CN204983436U - Various steel sheet canopy in workshop - Google Patents

Various steel sheet canopy in workshop Download PDF

Info

Publication number
CN204983436U
CN204983436U CN201520707029.3U CN201520707029U CN204983436U CN 204983436 U CN204983436 U CN 204983436U CN 201520707029 U CN201520707029 U CN 201520707029U CN 204983436 U CN204983436 U CN 204983436U
Authority
CN
China
Prior art keywords
canopy
roof beam
beam structure
workshop
panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520707029.3U
Other languages
Chinese (zh)
Inventor
段锋华
刘海云
张一凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuzhou Huafeng Steel Structure Co Ltd
Original Assignee
Zhuzhou Huafeng Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuzhou Huafeng Steel Structure Co Ltd filed Critical Zhuzhou Huafeng Steel Structure Co Ltd
Priority to CN201520707029.3U priority Critical patent/CN204983436U/en
Application granted granted Critical
Publication of CN204983436U publication Critical patent/CN204983436U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model discloses a various steel sheet canopy in workshop, including installing in the canopy roof beam structure of workshop door top side, laid the canopy panel above the canopy roof beam structure, the canopy bottom plate has been installed to the below of canopy roof beam structure, and wrap up in the place ahead of canopy roof beam structure has canopy eaves mouth cornerite, all be equipped with the flashing between canopy panel and canopy bottom plate and the workshop wall body. The utility model discloses a canopy bottom plate is also approximately established to various steel sheet canopy below the canopy roof beam structure to in the place ahead parcel canopy eaves mouth cornerite, wrap up the canopy roof beam structure in various steel canopy inboard completely, can further prevent the rainwater water clock, the outward appearance is pleasing to the eye moreover. The flashing is set up between various steel sheet of canopy and the wall, rain water leakage can be prevented, simple structure, water -proof effects is good.

Description

A kind of workshop color steel canopy
Technical field
The utility model relates to building adminicle field, particularly the color steel canopy in workshop.
Background technology
Along with the fast development of modern industry, various factory building rise abruptly ground and rise, a feast for the eyes, people also more and more pay attention to every structure of factory building, have higher requirement, waterproof rain tent device wherein on plant floor door is widely used, but traditional waterproof canopy all only lays splash guard above frame for rain-awning, and frame for rain-awning is exposed in below, not only unsightly, and Sometimes When It Rains, canopy also can be caused to leak, reduce the application life of canopy.
Utility model content
The technical problems to be solved in the utility model overcomes the deficiencies in the prior art, provides a kind of structure simple, good water-proof effect, the workshop color steel canopy of appearance looks elegant.
For solving the problems of the technologies described above, the technical scheme that the utility model proposes is:
A kind of workshop color steel canopy, comprise the canopy roof beam structure be installed in above door top, workshop, canopy panel is equipped with above canopy roof beam structure, the below of described canopy roof beam structure is equiped with canopy base plate, the front of canopy roof beam structure is enclosed with canopy cornice cornerite, is equipped with flashing between described canopy panel and workshop body of wall and between canopy base plate and workshop body of wall.
Further improvement as technique scheme:
Preferably, described canopy cornice cornerite top is inserted between described canopy panel and canopy roof beam structure, and screw fastening is also passed through in the bottom being wrapped in canopy base plate below of canopy cornice cornerite.
Preferably, described canopy panel is tilted to lower installation, and canopy floor level is installed.
Preferably, the angle that described canopy panel tilts is 1:20.
Preferably, described canopy panel and canopy base plate are 0.376 thick 900 type color steels.
Compared with prior art, the utility model has the advantage of:
Color steel canopy of the present utility model, below canopy roof beam structure, also lid establishes canopy base plate, and in front parcel canopy cornice cornerite, is wrapped in completely by canopy roof beam structure in color steel awning plate, can prevents rainwater water clock further, and appearance looks elegant.Arrange flashing between canopy color steel and metope, can prevent rain leakage, structure is simple, good water-proof effect.
Accompanying drawing explanation
Fig. 1 is application structure schematic diagram of the present utility model.
1, canopy roof beam structure; 2, canopy panel; 3, canopy base plate; 4, canopy cornice cornerite; 5, flashing.
Detailed description of the invention
For the ease of understanding the utility model, hereafter will do to describe more comprehensively, meticulously to the utility model in conjunction with Figure of description and preferred embodiment, but protection domain of the present utility model is not limited to following specific embodiment.
As shown in Figure 1, a kind of workshop of the present utility model color steel canopy, comprise canopy roof beam structure 1, canopy roof beam structure 1 is installed in above door top, workshop, the top of canopy roof beam structure 1 is equipped with canopy panel 2 and passes through screw fastening, the below of canopy roof beam structure 1 is equiped with canopy base plate 3 and by screw fastening, the front of canopy roof beam structure 1 is enclosed with canopy cornice cornerite 4, canopy panel 2 and be equipped with flashing 5 between canopy base plate 3 and workshop body of wall and pass through screw fastening.Below canopy roof beam structure, also lid establishes canopy base plate, and in front parcel canopy cornice cornerite, is wrapped in completely by canopy roof beam structure in color steel awning plate, can prevents rainwater water clock further, and appearance looks elegant.
In the present embodiment, the top of canopy cornice cornerite 4 is inserted between canopy panel 2 and canopy roof beam structure 1, and screw fastening is also passed through in the bottom being wrapped in canopy base plate 3 below of canopy cornice cornerite 4.Canopy panel 2 is tilted to lower installation, and angle is that 1:20 canopy base plate 3 level is installed.
In the present embodiment, canopy panel 2 and canopy base plate 3 are 0.376 thick 900 type color steels.
The foregoing is only preferred embodiment of the present utility model; should be understood that; for a person skilled in the art; under the prerequisite not departing from the utility model structure; some distortion and improvement can also be made; these improvement all should be included within protection domain of the present utility model, all can not affect effect and the practical applicability of the utility model enforcement.

Claims (5)

1. a workshop color steel canopy, comprise the canopy roof beam structure be installed in above door top, workshop, canopy panel is equipped with above canopy roof beam structure, it is characterized in that, the below of described canopy roof beam structure is equiped with canopy base plate, the front of canopy roof beam structure is enclosed with canopy cornice cornerite, is equipped with flashing between described canopy panel and workshop body of wall and between canopy base plate and workshop body of wall.
2. workshop according to claim 1 color steel canopy, is characterized in that: described canopy cornice cornerite top is inserted between described canopy panel and canopy roof beam structure, and screw fastening is also passed through in the bottom being wrapped in canopy base plate below of canopy cornice cornerite.
3. workshop according to claim 1 color steel canopy, is characterized in that: described canopy panel is tilted to lower installation, and canopy floor level is installed.
4. workshop according to claim 3 color steel canopy, is characterized in that: the angle that described canopy panel tilts is 1:20.
5. the workshop color steel canopy according to any one of claim 1-4, is characterized in that: described canopy panel and canopy base plate are 0.376 thick 900 type color steels.
CN201520707029.3U 2015-09-14 2015-09-14 Various steel sheet canopy in workshop Expired - Fee Related CN204983436U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520707029.3U CN204983436U (en) 2015-09-14 2015-09-14 Various steel sheet canopy in workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520707029.3U CN204983436U (en) 2015-09-14 2015-09-14 Various steel sheet canopy in workshop

Publications (1)

Publication Number Publication Date
CN204983436U true CN204983436U (en) 2016-01-20

Family

ID=55117818

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520707029.3U Expired - Fee Related CN204983436U (en) 2015-09-14 2015-09-14 Various steel sheet canopy in workshop

Country Status (1)

Country Link
CN (1) CN204983436U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112282224A (en) * 2020-10-26 2021-01-29 安徽三建工程有限公司 Peripheral waterproof construction of high protruding jar of body of steel construction roofing

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112282224A (en) * 2020-10-26 2021-01-29 安徽三建工程有限公司 Peripheral waterproof construction of high protruding jar of body of steel construction roofing

Similar Documents

Publication Publication Date Title
WO2008045855A3 (en) Building siding with horizontal panels installed
CN204300966U (en) Transformer station's optical lighting system
CN206070911U (en) A kind of BAIYE turnover panel with light bar, bindiny mechanism and awning
CN204983436U (en) Various steel sheet canopy in workshop
CN204299382U (en) The waterproof construction of aluminum window in stone curtain wall system
CN202324397U (en) Supporting structure for exposed laying construction of lightning protection grid of waterproof roof
CN211257597U (en) Steel construction waterproof awning receives limit structure
CN203932906U (en) A kind of new antenna mounting structure
CN204590448U (en) A kind of mounting structure of lightning-arrest support
CN204826720U (en) Outside mechanism of activity board house
CN205078088U (en) Combined door frame
CN204152071U (en) A kind of thermal-insulating waterproof side fascia
CN207672531U (en) A kind of lock gate for flood protection for city garage exit/entry
CN205116005U (en) Sky inner bridge drainage system of prevent pollution overline bridge facade
CN207194251U (en) Split curtain wall system waterproof construction
CN205385733U (en) Modular plant greening wall
CN203097589U (en) Window with mounting flanges
CN208884853U (en) A kind of concealed lighting device structure for metal Roof
EP2787143B1 (en) Lower profile for balcony railing
CN202559576U (en) Shutter top pergola
CN208981671U (en) A kind of French building eave structure
KR101323130B1 (en) A course change structure for safety-grating
CN204057738U (en) The rainproof operator's compartment of a kind of hoisting crane
CN103255883B (en) Fixed rainproof fire-spreading-resistant window sun-shading board
CN204960656U (en) Between interior windowsill rainwater device between drowning outside with that falls into water

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160120

Termination date: 20180914

CF01 Termination of patent right due to non-payment of annual fee