09 北京市建筑设计研究院有限公司 Device capable of releasing installation-stage internal force of steel support and installation method
CN105133843B (en) * 2015-09-02 2017-04-05 北京市建筑设计研究院有限公司 Bracing members can be discharged with the installation method of the device of erection stage internal force

Similar Documents

Publication Publication Date Title
CN206309097U (en) The replaceable assembled buckling restrained brace of section is surrendered after one kind shake
CN110939210B (en) Toggle damper with steel multi-stage yield and friction energy consumption
CN210460134U (en) Double-pipe constraint type self-resetting buckling-restrained brace device based on belleville springs
CN105133843A (en) Device capable of releasing installation-stage internal force of steel support and installation method
Deng et al. Numerical study on a fully-prefabricated damage-tolerant beam to column connection for an earthquake-resilient frame
CN202672400U (en) Novel bamboo type steel tube buckling restricting energy consumption support
CN109811888B (en) Connecting node of raw bamboo cross beam and upright post
CN112392163A (en) Multistage self-recovery type energy dissipation support and energy dissipation method thereof
CN108867857A (en) A kind of assembly Braced Frames structure with function of seismic resistance
CN110295780B (en) Multi-order yielding double-tube constraint type self-resetting buckling restrained brace device
CN205036092U (en) Device of erection stage internal force can release steel shotcrete
CN105926795B (en) A kind of sleeve pipe constraining anti-buckling support with symmetrical initial imperfection
CN102011434A (en) BRB (buckling restrained brace) concrete frame beam-column joint
CN204919858U (en) Buckling restrained brace component
CN114482612A (en) Combined assembly type buckling-restrained energy-dissipation supporting component
CN112411784A (en) Stay cable type energy dissipation support and energy dissipation method thereof
CN110528946B (en) Double-tube constraint type self-resetting buckling-restrained supporting device based on belleville springs
CN105201098B (en) Without energy consuming support
CN106049952A (en) Buckling control support with bidirectional pyramid-shaped energy dissipation units at ends
CN101974940A (en) Joint of buckling restrained brace and concrete beam
CN210858187U (en) Multistage yielding double-pipe constraint type self-resetting buckling-restrained brace device
CN207296057U (en) Double ranks surrender energy dissipating bracing members
CN105839973A (en) Buckling control support with end provided with staggered pyramid type energy consumption unit
Liu et al. Structural behavior of steel tube and coupler scaffolds with stability strengthening details
CN214497935U (en) Stay cable type energy dissipation support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant