CN205000666U - Steel construction apartment block and hot and cold water pipe -line system thereof - Google Patents

Steel construction apartment block and hot and cold water pipe -line system thereof Download PDF

Info

Publication number
CN205000666U
CN205000666U CN201520582474.1U CN201520582474U CN205000666U CN 205000666 U CN205000666 U CN 205000666U CN 201520582474 U CN201520582474 U CN 201520582474U CN 205000666 U CN205000666 U CN 205000666U
Authority
CN
China
Prior art keywords
water
hot
cold water
communicated
water outlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520582474.1U
Other languages
Chinese (zh)
Inventor
刘锋
邓亚君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wendeng Landao Construction Engineering Co Ltd
Original Assignee
Wendeng Landao Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wendeng Landao Construction Engineering Co Ltd filed Critical Wendeng Landao Construction Engineering Co Ltd
Priority to CN201520582474.1U priority Critical patent/CN205000666U/en
Application granted granted Critical
Publication of CN205000666U publication Critical patent/CN205000666U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Domestic Plumbing Installations (AREA)

Abstract

The utility model discloses an end of registering one's residence that steel construction apartment block and hot and cold water pipe -line system thereof, the latter's cold water registered one's residence the pipeline is linked together with many branch roads respectively, and wherein, the cooling water outlet of dish basin, the main cooling water outlet of defending of secondary cooling water branch road intercommunication are washed to first cold water branch road intercommunication kitchen, install the water heater in the laundry, third cold water branch road with the cooling water inlet of water heater is linked together, the hot water export intercommunication of water heater has the hot water pipeline, the hot water pipeline includes first water end (W. E. ), second play water end (W. E. ) and third play water end (W. E. ), first water end (W. E. ) intercommunication the hot water export of dish basin is washed in the kitchen, the second goes out the water end (W. E. ) intercommunication the main hot water export of defending the wash -basin, the third goes out the water end (W. E. ) intercommunication the hot water export of main bathroom jar. Like this, can be applicable to arranging of the interior hot and cold water pipeline of steel construction apartment block, not only realize set service function, guarantee the arrange rationality and the convenience of hot and cold water pipeline again.

Description

A kind of steel department building and hot and cold water pipeline system thereof
Technical field
The utility model relates to construction engineering technical field, particularly relates to a kind of hot and cold water pipeline system for steel work building body.The utility model also relates to a kind of steel work building body comprising above-mentioned hot and cold water pipeline system.
Background technology
Along with the raising day by day of living standard, people are increasing with the demand doing utilities building for house.Existing building mostly is reinforced concrete structure, but traditional reinforced concrete structure building course is comparatively complicated, wastes a large amount of manpower and materials; Meanwhile, during the demolishing buildings of reinforced concrete structure, need to carry out destructiveness dismounting, the constructional materials after dismounting cannot carry out recycling, the serious waste of the resource caused, and the steel work building body structure of plug-in type arises at the historic moment.And in steel work building body structure, the layout of resident family's household hot and cold water pipeline cannot be identical with traditional concrete structure arrangement, therefore, a kind of hot and cold water pipeline system for steel department building is provided, to the hot and cold water pipeline arrangement in steel department building can be applicable to, ensureing arrangement reasonability and the convenience of hot and cold water pipeline, needing the problem of solution with regard to becoming those skilled in the art badly.
Utility model content
The purpose of this utility model is to provide a kind of hot and cold water pipeline system for steel department building, to being applicable to the layout of the hot and cold water pipeline in steel department building, ensures arrangement reasonability and the convenience of hot and cold water pipeline.Another object of the present utility model is to provide a kind of steel department building comprising above-mentioned hot and cold water pipeline system.
To achieve these goals, the utility model provides a kind of hot and cold water pipeline system for steel department building, comprise the cold water be communicated with water source to register one's residence pipeline, described cold water register one's residence pipeline register one's residence end be connected with the 3rd cold water branch road with the first cold water branch road, the second cold water branch road respectively, described first cold water branch road is communicated with the cooling water outlet that nappy is washed in kitchen, described second cold water branch road is communicated with main defends cooling water outlet, described master defend cooling water outlet comprise main defend wash basin cooling water outlet, mainly defend the delivery port of toilet and the cooling water outlet of main bathroom cylinder;
In laundry, geyser is installed, described 3rd cold water branch road is connected with the cooling water inlet of described geyser, the hot water outlet of described geyser is communicated with hot water line, described hot water line comprises the first water side, the second water side and the 3rd water side, described first water side is communicated with the hot water outlet that nappy is washed in described kitchen, described second water side is communicated with the hot water outlet that described master defends wash basin, and described 3rd water side is communicated with the hot water outlet of described main bathroom cylinder.
Further, be also provided with laundry's wash basin in described laundry, also comprise the 4th cold water branch road, described 4th cold water branch road is communicated with the cooling water outlet of described laundry wash basin; Described hot water line also comprises the 4th water side, and described 4th water side is communicated with the hot water outlet of described laundry wash basin.
Further, described steel department building also comprises master bedroom washroom, described hot and cold water pipeline system also comprises the 5th cold water branch road, described 5th cold water branch road is communicated with master bedroom washroom cooling water outlet, and described master bedroom washroom cooling water outlet comprises the cooling water outlet of the cooling water outlet of master bedroom washroom wash basin, the delivery port of master bedroom toilet and the shower of master bedroom washroom;
Described hot water line also comprises the 5th water side and the 6th water side, and described 5th water side is communicated with the hot water outlet of described master bedroom washroom wash basin, and described 6th water side is communicated with the hot water outlet of described master bedroom washroom shower.
Further, described geyser is gas water heater.
The utility model also provides a kind of steel department building, comprises laundry, main sanitary accomodation, kitchen, master bedroom washroom, and the hot and cold water pipeline system of arranging betwixt, and described hot and cold water pipeline system is hot and cold water pipeline system as above.
The hot and cold water pipeline system that the utility model provides is for steel department building, this hot and cold water pipeline system comprises the cold water be communicated with water source and to register one's residence pipeline, described cold water register one's residence pipeline register one's residence end be connected with the 3rd cold water branch road with the first cold water branch road, the second cold water branch road respectively, described first cold water branch road is communicated with the cooling water outlet that nappy is washed in kitchen, described second cold water branch road is communicated with main defends cooling water outlet, described master defend cooling water outlet comprise main defend wash basin cooling water outlet, mainly defend the delivery port of toilet and the cooling water outlet of main bathroom cylinder; In laundry, geyser is installed, described 3rd cold water branch road is connected with the cooling water inlet of described geyser, the hot water outlet of described geyser is communicated with hot water line, described hot water line comprises the first water side, the second water side and the 3rd water side, described first water side is communicated with the hot water outlet that nappy is washed in described kitchen, described second water side is communicated with the hot water outlet that described master defends wash basin, and described 3rd water side is communicated with the hot water outlet of described main bathroom cylinder.
Like this, by above-mentioned hot and cold water pipeline system, achieve when geyser is arranged in laundry, the arrangement of hot water pipe in laundry, between main sanitary accomodation and kitchen, it can be applicable to the layout of the hot and cold water pipeline in steel department building, not only achieve set using function, in turn ensure that arrangement reasonability and the convenience of hot and cold water pipeline.
In a preferred embodiment, in hot and cold water pipeline system provided by the utility model, when being also provided with laundry's wash basin in laundry, this hot and cold water pipeline system also comprises the 4th cold water branch road, and described 4th cold water branch road is communicated with the cooling water outlet of described laundry wash basin; Described hot water line also comprises the 4th water side, and described 4th water side is communicated with the hot water outlet of described laundry wash basin; To meet the hot and cold water supply of laundry wash basin, and to ensure connection and reasonable arrangement and convenience.
In another preferred embodiment, in hot and cold water pipeline system provided by the utility model, when steel department building also comprises master bedroom washroom, this hot and cold water pipeline system also comprises the 5th cold water branch road, described 5th cold water branch road is communicated with master bedroom washroom cooling water outlet, and described master bedroom washroom cooling water outlet comprises the cooling water outlet of the cooling water outlet of master bedroom washroom wash basin, the delivery port of master bedroom toilet and the shower of master bedroom washroom; Described hot water line also comprises the 5th water side and the 6th water side, and described 5th water side is communicated with the hot water outlet of described master bedroom washroom wash basin, and described 6th water side is communicated with the hot water outlet of described master bedroom washroom shower; To meet the hot and cold water supply of master bedroom rest room, and to ensure connection and reasonable arrangement and convenience.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present application or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment below, apparently, the accompanying drawing that the following describes is only some embodiments recorded in the utility model, for those of ordinary skill in the art, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of a kind of detailed description of the invention of hot and cold water pipeline system provided by the utility model.
Detailed description of the invention
Core of the present utility model is to provide a kind of hot and cold water pipeline system for steel department building, to being applicable to the layout of the hot and cold water pipeline in steel department building, ensures arrangement reasonability and the convenience of hot and cold water pipeline.Another core of the present utility model is to provide a kind of steel department building comprising above-mentioned hot and cold water pipeline system.
In order to make those skilled in the art understand the technical solution of the utility model better, below in conjunction with accompanying drawing, the utility model is further detailed.
Please refer to Fig. 1, Fig. 1 is the structural representation of a kind of detailed description of the invention of hot and cold water pipeline system provided by the utility model.
In a kind of detailed description of the invention, the hot and cold water pipeline system that the utility model provides is for steel department building, this hot and cold water pipeline system comprises the cold water be communicated with water source and to register one's residence pipeline 1, described cold water register one's residence pipeline 1 register one's residence end respectively with the first cold water branch road 2, second cold water branch road 3 is connected with the 3rd cold water branch road 4, described first cold water branch road 2 is communicated with the cooling water outlet that nappy 5 is washed in kitchen, described second cold water branch road 3 is communicated with master and defends cooling water outlet, described master defends cooling water outlet and comprises the main cooling water outlet defending wash basin 6, master defends the delivery port of toilet 7 and the cooling water outlet of main bathroom cylinder 8, geyser 9 is installed in laundry, described 3rd cold water branch road 4 is connected with the cooling water inlet of described geyser 9, the hot water outlet of described geyser 9 is communicated with hot water line 10, described hot water line 10 comprises the first water side a, the second water side b and the 3rd water side c, described first water side a is communicated with the hot water outlet that nappy 5 is washed in described kitchen, described second water side b is communicated with the hot water outlet that described master defends wash basin 6, and described 3rd water side c is communicated with the hot water outlet of described main bathroom cylinder 8.
In Fig. 1, the pipeline indicating J is cold water pipe, is denoted as the hot-water line of the pipeline of RJ.
Like this, by above-mentioned hot and cold water pipeline system, achieve when geyser 9 is arranged in laundry, the arrangement of hot water pipe in laundry, between main sanitary accomodation and kitchen, it can be applicable to the layout of the hot and cold water pipeline in steel department building, not only achieve set using function, in turn ensure that arrangement reasonability and the convenience of hot and cold water pipeline.
Further, when being also provided with laundry's wash basin 11 in laundry, this hot and cold water pipeline system also comprises the 4th cold water branch road 12, and described 4th cold water branch road 12 is communicated with the cooling water outlet of described laundry wash basin 11; Described hot water line 10 also comprises the 4th water side d, and described 4th water side d is communicated with the hot water outlet of described laundry wash basin 11; To meet the hot and cold water supply of laundry wash basin, and to ensure connection and reasonable arrangement and convenience.
Further, when steel department building also comprises master bedroom washroom, this hot and cold water pipeline system also comprises the 5th cold water branch road 14, described 5th cold water branch road 14 is communicated with master bedroom washroom cooling water outlet, and described master bedroom washroom cooling water outlet comprises the cooling water outlet of the cooling water outlet of master bedroom washroom wash basin 15, the delivery port of master bedroom toilet 16 and master bedroom washroom shower 17; Described hot water line 10 also comprises the 5th water side e and the 6th water side f, and described 5th water side e is communicated with the hot water outlet of described master bedroom washroom wash basin 15, and described 6th water side f is communicated with the hot water outlet of described master bedroom washroom shower 17; To meet the hot and cold water supply of master bedroom rest room, and to ensure connection and reasonable arrangement and convenience.
Particularly, above-mentioned geyser 9 is gas water heater, or electric water heater.
It should be pointed out that ordinal numbers such as " first, second, third, fourth " described in literary composition, is the different structure in order to distinguish same names, only for convenience, does not represent certain order, more should not be construed as any restriction.
Except above-mentioned hot and cold water pipeline system, the utility model also provides a kind of steel department building comprising above-mentioned hot and cold water pipeline system, and other Each part in this steel department building please refer to prior art, do not repeat them here.
Mode above only by illustrating describes some one exemplary embodiment of the present utility model, undoubtedly, for those of ordinary skill in the art, when not departing from spirit and scope of the present utility model, can revise described embodiment by various different mode.Therefore, above-mentioned accompanying drawing is illustrative with being described in essence, should not be construed as the restriction to the utility model claims.

Claims (5)

1. the hot and cold water pipeline system for steel department building, it is characterized in that, comprise the cold water be communicated with water source to register one's residence pipeline (1), described cold water register one's residence pipeline (1) register one's residence end respectively with the first cold water branch road (2), second cold water branch road (3) is connected with the 3rd cold water branch road (4), described first cold water branch road (2) is communicated with the cooling water outlet that nappy (5) are washed in kitchen, described second cold water branch road (3) is communicated with master and defends cooling water outlet, described master defends cooling water outlet and comprises the main cooling water outlet defending wash basin (6), master defends the delivery port of toilet (7) and the cooling water outlet of main bathroom cylinder (8),
Geyser (9) is installed in laundry, described 3rd cold water branch road (4) is connected with the cooling water inlet of described geyser (9), the hot water outlet of described geyser (9) is communicated with hot water line (10), described hot water line (10) comprises the first water side (a), second water side (b) and the 3rd water side (c), described first water side (a) is communicated with the hot water outlet that nappy (5) are washed in described kitchen, described second water side (b) is communicated with the hot water outlet that described master defends wash basin (6), described 3rd water side (c) is communicated with the hot water outlet of described main bathroom cylinder (8).
2. hot and cold water pipeline system according to claim 1, it is characterized in that, laundry's wash basin (11) is also installed in described laundry, also comprise the 4th cold water branch road (12), described 4th cold water branch road (12) is communicated with the cooling water outlet of described laundry wash basin (11); Described hot water line (10) also comprises the 4th water side (d), and described 4th water side (d) is communicated with the hot water outlet of described laundry wash basin (11).
3. hot and cold water pipeline system according to claim 2, it is characterized in that, described steel department building also comprises master bedroom washroom, described hot and cold water pipeline system also comprises the 5th cold water branch road (14), described 5th cold water branch road (14) is communicated with master bedroom washroom cooling water outlet, and described master bedroom washroom cooling water outlet comprises the cooling water outlet of the cooling water outlet of master bedroom washroom wash basin (15), the delivery port of master bedroom toilet (16) and master bedroom washroom shower (17);
Described hot water line (10) also comprises the 5th water side (e) and the 6th water side (f), described 5th water side (e) is communicated with the hot water outlet of described master bedroom washroom wash basin (15), and described 6th water side (f) is communicated with the hot water outlet of described master bedroom washroom shower (17).
4. hot and cold water pipeline system according to claim 3, is characterized in that, described geyser (9) is gas water heater.
5. a steel department building, comprise laundry, main sanitary accomodation, kitchen, master bedroom washroom, and the hot and cold water pipeline system of arranging betwixt, it is characterized in that, described hot and cold water pipeline system is the hot and cold water pipeline system as described in any one of claim 1-4.
CN201520582474.1U 2015-08-05 2015-08-05 Steel construction apartment block and hot and cold water pipe -line system thereof Expired - Fee Related CN205000666U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520582474.1U CN205000666U (en) 2015-08-05 2015-08-05 Steel construction apartment block and hot and cold water pipe -line system thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520582474.1U CN205000666U (en) 2015-08-05 2015-08-05 Steel construction apartment block and hot and cold water pipe -line system thereof

Publications (1)

Publication Number Publication Date
CN205000666U true CN205000666U (en) 2016-01-27

Family

ID=55157562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520582474.1U Expired - Fee Related CN205000666U (en) 2015-08-05 2015-08-05 Steel construction apartment block and hot and cold water pipe -line system thereof

Country Status (1)

Country Link
CN (1) CN205000666U (en)

Similar Documents

Publication Publication Date Title
CN205000666U (en) Steel construction apartment block and hot and cold water pipe -line system thereof
CN202831109U (en) Same layer water draining device
CN202347597U (en) Device for recycling and utilizing domestic water
CN105780844A (en) Family intelligent quality-based water saving system
Dudkiewicz et al. Implementation of greywater heat recovery system in hospitals
CN205035857U (en) Steel construction plug -in type building body floor water supply and sewerage system
CN203857694U (en) Solar water heater
CN202392301U (en) PVC-M (polyvinyl chloride-M) high-impact water supply pipe
CN202745132U (en) Water-pipe serial-connection secondary-water parallel-connection storage recycling high-energy-saving closestool for bathroom on each floor
CN205954771U (en) Takeover structure between residential sanitation
CN212715174U (en) Bathroom hot water circulation pipe-line system reaches bathroom including it
CN205000406U (en) Steel construction apartment block and one deck fire service pipe way system thereof
CN203823869U (en) Residential optional heat-source household metering heating system
CN204225214U (en) A kind of water storage device receiving water water on toilet under wash basin
CN204004971U (en) A kind of three-way telescopic pipe
CN202108087U (en) Sewer structure
CN204898795U (en) Kitchen drainage system , whole kitchen and building body
CN202380283U (en) Water saving pipeline for washing machine
CN204326172U (en) A kind of balcony solar water is washed one's face and rinsed one's mouth device
CN203270708U (en) Same-floor water drainage structure capable of preventing toilets from leaking
CN203113469U (en) Water-saving closestool structure
CN205637681U (en) Reassembling type environment -friendly mobile toilet
CN205276442U (en) Antifouling device of bathroom downcomer
CN201722749U (en) O-shaped trap
CN205676981U (en) A kind of Multifunction Portable tap

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160127

Termination date: 20160805

CF01 Termination of patent right due to non-payment of annual fee