CN205026223U - Direct -burried steam conduit is at waterproof connection structure of valve inspection shaft department - Google Patents
Direct -burried steam conduit is at waterproof connection structure of valve inspection shaft department Download PDFInfo
- Publication number
- CN205026223U CN205026223U CN201520645460.XU CN201520645460U CN205026223U CN 205026223 U CN205026223 U CN 205026223U CN 201520645460 U CN201520645460 U CN 201520645460U CN 205026223 U CN205026223 U CN 205026223U
- Authority
- CN
- China
- Prior art keywords
- inspection shaft
- steel
- valve inspection
- pipeline
- pipeline valve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000007689 inspection Methods 0.000 title claims abstract description 43
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 79
- 239000010959 steel Substances 0.000 claims abstract description 79
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 57
- -1 valve Substances 0.000 claims abstract description 3
- 239000011810 insulating material Substances 0.000 claims description 9
- 230000000694 effects Effects 0.000 abstract description 4
- 241001631457 Cannula Species 0.000 abstract 7
- 239000012774 insulation material Substances 0.000 abstract 2
- 238000005516 engineering process Methods 0.000 abstract 1
- 238000004321 preservation Methods 0.000 abstract 1
- 238000009413 insulation Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 239000003566 sealing material Substances 0.000 description 2
- 238000002791 soaking Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000004078 waterproofing Methods 0.000 description 1
Landscapes
- Details Of Valves (AREA)
Abstract
Direct -burried steam conduit is at waterproof connection structure of valve inspection shaft department relates to steam conduit connection technology field. It includes waterproof cannulas, insulation material, valve, steel bushing steel work pipe, closure plate and bellows, the valve is arranged in the pipeline valve gate inspection shaft the both ends of valve are connected with steel bushing steel work pipe be equipped with two waterproof cannulas on the wall of a well of pipeline valve gate inspection shaft, two steel bushing steel work pipe extends to the outside of pipeline valve gate inspection shaft after passing corresponding waterproof cannulas, it has insulation material to fill between waterproof cannulas and the work of the steel bushing steel pipe, is equipped with the bellows on arranging the outside waterproof cannulas of pipeline valve gate inspection shaft in, is equipped with the closure plate with the work of steel bushing steel between managing arranging the inside waterproof cannulas tip of pipeline valve gate inspection shaft in. This structure can effectively be solved and soak the heat preservation after the outer water of pipeline valve gate inspection shaft flows backward into in the well and waterproof cannulas not hard up problem easily under the thrust effect of wall of a well extra income.
Description
Technical field
The utility model relates to steam line interconnection technique field, and specifically a kind of direct-buried steam pipeline of high water level area is at the waterproof connecting structure of valve inspection Jing Chu.
Background technique
The no matter heating steam directly buried pipeline of northern area or the industrial direct-buried steam pipeline of southern area, when laying in the region that level of ground water is high, no matter how exquisite the design and construction of Civil Specialities are, in conduit running process, always there will be the situation of water of infiltration in pipeline valve inspection shaft.Thing followed consequence is, direct-burried steel jacket pipe thermal insulation layer is soaked, and causes pipeline heat loss to strengthen, and more serious consequence may affect the operation of pipeline.
In the running of directly buried pipeline, water string traditional in the conduit shaft in high water level area causes water-proofing material to lose efficacy because of various reasons after conduit running, normal effect cannot be played, What is more, and loosening appears in water string, to such an extent as to the water outside valve well infiltrates in well along the space between water string and steel bushing steel jacket.As shown in Figure 1, the water outside pipeline valve inspection shaft pours in down a chimney after in well, and the thermal insulation layer 3 between steel bushing steel jacket 21 and steel sleeve steel working pipe 5 can be immersed in water.Water outside the pipeline valve inspection shaft borehole wall 1 to the sealing material 22 applied thrust F between steel bushing steel jacket 21 and water string 2, can cause loosening of water string.
Model utility content
The purpose of this utility model is the waterproof connecting structure providing direct-buried steam pipeline at valve inspection Jing Chu, soaks thermal insulation layer and water string easily loosens under the thrust of the outer water of the borehole wall problem for the water solved outside pipeline valve inspection shaft after pouring in down a chimney in well.
The technical scheme in the invention for solving the technical problem is: direct-buried steam pipeline is at the waterproof connecting structure of valve inspection Jing Chu, it is characterized in that, it comprises water string, thermal insulating material, valve, steel sleeve steel working pipe, closure plate and bellows, described valve is arranged in pipeline valve inspection shaft, steel sleeve steel working pipe is connected with at the two ends of described valve, the borehole wall of described pipeline valve inspection shaft is provided with two water strings, and steel sleeve steel working pipe described in two extends through the outside to pipeline valve inspection shaft after corresponding water string; Thermal insulating material is filled with between described water string and steel sleeve steel working pipe, the water string being placed in pipeline valve inspection shaft outside is provided with bellows, between the water string end being placed in pipeline valve inspection shaft inside and steel sleeve steel working pipe, is provided with closure plate.
Further, the water string being placed in pipeline valve inspection shaft inside is also provided with bellows.
Further, between described closure plate and steel sleeve steel working pipe, seal ring is provided with.
The beneficial effects of the utility model are: the direct-buried steam pipeline that the utility model provides is at the waterproof connecting structure of valve inspection Jing Chu, by the setting of bellows, absorb the thrust be applied on water string, to alleviate the active force of water string to the borehole wall, prevent loosening between water string and the borehole wall.Closure plate between water string and steel sleeve steel working pipe, can prevent from pouring in down a chimney the thermal insulating material between the water soaking water string of valve inspection well inside, inlet pipe road and steel sleeve steel working pipe.
Accompanying drawing explanation
Fig. 1 is the waterproof connecting structure schematic diagram of existing direct-buried steam pipeline at valve inspection Jing Chu;
Fig. 2 is schematic diagram of the present utility model;
In figure: 1 borehole wall, 2 water strings, 21 steel bushing steel jackets, 22 sealing materials, 3 thermal insulating materials, 4 valves, 5 steel sleeve steel working pipe, 6 closure plates, 7 bellowss, F thrust.
Embodiment
As shown in Figure 2, the utility model mainly comprises water string 2, thermal insulating material 3, valve 4, steel sleeve steel working pipe 5, closure plate 6 and bellows 7, is described in detail the utility model below in conjunction with accompanying drawing.
As shown in Figure 2, the valve 4 of steam line is arranged in pipeline valve inspection shaft, to facilitate installation, the maintenance of valve.Be provided with steel sleeve steel working pipe 5, two steel sleeve steel working pipe to be through on the borehole wall 1 of pipeline valve inspection shaft at the two ends of valve.Be provided with water string 2 in the outside of steel sleeve steel working pipe, between water string and steel sleeve steel working pipe, be filled with thermal insulating material, thermal insulating material can realize the insulation to steel sleeve steel working pipe.The outer wall of water string is fixed on the borehole wall, and good seal between the two, bellows 7 is connected at the two ends of each water string, bellows is can by the flexible pipe compressed, and bellows can restore to the original state when external force is cancelled, on each water string, the bellows at two ends is placed in the inside and outside both sides of pipeline valve inspection shaft respectively, closure plate 6 is provided with in the one end of the bellows being placed in pipeline valve inspection shaft inside, closure plate and bellows, good seal between closure plate and steel sleeve steel working pipe, the setting of closure plate can avoid pouring in down a chimney the thermal insulation layer between water soaking steel sleeve steel working pipe in inlet pipe road valve inspection well and water string, ensure the normal work of steam line.
When the water of pipeline valve inspection shaft outside is to water string applied thrust, water string can by this thrust in the borehole wall, the setting of pipeline valve inspection shaft outer corrugations pipe, the active force of water string to the borehole wall can be absorbed, and then avoid loosening between the excessive water string that causes of the active force of water string to the borehole wall and the borehole wall.Under the effect of external thrust; when steel sleeve steel working pipe moves in water string; the setting of the inner bellows of pipeline valve inspection shaft; water string can be made to adapt to the displacement of steel sleeve steel working pipe; namely when steel sleeve steel working pipe moves; under the effect of steel sleeve steel working pipe pulling force; the bellows of pipeline valve inspection shaft inside is stretched; to avoid steel sleeve steel working pipe to drive water string moving relative to the borehole wall with the frictional force between water string, protection water string is closely engaged on the borehole wall.For ensureing good sealing, between water string and steel sleeve steel working pipe, be provided with seal ring.
Claims (3)
1. direct-buried steam pipeline is at the waterproof connecting structure of valve inspection Jing Chu, it is characterized in that, it comprises water string, thermal insulating material, valve, steel sleeve steel working pipe, closure plate and bellows, described valve is arranged in pipeline valve inspection shaft, steel sleeve steel working pipe is connected with at the two ends of described valve, the borehole wall of described pipeline valve inspection shaft is provided with two water strings, and steel sleeve steel working pipe described in two extends through the outside to pipeline valve inspection shaft after corresponding water string; Thermal insulating material is filled with between described water string and steel sleeve steel working pipe, the water string being placed in pipeline valve inspection shaft outside is provided with bellows, between the water string end being placed in pipeline valve inspection shaft inside and steel sleeve steel working pipe, is provided with closure plate.
2. direct-buried steam pipeline according to claim 1 is at the waterproof connecting structure of valve inspection Jing Chu, it is characterized in that, the water string being placed in pipeline valve inspection shaft inside is also provided with bellows.
3. direct-buried steam pipeline according to claim 1 is at the waterproof connecting structure of valve inspection Jing Chu, it is characterized in that, between described closure plate and steel sleeve steel working pipe, be provided with seal ring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520645460.XU CN205026223U (en) | 2015-08-24 | 2015-08-24 | Direct -burried steam conduit is at waterproof connection structure of valve inspection shaft department |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520645460.XU CN205026223U (en) | 2015-08-24 | 2015-08-24 | Direct -burried steam conduit is at waterproof connection structure of valve inspection shaft department |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205026223U true CN205026223U (en) | 2016-02-10 |
Family
ID=55258756
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520645460.XU Expired - Fee Related CN205026223U (en) | 2015-08-24 | 2015-08-24 | Direct -burried steam conduit is at waterproof connection structure of valve inspection shaft department |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205026223U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112728224A (en) * | 2020-12-30 | 2021-04-30 | 北京航天益森风洞工程技术有限公司 | Cross-cabin sealing structure and equipment |
CN113833085A (en) * | 2021-11-12 | 2021-12-24 | 中建七局安装工程有限公司 | Maintenance method for inspection well without stopping water supply |
-
2015
- 2015-08-24 CN CN201520645460.XU patent/CN205026223U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112728224A (en) * | 2020-12-30 | 2021-04-30 | 北京航天益森风洞工程技术有限公司 | Cross-cabin sealing structure and equipment |
CN113833085A (en) * | 2021-11-12 | 2021-12-24 | 中建七局安装工程有限公司 | Maintenance method for inspection well without stopping water supply |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106049551B (en) | Pipe gallery boss sealing structure | |
CN205026223U (en) | Direct -burried steam conduit is at waterproof connection structure of valve inspection shaft department | |
CN102661449B (en) | Water-proof structure of upstream face of flexible wall penetration pipe | |
CN104089103B (en) | Glass steel pipe lining method of circulating water pipe lined with glass steel pipe | |
CN205875188U (en) | Pressure -bearing precipitation well plugging device | |
CN204402513U (en) | A kind of device solving the infiltration of underground chamber lining cutting surface and leak | |
CN202580324U (en) | Waterproof structure of upstream face of flexible through-wall pipe | |
CN202660163U (en) | Joint structure of sealing-type prefabricated direct-buried thermal pipes of thermal contraction belt | |
CN203808381U (en) | Foam-concrete wear roofing pipeline structure | |
CN204139229U (en) | A kind of Metro Deep Excavation dewatering well Accrete clearing device | |
CN204437508U (en) | A kind of prefabricated direct-buried thermal insulation pipe with waterproof construction | |
CN107131363A (en) | A kind of concrete water transfer pipeline applied to seabed | |
CN207621557U (en) | Deformed thermal-insulating pipe | |
CN205938315U (en) | Stagnant water heat -preservation sleeve compensator for well | |
CN207921594U (en) | A kind of directly buried compensation device sealing thermal insulation structure | |
CN206174970U (en) | Cable tunnel push pipe tube coupling and waterproof connection structure of work well | |
CN102003588B (en) | Direct-buried type maintenance-free sleeve compensator | |
CN205078917U (en) | Cross a river conduit bridge structure of mud -rock flow district occurred frequently | |
CN206290844U (en) | A kind of underground pipe wears waterproof slab processing unit | |
CN206328767U (en) | A kind of foundation ditch waterproof steel bushing tubular construction | |
CN106013260B (en) | Pipe gallery labyrinth seal structure | |
CN203892001U (en) | Return pipe assembly for waterstop water pump | |
CN218480310U (en) | Direct-buried bidirectional corrugated pipe compensator | |
CN203336078U (en) | Vibration reduction heating type petroleum drilling and exploiting rubber pipe | |
CN215715722U (en) | Pipe jacking type vertical water taking structure system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160210 |