CN204982696U - Novel concrete sound barrier - Google Patents

Novel concrete sound barrier Download PDF

Info

Publication number
CN204982696U
CN204982696U CN201520782161.0U CN201520782161U CN204982696U CN 204982696 U CN204982696 U CN 204982696U CN 201520782161 U CN201520782161 U CN 201520782161U CN 204982696 U CN204982696 U CN 204982696U
Authority
CN
China
Prior art keywords
puigging
absorbing layer
sound absorbing
sound
cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520782161.0U
Other languages
Chinese (zh)
Inventor
蔡军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shangluo University
Original Assignee
Shangluo University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shangluo University filed Critical Shangluo University
Priority to CN201520782161.0U priority Critical patent/CN204982696U/en
Application granted granted Critical
Publication of CN204982696U publication Critical patent/CN204982696U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a novel concrete sound barrier, including sound absorbing layer and puigging, link to each other through the spring between sound absorbing layer and the puigging, be equipped with the cavity between sound absorbing layer and the puigging, the cavity intussuseption is filled with soundproof cotton, the sound absorbing layer upper surface is equipped with a plurality of sound holes of inhaling, the cuboid that the sound absorbing layer is shale ceramsite, excel in modified cement and water pressure system form, the puigging is gold tail ore sand concrete layer. The utility model discloses ore sand concrete layer regards as the puigging with the gold tail, avoids a large amount of tailing polluted environments, and changing waste into valuables has apparent economic benefits and social.

Description

New concrete sound barrier
Technical field
The utility model relates to a kind of sound barrier, is specifically related to a kind of new concrete sound barrier.
Background technology
Along with the fast development of China's economic society, the style of economic increase that tradition is extensive, make the contradiction of china natural resources shortage more and more outstanding, environment stress is also increasing.Golden production generally adopts cyanidation gold-extracted method, must add cyanide in this activities, causes mine tailing also residual a certain amount of cyanogen.Due to the process of gold tailings many employings bin system, along with the expansion of golden production scale and the prolongation of production history, gold tailings accumulating amount increases year by year, not only takies a large amount of soil, atmosphere pollution, surface water and groundwater; And a lot of Tailings Dam exceeds the time limit or overburden uses, even violation operation, makes Tailings Dam there is very big potential safety hazard.In addition, Tailings Dam build and maintenance management also need to drop into substantial contribution.Therefore, accelerate advance gold tailings process and fully utilize extremely urgent.
Meanwhile, existing concrete acoustical barrier sound insulation erasure effect is poor.
Utility model content
For solving the problem, the utility model provides a kind of new concrete sound barrier, using gold tailings sand concrete layer as puigging, avoids a large amount of tailings pollution environment, turns waste into wealth, have significant economic benefit and social benefit.
For achieving the above object, the technical scheme that the utility model is taked is:
New concrete sound barrier, comprise sound absorbing layer and puigging, be connected by spring between sound absorbing layer and puigging, cavity is provided with between sound absorbing layer and puigging, Sound-proof material is filled with in cavity, described sound absorbing layer upper surface is provided with some sound-absorption hole, and described sound absorbing layer is the cuboid of haydites of book structure, high-strength modified cement and hydraulic pressure system, and described puigging is gold tailings sand concrete layer.
As preferably, the inwall of described sound-absorption hole and cavity is coated with acoutic fibre board coating.
As preferably, the Thickness Ratio of described sound absorbing layer, puigging and cavity is 2: 4: 1.
The beneficial effects of the utility model are:
Using gold tailings sand concrete layer as puigging, avoid a large amount of tailings pollution environment, turn waste into wealth, there is significant economic benefit and social benefit.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model embodiment.
Detailed description of the invention
In order to make the purpose of this utility model and advantage clearly understand, below in conjunction with embodiment, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the utility model, and be not used in restriction the utility model.
As shown in Figure 1, the utility model embodiment provides a kind of new concrete sound barrier, comprise sound absorbing layer 1 and puigging 2, be connected by spring 3 between sound absorbing layer 1 and puigging 2, be provided with cavity 4 between sound absorbing layer 1 and puigging 2, be filled with Sound-proof material in cavity 4, described sound absorbing layer 1 upper surface is provided with some sound-absorption hole 5, described sound absorbing layer 1 is the cuboid of haydites of book structure, high-strength modified cement and hydraulic pressure system, and described puigging 2 is gold tailings sand concrete layer.
As preferably, the inwall of described sound-absorption hole 5 and cavity 4 is coated with acoutic fibre board coating.
As preferably, the Thickness Ratio of described sound absorbing layer 1, puigging 2 and cavity 4 is 2: 4: 1.
Wherein, described spring 3 is socketed to form by inner spring and outer spring, is also provided with protection muscle in described inner spring, and this concrete proportioning implementing gold tailings sand concrete layer is portland cement 465kg/m 3, water 165kg/m 3, polycarboxylate water-reducer 15kg/m 3, the gold tailings sand 635kg/m of particle diameter 0 ~ 5mm 3, the stone 960kg/m of particle diameter 5 ~ 20mm 3.
This is specifically implemented using gold tailings sand concrete layer as puigging, avoids a large amount of tailings pollution environment, turns waste into wealth, have significant economic benefit and social benefit.
The above is only preferred embodiment of the present utility model; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the utility model principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (3)

1. new concrete sound barrier, comprise sound absorbing layer (1) and puigging (2), it is characterized in that, be connected by spring (3) between sound absorbing layer (1) and puigging (2), cavity (4) is provided with between sound absorbing layer (1) and puigging (2), cavity is filled with Sound-proof material in (4), described sound absorbing layer (1) upper surface is provided with some sound-absorption hole (5), described sound absorbing layer (1) is haydites of book structure, the cuboid of high-strength modified cement and hydraulic pressure system, and described puigging (2) is gold tailings sand concrete layer.
2. new concrete sound barrier according to claim 1, is characterized in that, the inwall of described sound-absorption hole (5) and cavity (4) is coated with acoutic fibre board coating.
3. new concrete sound barrier according to claim 1, is characterized in that, the Thickness Ratio of described sound absorbing layer (1), puigging (2) and cavity (4) is 2: 4: 1.
CN201520782161.0U 2015-09-30 2015-09-30 Novel concrete sound barrier Expired - Fee Related CN204982696U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520782161.0U CN204982696U (en) 2015-09-30 2015-09-30 Novel concrete sound barrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520782161.0U CN204982696U (en) 2015-09-30 2015-09-30 Novel concrete sound barrier

Publications (1)

Publication Number Publication Date
CN204982696U true CN204982696U (en) 2016-01-20

Family

ID=55117078

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520782161.0U Expired - Fee Related CN204982696U (en) 2015-09-30 2015-09-30 Novel concrete sound barrier

Country Status (1)

Country Link
CN (1) CN204982696U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105714702A (en) * 2016-02-26 2016-06-29 江苏远兴环保集团有限公司 Damping vibration-isolation sound barrier
CN107938528A (en) * 2017-12-01 2018-04-20 吴振明 A kind of soundproof wall easy to adjusting and installation for security protection
CN112759335A (en) * 2021-02-01 2021-05-07 浙江广厦建设职业技术大学 Preparation method of 3D printing cement noise reduction barrier based on graphene sound absorption cotton fiber base material
CN114516105A (en) * 2020-11-20 2022-05-20 江苏瑞达康环保科技发展有限公司 Production process of sound barrier metal ceramsite sound absorption board

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105714702A (en) * 2016-02-26 2016-06-29 江苏远兴环保集团有限公司 Damping vibration-isolation sound barrier
CN107938528A (en) * 2017-12-01 2018-04-20 吴振明 A kind of soundproof wall easy to adjusting and installation for security protection
CN114516105A (en) * 2020-11-20 2022-05-20 江苏瑞达康环保科技发展有限公司 Production process of sound barrier metal ceramsite sound absorption board
CN112759335A (en) * 2021-02-01 2021-05-07 浙江广厦建设职业技术大学 Preparation method of 3D printing cement noise reduction barrier based on graphene sound absorption cotton fiber base material

Similar Documents

Publication Publication Date Title
CN204982696U (en) Novel concrete sound barrier
Ma et al. Effect of ground waste concrete powder on cement properties
CN102320803B (en) Self-compacting concrete prepared from iron ore tailings, and preparation method thereof
CN104692720B (en) A kind of copper tailing is non-burning brick and preparation method thereof
CN104355577B (en) A kind of Ceramic Tiles adhesive mortar
Chang et al. Implementation of paste backfill mining technology in Chinese coal mines
CN107619297B (en) Preparation method of tailing ceramsite light permeable brick
CN104341130B (en) One is utilized the concrete production method of chats system and production system
Ting-xiang et al. Research on the coupling effects between stereo gas extraction and coal spontaneous combustion
CN107975044A (en) A kind of method that Caving Method with Large Space mine is backfilled using tailing surface subsidence hole
Zhu et al. Permeability of Sand‐Based Cemented Backfill under Different Stress Conditions: Effects of Confining and Axial Pressures
Yin et al. Experimental study on gangue backfilling materials improved by soda residue and field measurement of surface subsidence
Zhu et al. Control effect of coal mining solid-waste backfill for ground surface movement in slice mining: A case study of the Nantun Coal Mine
CN202543757U (en) Filling structure for blown sand road foundation
Song et al. Study on mechanical properties and damage characteristics of rice straw fiber-reinforced cemented tailings backfill based on energy evolution
CN103541500A (en) Special-shaped section steel tube glass concrete core column
CN106638485B (en) One kind mixing rubber antidetonation earth and rockfill dam and its design and construction method
CN104446223A (en) High-strength concrete building block
Jia et al. Experimental research on the fracture properties of roller compacted steel fiber recycled concrete
CN106759174A (en) The method that superfine granule, upper reaches method Tailing dam construction prevent earthquake liquefaction unstable failure
LI et al. Physical and mechanical characteristics and definition of weakly cemented sandstone
Li et al. Connotation and technology system of green mining of manganese resources
Li et al. Numerical simulation of roof movement and fill strength of coal deep mining
Xu et al. A Case Study of Thaumasite Sulfate Attack in Tunnel Engineering
CN102953358A (en) Method and structure for improving anti-impact structure of overflow surface of gravity dam and improved structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160120

Termination date: 20160930

CF01 Termination of patent right due to non-payment of annual fee