CN205024256U - Inside callipers instrument of using is placed to RH flooding pipe ring brick - Google Patents
Inside callipers instrument of using is placed to RH flooding pipe ring brick Download PDFInfo
- Publication number
- CN205024256U CN205024256U CN201520777373.XU CN201520777373U CN205024256U CN 205024256 U CN205024256 U CN 205024256U CN 201520777373 U CN201520777373 U CN 201520777373U CN 205024256 U CN205024256 U CN 205024256U
- Authority
- CN
- China
- Prior art keywords
- ring brick
- plate
- connecting plate
- fixed connecting
- supporter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model provides an inside callipers instrument of using is placed to RH flooding pipe ring brick, relates to an inside callipers instrument, including lifting hook (8), lift bar (9) and supporter, is equipped with the lifting hook in the upper end of lift bar, and the interval is even on the outer disc of lift bar is equipped with a plurality of supporters, the supporter includes fixed connection board (13), lower fixed connection board (16), goes up fly leaf (10), lower movable plate (15), backup pad (12) and friction disc (11), go up the fixed connection board, down the fixed connection inter -plate separate and set up at the lower part and the middle part of lift bar, last fixed connection board under, the one end of fixed connection board be equipped with fly leaf, lower movable plate respectively, the both ends of backup pad are connected with last fly leaf, lower movable plate respectively, all are equipped with the friction disc on the lateral surface of backup pad, the utility model discloses a set up the supporter of a plurality of articulated connections on the lift bar, all be equipped with the friction disc on the lateral surface of backup pad, realized that RH encircles the purpose that the brick lifted by crane, placed.
Description
[technical field]
The utility model relates to a kind of interior card instrument, especially relates to a kind of RH and floods the interior card instrument of pipe ring brick placement.
[background technology]
Known, when RH soaking tub casting, usual needs are placed in steel courage on the base of casting mold and also prop certain altitude as required, assemble casting mold, then bonding in advance grinding and to be placed in steel courage with the RH ring brick that steel band ties inner, carry out shaping according to the order of first pouring into a mould self-flowing material and pour into a mould again outer mould material, shaping complete after, put into dry kiln and carry out the baking regular hour, after having toasted, carry out the making that follow-up packaging process just completes RH soaking tub.
As shown in Figure 1, be ring brick 7, self-flowing material 2, steel courage 3, mould material 6 from the inside to surface successively, wherein the thickness of self-flowing material is generally about 20-30mm to RH soaking tub structure, and anchoring piece 4, steel mesh 5 are separately positioned in mould material 6, during casting, need through grinding and bonding complete after ring brick 7 to insert steel courage 3 inner, because the distance between ring brick 7 and steel courage 3 only has 20-30mm, ring brick 7 clamped the process of putting toward steel courage 3 inside with existing RH ring brick replacer from outside, because outer replacer two ends have the lifting appliance of certain length, its length is often all greater than 30mm, it is inner that this certainly will cause ring brick can not put into steel courage, at present, operator can only use rope and overhead traveling crane, under the cooperation of a few individual, ring brick could be put into the inside of steel courage, and need the later stage to adjust the thickness of self-flowing material by Mobile steel courage, this working method not only increases the labour intensity of workman and the danger of operation, and well can not ensure the homogeneity of self-flowing material thickness, and then affect the work-ing life of soaking tub.
[utility model content]
In order to overcome the deficiency in background technology, the utility model discloses a kind of RH and flood the interior card instrument of pipe ring brick placement, by arranging multiple supporter be articulated and connected on lifting rod, the outer side of back up pad is equipped with friction plate, the object of achieve the lifting of RH ring brick, placing.
In order to realize described goal of the invention, the utility model adopts following technical scheme:
A kind of RH floods pipe ring brick and places with interior card instrument, comprise suspension hook, lifting rod and supporter, suspension hook is provided with in the upper end of lifting rod, on the periphery of lifting rod, interval is provided with multiple supporter uniformly, described supporter comprises fixed connecting plate, lower fixed connecting plate, upper mobile board, lower portable plate, back up pad and friction plate, fixed web plate, lower fixed connecting plate is disposed on bottom and the middle part of lifting rod, at upper fixed connecting plate, one end of lower fixed connecting plate is respectively equipped with upper mobile board, lower portable plate, the two ends of back up pad respectively with upper mobile board, lower portable plate connects, the outer side of back up pad is equipped with friction plate.
Described RH floods pipe ring brick and places with interior card instrument, is all connected by hinge and by baffle ring backstop between fixed web plate, upper mobile board, back up pad, lower portable plate, lower fixed connecting plate.
Described RH floods pipe ring brick and places with interior card instrument, and fixed web plate and lower fixed connecting plate are fixedly connected on middle part and the bottom of lifting rod respectively.
Described RH floods pipe ring brick and places with interior card instrument, and described supporter is at least set to two.
Owing to have employed technique scheme, the utility model has following beneficial effect:
RH described in the utility model floods pipe ring brick and places with interior card instrument, multiple supporter is provided with uniformly by interval on the periphery of lifting rod, in supporter, each parts are and are articulated and connected, the outer side of the back up pad of supporter arranges friction plate, when friction plate contacts with ring brick internal surface, friction plate all contacts with ring brick internal surface, due to the existence of ring brick weight, under the effect of frictional force, ring brick will be raised, then RH is flooded pipe ring brick and be placed in steel courage inside, be applicable to the service requirements of ring brick when inserting steel courage and being inner of different size internal diameter size, the utility model need not regulate the gap of self-flowing material by the mold that moves around, effectively alleviate the labour intensity of workman, improve working efficiency and production efficiency, add the security of operation and the popularity of use, and structure is simple, easy to operate, a people gets final product lifting and the work of placement of complete independently RH ring brick.
[accompanying drawing explanation]
Fig. 1 is soaking tub structural representation;
Fig. 2 is structural representation of the present utility model;
In figure: 1, flanged plate; 2, self-flowing material; 3, steel courage; 4, anchoring piece; 5, steel mesh; 6, mould material; 7, ring brick; 8, suspension hook; 9, lifting rod; 10, upper mobile board; 11, friction plate; 12, back up pad; 13, upper fixed connecting plate; 14, bearing pin; 15, lower portable plate; 16, lower fixed connecting plate; 17, baffle ring.
[embodiment]
By explanation the utility model that the following examples can be detailed, open the purpose of this utility model is intended to protect all technological improvements within the scope of the utility model.
RH by reference to the accompanying drawings described in 1 floods pipe ring brick and places with interior card instrument, comprise suspension hook 8, lifting rod 9 and supporter, suspension hook 8 is provided with in the upper end of lifting rod 9, on the periphery of lifting rod 9, interval is provided with multiple supporter uniformly, described supporter comprises fixed connecting plate 13, lower fixed connecting plate 16, upper mobile board 10, lower portable plate 15, back up pad 12 and friction plate 11, fixed web plate 13, lower fixed connecting plate 16 is disposed on middle part and the bottom of lifting rod 9, at upper fixed connecting plate 13, one end of lower fixed connecting plate 16 is respectively equipped with upper mobile board 10, lower portable plate 15, the two ends of back up pad 12 respectively with upper mobile board 10, lower portable plate 15 connects, the outer side of back up pad 12 is equipped with friction plate 11.
Described RH floods pipe ring brick and places with interior card instrument, is all articulated and connected by bearing pin 14 and by baffle ring 17 backstop between fixed web plate 13, upper mobile board 10, back up pad 12, lower portable plate 15, lower fixed connecting plate 16.
Described RH floods pipe ring brick and places with interior card instrument, and fixed web plate 13 and lower fixed connecting plate 16 are fixedly connected on middle part and the bottom of lifting rod 9 respectively.
Described RH floods pipe ring brick and places with interior card instrument, and described supporter is at least set to two.
Implement RH described in the utility model and flood the interior card instrument of pipe ring brick placement, in use, supporter is set to three along the circumferential direction uniform intervals of lifting rod 9, the utility model is placed on and needs the RH of lifting to flood pipe ring brick 7 middle position, lifting rod 9 is slowly mentioned by overhead traveling crane, when friction plate 11 contacts with ring brick 7 internal surface time, finely tune according to on-site actual situations, ensure that three friction plates 11 all contact with ring brick 7 internal surface, due to the existence of ring brick 7 weight, under the effect of frictional force, ring brick 7 will be raised, then RH is flooded pipe ring brick and be placed in steel courage inside, thus reach application target, the utility model can meet the service requirements of ring brick when inserting steel courage and being inner of different size internal diameter size.
The non-detailed portion of the utility model is prior art.
The embodiment selected in this article in order to open goal of the invention of the present utility model, currently thinks to be suitable for, but it is to be understood that the utility model is intended to comprise all changes belonging to the embodiment within the scope of this design and utility model and improvement.
Claims (4)
1. a RH floods the interior card instrument of pipe ring brick placement, comprise suspension hook (8), lifting rod (9) and supporter, it is characterized in that: be provided with suspension hook (8) in the upper end of lifting rod (9), on the periphery of lifting rod (9), interval is provided with multiple supporter uniformly, described supporter comprises fixed connecting plate (13), lower fixed connecting plate (16), upper mobile board (10), lower portable plate (15), back up pad (12) and friction plate (11), fixed web plate (13), lower fixed connecting plate (16) is disposed on bottom and the middle part of lifting rod (9), in upper fixed connecting plate (13), one end of lower fixed connecting plate (16) is respectively equipped with upper mobile board (10), lower portable plate (15), the two ends of back up pad (12) respectively with upper mobile board (10), lower portable plate (15) connects, the outer side of back up pad (12) is equipped with friction plate (11).
2. RH according to claim 1 floods pipe ring brick and places with interior card instrument, it is characterized in that: fixed web plate (13), upper mobile board (10), back up pad 1(2), to be all articulated and connected by bearing pin (14) between lower portable plate (15), lower fixed connecting plate (16) and by baffle ring (17) backstop.
3. RH according to claim 1 floods the interior card instrument of pipe ring brick placement, it is characterized in that: fixed web plate (13) and lower fixed connecting plate (16) are fixedly connected on middle part and the bottom of lifting rod (9) respectively.
4. RH according to claim 1 floods the placement of pipe ring brick with interior card instrument, it is characterized in that: described supporter is at least set to two.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520777373.XU CN205024256U (en) | 2015-10-09 | 2015-10-09 | Inside callipers instrument of using is placed to RH flooding pipe ring brick |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520777373.XU CN205024256U (en) | 2015-10-09 | 2015-10-09 | Inside callipers instrument of using is placed to RH flooding pipe ring brick |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205024256U true CN205024256U (en) | 2016-02-10 |
Family
ID=55256806
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520777373.XU Expired - Fee Related CN205024256U (en) | 2015-10-09 | 2015-10-09 | Inside callipers instrument of using is placed to RH flooding pipe ring brick |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205024256U (en) |
-
2015
- 2015-10-09 CN CN201520777373.XU patent/CN205024256U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201756400U (en) | Grinding roller lifting device | |
CN205024256U (en) | Inside callipers instrument of using is placed to RH flooding pipe ring brick | |
CN107934781B (en) | Three-point positioning buffer contact device | |
CN203994149U (en) | A kind of adobe process equipment of insulating brick | |
CN203903304U (en) | Belt conveyer with magnetic force attraction | |
CN110963437B (en) | Transfer device for flat prefabricated parts | |
CN201980837U (en) | Lifting appliance for replacing furnace top roller of annealing furnace | |
CN105417344B (en) | Super-tonnage dry type smoothing reactor coil demoulding lifting suspension hook and its hoisting method | |
CN203700432U (en) | Upper-opened retarded cooling hood for steel ingot | |
CN207973403U (en) | Cover board suspender | |
CN204224100U (en) | A kind of lifting device for prefabricated section | |
CN101845533A (en) | Installation device and method of large converter shell and backing ring | |
CN204847750U (en) | Rotatable crane sling of lifting hook | |
CN208218227U (en) | A kind of disc crane lifting device | |
CN204265221U (en) | A kind of super large-scale hoisting steel plate instrument | |
CN102774738B (en) | Gantry hook lifting device span adjusting structure | |
CN201961952U (en) | Electronic translation of novel bridge crane clamp | |
CN203545446U (en) | Tire lifting device | |
CN204029578U (en) | Transformer Winding suit hold down gag | |
CN207955692U (en) | A kind of steam-cured trolley lifting hooking device | |
CN202829259U (en) | Span adjusting structure of gantry hook hoisting appliance | |
CN204338580U (en) | A kind of suspender for lifting roughing mill frame | |
CN216997347U (en) | Reduction furnace bell jar hoist and mount guider | |
CN204958167U (en) | Mantle lifting device | |
CN2584582Y (en) | Continuous activity pole type lifting electromagnet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160210 Termination date: 20201009 |
|
CF01 | Termination of patent right due to non-payment of annual fee |