CN205011260U - Intelligent hoist lifting rope choke shakes subassembly - Google Patents
Intelligent hoist lifting rope choke shakes subassembly Download PDFInfo
- Publication number
- CN205011260U CN205011260U CN201520779865.2U CN201520779865U CN205011260U CN 205011260 U CN205011260 U CN 205011260U CN 201520779865 U CN201520779865 U CN 201520779865U CN 205011260 U CN205011260 U CN 205011260U
- Authority
- CN
- China
- Prior art keywords
- lifting rope
- wind direction
- choke
- electrically connected
- hoisting crane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model discloses an intelligent hoist lifting rope choke shakes subassembly, include and install the inclined to one side frame of preventing on the hoist mast, and set up in the wind direction detection mechanism who prevents inclined to one side frame top, reach the wind direction treatment circuit of being connected with wind direction detection mechanism electricity, prevent that inclined to one side frame comprises the solid metal section of thick bamboo in a middle part, the inboard upper portion of a metal section of thick bamboo is provided with four groups and hinders and shake the mechanism, the guide way has been seted up in the middle of the metal section of thick bamboo, the inboard lower part of a metal section of thick bamboo is provided with the output aligning gear, the output aligning gear shakes the mechanism and all has telescopic link forward -mounted leading wheel to constitute with hindering, the telescopic link is connected with wind direction treatment circuit electricity. The utility model discloses an intelligent hoist lifting rope choke shakes subassembly under the gentle breeze state, can guarantee that the lifting rope is more steady, under the bigger condition of wind -force, can carry out the choke, improves the lifting rope stationarity.
Description
Technical field
The utility model relates to a kind of hoisting crane assembly, and particularly one intelligent hoisting crane lifting rope choke rolling assembly, belongs to hoisting crane component technology field.
Background technology
Hoisting crane refers to many actions elevator machinery of vertical-lift within the specific limits and horizontal carrying heavy goods; The work characteristics that weight-lifting equipment has does intermittent exercise, and namely in a working cycle, the corresponding mechanism of the action such as feeding, migration, unloading is alternation, hoisting crane development commercially and use more and more extensive; Often occur some accidents owing to travelling without supporting leg lift heavy and lift heavy, also comparatively crawler crane is fast for the speed of traveling; Operation is stable, hoisting capacity large, can lift heavy walking but must ensure that path formation is solid, tire pressure meets the requirements and hang ground must not more than 50CM in particular range; Forbid the long distance walking of on-load; Hoisting crane is linked by lifting rope with suspension hook; In prior art, wind-force can produce larger impact to hanging thing, and it is difficult to carry out lifting article and accurately locates, and easily causes lifting rope sideslip to cause the accident.
Utility model content
(1) technical matters that will solve
For solving the problem, the utility model proposes a kind of intelligent hoisting crane lifting rope choke and shaking assembly, position-limiting action can be played to lifting rope, make it lift by crane process more steady.
(2) technical scheme
Intelligent hoisting crane lifting rope choke rolling assembly of the present utility model, comprises the anti-bias frame be installed on crane mast, and is arranged at the wind direction testing agency of anti-bias frame top; And the wind direction treatment circuit to be electrically connected with wind direction testing agency; Described anti-bias frame is made up of solid metal cylinder in the middle part of; Described metal cylinder inside upper part is provided with four Zu Zuhuang mechanisms; Guide groove is offered in the middle of described metal cylinder; Described metal cylinder lower inside is provided with output correcting mechanism; Described output correcting mechanism and Zu Huang mechanism all have expansion link front portion to install track adjusting wheel formation; Described expansion link is electrically connected with wind direction treatment circuit.
Further, described wind direction treatment circuit comprises modulate circuit, and the controller be electrically connected with modulate circuit; And the expansion link switch circuit to be electrically connected with controller.
Further, described guide groove length is not less than 0.5m.
Further, described Zu Huang mechanism installs according to all directions four direction; And the Zu Huang mechanism of the Zu Huang mechanism of east-west direction and North and South direction is staggered installation of up and down.
beneficial effect
Compared with prior art, intelligent hoisting crane lifting rope choke rolling assembly of the present utility model, by wind direction testing agency, wind direction and wind-force are detected, and data are delivered to controller by modulate circuit, after lifting rope is subject to a resistance contrary with wind direction, exported by guide groove, the output correcting mechanism of mouth gives one and Zu Huang mechanism equidirectional power again, its expansion link distance of stretch out and draw back is by wind-force size adjustment, it is under gentle breeze state, can ensure that lifting rope is more steady, when wind-force is larger, choke can be carried out, improve lifting rope stationarity.
Accompanying drawing explanation
Fig. 1 is integral structure schematic diagram of the present utility model.
Detailed description of the invention
Intelligent hoisting crane lifting rope choke rolling assembly as shown in Figure 1, comprises the anti-bias frame 1 be installed on crane mast, and is arranged at the wind direction testing agency 2 of anti-bias frame top; And the wind direction treatment circuit 3 to be electrically connected with wind direction testing agency; Described anti-bias frame is made up of solid metal cylinder 4 in the middle part of; Described metal cylinder inside upper part is provided with four Zu Zuhuang mechanisms 5; Guide groove 6 is offered in the middle of described metal cylinder; Described metal cylinder 1 lower inside is provided with and exports correcting mechanism 7; Described output correcting mechanism 6 and Zu Huang mechanism 7 all have installation track adjusting wheel 9 in expansion link 8 front portion to form; Described expansion link 8 is electrically connected with wind direction treatment circuit 3.
Described wind direction treatment circuit 3 comprises modulate circuit, and the controller be electrically connected with modulate circuit; And the expansion link switch circuit to be electrically connected with controller.
Described guide groove 6 length is not less than 0.5m.
Described Zu Huang mechanism 5 installs according to all directions four direction; And the Zu Huang mechanism 5 of east-west direction is staggered installation of with the Zu Huang mechanism about 5 of North and South direction.
Intelligent hoisting crane lifting rope choke rolling assembly of the present utility model, by wind direction testing agency, wind direction and wind-force are detected, and data are delivered to controller by modulate circuit, controller provides corresponding drive scheme, namely control the contrary expansion link of wind direction and carry out action, lifting rope is exported by guide groove after being subject to a resistance contrary with wind direction, the output correcting mechanism of mouth gives one and Zu Huang mechanism equidirectional power again, and its expansion link distance of stretch out and draw back is by wind-force size adjustment.
Embodiment recited above is only be described preferred implementation of the present utility model, not limits design of the present utility model and scope.Under the prerequisite not departing from the utility model design concept; the various modification that this area ordinary person makes the technical solution of the utility model and improvement; protection domain of the present utility model all should be dropped into; the technology contents of the utility model request protection, all records in detail in the claims.
Claims (4)
1. an intelligent hoisting crane lifting rope choke rolling assembly, comprises the anti-bias frame be installed on crane mast, and is arranged at the wind direction testing agency of anti-bias frame top; And the wind direction treatment circuit to be electrically connected with wind direction testing agency; Described anti-bias frame is made up of solid metal cylinder in the middle part of; Described metal cylinder inside upper part is provided with four Zu Zuhuang mechanisms; Guide groove is offered in the middle of described metal cylinder; Described metal cylinder lower inside is provided with output correcting mechanism; Described output correcting mechanism and Zu Huang mechanism all have expansion link front portion to install track adjusting wheel formation; Described expansion link is electrically connected with wind direction treatment circuit.
2. intelligent hoisting crane lifting rope choke rolling assembly according to claim 1, is characterized in that: described wind direction treatment circuit comprises modulate circuit, and the controller be electrically connected with modulate circuit; And the expansion link switch circuit to be electrically connected with controller.
3. intelligent hoisting crane lifting rope choke rolling assembly according to claim 1, is characterized in that: described guide groove length is not less than 0.5m.
4. intelligent hoisting crane lifting rope choke rolling assembly according to claim 1, is characterized in that: described Zu Huang mechanism installs according to all directions four direction; And the Zu Huang mechanism of the Zu Huang mechanism of east-west direction and North and South direction is staggered installation of up and down.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520779865.2U CN205011260U (en) | 2015-10-10 | 2015-10-10 | Intelligent hoist lifting rope choke shakes subassembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520779865.2U CN205011260U (en) | 2015-10-10 | 2015-10-10 | Intelligent hoist lifting rope choke shakes subassembly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205011260U true CN205011260U (en) | 2016-02-03 |
Family
ID=55209874
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520779865.2U Expired - Fee Related CN205011260U (en) | 2015-10-10 | 2015-10-10 | Intelligent hoist lifting rope choke shakes subassembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205011260U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108408605A (en) * | 2018-06-12 | 2018-08-17 | 北京建筑大学 | One kind is anti-to wave construction derrick crane |
CN108408604A (en) * | 2018-06-12 | 2018-08-17 | 北京建筑大学 | A kind of bell-type is anti-to wave construction derrick crane |
-
2015
- 2015-10-10 CN CN201520779865.2U patent/CN205011260U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108408605A (en) * | 2018-06-12 | 2018-08-17 | 北京建筑大学 | One kind is anti-to wave construction derrick crane |
CN108408604A (en) * | 2018-06-12 | 2018-08-17 | 北京建筑大学 | A kind of bell-type is anti-to wave construction derrick crane |
CN108408605B (en) * | 2018-06-12 | 2020-04-28 | 北京建筑大学 | Anti-swing tower crane for building construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105152011A (en) | Intelligent wind and sway prevention assembly of lifting rope of crane | |
CN205011260U (en) | Intelligent hoist lifting rope choke shakes subassembly | |
CN105460736A (en) | Freight elevator system capable of safely lifting up and dropping down | |
CN107140545A (en) | Possess discharging to reckon by the piece the gantry of statistical function | |
CN204549690U (en) | A kind of elevator weighting apparatus | |
CN205973601U (en) | Steel cord hoist and mount transport vechicle | |
CN205772933U (en) | A kind of guide rail lifting appliance for guide rail processing | |
CN203998745U (en) | The tower machine suspension hook disconnected rope anti-drop device of rushing to summit | |
CN107572422A (en) | The gantry of water buoyancy shock-absorbing protecting | |
CN205419633U (en) | Syllogic speed lifting machine controlgear | |
CN209685173U (en) | A kind of crane height limiting device | |
CN202897405U (en) | Belt conveyor take-up car with induction | |
CN205076674U (en) | Gantry crane's assembly auxiliary device | |
CN202953707U (en) | Electrolytic copper powder anode plate lifting and mounting hanging frame | |
CN204847927U (en) | Bridge crane cable drags and makes running gear | |
CN205187593U (en) | Lifting device | |
CN206375579U (en) | Telehoist | |
CN104555753B (en) | A kind of multi-functional fixed crane | |
CN204453863U (en) | A kind of self-balancing driver's cab and there is the construction machinery and equipment of this driver's cab | |
CN211895871U (en) | Tank lifting device for preventing top rushing | |
CN204847877U (en) | Gantry crane running gear | |
CN205114919U (en) | Portable hoisting device is used to pump | |
CN207524836U (en) | Electric monorail crane | |
CN203794485U (en) | Single-main-beam hook gantry crane | |
CN209974211U (en) | Hand formula lifting machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160203 Termination date: 20171010 |
|
CF01 | Termination of patent right due to non-payment of annual fee |