CN205032718U - Tundish flow stabilizer - Google Patents
Tundish flow stabilizer Download PDFInfo
- Publication number
- CN205032718U CN205032718U CN201520788263.3U CN201520788263U CN205032718U CN 205032718 U CN205032718 U CN 205032718U CN 201520788263 U CN201520788263 U CN 201520788263U CN 205032718 U CN205032718 U CN 205032718U
- Authority
- CN
- China
- Prior art keywords
- diapire
- utility
- hanger
- model
- current stabilizer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Casting Support Devices, Ladles, And Melt Control Thereby (AREA)
Abstract
The utility model provides a tundish flow stabilizer, the lateral wall and the lug that upwards extend including the diapire, by the periphery of this diapire, diapire and lateral wall enclose establishes into a cavity, the lug is acceptd in the cavity to it is fixed mutually with the middle part of diapire. The utility model discloses a tundish flow stabilizer arranges the lug in the middle part of its diapire, because the diapire of whole current stabilizer is thick and the area is great, is difficult for appearing the problem that intensity is not enough in manufacturing process, and the lug is put in here closelyer apart from the focus in addition, can the slope phenomenon not appear at the hoist and mount in -process to the possibility that reduces to cause danger.
Description
Technical field
The utility model relates to a kind of refractory material, particularly relates to a kind of tundish current stabilizer.
Background technology
Tundish is a requisite link in continuous-casting steel-making technique, needs to install the flowing that prefabricated component controls molten steel in the knotting process of tundish.Longer in some service lifes, water in the tundish of steel bar part harshness and need to use integral current stabilizer just can reach requirement.
The hanger of existing flow straightener is located at the peak position of flow straightener sidewall, so that take.But existing flow straightener sidewall is the thinnest, after vibrations, easily there is the problems such as intensity is not high relative to other positions.Along with the increase of flow straightener volume and the change of shape, when hanger is arranged on this position, may occurs because intensity is not high and break off relations, or the run-off the straight when lifting because the position of centre of gravity of flow straightener is bad, therefore the position of hanger just seems very important.
Utility model content
The utility model proposes a kind of tundish current stabilizer, solve hanger on existing tundish current stabilizer and fix unstable etc. problem.
The technical solution of the utility model is achieved in that
A kind of tundish current stabilizer, comprise diapire, the sidewall upwards extended by the periphery of this diapire and a hanger, described diapire and sidewall are enclosed to form a cavity, and described hanger is contained in cavity, and fix with the middle part of diapire.
Preferred version is, the thickness of described diapire is 200mm-500mm.
Preferred version is, the thickness of described sidewall is 80mm-200mm.
Preferred version is, described hanger is reinforcing bar hanger.
Preferred version is, the diameter of described reinforcing bar hanger is 10mm-12mm.
The beneficial effects of the utility model are:
Tundish current stabilizer of the present utility model is middle part hanger being arranged in its diapire, diapire due to integral current stabilizer is thicker and area is larger, the problem of insufficient strength is not easily there is in manufacturing process, and hanger is placed on nearer apart from center of gravity herein, tilt phenomenon can not be there is in hoisting process, thus the possibility that reduction is caused danger.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the longitudinal sectional view of the utility model tundish current stabilizer.
In figure:
10, tundish current stabilizer; 11, diapire; 12, sidewall; 13, hanger; 15, cavity.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
As shown in Figure 1, this tundish current stabilizer 10 hanger 13 of comprising diapire 11, the sidewall 12 upwards extended by the periphery of this diapire 11 and being located on this diapire 11.
Described diapire 11 is the arcwall of evagination, and its thickness is 200mm-500mm.During concrete enforcement, the shape of this diapire 11 is not limited to the situation of the present embodiment, and it also can be tabular or other shapes.The thickness of described sidewall 12 is 80mm-200mm.Described diapire 11 is enclosed to form a cavity 15 with sidewall 12.
Described hanger 13 is contained in inner chamber 15, and fixes with the middle part of the diapire of tundish current stabilizer 10.This hanger 13 is reinforcing bar hanger, and the diameter of its reinforcing bar is 10mm-12mm.
Tundish current stabilizer of the present utility model is middle part hanger being arranged in its diapire, diapire due to integral current stabilizer is thicker and area is larger, the problem of insufficient strength is not easily there is in manufacturing process, and hanger is placed on nearer apart from center of gravity herein, tilt phenomenon can not be there is in hoisting process, therefore can reduce the possibility of causing danger at this location arrangements hanger.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.
Claims (5)
1. a tundish current stabilizer, comprise diapire, the sidewall upwards extended by the periphery of this diapire and a hanger, described diapire and sidewall are enclosed to form a cavity, it is characterized in that: described hanger is contained in cavity, and fix with the middle part of diapire.
2. tundish current stabilizer as claimed in claim 1, is characterized in that: the thickness of described diapire is 200mm-500mm.
3. tundish current stabilizer as claimed in claim 1, is characterized in that: the thickness of described sidewall is 80mm-200mm.
4. as the tundish current stabilizer in claims 1 to 3 as described in any one, it is characterized in that: described hanger is reinforcing bar hanger.
5. tundish current stabilizer as claimed in claim 4, is characterized in that: the diameter of described reinforcing bar hanger is 10mm-12mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520788263.3U CN205032718U (en) | 2015-10-13 | 2015-10-13 | Tundish flow stabilizer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520788263.3U CN205032718U (en) | 2015-10-13 | 2015-10-13 | Tundish flow stabilizer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205032718U true CN205032718U (en) | 2016-02-17 |
Family
ID=55291650
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520788263.3U Active CN205032718U (en) | 2015-10-13 | 2015-10-13 | Tundish flow stabilizer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205032718U (en) |
-
2015
- 2015-10-13 CN CN201520788263.3U patent/CN205032718U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206779390U (en) | A kind of fixation frock between sand mold and core | |
MX2020006559A (en) | Configured tundish. | |
RU2014147495A (en) | SUBMERSIBLE GLASS FOR INSTALLATION OF CONTINUOUS CASTING | |
CN205032718U (en) | Tundish flow stabilizer | |
US10562094B2 (en) | Annular weir | |
KR101235614B1 (en) | Apparatus for lifting of ladle | |
CA2898033C (en) | Refractory impact pad | |
RU2011149480A (en) | PROCESSING BUCKET | |
CN204997056U (en) | Middle current stabilizer of guaranteeing serviceability of T type continuous casting | |
CN104972068A (en) | Slag stopping sprue cup | |
CN204700292U (en) | The submersed nozzle of large discharge current stabilization speed | |
CN108031829A (en) | Hot ladle pocket block repairing mould and restorative procedure | |
JP2014133241A (en) | Long nozzle for continuous casting | |
CN204818028U (en) | Package current stabilizer in middle of modified continuous casting | |
CN203346460U (en) | Nodulizing ladle cover with drainage device | |
MX2011005327A (en) | Immersion nozzle. | |
JP6215092B2 (en) | Vacuum degassing equipment | |
TWI581878B (en) | Ladle bottom and ladle | |
CN204672945U (en) | Be applicable to the manipulator backing ring of tubaeform ladle long nozzle | |
CN204308185U (en) | There is the ladle of band | |
CN209830251U (en) | Mould for coating fireproof layer in casting ladle | |
CN209636258U (en) | A kind of safeguard structure of slag ladle axis platform crackle | |
CN206464537U (en) | Slag blocking wall for tundish | |
US11958107B2 (en) | Tundish funnel | |
CN207043335U (en) | A kind of device for reducing long nozzle slag line etch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |