CN205005134U - Railway emergent communication system in tunnel that grows up - Google Patents

Railway emergent communication system in tunnel that grows up Download PDF

Info

Publication number
CN205005134U
CN205005134U CN201520699832.7U CN201520699832U CN205005134U CN 205005134 U CN205005134 U CN 205005134U CN 201520699832 U CN201520699832 U CN 201520699832U CN 205005134 U CN205005134 U CN 205005134U
Authority
CN
China
Prior art keywords
tunnel
main frame
host computer
video
communication system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520699832.7U
Other languages
Chinese (zh)
Inventor
李彩月
杨彬
张钊硕
聂殿华
胡瑞杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Railway Survey & Design Institute Co Ltd
Original Assignee
Jilin Railway Survey & Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin Railway Survey & Design Institute Co Ltd filed Critical Jilin Railway Survey & Design Institute Co Ltd
Priority to CN201520699832.7U priority Critical patent/CN205005134U/en
Application granted granted Critical
Publication of CN205005134U publication Critical patent/CN205005134U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Alarm Systems (AREA)
  • Closed-Circuit Television Systems (AREA)

Abstract

The utility model belongs to the technical field of communication, especially, relate to a railway emergent communication system in tunnel that grows up. This system is including dispatching host computer, phone emergency system and video monitor system, and phone emergency system and video monitor system are connected with the dispatch host computer to with information transfer to the dispatch host computer that is located the surveillance center, phone emergency system is including setting up a plurality of telephone terminal in the tunnel, and on telephone terminal was connected to the tunnel host computer, the tunnel host computer passes through the data network to be connected with long -range call center's host computer, and central host computer is connected to on the dispatch host computer by telephone. The utility model discloses establish pronunciation, image, data etc. And write to each other between the scene of the accident and rescue command center at different levels, establish reliable writing to each other for the scene of the accident and outside, provide effective guarantee for in time formulating, implement feasible rescue protocol.

Description

A kind of Large Railway Tunnel emergency communication system
Technical field
The utility model belongs to communication technical field, particularly relates to a kind of Large Railway Tunnel emergency communication system.
Background technology
The main emphasis of railway tunnel Fire prevention design is in the past " preventing " and " disappearing ", when haveing no alternative but be parked in tunnel to accident train, and the research how establishment officer's safe escape does not have system deep and PRACTICE OF DESIGN.When appearance burst emergency episode, cause the inefficacy of various means of communication, when there is no reliable communication mode, actual conditions in tunnel promptly and accurately cannot be reported to floor manager and rescue personnel, micro-judgment can only be leaned on, affect rescue time adversely, even cause unnecessary error and loss.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of Large Railway Tunnel emergency communication system, after burst train disaster accident can in time and outside have good information to link up, to adopt an effective measure, reach safe and personnel are evacuated target rapidly, for scene of the accident rescue command provides communication system accurately and effectively, between the scene of the accident and rescue command center at different levels, establish voice, image, data etc. write to each other.
The utility model realizes like this, a kind of Large Railway Tunnel emergency communication system, this system comprises dispatching host machine, phone emergency system and video monitoring system, phone emergency system and video monitoring system are connected with dispatching host machine, and information is passed to is positioned in the dispatching host machine of Surveillance center, described phone emergency system comprises the multiple telephone terminals be arranged in tunnel, telephone terminal is connected on tunnel main frame, tunnel main frame is connected with long-range call center's main frame by data network, is connected in dispatching host machine by call center's main frame.
Further, described video monitoring system comprises the multiple cameras be arranged in tunnel, the image information of described camera collection is connected on video encoder by connecting video optical multiplexer, be connected on Ethernet switch by video encoder, be connected with the monitoring terminal of setting by video area node, described monitoring terminal is connected with dispatching host machine.
Further, tunnel main frame is arranged on station machine room, and audio signal is extended on call center's main frame of tunnel face by the four line audio interface provided by data network, then by the telephone terminal in low frequency protective cable incoming tunnel.
Further, when tunnel main frame is arranged on central machine room in tunnel face or tunnel, directly connect the crisis phone only terminal in tunnel by cable.
The utility model compared with prior art, beneficial effect is: the utility model establishes voice, image, data etc. and writes to each other between the scene of the accident and rescue command center at different levels, write to each other reliably for the scene of the accident and outside establish, provide effective guarantee for formulating, implementing feasible rescue method in time.
Accompanying drawing explanation
Fig. 1 is the system architecture diagram that the utility model embodiment provides;
Fig. 2 is the structured flowchart of the phone emergency system that the utility model embodiment provides;
Fig. 3 is the structured flowchart of the video monitoring system that the utility model embodiment provides.
Embodiment
In order to make the purpose of this utility model, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the utility model, and be not used in restriction the utility model.
Embodiment 1:
See Fig. 1 composition graphs 2 and Fig. 3, a kind of Large Railway Tunnel emergency communication system, this system comprises dispatching host machine, phone emergency system and video monitoring system, phone emergency system and video monitoring system are connected with dispatching host machine, and information is passed to is positioned in the dispatching host machine of Surveillance center, dispatching host machine is connected with dispatching control desk, and multiple scheduling extensions, each scheduling extensions is all positioned at watch bench of station, described phone emergency system comprises the multiple telephone terminals be arranged in tunnel, telephone terminal is connected on tunnel main frame, tunnel main frame is connected with long-range call center's main frame by data network, be connected in dispatching host machine by call center's main frame, call center's main frame is also by connecting crisis phone only control desk, controlled by crisis phone only control desk.
Tunnel main frame is arranged on station machine room, and audio signal is extended in the central host of tunnel face by the four line audio interface provided by data network, then by the telephone terminal in low frequency protective cable incoming tunnel.
Transmission means between tunnel main frame to telephone terminal is cable mode.When tunnel main frame is arranged on station machine room, audio signal extends on call center's main frame of tunnel face by the four line audio interface provided by Access Network, again by the telephone terminal in low frequency protective cable incoming tunnel, telephone terminal is by tunnel host supplying power.This kind of plan of establishment advantage is to share a main process equipment in multiple tunnel, cost-saving, but whether scheme is limited to circuit has Access Network.
See Fig. 3, video monitoring system comprises the multiple cameras 2 be arranged in tunnel, the image information that camera 2 gathers is connected on video encoder 4 by connecting video optical multiplexer 5, be connected on Ethernet switch 1 by video encoder 4, be connected with the monitoring terminal of setting by video area node, described monitoring terminal is connected with dispatching host machine, Ethernet switch being also connected with memory card 3 for being stored by image, being convenient to have access to.
Emergency exit in the gateway, tunnel at two ends, tunnel, sanctuary, Rescue Station rationally arrange video acquisition point.
The video information of video acquisition point is linked into the access node of station or Synthetic Visual System by video optical multiplexer and fiber resource, then by transmission system or data network, vision signal is delivered to scheduling and emergency center; Video optical multiplexer can adopt optical transmitter and receiver and the node type optical transmitter and receiver of point-to-point type.
Embodiment 2:
Be with the difference of embodiment 1, when tunnel main frame is arranged on central machine room in tunnel face or tunnel, directly connect the crisis phone only terminal in tunnel by cable.When tunnel main frame is arranged on central machine room in tunnel face or tunnel, directly connect the telephone terminal in tunnel by cable, tunnel main frame is powered to crisis phone only by cable simultaneously.Tunnel main frame is by transmitting the 2M passage access call center main frame provided.
The obvious advantage of cable mode is: voice signal and power supply signal are fed to telephone terminal by cable by tunnel main frame simultaneously, and the telephone terminal in tunnel does not need independent power supply.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all do within spirit of the present utility model and principle any amendment, equivalent to replace and improvement etc., all should be included within protection range of the present utility model.

Claims (4)

1. a Large Railway Tunnel emergency communication system, it is characterized in that, this system comprises dispatching host machine, phone emergency system and video monitoring system, phone emergency system and video monitoring system are connected with dispatching host machine, and information is passed to is positioned in the dispatching host machine of Surveillance center, described phone emergency system comprises the multiple telephone terminals be arranged in tunnel, telephone terminal is connected on tunnel main frame, tunnel main frame is connected with long-range call center's main frame by data network, is connected in dispatching host machine by call center's main frame.
2. Large Railway Tunnel emergency communication system as claimed in claim 1, it is characterized in that, described video monitoring system comprises the multiple cameras be arranged in tunnel, the image information of described camera collection is connected on video encoder by connecting video optical multiplexer, be connected on Ethernet switch by video encoder, be connected with the monitoring terminal of setting by video area node, described monitoring terminal is connected with dispatching host machine.
3. Large Railway Tunnel emergency communication system as claimed in claim 1, it is characterized in that, tunnel main frame is arranged on station machine room, audio signal is extended on call center's main frame of tunnel face by the four line audio interface provided by data network, then by the telephone terminal in low frequency protective cable incoming tunnel.
4. Large Railway Tunnel emergency communication system as claimed in claim 1, is characterized in that, when tunnel main frame is arranged on central machine room in tunnel face or tunnel, directly connects the crisis phone only terminal in tunnel by cable.
CN201520699832.7U 2015-09-10 2015-09-10 Railway emergent communication system in tunnel that grows up Expired - Fee Related CN205005134U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520699832.7U CN205005134U (en) 2015-09-10 2015-09-10 Railway emergent communication system in tunnel that grows up

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520699832.7U CN205005134U (en) 2015-09-10 2015-09-10 Railway emergent communication system in tunnel that grows up

Publications (1)

Publication Number Publication Date
CN205005134U true CN205005134U (en) 2016-01-27

Family

ID=55162003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520699832.7U Expired - Fee Related CN205005134U (en) 2015-09-10 2015-09-10 Railway emergent communication system in tunnel that grows up

Country Status (1)

Country Link
CN (1) CN205005134U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115643587A (en) * 2022-12-05 2023-01-24 中国铁道科学研究院集团有限公司通信信号研究所 Multi-mode railway tunnel emergency communication system using satellite communication

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115643587A (en) * 2022-12-05 2023-01-24 中国铁道科学研究院集团有限公司通信信号研究所 Multi-mode railway tunnel emergency communication system using satellite communication

Similar Documents

Publication Publication Date Title
CN108156033A (en) The wearable maintenance support of unmanned plane supports system
CN207650333U (en) A kind of novel electric power fault recording and monitoring system
CN101982986A (en) Underground personnel positioning system
CN207589191U (en) A kind of multimode emergency commading system of multi-line
CN108564767A (en) The double net fireman's Operation Securities in wearable narrowband monitor system
CN205005134U (en) Railway emergent communication system in tunnel that grows up
CN204887245U (en) Long -range video monitor system in job site
CN209962369U (en) Security protection video signal transmission system
CN204810445U (en) Law enforcement message transmission system
CN106504457A (en) A kind of urban fire control information acquisition system
CN207283533U (en) A kind of fusion command system based on power emergency trunking communicating technology
CN207802397U (en) A kind of mobile phone signal repeater or base station monitoring-controlling system
CN207559687U (en) power emergency system
CN209120174U (en) Relayed communications shines wire coil device
CN202759547U (en) Digital video local storage apparatus
CN207742765U (en) A kind of forest fire intelligent monitoring and controlling device
CN207318842U (en) A kind of electric power intelligent glasses
CN203646573U (en) Video safety helmet having functions of isolated storage and 3G wireless video calls
CN210670373U (en) Visual intelligent emergency command device for fire fighting
CN110011889B (en) Fire-fighting emergency communication system and fire-fighting emergency communication method
CN203301518U (en) Network bridge with wireless transceiving function
CN107426547A (en) A kind of Video Surveillance Alarm System based on interruption monitoring
CN209928609U (en) Special redundant safe temperature and humidity acquisition equipment system for data center machine room
CN108696826A (en) A kind of self-power wireless duplex emergency broadcase system
CN214627188U (en) Wireless access point and wireless communication network architecture

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160127

Termination date: 20210910