CN205035789U - 减小灌注桩负摩擦力装置 - Google Patents
减小灌注桩负摩擦力装置 Download PDFInfo
- Publication number
- CN205035789U CN205035789U CN201520760962.7U CN201520760962U CN205035789U CN 205035789 U CN205035789 U CN 205035789U CN 201520760962 U CN201520760962 U CN 201520760962U CN 205035789 U CN205035789 U CN 205035789U
- Authority
- CN
- China
- Prior art keywords
- pile
- geotechnological
- steel bar
- reinforced steel
- skin friction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本实用新型公开了一种减小灌注桩负摩擦力装置,由土工内膜、土工外膜、绳套、薄油膜、封闭端、下端钢筋环、短钢筋、上端钢筋环、连接带组成,本实用新型的减小灌注桩负摩擦力装置可有效地保障灌注桩中性点以上桩段与周围土层之间的摩擦系数接近为零,可以消除负摩擦力对灌注桩的不利影响,该装置结构简单、成本低廉、施工速度快、消除灌注桩负摩擦力效果好。
Description
技术领域
本实用新型涉及桩基施工技术领域,具体是一种减小灌注桩负摩擦力装置。
背景技术
沿海地区存在着大量的浅海相、湖沼相、三角洲相沉积地层,它们一般为软弱地基。虽然桩基在软弱地基已经大量使用,但还有许多问题未能很好解决,减小基桩负摩阻力就是一个比较复杂的问题。正常情况下,桩顶受竖向荷载作用下沉,桩侧土体对桩产生与桩的位移方向相反的摩阻力,摩阻力作用方向向上;而当桩侧土体因某些原因下沉量大于桩的沉降量时,桩周土对桩产生与位移方向一致的摩阻力,摩阻力作用方向向下,不利于基桩承载,即为负摩阻力。软弱地基中最易产生负摩擦力。目前减少灌注桩负摩阻力的措施可归纳为以下几种:1、支承桩柱法:尽量减少穿过产生负摩阻力区域的桩侧面积,在可能的情况下采用细长桩,而在桩端采用扩大桩头来提高端承能力,这只适合于端承桩;2、群桩法:该法通过增加桩数来体现群桩效应,以减小负摩擦力;3、分段施工法:该法是将桩基施工0.5-1年后,再继续其上部结构施工,可以缓解负摩擦力的作用;4、地基处理,消除土层负摩擦力。这些方法存在施工复杂、成本高、工期长等问题。
实用新型内容
为了解决现有技术中存在的上述技术问题,本实用新型提供了一种减小灌注桩负摩擦力装置,由土工内膜、土工外膜、绳套、薄油膜、封闭端、下端钢筋环、短钢筋、上端钢筋环、连接带组成,所述土工内膜与土工外膜下端封闭固定在一起,土工内膜与土工外膜之间放进少量润滑油形成薄油膜。
进一步的,所述下端钢筋环直径等于桩孔直径,捆绑在装置下端。
进一步的,所述上端钢筋环直径大于桩孔直径,放置于地面。
进一步的,所述连接带一端与上端钢筋环捆绑在一起,另一端与装置上端捆绑在一起。
进一步的,所述绳套一端固定设置在土工外膜下端外侧,另一端套住短钢筋。
进一步的,所述短钢筋数量在三根及以上,一端为小环状,套置在下端钢筋环上,另一端置于绳套内,下放装置时短钢筋受孔壁阻挡向内转,上提装置时短钢筋受土工膜作用向外转动并插入孔壁。
附图说明
图1是减小灌注桩负摩擦力装置剖面示意图;
图2是该装置放入过程短钢筋状态示意图;
图3是该装置上提短钢筋插入孔壁示意图;
图4是该装置制成桩剖面示意图。
具体实施方式
下面结合附图对实用新型作进一步说明。
如图1-4所示,本实用新型的减小灌注桩负摩擦力装置由土工内膜1、土工外膜2、绳套21、薄油膜3、封闭端4、下端钢筋环5、短钢筋51、上端钢筋环6、连接带7组成,所述土工内膜1与土工外膜2下端封闭固定在一起,土工内膜1与土工外膜2之间放进少量润滑油形成薄油膜;下端钢筋环5直径等于桩孔直径,捆绑在装置下端;上端钢筋环6直径大于桩孔直径,放置于地面;连接带7一端与上端钢筋环6捆绑在一起,另一端与装置上端捆绑在一起;绳套21一端固定设置在土工外膜2下端外侧,另一端套住短钢筋51;短钢筋51数量在三根及以上,一端为小环状,套置在下端钢筋环上,另一端置于绳套21内。
本实用新型的减小灌注桩负摩擦力装置使用时,成孔后,灌注混凝土之前,上端钢筋环放置于地面,通过连接带把减小灌注桩负摩擦力装置悬挂于桩孔内(中性点以上段),减小灌注桩负摩擦力装置就位后,稍稍上提,短钢筋外端插入孔壁(保障浇筑混凝土过程中装置不上浮),装置贴于桩孔孔壁。按常规浇筑混凝土,灌注桩混凝土浇筑完成后,解开连接带,上端钢筋环重复利用,减小灌注桩负摩擦力装置进入工作状态。
灌注桩施工完成后、建筑物运行期间,桩周土体下沉,带动土工外膜下沉,原本光滑的土工内、外膜之间又有薄油膜的润滑作用,使得土工内膜不会受到负摩擦力作用,即桩不会受到负摩擦力作用。
Claims (6)
1.一种减小灌注桩负摩擦力装置,由土工内膜(1)、土工外膜(2)、绳套(21)、薄油膜(3)、封闭端(4)、下端钢筋环(5)、短钢筋(51)、上端钢筋环(6)、连接带(7)组成,其特征在于:所述土工内膜(1)与土工外膜(2)下端封闭固定在一起,土工内膜(1)与土工外膜(2)之间放进少量润滑油形成薄油膜。
2.如权利要求1所述的减小灌注桩负摩擦力装置,其特征在于:所述下端钢筋环(5)直径等于桩孔直径,捆绑在装置下端。
3.如权利要求1所述的减小灌注桩负摩擦力装置,其特征在于:所述上端钢筋环(6)直径大于桩孔直径,放置于地面。
4.如权利要求1所述的减小灌注桩负摩擦力装置,其特征在于:所述连接带(7)一端与上端钢筋环(6)捆绑在一起,另一端与装置上端捆绑在一起。
5.如权利要求1所述的减小灌注桩负摩擦力装置,其特征在于:所述绳套(21)一端固定设置在土工外膜(2)下端外侧,另一端套住短钢筋(51)。
6.如权利要求1所述的减小灌注桩负摩擦力装置,其特征在于:所述短钢筋(51)数量在三根及以上,一端为小环状,套置在下端钢筋环上,另一端置于绳套(21)内。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520760962.7U CN205035789U (zh) | 2015-09-29 | 2015-09-29 | 减小灌注桩负摩擦力装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520760962.7U CN205035789U (zh) | 2015-09-29 | 2015-09-29 | 减小灌注桩负摩擦力装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205035789U true CN205035789U (zh) | 2016-02-17 |
Family
ID=55294701
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520760962.7U Expired - Fee Related CN205035789U (zh) | 2015-09-29 | 2015-09-29 | 减小灌注桩负摩擦力装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205035789U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107190762A (zh) * | 2017-07-11 | 2017-09-22 | 中铁第四勘察设计院集团有限公司 | 一种减小侧摩阻力的桩基结构 |
CN107893416A (zh) * | 2017-12-22 | 2018-04-10 | 长安大学 | 一种用于降低灌注桩所受负摩擦力影响效果的塑料套管装置 |
CN108517862A (zh) * | 2018-03-26 | 2018-09-11 | 中冶天工集团有限公司 | 一种桩侧油毡铺贴的施工方法 |
-
2015
- 2015-09-29 CN CN201520760962.7U patent/CN205035789U/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107190762A (zh) * | 2017-07-11 | 2017-09-22 | 中铁第四勘察设计院集团有限公司 | 一种减小侧摩阻力的桩基结构 |
CN107893416A (zh) * | 2017-12-22 | 2018-04-10 | 长安大学 | 一种用于降低灌注桩所受负摩擦力影响效果的塑料套管装置 |
CN108517862A (zh) * | 2018-03-26 | 2018-09-11 | 中冶天工集团有限公司 | 一种桩侧油毡铺贴的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103603342B (zh) | 大直径组合套管超长灌注桩施工方法 | |
CN205035789U (zh) | 减小灌注桩负摩擦力装置 | |
CN204370469U (zh) | 一种钻孔桩长腿导管架海上风机基础 | |
CN107401177B (zh) | 一种底板带压浆装置的吸力式沉箱基础 | |
CN107893429B (zh) | 一种地下槽形体抗浮构造的抗浮验算方法 | |
CN110984214A (zh) | 海上风电单桩-翼板-堆石体复合基础及其施工方法 | |
CN105297764B (zh) | 海上风电场风机单桩基础及其施工方法 | |
CN205035794U (zh) | 减小预制桩负摩擦力装置 | |
CN105780806A (zh) | 一种钻孔桩长腿导管架海上风机基础及其施工方法 | |
CN211646449U (zh) | 海上风机组合式单桩基础 | |
CN106703069B (zh) | 一种破土减阻保压的筒形基础沉放装置及其沉放方法 | |
CN206646541U (zh) | 一种岩基海床海上风机嵌岩单桩基础 | |
CN202031104U (zh) | 复合桩基 | |
CN210086280U (zh) | 一种扩大头土锚杆-预制混凝土复合铁塔基础结构 | |
CN102808407A (zh) | 软土地基钢筋混凝土灌注桩施工方法 | |
CN110984212A (zh) | 海上风机组合式单桩基础及施工方法 | |
CN116497818B (zh) | 海上大直径钢管桩防溜桩装置及其使用方法 | |
CN206052761U (zh) | 一种海上风电场单桩基础 | |
CN204827213U (zh) | 双动力头旋挖钻机 | |
CN202090352U (zh) | 钢管桩-自钻式预应力锚杆深基坑支护系统 | |
CN204715198U (zh) | 一种新型吸力式桥梁深水基础 | |
CN110670620A (zh) | 一种带有翼板的现浇重力式吸力式沉箱基础 | |
CN110670618A (zh) | 一种带有翼板的预制重力式吸力式沉箱基础 | |
CN204000856U (zh) | 内撑灌浆式水平抗侧变刚度桩基 | |
CN203977417U (zh) | 一种深水桩基础用加强肋嵌入式钢护筒 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160217 Termination date: 20160929 |
|