CN204982026U - Galvanization device - Google Patents

Galvanization device Download PDF

Info

Publication number
CN204982026U
CN204982026U CN201520590759.XU CN201520590759U CN204982026U CN 204982026 U CN204982026 U CN 204982026U CN 201520590759 U CN201520590759 U CN 201520590759U CN 204982026 U CN204982026 U CN 204982026U
Authority
CN
China
Prior art keywords
burner
gas treatment
waste gas
heat storage
galvanizing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520590759.XU
Other languages
Chinese (zh)
Inventor
李晓栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongxiang Tongde Electric Power Accessories Co., Ltd
Original Assignee
Tongxiang City Paulownia Moral Electric Power Accessory Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongxiang City Paulownia Moral Electric Power Accessory Co Ltd filed Critical Tongxiang City Paulownia Moral Electric Power Accessory Co Ltd
Priority to CN201520590759.XU priority Critical patent/CN204982026U/en
Application granted granted Critical
Publication of CN204982026U publication Critical patent/CN204982026U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

The utility model provides a galvanization device belongs to hot galvanizing technology field. It includes galvanizing furnace, exhaust -gas treatment mechanism, galvanizing furnace includes the furnace body, the side flame path, left side nozzle and right nozzle set up the left and right sides at the side flame path respectively, the left side of left side nozzle is provided with left heat accumulator, the right side of right side nozzle is provided with right heat accumulator, exhaust -gas treatment mechanism includes the gas collecting channel, the dust removal sack, the lower extreme of gas collecting channel is provided with the guide pulley, but the gas collecting channel passes through the setting of guide pulley horizontal slip on the guide rail, the upper end of gas collecting channel is provided with the connecting pipe, first tracheal one end is passed through the staple bolt and is connected in the connecting pipe, but the setting of first tracheal other end horizontal slip is on the second trachea, the exhaust -gas treatment case is connected to the second trachea, the dust removal sack passes through the sack cardboard and sets up in last processing cashier's office in a shop, in exhaust gas treating unit sets up and to handle the cabinet under, the one side of handling the cabinet down is connected with the outlet duct. The utility model discloses it is not only zinc -plated effectual, realized the processing to zinc -plated waste gas moreover, protected the environment greatly.

Description

A kind of galvanizing rig
Technical field
The utility model relates to Hot Galvanizing Technology field, particularly a kind of galvanizing rig.
Background technology
Zinc-plated refer to metal, alloy or other material plated surface one deck zinc with rise attractive in appearance, antirustdeng the process for treating surface of effect, the main method adopted is pot galvanize.Pot galvanize is a kind of effective anti-corrosion of metal mode, and it makes molten metal and iron-based precursor reactant and produces alloy layer, thus both matrix and coating are combined.Pot galvanize first steel piece is carried out pickling, in order to remove the ferric oxide on steel piece surface, after pickling, by cleaning in ammonium chloride or solder(ing)acid or ammonium chloride and zinc chloride mixed aqueous solution groove, then sends in hot-dip tank.The advantages such as coating is even, processing costs is low because pot galvanize has, strong adhesion, durable, long service life, so widely use aborning, and a requisite operation on the metal construction facility becoming production every profession and trade.But in pot galvanize is produced, the dust-laden exhaust gas such as sodium-chlor, zinc chloride, zinc fume and zinc oxide dust of overflowing in a large number above galvanizing furnace, collecting and process if do not added, will pollute workshop, even causing topsoil, and can affect HUMAN HEALTH.In the enterprise of current a lot of zinc-plated production, effective measure of control and specific equipment be there is no to waste gas above galvanizing furnace.Also there is part to adopt fixed emission-control equipment at present, gas sampling and process can only be carried out for regional area, usage space and limited efficiency.
Utility model content
The purpose of this utility model is to provide a kind of galvanizing rig, not only galvanizing furnace homogeneous temperature, zinc-plated effective, and achieves the process to zinc-plated waste gas, greatly protects environment.
The utility model solves the technical scheme that its technical problem adopts:
A kind of galvanizing rig, it comprises galvanizing furnace, waste gas treatment mechanism, described galvanizing furnace comprises body of heater, refractory brick, side quirk, left burner, left heat storage, left fuel tube, right burner, right heat storage, right fuel tube, described refractory brick is arranged on the surrounding of body of heater, described side quirk is arranged on the both sides, front and back of body of heater, described left burner and right burner are separately positioned on the left and right sides of side quirk, the left side of described left burner is provided with left heat storage, and left burner is connected in one end of described left fuel tube, and the right side of described right burner is provided with right heat storage, one end of described right fuel tube is communicated with right burner, and described waste gas treatment mechanism comprises guide rail, guide wheel, gas skirt, pipe connecting, first tracheae, anchor ear, second tracheae, dust-removal cloth-bag, cloth bag clamp, waste gas treatment tank, exhaust processor, escape pipe, described guide rail is horizontally set on the both sides of galvanizing furnace upper end, the lower end of described gas skirt is provided with guide wheel, described gas skirt can be horizontally slipped by guide wheel and be arranged on guide rail, the upper end of described gas skirt is provided with pipe connecting, one end of described first tracheae is connected to pipe connecting by anchor ear, the other end of described first tracheae can horizontally slip and be arranged on the second tracheae, described second tracheae connects waste gas treatment tank, described waste gas treatment tank comprises process cabinet and lower process cabinet, described dust-removal cloth-bag is arranged on upper process cashier's office in a shop by cloth bag clamp, and described exhaust processor is arranged in lower process cabinet, and the side of described lower process cabinet is connected with escape pipe.
Further, described left heat storage and right heat storage are honey comb like aluminum oxide.
Further, the upper process of described waste gas treatment tank is provided with access door cashier's office in a shop.
Further, described guide wheel is heating resisting metal guide wheel.
Further, the thickness of described refractory brick is 20 ~ 25cm.
Compared to the prior art the utility model, has the following advantages and effect: galvanizing furnace achieves the fast zinc-electroplating to part, is heated evenly, effective, and waste gas treatment mechanism realization, to effective collection of waste gas and process, protects environment.Left burner and the periodically alternation of right burner, when left burner work, right burner quits work, a large amount of high-temperature flue gas that left burner produces pass through and heat right heat storage, about 150 DEG C can be dropped to the flue-gas temperature after right heat storage heat exchange, through after a period of time, left burner quits work, right burner starts, when air is preheating to burning at once flue-gas temperature 80% ~ 90%, the flue gas of right burner is by left heat storage, by the alternate run mode that a pair heat storage goes round and begins again, not only achieve the homogeneous heating to body of heater, and the limit of the high temperature preheating and fume afterheat that achieve combustion air reclaims.Gas skirt can horizontally slip along guide rail, realizes the collection to waste gas, and waste gas enters dust-removal cloth-bag through the first tracheae and the second tracheae, and dust is separated from flue gas.Finally, the flue gas after dedusting is discharged from escape pipe after exhaust processor process.The thickness of refractory brick is 20 ~ 25cm, at high temperature can stand various physicochemical change and mechanical effect.Left heat storage and right heat storage are honey comb like aluminum oxide, and specific surface area is large, and accumulation of heat is effective.Guide wheel is heating resisting metal guide wheel, substantially prolongs work-ing life, effective.The upper process of waste gas treatment tank is provided with access door cashier's office in a shop, clears up fast and change for operating maintenance personnel to dust-removal cloth-bag.The utility model is galvanizing furnace homogeneous temperature not only, zinc-plated effective, and achieves the process to zinc-plated waste gas, greatly protects environment.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is right view of the present utility model.
Fig. 3 is the structural representation of the utility model galvanizing furnace.
Fig. 4 is the partial enlarged drawing A of the utility model Fig. 3.
In figure: 1. galvanizing furnace, 2. waste gas treatment mechanism, 3. body of heater, 4. refractory brick, 5. side quirk, 6. left burner, 7. left heat storage, 8. left fuel tube, 9. right burner, 10. right heat storage, 11. right fuel tubes, 12. guide rails, 13. guide wheels, 14. gas skirts, 15. pipe connectings, 16. first tracheaes, 17. anchor ears, 18. second tracheaes, 19. dust-removal cloth-bags, 20. cloth bag clamps, 21. waste gas treatment tanks, 22. exhaust processors, 23. escape pipes, process cabinet on 24., 25. times process cabinets, 26. access doors.
Embodiment
Below in conjunction with accompanying drawing, also by embodiment, the utility model is described in further detail, and following examples are that the utility model is not limited to following examples to explanation of the present utility model.
As shown in Figure 1, Figure 2, Figure 3 and Figure 4, a kind of galvanizing rig, it comprises galvanizing furnace 1, waste gas treatment mechanism 2; galvanizing furnace 1 achieves the fast zinc-electroplating to part, is heated evenly, effective; waste gas treatment mechanism 2 realizes effective collection to waste gas and process, protects environment.Described galvanizing furnace 1 comprises body of heater 3, refractory brick 4, side quirk 5, left burner 6, left heat storage 7, left fuel tube 8, right burner 9, right heat storage 10, right fuel tube 11, described refractory brick 4 is arranged on the surrounding of body of heater 3, the thickness of described refractory brick 4 is 20 ~ 25cm, at high temperature can stand various physicochemical change and mechanical effect.Described side quirk 5 is arranged on the both sides, front and back of body of heater 3, described left burner 6 and right burner 9 are separately positioned on the left and right sides of side quirk 5, the left side of described left burner 6 is provided with left heat storage 7, left burner 6 is connected in one end of described left fuel tube 8, the right side of described right burner 9 is provided with right heat storage 10, and one end of described right fuel tube 11 is communicated with right burner 9, and described left heat storage 7 and right heat storage 10 are honey comb like aluminum oxide, specific surface area is large, and accumulation of heat is effective.Described waste gas treatment mechanism 2 comprises guide rail 12, guide wheel 13, gas skirt 14, pipe connecting 15, first tracheae 16, anchor ear 17, second tracheae 18, dust-removal cloth-bag 19, cloth bag clamp 20, waste gas treatment tank 21, exhaust processor 22, escape pipe 23, described guide rail 12 is horizontally set on the both sides of galvanizing furnace 1 upper end, the lower end of described gas skirt 14 is provided with guide wheel 13, described guide wheel 13 is heating resisting metal guide wheel, substantially prolongs work-ing life, effective.Described gas skirt 14 can be horizontally slipped by guide wheel 13 and be arranged on guide rail 12, the upper end of described gas skirt 14 is provided with pipe connecting 15, one end of described first tracheae 16 is connected to pipe connecting 15 by anchor ear 17, the other end of described first tracheae 16 can horizontally slip and be arranged on the second tracheae 18, and described second tracheae 18 connects waste gas treatment tank 21.Described waste gas treatment tank 21 comprises process cabinet 24 and lower process cabinet 25, described dust-removal cloth-bag 19 is arranged on upper process cabinet 24 by cloth bag clamp 20, the upper process cabinet 24 of described waste gas treatment tank 21 is provided with access door 26, fast for operating maintenance personnel dust-removal cloth-bag 19 is cleared up and changed.Described exhaust processor 22 is arranged in lower process cabinet 25, and the side of described lower process cabinet 25 is connected with escape pipe 23.
Pass through technique scheme, when a kind of galvanizing rig of the utility model uses, left burner 6 and right burner 9 periodically alternation, when left burner 6 works, right burner 9 quits work, a large amount of high-temperature flue gas that left burner 6 produces pass through and heat right heat storage 10, about 150 DEG C can be dropped to the flue-gas temperature after the heat exchange of right heat storage 10, through after a period of time, left burner 6 quits work, right burner 9 starts, when air is preheating to burning at once flue-gas temperature 80% ~ 90%, the flue gas of right burner 9 is by left heat storage 7, by the alternate run mode that a pair heat storage goes round and begins again, not only achieve the homogeneous heating to body of heater 3, and the limit of the high temperature preheating and fume afterheat that achieve combustion air reclaims.Gas skirt 14 can horizontally slip along guide rail 12, realizes the collection to waste gas, and waste gas enters dust-removal cloth-bag 19 through the first tracheae 16 and the second tracheae 18, and dust is separated from flue gas.Finally, the flue gas after dedusting is discharged from escape pipe 23 after exhaust processor 22 processes.The utility model is galvanizing furnace 1 homogeneous temperature not only, zinc-plated effective, and achieves the process to zinc-plated waste gas, greatly protects environment.
Above content described in this specification sheets is only to the explanation of the utility model example.The utility model person of ordinary skill in the field can make various amendment or supplements or adopt similar mode to substitute to described specific embodiment; only otherwise depart from the content of the utility model specification sheets or surmount this scope as defined in the claims, protection domain of the present utility model all should be belonged to.

Claims (5)

1. a galvanizing rig, is characterized in that: it comprises galvanizing furnace, waste gas treatment mechanism, described galvanizing furnace comprises body of heater, refractory brick, side quirk, left burner, left heat storage, left fuel tube, right burner, right heat storage, right fuel tube, described refractory brick is arranged on the surrounding of body of heater, described side quirk is arranged on the both sides, front and back of body of heater, described left burner and right burner are separately positioned on the left and right sides of side quirk, the left side of described left burner is provided with left heat storage, and left burner is connected in one end of described left fuel tube, and the right side of described right burner is provided with right heat storage, one end of described right fuel tube is communicated with right burner, and described waste gas treatment mechanism comprises guide rail, guide wheel, gas skirt, pipe connecting, first tracheae, anchor ear, second tracheae, dust-removal cloth-bag, cloth bag clamp, waste gas treatment tank, exhaust processor, escape pipe, described guide rail is horizontally set on the both sides of galvanizing furnace upper end, the lower end of described gas skirt is provided with guide wheel, described gas skirt can be horizontally slipped by guide wheel and be arranged on guide rail, the upper end of described gas skirt is provided with pipe connecting, one end of described first tracheae is connected to pipe connecting by anchor ear, the other end of described first tracheae can horizontally slip and be arranged on the second tracheae, described second tracheae connects waste gas treatment tank, described waste gas treatment tank comprises process cabinet and lower process cabinet, described dust-removal cloth-bag is arranged on upper process cashier's office in a shop by cloth bag clamp, and described exhaust processor is arranged in lower process cabinet, and the side of described lower process cabinet is connected with escape pipe.
2. a kind of galvanizing rig according to claim 1, is characterized in that: described left heat storage and right heat storage are honey comb like aluminum oxide.
3. a kind of galvanizing rig according to claim 1, is characterized in that: the upper process of described waste gas treatment tank is provided with access door cashier's office in a shop.
4. a kind of galvanizing rig according to claim 1, is characterized in that: described guide wheel is heating resisting metal guide wheel.
5. a kind of galvanizing rig according to claim 1, is characterized in that: the thickness of described refractory brick is 20 ~ 25cm.
CN201520590759.XU 2015-08-08 2015-08-08 Galvanization device Active CN204982026U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520590759.XU CN204982026U (en) 2015-08-08 2015-08-08 Galvanization device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520590759.XU CN204982026U (en) 2015-08-08 2015-08-08 Galvanization device

Publications (1)

Publication Number Publication Date
CN204982026U true CN204982026U (en) 2016-01-20

Family

ID=55116410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520590759.XU Active CN204982026U (en) 2015-08-08 2015-08-08 Galvanization device

Country Status (1)

Country Link
CN (1) CN204982026U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111804109A (en) * 2020-07-24 2020-10-23 惠博新型材料有限公司 Purification exhaust apparatus based on hot galvanizing production line

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111804109A (en) * 2020-07-24 2020-10-23 惠博新型材料有限公司 Purification exhaust apparatus based on hot galvanizing production line

Similar Documents

Publication Publication Date Title
CN203534230U (en) Continuous annealing furnace mouth waste heat recovery device
CN204982026U (en) Galvanization device
CN106756698A (en) A kind of hot dip galvanizing production process
CN207435523U (en) A kind of soot processing device for galvanizing by dipping
CN203700473U (en) Zinc smoke absorbing device on hot-dip galvanizing production line
CN205528979U (en) Stokehold waste heat recovery system
CN208643044U (en) A kind of suspension type spraying line
CN217567928U (en) Exhaust gas purification device for galvanizing process
CN106391736B (en) A kind of belt steel surface processing method
CN209696618U (en) It is a kind of to purify clean galvanizing by dipping exhaust treatment system
CN203923355U (en) A kind of emission-control equipment for galvanizing furnace
CN205368474U (en) Zinc -plating flue gas recycle system
CN207528073U (en) A kind of exhaust-gas treatment structure of Metal Melting
CN106048595B (en) A kind of processing of steel member surface anticorrosion is heating and curing furnace
CN210773498U (en) Heating furnace flue gas waste heat recovery device
CN211284416U (en) Blast furnace slag flushing and white removing equipment
CN207891408U (en) A kind of channel steel surface layer is zinc-plated to use hot dipping device
CN106076765B (en) A kind of volatile solvent circular treatment heating and drying furnace
CN219907791U (en) Scrap iron recycling device of steel pipe heat treatment industrial furnace
CN106000820B (en) A kind of environmental protection of volatile solvent synchronization process is heating and curing furnace
CN208343568U (en) A kind of wrinkle resistant steam rewetting system of label
CN105671467B (en) Automate thermal cycle galvanizing equipment
CN215676534U (en) Waste heat recovery device with shower function for dedusting of industrial furnace
CN217991618U (en) Full-automatic production system of electric power tower
CN215628117U (en) Bright annealing device of seamless pipe for ferrous metal smelting rolled product

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 314513, Zhejiang, Jiaxing, Tongxiang Quanzhou Town Road Village

Patentee after: Tongxiang Tongde Electric Power Accessories Co., Ltd

Address before: 314513, Zhejiang, Jiaxing, Tongxiang Quanzhou Town Road Village

Patentee before: TONGXIANG TONGDE ELECTRIC POWER FITTING Co.,Ltd.