CN205026387U - Furred ceiling structure of liquefied natural gas storage tank - Google Patents

Furred ceiling structure of liquefied natural gas storage tank Download PDF

Info

Publication number
CN205026387U
CN205026387U CN201520285674.0U CN201520285674U CN205026387U CN 205026387 U CN205026387 U CN 205026387U CN 201520285674 U CN201520285674 U CN 201520285674U CN 205026387 U CN205026387 U CN 205026387U
Authority
CN
China
Prior art keywords
frame beam
natural gas
liquefied natural
lng
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
CN201520285674.0U
Other languages
Chinese (zh)
Inventor
刘博�
黄勇华
程伟
张金伟
高天喜
高贤
金建兴
张春华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhenshen Insulation Technology Corp ltd
China Huanqiu Contracting and Engineering Corp
Original Assignee
Zhejiang Zhenshen Cold Insulation Technology Co Ltd
China Huanqiu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhenshen Cold Insulation Technology Co Ltd, China Huanqiu Engineering Co Ltd filed Critical Zhejiang Zhenshen Cold Insulation Technology Co Ltd
Priority to CN201520285674.0U priority Critical patent/CN205026387U/en
Application granted granted Critical
Publication of CN205026387U publication Critical patent/CN205026387U/en
Ceased legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The utility model discloses a furred ceiling structure of liquefied natural gas storage tank, include: a set of jib, buckled plate and frame roof beam, the frame roof beam is whole arranges that the longeron and the ring beam junction of frame roof beam are provided with the rigid connection node respectively, link together through the connection plate into the structure of many pin frame around the Center circle, be connected through a set of jib between the dome of storage tank and the frame roof beam of furred ceiling, the middle part of every jib is provided with the two -way regulation head of threaded, is used for adjusting the levelness of furred ceiling in the installation, buckled plate and frame roof beam pass through rivet connection together, and the cold insulation material is laid to the buckled plate upper surface, the passing through on the buckled plate evenly transmits the frame roof beam from the heavy load of cold insulation material.

Description

A kind of ceiling structure of liquefied natural gas (LNG) tank
Technical field
The utility model relates to LNG Liquefied natural gas field, in particular to a kind of ceiling structure of liquefied natural gas (LNG) tank.
Background technique
LNG (LNG Liquefied natural gas) storage tank is a kind of container of splendid attire low temperature liquid rock gas, under utilizing the low temperature below-165 DEG C, rock gas can normal pressure liquid form store principle design form.LNG storage tank is generally made up of inner canister, outer tank and cold insulation heat insulation layer.Inner canister is for storing low temperature liquid rock gas, and the top of inner canister, bottom and tank skin surrounding are all wrapped in cold insulation heat insulation layer.Outer tank is made up of outer tank skin and dome, and dome is fixed on outer tank skin top, and inner canister furred ceiling is suspended in dome steel structure by one group of pull bar.
Ceiling structure has flat surface configuration usually, is suspended on directly over inner canister, in order to support the thermoinsulation material of interior tank top, to reduce the heat transmission of cold conditions storage medium and external heat source, reduces the relative evaporation of LNG.Ceiling material should tolerate the minimum design temperature of medium, and the cold events effect that tank deck or any position of tank skin may occur under any possibility operating conditions.The topmost function of furred ceiling supports cold insulation material, the LNG Liquefied natural gas preventing from cold insulation material from falling into inner canister storing.Meanwhile, furred ceiling should be able to bear the construction load produced in furred ceiling and cold insulation material work progress, ensures the personal safety of workmen.
LNG storage tank technical development is in recent years rapid, and maximum-norm is increased to 16 ten thousand steres, 20 ten thousand steres, even 30 ten thousand steres from 3 ten thousand steres.The ceiling structure matched with it, is also increased to 80,90 meters from diameter about 40 meters.Because traditional furred ceiling is all generally welded at the scene, under this size and scale, the traditional ceiling structure meeting standard specification and design safety seems more and more heavier, difficulty of construction is increasing, manufacturing cycle is more and more longer, cost is also more and more expensive, by technological innovation and need transform with the large scale development trend adapting to LNG storage tank.
Model utility content
The utility model provides a kind of ceiling structure of liquefied natural gas (LNG) tank, and can solve in LNG storage tank large scale development process, traditional ceiling structure Problems existing, meets design requirement.
The utility model provides a kind of ceiling structure of liquefied natural gas (LNG) tank, comprising: one group of suspension rod, corrugated sheet and frame beam, wherein:
The grid arrangement of described frame beam (comprising Main subrack to set a roof beam in place) be many Pin framework around the form of center circle, quadrilateral, triangle, ring, gilled rings shape, fan-shaped in the form that combines of one or more forms;
Suspension rod described in every root is connected between the dome of storage tank and described frame beam, described in every root, the upper end of suspension rod is suspended in dome steel structure, suspension rod lower end described in every root is articulated with on described frame beam, the neutral position of suspension rod described in every root is provided with threaded bidirectional modulation head, for adjusting the levelness of furred ceiling in installation process;
Described corrugated sheet and described frame beam pass through together with rivet interlacement, and described corrugated sheet upper surface lays cold insulation material, being evenly delivered on frame beam by described corrugated sheet from heavy load of cold insulation material.
Further, the material of described suspension rod is stainless steel or 9Ni steel or aluminum alloy.
Further, described corrugated sheet is one group of die mould aluminium alloy plate supporting cold insulation material, is riveted together between two, and is fixed on described frame beam by rivet after overlap joint.
Further, described frame beam is any one in I-shaped structure steel, angle steel, channel-section steel, T bar.
Further, the material of described frame beam is stainless steel or 9Ni steel or aluminum alloy.
Further, when the grid arrangement of described frame beam is many Pin framework around the form of center circle, longeron and the ring beam joint of described frame beam are respectively arranged with rigid joint, are linked together by gusset plate.
Further, described gusset plate with between ring beam, longeron by be welded to connect or bolt is connected or weld and be connected with the compound mode of bolt.
Further, the material of described corrugated sheet is stainless steel or 9Ni steel or aluminum alloy.
Further, the cross section of described suspension rod can be the form of round steel+be threaded, and also can be round steel, band steel, angle steel uniform section or its composite structure.
Ceiling structure of the present utility model uses thin-walled corrugated sheet furred ceiling to substitute traditional reinforcement flat sheet combination structure, significantly saves material, effectively reduces the load of dome steel structure, improve the Security of storage tank; Owing to adopting prefabrication+field-installed method of construction, lifting machining accuracy is high, and flatness is good, reduces welding job amount simultaneously, more saves the duration.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technological scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the furred ceiling overall structure schematic diagram of the liquefied natural gas (LNG) tank of the utility model embodiment;
Fig. 2 is the furred ceiling thin portion structural representation of Fig. 1 embodiment;
Fig. 3 is the ceiling structure of the utility model embodiment and the linkage structure schematic diagram with dome, frame beam thereof;
Fig. 4 is the corrugated sheet schematic cross-section of the utility model embodiment;
Fig. 5 is that the frame beam of the utility model embodiment arranges (single Pin) schematic diagram;
Fig. 6 is the frame beam connected node schematic diagram of the utility model embodiment.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technological scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not paying the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
Fig. 1 is the furred ceiling overall structure schematic diagram of the liquefied natural gas (LNG) tank of the utility model embodiment, Fig. 2 is the furred ceiling thin portion structural representation of Fig. 1 embodiment, Fig. 3 is the ceiling structure of the utility model embodiment and the linkage structure schematic diagram with dome, frame beam thereof, this ceiling structure is applicable to double-walled low-temperature liquefaction rock gas vertical cylinder storage tank, in figure, 5 is interior tank skin, and 6 is outer tank skin, and this furred ceiling forms primarily of suspension rod 4, corrugated sheet 2 and frame beam 3 three part.
The grid arrangement of frame beam be many Pin framework around the form of center circle, quadrilateral, triangle, ring, gilled rings shape, fan-shaped in the form that combines of one or more forms, when the grid arrangement of frame beam is many Pin framework around the form of center circle, longeron and the ring beam joint of frame beam are respectively arranged with rigid joint, are linked together by gusset plate;
Suspension rod is one group of tensional element connecting dome steel structure 1 and frame beam (such as main material can be stainless steel or 9Ni steel or aluminum alloy), play and connect dome and framework beam action, every root suspension rod is connected between the dome of storage tank and frame beam, the upper end of every root suspension rod is suspended in dome steel structure, every root suspension rod lower end is articulated with on frame beam, the neutral position of every root suspension rod is provided with threaded bidirectional modulation head, in Fig. 3,9 is the bidirectional modulation screw thread of bidirectional modulation head, for adjusting the levelness of furred ceiling in installation process;
Corrugated sheet and frame beam pass through together with rivet interlacement, corrugated sheet upper surface lays cold insulation material, evenly being delivered on frame beam by corrugated sheet from heavy load of cold insulation material, frame beam is the main support structure of furred ceiling, being born by frame beam from heavy load of cold insulation material and furred ceiling, and be delivered in dome steel structure eventually through hanging rod structure.
Wherein, the cross section of suspension rod can be the form of round steel+be threaded, and also can be round steel, band steel, angle steel uniform section or its composite structure.
Fig. 4 is the corrugated sheet schematic cross-section of the utility model embodiment, and corrugated sheet is one group of die mould aluminium alloy plate supporting cold insulation material, is riveted together between two, is fixed on frame beam eventually through rivet after overlap joint.Corrugated sheet is a kind of orthotropic sheet material, and the rigidity of section of its strong edge direction is comparatively large, the deadweight uniform load of cold insulation material can be delivered on frame beam.Meanwhile, corrugated sheet can also bear the construction load produced in cold insulation material work progress.Compared with traditional panel suspended ceiling structure, because corrugated board structures takes full advantage of the module of anti-bending section of material, therefore greatly reduce the consumption of material, reduce furred ceiling deadweight, improve bearing capacity simultaneously.
Wherein, the corrugated sheet in above-described embodiment is also substitutable for the contour plate of other section forms.
Fig. 5 is that the frame beam of the utility model embodiment arranges (single Pin) schematic diagram, Fig. 6 is the frame beam connected node schematic diagram of the utility model embodiment, frame beam is one group of aluminum keel structure supporting corrugated sheet, connection suspension rod, is the main support structure of furred ceiling.The Cross section Design of beam is formed steel construction.Framework integral arrangement is the structure of many Pin framework around center circle, and each Pin framework size is all identical, can realize batch prefabricated, and be transported to Assembling, to improve machining accuracy and project progress in manufactory.Longeron 12 and ring beam 11 joint of frame beam are respectively arranged with rigid joint, are linked together by gusset plate; By being welded to connect between gusset plate and beam.In addition, for strengthening join strength, also bolt fastening structure can be set up.
Wherein, specific to the position relationship between the ring beam of frame beam and longeron, ring beam can be positioned at above or below longeron, also can align with the center line of longeron; The grid arrangement of frame beam (comprising Main subrack to set a roof beam in place) can be the form shown in Fig. 5, also can be quadrilateral, triangle, ring, gilled rings shape, other grid configurations such as fan-shaped, and the form that above various ways combines.
In the specific implementation, every root suspension rod upper and lower end also can arrange one group of suspension rod connecting plate 8 respectively, respectively by bolt be welded on the dome connecting plate 7 on dome and the frame attachment plate 10 on frame beam is fixed together.
Compared with prior art, improvement of the present utility model is:
Adopt frame structure to replace composite structure that is dull and stereotyped and stiffening ring, make full use of the resistance to flexure of beam, improve stock utilization, improve design safety factor simultaneously;
Adopt corrugated sheet to replace slab construction, take full advantage of the flexural rigidity of the strong edge direction of corrugated sheet, the bearing capacity of furred ceiling is improved greatly;
Adopt the hanging rod structure of adjustable length, ensure that in installation process, furred ceiling levelness can control;
The arrangement and method for construction of prefabrication+scene splicing can be adopted, decrease Site Welding workload, substantially reduce the site operation duration, improve working environment, improve manufacture and machining accuracy.
About detailed dimensions and the layout design of ceiling structure in the utility model, as the design of corrugated sheet bearing capacity, waveform size, the design of frame beam sectional dimension, carrying spacing, the design of suspension rod distribute spacing, and the design of connection rivet bearing capacity, can calculate according to design condition and determine, to meet the requirement of the various load working condition of storage tank.
To sum up, LNG storage tank ceiling structure of the present utility model, under the prerequisite realizing traditional furred ceiling all functions, significantly reduces the material consumption of furred ceiling, manufacturing cycle and expense, eliminate the problem that classic flat-plate furred ceiling easily occurs to bend, improve bearing capacity and the Safety performance of furred ceiling.Simultaneously because furred ceiling deadweight reduces, and then the material consumption of dome steel structure can be reduced further.The utility model can adopt the manufacture method of prefabrication+on-site consolidation, and significantly reduce Site Welding workload, accelerating construction progress, improves the working environment of workman.
In addition, model utility people compares the ceiling structure in above-described embodiment, for the furred ceiling of certain project intended diameter 83 meters, if the ceiling structure of traditionally flat board and stiffening ring combination, estimate to consume aluminum alloy material about 136 tons, stainless steel about 30 tons; And according to the technological scheme that the utility model provides, amount to and consume aluminum alloy material about 80 tons, stainless steel about 23 tons; Only material construction one can save about 1,700,000 yuan.Compared with traditional furred ceiling, the aluminium consumption in unit area reduces 41%, and stainless steel material consumption reduces 23%.Meanwhile, site operation duration about 30 Working days, minimizing weld lengths about 6000 meters can be reduced according to this programme, reduce the stressed 610KN of dome.
One of ordinary skill in the art will appreciate that: accompanying drawing is the schematic diagram of an embodiment, the module in accompanying drawing or flow process might not be that enforcement the utility model is necessary.
One of ordinary skill in the art will appreciate that: the module in the device in embodiment can describe according to embodiment and be distributed in the device of embodiment, also can carry out respective change and be arranged in the one or more devices being different from the present embodiment.The module of above-described embodiment can merge into a module, also can split into multiple submodule further.
Last it is noted that above embodiment is only in order to illustrate the technical solution of the utility model, be not intended to limit; Although be described in detail the utility model with reference to previous embodiment, those of ordinary skill in the art is to be understood that: it still can be modified to the technological scheme described in previous embodiment, or carries out equivalent replacement to wherein portion of techniques feature; And these amendments or replacement, do not make the essence of appropriate technical solution depart from the spirit and scope of the utility model embodiment technological scheme.

Claims (8)

1. a ceiling structure for liquefied natural gas (LNG) tank, is characterized in that, comprising: one group of suspension rod, corrugated sheet and frame beam, wherein:
The grid arrangement of described frame beam be many Pin framework around the form of center circle, quadrilateral, triangle, ring, gilled rings shape, fan-shaped in one;
Suspension rod described in every root is connected between the dome of storage tank and described frame beam, described in every root, the upper end of suspension rod is suspended in dome steel structure, suspension rod lower end described in every root is articulated with on described frame beam, the neutral position of suspension rod described in every root is provided with threaded bidirectional modulation head, for adjusting the levelness of furred ceiling in installation process;
Described corrugated sheet and described frame beam pass through together with rivet interlacement, and described corrugated sheet upper surface lays cold insulation material, being evenly delivered on frame beam by described corrugated sheet from heavy load of cold insulation material.
2. the ceiling structure of liquefied natural gas (LNG) tank according to claim 1, is characterized in that, the material of described suspension rod is stainless steel or 9Ni steel or aluminum alloy.
3. the ceiling structure of liquefied natural gas (LNG) tank according to claim 1, is characterized in that, described corrugated sheet is one group of die mould aluminium alloy plate supporting cold insulation material, is riveted together between two, and is fixed on described frame beam by rivet after overlap joint.
4. the ceiling structure of liquefied natural gas (LNG) tank according to claim 1, is characterized in that, described frame beam is any one in I-shaped structure steel, angle steel, channel-section steel, T bar.
5. the ceiling structure of liquefied natural gas (LNG) tank according to claim 1, is characterized in that, the material of described frame beam is stainless steel or 9Ni steel or aluminum alloy.
6. the ceiling structure of liquefied natural gas (LNG) tank according to claim 1, it is characterized in that, when the grid arrangement of described frame beam is many Pin framework around the form of center circle, longeron and the ring beam joint of described frame beam are respectively arranged with rigid joint, are linked together by gusset plate.
7. the ceiling structure of liquefied natural gas (LNG) tank according to claim 6, is characterized in that, described gusset plate with between ring beam, longeron by be welded to connect or bolt is connected or weld and be connected with the compound mode of bolt.
8. the ceiling structure of liquefied natural gas (LNG) tank according to claim 1, is characterized in that, the material of described corrugated sheet is stainless steel or 9Ni steel or aluminum alloy.
CN201520285674.0U 2015-05-05 2015-05-05 Furred ceiling structure of liquefied natural gas storage tank Ceased CN205026387U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520285674.0U CN205026387U (en) 2015-05-05 2015-05-05 Furred ceiling structure of liquefied natural gas storage tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520285674.0U CN205026387U (en) 2015-05-05 2015-05-05 Furred ceiling structure of liquefied natural gas storage tank

Publications (1)

Publication Number Publication Date
CN205026387U true CN205026387U (en) 2016-02-10

Family

ID=55258917

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520285674.0U Ceased CN205026387U (en) 2015-05-05 2015-05-05 Furred ceiling structure of liquefied natural gas storage tank

Country Status (1)

Country Link
CN (1) CN205026387U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104832784A (en) * 2015-05-05 2015-08-12 中国寰球工程公司 Suspended ceiling structure of liquefied natural gas storage tank

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104832784A (en) * 2015-05-05 2015-08-12 中国寰球工程公司 Suspended ceiling structure of liquefied natural gas storage tank

Similar Documents

Publication Publication Date Title
CN104832784A (en) Suspended ceiling structure of liquefied natural gas storage tank
CN105863145A (en) String structure, string beam and building
CN205100085U (en) Modularization combined material - metallic combination space truss bridge
CN102943546A (en) Main girder for boiler steel structure
US20110094180A1 (en) Pole construction for framework towers of wind power plants
CN205026387U (en) Furred ceiling structure of liquefied natural gas storage tank
CN203319564U (en) Portal crane for shipbuilding
CN203603030U (en) Steel box truss beam
CN201809086U (en) Anchor ear connecting frame for construction of tower frame of tubular flare tower
CN202227480U (en) Floor roof connection structure of light-steel house
CN104533114B (en) A kind of seashore flexible direct current converter station valve Room joint architectural structure system
CN204238349U (en) A kind of H-shaped steel of corrugated web cable channel
CN203034345U (en) Coal transporting trestle of integral continuous steel truss
CN202509667U (en) Combined steel bar truss floor bearing plate
CN102425269A (en) Board girder capable of hanging weights and construction method thereof
CN205557290U (en) Monolithic purlin formula annular passenger footbridge
CN204311791U (en) Seashore flexible direct current converter station valve Room associating architectural structure system
CN101367464B (en) Large-scale stress outer panel skin net-shell vertical storage tank
CN210562906U (en) Variable cross section wave form steel sheet-concrete compoboard structure
CN203096595U (en) Prestress concrete filled steel tube combined braced girder
CN216046086U (en) Novel quick distributor
CN203770852U (en) Multi-deck integrated pipe frame structure
CN208415635U (en) The angle brace device that purlin for distributed photovoltaic roofing is reinforced
CN102674168A (en) Reinforced boom and crane with reinforced boom
CN202148639U (en) Composite building steel column

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Two road 100012 Beijing city Chaoyang District high tech Industrial Park, No. 1.

Patentee after: CHINA HUANQIU CONTRACTING & ENGINEERING Co.,Ltd.

Patentee after: ZHEJIANG ZHENSHEN INSULATION TECHNOLOGY Corp.,Ltd.

Address before: Two road 100012 Beijing city Chaoyang District high tech Industrial Park, No. 1.

Patentee before: China Huanqiu Contracting & Engineering Corp.

Patentee before: ZHEJIANG ZHENSHEN INSULATION TECHNOLOGY Corp.,Ltd.

IW01 Full invalidation of patent right
IW01 Full invalidation of patent right

Decision date of declaring invalidation: 20230725

Decision number of declaring invalidation: 563136

Granted publication date: 20160210