CN204986957U - Boiler equipment - Google Patents

Boiler equipment Download PDF

Info

Publication number
CN204986957U
CN204986957U CN201520426945.XU CN201520426945U CN204986957U CN 204986957 U CN204986957 U CN 204986957U CN 201520426945 U CN201520426945 U CN 201520426945U CN 204986957 U CN204986957 U CN 204986957U
Authority
CN
China
Prior art keywords
flue gas
delivery pipe
boiler
gas delivery
observation ward
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520426945.XU
Other languages
Chinese (zh)
Inventor
艾新桥
杨德鑫
杨胜军
张涛
苟彦军
赵阳
杨晶丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinchuan Group Copper Gui Co ltd
Original Assignee
Jinchuan Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinchuan Group Co Ltd filed Critical Jinchuan Group Co Ltd
Priority to CN201520426945.XU priority Critical patent/CN204986957U/en
Application granted granted Critical
Publication of CN204986957U publication Critical patent/CN204986957U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Examining Or Testing Airtightness (AREA)

Abstract

The utility model provides a boiler equipment relates to sulphuric acid preparation production peripheral equipment technical field and includes: anterior flue gas conveyer pipe, rear portion flue gas conveyer pipe, anterior flue gas conveyer pipe rear end is connected with the boiler, and main relieving haperacidity flue is access to to rear portion flue gas conveyer pipe rear end. The flue gas inlet tube is access to to anterior flue gas conveyer pipe rear end, and rear portion flue gas conveyer pipe front end is connected with the flue gas fairlead, is equipped with the observation ward between flue gas inlet tube and the flue gas fairlead, is equipped with monitoring devices in the observation ward. This device can the short -term test boiler whether be in the state of revealing, this device simple structure simultaneously only needs to set up by pass pipe way, valve on the existing equipment basis, it can to install the observation ward. The device has increased DCS temperature measuring device, has realized that automatic monitoring gives first place to and personal monitoring is the assistance, has improved monitoring efficiency, has practiced thrift the manpower.

Description

A kind of boiler leakage checkout gear
Technical field
The utility model relates to sulfuric acid preparation and produces ancillary equipment technical field, specifically a kind of boiler leakage checkout gear.
Background technology
At sulfuric acid industry, particularly be equipped with the acid making system of high concentration conversion process, because conversion process can discharge a large amount of heats, from the angle of comprehensive utilization of energy, newly-built relieving haperacidity enterprise is generally provided with waste heat boiler at conversion procedure absorption system, by boiler water and reacted high-temperature flue gas heat exchange, on the one hand by heat for generation of steam, on the other hand unnecessary transfer of heat is gone out conversion system, maintain heat balance, ensure effective operation of conversion process, putting into practice in production process, particularly metallurgical off-gas acid-making industry, owing to coordinating smelting process for production regulation and control, acid making system on-off frequency is frequent, boiler temperature also can frequent variations, and amplitude of variation is very large, wear and tear in addition, corrosion, the external factors such as drawing crack, boiler leakage will be caused, boiler is once leak, not only increase unplanned property production suspension induced losses, maintenance workload, also will lead to a disaster time serious.
Utility model content
The purpose of this utility model is to provide a kind of boiler leakage checkout gear, to solve the problem cannot monitoring boiler working order in prior art.
In order to solve the problem, the technical solution adopted in the utility model is: a kind of boiler leakage checkout gear, comprise anterior flue gas delivery pipe, rear portion flue gas delivery pipe, anterior flue gas delivery pipe rear end is connected with boiler, and main relieving haperacidity flue is led in flue gas delivery pipe rear end, rear portion.
Flue gas inlet tube is led in anterior flue gas delivery pipe rear end, and flue gas delivery pipe front end, rear portion is connected with flue gas fairlead, and be provided with observation ward between flue gas inlet tube and flue gas fairlead, observation ward is provided with monitoring device.
Be provided with into cigarette control valve between anterior flue gas delivery pipe and flue gas inlet tube.
Smoke control valve is provided with between rear portion flue gas delivery pipe and flue gas fairlead.
Intermediate conduit is connected with between anterior flue gas delivery pipe rear end and flue gas delivery pipe front end, rear portion.
Observation ward is provided with transparent observing mouth.
Observation ward is provided with DCS temperature measuring equipment.
The below of observation ward is provided with condensation acid tank, is provided with separator valve between observation ward and condensation acid tank.
The beneficial effects of the utility model are: this device can detect boiler fast and whether be in leak condition, and this apparatus structure is simple simultaneously, only need set up bypass duct, valve on existing equipment basis, install observation ward.This device adds DCS temperature measuring equipment, and it is main for achieving monitoring automatically and personal monitoring is auxiliary, improves monitoring efficiency, has saved manpower.
Accompanying drawing explanation
Fig. 1 is device structure schematic diagram of the present utility model.
Description of reference numerals: 1 boiler, 2 anterior flue gas delivery pipe, 3DCS temperature measuring equipment, 4 intermediate conduit, 5 enter cigarette control valve, 6 smoke control valves, 7 flue gas inlet tubes, 8 observation ward, 9 flue gas fairleads, 10 separator valves, 11 condensation acid tanks, 12 rear portion flue gas delivery pipe, 13 transparent observing mouths.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described further.
A kind of boiler leakage checkout gear, comprise anterior flue gas delivery pipe 2, rear portion flue gas delivery pipe 12, anterior flue gas delivery pipe 2 rear end is connected with boiler 1, and main relieving haperacidity flue is led in rear portion flue gas delivery pipe 12 rear end.Flue gas inlet tube 7 is led in anterior flue gas delivery pipe 2 rear end, and rear portion flue gas delivery pipe 12 front end is connected with flue gas fairlead 9, is provided with observation ward 8 between flue gas inlet tube 7 and flue gas fairlead 9, and observation ward 8 is provided with monitoring device.Be provided with into cigarette control valve 5 between anterior flue gas delivery pipe 2 and flue gas inlet tube 7.Smoke control valve 6 is provided with between rear portion flue gas delivery pipe 12 and flue gas fairlead 9.Intermediate conduit 4 is connected with between anterior flue gas delivery pipe 2 rear end and rear portion flue gas delivery pipe 12 front end.Observation ward 8 is provided with transparent observing mouth 13.Observation ward 8 is provided with DCS temperature measuring equipment 3.The below of observation ward 8 is provided with condensation acid tank 11, is provided with separator valve 10 between observation ward 8 and condensation acid tank 11.
When boiler occurs to leak, flue gas is moisture in a large number, forms a large amount of acid mists, by cooling rear formation condensation acid, after condensation acid is gathered, a large amount of condensation acid can be seen by transparent observing mouth 13, meanwhile, the temperature in observation ward 8 can decline rapidly, thus primitive decision boiler leaks.Or can directly determine to reveal by DCS temperature measuring equipment 3.
When this checkout gear breaks down, only need by entering cigarette control valve 5, smoke control valve 6 is closed, and can carry out repair and maintenance.The acid solution of saving bit by bit in observation ward 8 flows into condensation acid tank 11 by separator valve 10, and after maintenance terminates, whole device can work on again.

Claims (7)

1. a boiler leakage checkout gear, comprise anterior flue gas delivery pipe (2), rear portion flue gas delivery pipe (12), described anterior flue gas delivery pipe (2) rear end is connected with boiler (1), main relieving haperacidity flue is led in flue gas delivery pipe (12) rear end, described rear portion, it is characterized in that: flue gas inlet tube (7) is led in described anterior flue gas delivery pipe (2) rear end, flue gas delivery pipe (12) front end, described rear portion is connected with flue gas fairlead (9), observation ward (8) is provided with between described flue gas inlet tube (7) and flue gas fairlead (9), described observation ward (8) is provided with monitoring device.
2. a kind of boiler leakage checkout gear according to claim 1, is characterized in that: be provided with into cigarette control valve (5) between described anterior flue gas delivery pipe (2) and flue gas inlet tube (7).
3. a kind of boiler leakage checkout gear according to claim 1, is characterized in that: be provided with smoke control valve (6) between described rear portion flue gas delivery pipe (12) and flue gas fairlead (9).
4. a kind of boiler leakage checkout gear according to Claims 2 or 3, is characterized in that: be connected with intermediate conduit (4) between described anterior flue gas delivery pipe (2) rear end and rear portion flue gas delivery pipe (12) front end.
5. a kind of boiler leakage checkout gear according to claim 4, is characterized in that: described observation ward (8) is provided with transparent observing mouth (13).
6. a kind of boiler leakage checkout gear according to claim 4, is characterized in that: described observation ward (8) is provided with DCS temperature measuring equipment (3).
7. a kind of boiler leakage checkout gear according to claim 5 or 6, is characterized in that: the below of described observation ward (8) is provided with condensation acid tank (11), is provided with separator valve (10) between described observation ward (8) and condensation acid tank (11).
CN201520426945.XU 2015-06-19 2015-06-19 Boiler equipment Active CN204986957U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520426945.XU CN204986957U (en) 2015-06-19 2015-06-19 Boiler equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520426945.XU CN204986957U (en) 2015-06-19 2015-06-19 Boiler equipment

Publications (1)

Publication Number Publication Date
CN204986957U true CN204986957U (en) 2016-01-20

Family

ID=55121324

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520426945.XU Active CN204986957U (en) 2015-06-19 2015-06-19 Boiler equipment

Country Status (1)

Country Link
CN (1) CN204986957U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107036070A (en) * 2017-05-22 2017-08-11 深圳钰湖电力有限公司 A kind of boiler leakage detects warning device
CN111457351A (en) * 2020-04-26 2020-07-28 新疆心连心能源化工有限公司 Waste heat boiler leakage detection method and device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107036070A (en) * 2017-05-22 2017-08-11 深圳钰湖电力有限公司 A kind of boiler leakage detects warning device
CN111457351A (en) * 2020-04-26 2020-07-28 新疆心连心能源化工有限公司 Waste heat boiler leakage detection method and device

Similar Documents

Publication Publication Date Title
CN204986957U (en) Boiler equipment
CN103439247A (en) Online corrosion monitoring device for natural gas pipeline
CN103528388B (en) Closed ferroalloy furnace coal gas dry method purification and recovery system
CN100494765C (en) Biomass marsh gas preprocessing system
CN116024576A (en) Full-automatic intelligent anti-corrosion system for power plant generator set and operation method
CN202139160U (en) Low-parameter exhaust-heat boiler for water glass kiln
CN205155918U (en) Vacuum type steam extraction recovery unit
CN205279057U (en) Automatic recovery system of steam condensate water
CN101363617B (en) Closed type condensate water recovery device
CN210886251U (en) High-temperature electrolysis condensate water recovery system
CN210241532U (en) Drainage water recovery device
CN203519468U (en) On-line corrosion monitoring device for natural gas pipeline
CN202018416U (en) Novel online corrosion monitoring auxiliary device
CN202125934U (en) Hydrocone type simple steaming device
CN201331053Y (en) Enclosed condensed water recycling device
CN203569128U (en) Detachable visible gas collecting device
CN211478193U (en) Sulfide detection device in chemical waste gas
CN218146770U (en) Simple dust concentration measuring structure of dry dedusting box
CN220012690U (en) On-line water testing device for water supply pump of evaporative cooling spray gun
CN213395272U (en) Energy-saving deaerating device
CN110184402A (en) A method of it is online quickly to determine the specific leak source of blast furnace cooling stave
CN217235632U (en) Soot blowing structure of thermal power plant boiler after shutdown
CN204806369U (en) Energy -saving thermal de aeration ware
CN204495639U (en) A kind of coal gas of converter analyser drainage arrangement
CN216480912U (en) Boiler water level detection device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240412

Address after: 737199 No. 2 Jianshe Road, Jinchuan District, Jinchang City, Gansu Province (east of Beijing Road, west of Heya Road, south of Guiyang Road)

Patentee after: Jinchuan Group Copper Gui Co.,Ltd.

Country or region after: China

Address before: 737103 No. 98, Jinchuan Road, Jinchang, Gansu

Patentee before: JINCHUAN GROUP Co.,Ltd.

Country or region before: China