CN205029263U - Cable conduit connection structure - Google Patents

Cable conduit connection structure Download PDF

Info

Publication number
CN205029263U
CN205029263U CN201520655622.8U CN201520655622U CN205029263U CN 205029263 U CN205029263 U CN 205029263U CN 201520655622 U CN201520655622 U CN 201520655622U CN 205029263 U CN205029263 U CN 205029263U
Authority
CN
China
Prior art keywords
hole
projection
connector
connection structure
conduit connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520655622.8U
Other languages
Chinese (zh)
Inventor
曹顺萌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG BIKONG ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd
Original Assignee
SHANDONG BIKONG ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG BIKONG ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd filed Critical SHANDONG BIKONG ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd
Priority to CN201520655622.8U priority Critical patent/CN205029263U/en
Application granted granted Critical
Publication of CN205029263U publication Critical patent/CN205029263U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

Cable conduit connection structure is including body and connecting piece, establish the through -hole on the lateral wall of body both ends, the through -hole number is the multirow, and every row of number is the even number, establish the lug at the both ends of connecting piece, row's number that the form of arranging and the through -hole on the body of messenger's lug were arranged is unanimous, and every row of number is the half the of through -hole, the pass of through -hole is narrow under the width, the appearance of lug corresponds unanimously with the lower extreme size of through -hole, the half interior part of a lug and body distolateral through -hole of serving connecting piece no. 1 is connected, lug on the other end extend behind the other end of body with another body on outer half partly being connected of a distolateral through -hole. Its simple structure uses the simple operation, and bolt installation time when having saved per two sections crane span structures the installation and connecting can improve the construction cycle that the cable testing bridge is connected, reduces the cost of labor. Especially, in the heavy construction, more can embody its labour saving and time saving's advantage.

Description

Cable conduit connection structure
Technical field
The utility model relates to cable testing bridge field, and what be specifically related to is cable conduit connection structure.
Background technology
Current cable testing bridge, be no matter the crane span structure of the form such as pellet type crane span structure or ladder-type, its connected mode is along limit and arranges 12 stove bolts, so often installs a joint crane span structure and all at least installs 24 even 36 bolts, considerably increase field installation time.Namely two exhausting holes are set by uniform up and down respectively on the both sides sidewall at the two ends of body, often row is three or four holes, such body arranges four groups of such through holes altogether, at the two ends of connector, correspondence arranges one group of such through hole respectively accordingly, then by two body docking, after the sets of vias of corresponding for connector body opposite end, connector is bolted with body respectively.
Utility model content
The utility model provides a kind of cable conduit connection structure, and it can improve the construction period that cable testing bridge connects, and reduces cost of labor.
The technical scheme in the invention for solving the technical problem is: cable conduit connection structure, comprises body and connector; The two side at described body two ends arranges through hole respectively, makes set through hole number be the many rows arranged up and down, often arranging number is even number; The longitudinal length of described connector is greater than the longitudinal length of described body; Arrange projection at the two ends of described connector, make the arrangement form of described projection consistent with the row of the via arrangement on described body, projection often arranges the half that number is through hole; On described body, the pass of each through hole is wide at the top and narrow at the bottom; The profile of described connector upper protruding block is corresponding consistent with the lower end size of through hole on described body; Projection on described connector one end is divided with the inner halves of body end side through hole and is connected, divide with the outer half of end side through hole on another body after the projection on the other end extends the other end of body and be connected.In use procedure, first the projection on connector is aimed at through hole upper end on body, then pull connector that connector upper end projection is stuck in the through hole lower end of body.
Further, the through hole that the two side at described body two ends is arranged is two rows arranged up and down, often arranges six; Two rows of the projection arranged at the two ends of described connector accordingly also for arranging up and down, often arrange three.
Further, on described body, the pass of through hole is inverted L-type, and makes the width of horizontal part be greater than the width of vertical component.In use procedure, first the projection on connector is aimed at the horizontal part in through hole upper end on body, then pull down the lower end that connector upper end projection just can be stuck in the through hole vertical component of body by follower link backward again.
Further, the pass of described through hole is trapezoidal and rectangular composite holes, and trapezoidal portions be placed in upper end and trapezoidal long limit upper; The width of rectangular segment is consistent with trapezoidal minor face width.
The beneficial effects of the utility model are: its structure is simple, use simple operation, eliminate bolt setting operation when every two joint crane span structures connect, can improve the construction period that cable testing bridge connects, reduce cost of labor when crane span structure is installed.Especially, in heavy construction, its time saving and energy saving advantage can more be embodied.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the view that the utility model connects application;
In figure: 1 body, 11 through holes, 2 connectors, 21 projections, 3 cover plates.
Embodiment
For ease of understanding technology contents of the present utility model, just by reference to the accompanying drawings its technical scheme is described further below.
Cable conduit connection structure as depicted in figs. 1 and 2, comprises body 1 and connector 2.The two side at described body 1 two ends arranges through hole 11 respectively, makes set through hole 11 number be two rows arranged up and down, often arranging number is six.The longitudinal length of described connector 2 is greater than the longitudinal length of described body 1.At the two ends of described connector 2, projection 21 is set, make the arrangement form of described projection 21 consistent with the row that the through hole 11 on described body 1 is arranged, it is (projection 21 only often arrange number consistent with the arrangement form of through hole 11 is different) that projection 21 often arranges number.On described body 11, the pass of each through hole is wide at the top and narrow at the bottom, as can be the inverted L-type shown in Fig. 2, and makes the width of horizontal part be greater than the width of vertical component.In use procedure, shown in installment state as shown in Figure 2, first the projection 21 on connector 2 is aimed at the horizontal part in through hole 11 upper end on body 1, then pull down the lower end that connector 2 upper end projection 21 just can be stuck in through hole 11 vertical component of body 1 by follower link 2 backward again.Cover plate 3 is covered after cable laying.The pass of described through hole 11 can also be trapezoidal and rectangular composite holes, and trapezoidal portions be placed in upper end and trapezoidal long limit upper, the width of rectangular segment is consistent with trapezoidal minor face width.No matter what shape the pass of through hole 11 is, and all makes the profile of the profile of projection 21 and through hole lower end narrower part adapt, is stuck in through hole 11 lower end to make projection 21.As shown in Figure 2, the projection 21 on described connector 2 one end is divided with the inner halves of body 1 end side through hole 11 and is connected, divide with the outer half of end side through hole 11 on another body 1 after the projection 21 on the other end extends the other end of body 1 and be connected.During connection, first the projection 21 on connector 2 is aimed at through hole 11 upper end on body 1, then pull connector 2 that connector 2 upper end projection 21 is stuck in through hole 11 lower end of body 1.
Its structure is simple, uses simple operation, can improve the construction period that cable testing bridge connects, and reduces cost of labor.When crane span structure is constructed, if each bolt peace 10s calculates, then the time can saving 4min once joint crane span structure is often installed, more manpower and time can be saved thus.
Except the technical characteristic described in specification, be the known technology of those skilled in the art.

Claims (4)

1. cable conduit connection structure, comprises body and connector; The two side at described body two ends arranges through hole respectively, it is characterized in that:
Make through hole number set on body be the many rows arranged up and down, often arranging number is even number;
The longitudinal length of described connector is greater than the longitudinal length of described body;
Arrange projection at the two ends of described connector, make the arrangement form of described projection consistent with the row of the via arrangement on described body, projection often arranges the half that number is through hole;
On described body, the pass of each through hole is wide at the top and narrow at the bottom;
The profile of described connector upper protruding block is corresponding consistent with the lower end size of through hole on described body;
Projection on described connector one end is divided with the inner halves of body end side through hole and is connected, divide with the outer half of end side through hole on another body after the projection on the other end extends the other end of body and be connected.
2. cable conduit connection structure according to claim 1, is characterized in that: the through hole arranged on the two side at described body two ends is two rows arranged up and down, often arranges six; Two rows of the projection arranged at the two ends of described connector accordingly also for arranging up and down, often arrange three.
3. cable conduit connection structure according to claim 1 and 2, is characterized in that: on described body, the pass of through hole is inverted L-type, and makes the width of horizontal part be greater than the width of vertical component.
4. cable conduit connection structure according to claim 1 and 2, is characterized in that: the pass of described through hole is trapezoidal and rectangular composite holes, and trapezoidal portions be placed in upper end and trapezoidal long limit upper; The width of rectangular segment is consistent with trapezoidal minor face width.
CN201520655622.8U 2015-08-27 2015-08-27 Cable conduit connection structure Expired - Fee Related CN205029263U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520655622.8U CN205029263U (en) 2015-08-27 2015-08-27 Cable conduit connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520655622.8U CN205029263U (en) 2015-08-27 2015-08-27 Cable conduit connection structure

Publications (1)

Publication Number Publication Date
CN205029263U true CN205029263U (en) 2016-02-10

Family

ID=55261767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520655622.8U Expired - Fee Related CN205029263U (en) 2015-08-27 2015-08-27 Cable conduit connection structure

Country Status (1)

Country Link
CN (1) CN205029263U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107181215A (en) * 2016-11-01 2017-09-19 许昌美特桥架股份有限公司 Crane span structure attachment structure and the installation method using the structure
CN107444295A (en) * 2016-05-31 2017-12-08 上海汽车集团股份有限公司 The protection device and automobile of shaft
CN109119951A (en) * 2018-08-29 2019-01-01 中国电建集团山东电力建设第工程有限公司 A kind of anti-tampering cable laying method of combustion engine signal under complex environment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107444295A (en) * 2016-05-31 2017-12-08 上海汽车集团股份有限公司 The protection device and automobile of shaft
CN107444295B (en) * 2016-05-31 2020-09-01 上海汽车集团股份有限公司 Rod-shaped object protection device and automobile
CN107181215A (en) * 2016-11-01 2017-09-19 许昌美特桥架股份有限公司 Crane span structure attachment structure and the installation method using the structure
CN107181215B (en) * 2016-11-01 2019-07-30 许昌美特桥架股份有限公司 Gantry connection structure and the installation method for using the structure
CN109119951A (en) * 2018-08-29 2019-01-01 中国电建集团山东电力建设第工程有限公司 A kind of anti-tampering cable laying method of combustion engine signal under complex environment

Similar Documents

Publication Publication Date Title
CN205029263U (en) Cable conduit connection structure
CN203150936U (en) Power distribution cabinet pedestal
CN203729202U (en) Combined bridge deck
CN202955081U (en) Connection structure of pipe framework
CN204441814U (en) Cable testing bridge and use the crane span structure assembly of this cable testing bridge
CN104466828B (en) Cable bridge convenient to install
CN203568222U (en) Side wall reinforcing structure of rectangular coal scuttle
CN206127905U (en) To open form base flange cross
CN204361611U (en) A kind of vertical crane span structure seven word fastener
CN204370571U (en) A kind of floor plates constructing structure for building
CN203878779U (en) Rectangular concrete-filled steel tube column and I-steel beam rebar penetrating type joint
CN203135223U (en) Lightning arrester combined support of single-column transformer platform
CN205829097U (en) A kind of temporary cable hanging hook assembly
CN201850670U (en) Wall and plug-in type building block
CN207277837U (en) A kind of templates for expansion joints without removing
CN206815128U (en) Grid board fixer
CN204495063U (en) Dropping-proof sintering machine fixed glides
CN206004251U (en) A kind of novel cable ditch support
CN207827619U (en) A kind of steel construction lift car fixed structure
CN204489900U (en) A kind of scraper conveyor tail pushing part
CN203297290U (en) Cushion plate for steel structure connection
CN204370304U (en) A kind of pecten formula rubber steel plate bridge expansion joint structure
CN204884715U (en) Modular ground connection dead end insulator
CN205669260U (en) High intensity beam-to-column joint steel construction
CN204614975U (en) A kind of lightning protection downlead

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160210