CN204981330U - Septic tank - Google Patents

Septic tank Download PDF

Info

Publication number
CN204981330U
CN204981330U CN201520536832.5U CN201520536832U CN204981330U CN 204981330 U CN204981330 U CN 204981330U CN 201520536832 U CN201520536832 U CN 201520536832U CN 204981330 U CN204981330 U CN 204981330U
Authority
CN
China
Prior art keywords
chamber
septic tank
tank body
end socket
partition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520536832.5U
Other languages
Chinese (zh)
Inventor
李利民
杨卓舒
段济远
张存
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuoda New Material Technology Group Co Ltd
Original Assignee
Zhuoda New Material Technology Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuoda New Material Technology Group Co Ltd filed Critical Zhuoda New Material Technology Group Co Ltd
Priority to CN201520536832.5U priority Critical patent/CN204981330U/en
Application granted granted Critical
Publication of CN204981330U publication Critical patent/CN204981330U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Biological Wastes In General (AREA)

Abstract

The utility model discloses a septic tank, including jar the body and sealing connection in two heads at jar body both ends. Internal first baffle and the second baffle of being equipped with of jar, first baffle and second baffle hold the chamber with septic tank and separate into drip chamber, filter chamber and clarification chamber. Be equipped with the spout hole on the first baffle, be equipped with air passing hole on the second baffle. The upper portion that constitutes the head of drip chamber is equipped with the water inlet, and the top of drip chamber is equipped with first the qing dynasty and draws the mouth, the top of filter chamber is equipped with the clear mouth of drawing of second, the upper portion that constitutes clarification chamber's head is equipped with the delivery port. The utility model has the advantages of water quality processing high quality, green simultaneously, the utility model discloses still have advantages such as the cost is lower, simple to operate, construction cycle is short, the crushing resistance good, long service life.

Description

A kind of septic tank
Technical field
The utility model relates to field of environment protection equipment, particularly relates to a kind of septic tank.
Background technology
Septic tank is the equipment of for the treatment of ight soil and in addition filtering-depositing, and wherein cured article decomposes at the bottom of pond, and the aquation object on upper strata enters pipeline and flows away, and prevents line clogging, is hydrolyzed to the time of cured article rubbish abundance.Septic tank is as the integral part in building sewage disposal discharge, and the curing cycle that is unimpeded, that increase large-diameter pipeline for protection municipal pipeline plays an important role.
Traditional septic tank is brick mix structure or skeleton construction, and this kind of septic tank is impervious, crushing resistance is poor, and work-ing life is not long, and severe patient also can cause above ground structure inclination in various degree.Simultaneously, traditional brick mixes septic tank, and also to there is water conditioning of poor quality, the drawback of effluent sewerage severe overweight, so just, the working load of sewage work greatly can be increased, What is more, in the minority area without city planting ductwork, the sewage after traditional manure pit process can directly be entered lake, river, brings havoc to periphery river lake water environment.In addition, traditional manure pit is long owing to drawing clearly the cycle, if routine maintenance management is not in place, also there will be the hidden dangers such as biogas is poisoning, blast.
Utility model content
The purpose of this utility model is to provide a kind of septic tank, and it has, and water conditioning quality is high, the advantage of environmental protection.
For achieving the above object, the utility model takes following technical proposals:
A kind of septic tank, comprise tank body and two end sockets being sealedly attached to described tank body two ends, be provided with the first dividing plate and second partition in described tank body, septic tank cavity volume is separated into settling chamber, filtration chamber and clarifying chamber by the first dividing plate and second partition; First dividing plate is provided with overflow weir, and second partition is provided with air passing hole;
The top forming the described end socket of described settling chamber is provided with water-in, and the top of described settling chamber is provided with first and draws mouth clearly; The top of described filtration chamber is provided with second and draws mouth clearly; The top forming the end socket of described clarifying chamber is provided with water outlet.
Further, described overflow weir place is provided with the first screen plate, and the first screen plate is fixed on the first dividing plate;
Described air passing hole place is provided with the second screen plate, and the second screen plate is fixed on second partition.
Preferably, described overflow weir is arranged at the middle and upper part of the first dividing plate, and described air passing hole is arranged at the middle and lower part of second partition.
Preferably, the outer wall of described tank body becomes corrugated.
Preferably, the diameter of described end socket is greater than described tank body internal diameter, and described end socket is provided with circular projection towards that side of described tank body, and the circular projection of two end socket sides is inserted two ends of tank body respectively and seals with described tank body.
Further, the inwall of described tank body is provided with multiple the first circular stiffening web.
Further, the end face outside of described end socket is provided with the second stiffening web.
1, the septic tank in the application is made up of tank body and two end sockets, and than integrally formed structure, production difficulty is low, easy construction, duration are short.Through practical proof, the septic tank in the application only can complete assembling with 3-5 hour, and can backfill.
The outer wall of the tank body of the septic tank 2, in the application becomes corrugated, adds the ultimate compression strength of septic tank.First stiffening web and the first stiffening web then further increase the intensity of tank body and the intensity of end socket, can resist backfill soil surging force and wall pressure strongly.
3, septic tank is separated into settling chamber, filtration chamber and clarifying chamber three part by the first dividing plate and second partition, can realize first precipitating sewage, rear degraded, the process that again precipitates, the Disposal quality for water quality is higher.The first screen plate that first dividing plate and second partition are arranged and the second screen plate are increased water quality Disposal quality further.
4, the top of settling chamber and filtration chamber is offered first and is drawn clearly mouth and second and draw mouth clearly, can the throw out of Qing Tao settling chamber and filtration chamber easily, shortens and draws the cycle clearly.The gas simultaneously produced in sewage treatment process can be drawn clearly mouth, second from first and draw clearly mouth and enter behind clarifying chamber through air passing hole and discharged by posticum, can effectively avoid due to settling chamber and filtration chamber's gas pressure intensity excessive and cause the phenomenon of blast to produce.
5, the septic tank in the application has good leakage performance and anticorrosion, anti-pressure ability, can meet Ordinary Rd driving loading demands, is longer than work-ing life about septic tank that is brick or concrete structure can reach ISUZU company.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of the septic tank according to a preferred embodiment;
Fig. 2 is the internal structure schematic diagram of the septic tank according to a preferred embodiment.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, carry out clear, complete description to the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
Fig. 1 is the structural representation of the septic tank according to a preferred embodiment.As shown in Figure 1, septic tank comprises tank body 1 and is sealedly attached to two end sockets 2 at tank body 1 two ends.Be provided with the first dividing plate 3 and second partition 4, first dividing plate 3 and second partition 4 in tank body 1 and septic tank cavity volume is separated into settling chamber 5, filtration chamber 6 and clarifying chamber 7.The top forming the end socket 2 of settling chamber 5 is provided with water-in 8, and the top of settling chamber 5 is provided with first and draws clearly mouth 9.The top of filtration chamber 6 is provided with second and draws clearly mouth 10.The top forming the end socket 2 of clarifying chamber 7 is provided with water outlet 13.The diameter of end socket 2 is greater than tank body 1 internal diameter, and end socket 2 is provided with circular projection towards that side of tank body 1, and the circular projection of two end socket 2 sides is inserted two ends of tank body 1 respectively and seals with tank body 1.
First dividing plate 3 is provided with overflow weir 11, and second partition 4 is provided with air passing hole 12.By overflow weir 11 and air passing hole 12, the water-in 8 being positioned at settling chamber 5 realizes being communicated with the water outlet being positioned at clarifying chamber 7.
Preferably, the overflow weir 11 in the present embodiment is arranged at the middle and upper part of the first dividing plate 3, and air passing hole 12 is arranged at the middle and lower part of second partition 4.
During work, sewage and biologic packing material etc. enter settling chamber 5 by water-in 8, and the suspended substance in biologic packing material and sewage precipitates in settling chamber 5, and throwing in settling chamber 5 has anerobe, and anerobe carries out anaerobic treatment to the suspended substance in biologic packing material and sewage.Liquid part after anaerobic treatment is flowed in filtration chamber 6 by overflow weir 11 and degrades.The biogas produced owing to degrading in filtration chamber 6 enters behind clarifying chamber 7 through air passing hole 12 and is discharged by posticum, liquid portion through degrading in filtration chamber 6 enters behind clarifying chamber 7 through air passing hole 12 and again precipitates, and discharges through posticum when the height of liquid portion arrives the height of posticum.
Further, the two ends being up and down provided with the first screen plate 14, first screen plate 14 at overflow weir 11 place are fixed on the first dividing plate 3, and the first screen plate 14 is for carrying out the first step filtration to the liquid portion through overflow weir 11.And the two ends being up and down provided with the second screen plate 15, second screen plate 15 at air passing hole 12 place are fixed on second partition 4.Second screen plate 15 is for carrying out second step filtration to the liquid portion through air passing hole 12.
Preferably, the outer wall of the tank body 1 in the present embodiment is corrugated.The outer wall of tank body 1 becomes corrugated, because the stressed area of tank body 1 outside surface increases, therefore can increase the ultimate compression strength of septic tank.
Fig. 2 is the internal structure schematic diagram of the septic tank according to a preferred embodiment.As shown in Figure 2, the inwall of septic tank tank body 1 is also provided with multiple the first circular stiffening web 16.First stiffening web of tank body 1 inside is distributed on the inwall of tank body 1, can improve the intensity of tank body 1 further, and conveniently manufacture.
Again further, the end face outside of end socket 2 is provided with also the second stiffening web (not shown), for strengthening the intensity of end socket 2.
From above technical scheme, the septic tank in the application has following beneficial effect:
1, the septic tank in the application is made up of tank body and two end sockets, and than integrally formed structure, production difficulty is low, easy construction, duration are short.Through practical proof, the septic tank in the application only can complete assembling with 3-5 hour, and can backfill.
The outer wall of the tank body of the septic tank 2, in the application becomes corrugated, adds the ultimate compression strength of septic tank.First stiffening web and the first stiffening web then further increase the intensity of tank body and the intensity of end socket, can resist backfill soil surging force and wall pressure strongly.
3, septic tank is separated into settling chamber, filtration chamber and clarifying chamber three part by the first dividing plate and second partition, can realize first precipitating sewage, rear degraded, the process that again precipitates, the Disposal quality for water quality is higher.The first screen plate that first dividing plate and second partition are arranged and the second screen plate are increased water quality Disposal quality further.
4, the top of settling chamber and filtration chamber is offered first and is drawn clearly mouth and second and draw mouth clearly, can the throw out of Qing Tao settling chamber and filtration chamber easily, shortens and draws the cycle clearly.The gas simultaneously produced in sewage treatment process can be drawn clearly mouth, second from first and draw clearly mouth and enter behind clarifying chamber through air passing hole and discharged by posticum, can effectively avoid due to settling chamber and filtration chamber's gas pressure intensity excessive and cause the phenomenon of blast to produce.
5, the septic tank in the application has good leakage performance and anticorrosion, anti-pressure ability, can meet Ordinary Rd driving loading demands, is longer than work-ing life about septic tank that is brick or concrete structure can reach ISUZU company.
Those skilled in the art, at consideration specification sheets and after putting into practice utility model disclosed herein, will easily expect other embodiment of the present utility model.The application is intended to contain any modification of the present utility model, purposes or adaptations, and these modification, purposes or adaptations are followed general principle of the present utility model and comprised the undocumented common practise in the art of the disclosure or conventional techniques means.Specification sheets and embodiment are only regarded as exemplary, and true scope of the present utility model and spirit are pointed out by claim below.
Should be understood that, the utility model is not limited to precision architecture described above and illustrated in the accompanying drawings, and can carry out various amendment and change not departing from its scope.Scope of the present utility model is only limited by appended claim.

Claims (7)

1. a septic tank, comprise tank body and two end sockets being sealedly attached to described tank body two ends, it is characterized in that, be provided with the first dividing plate and second partition in described tank body, septic tank cavity volume is separated into settling chamber, filtration chamber and clarifying chamber by the first dividing plate and second partition; First dividing plate is provided with overflow weir, and second partition is provided with air passing hole;
The top forming the described end socket of described settling chamber is provided with water-in, and the top of described settling chamber is provided with first and draws mouth clearly; The top of described filtration chamber is provided with second and draws mouth clearly; The top forming the end socket of described clarifying chamber is provided with water outlet.
2. septic tank according to claim 1, is characterized in that, described overflow weir place is provided with the first screen plate, and the first screen plate is fixed on the first dividing plate;
Described air passing hole place is provided with the second screen plate, and the second screen plate is fixed on second partition.
3. septic tank according to claim 1, is characterized in that, described overflow weir is arranged at the middle and upper part of the first dividing plate, and described air passing hole is arranged at the middle and lower part of second partition.
4. septic tank according to claim 1, is characterized in that, the outer wall of described tank body becomes corrugated.
5. according to described septic tank arbitrary in Claims 1-4, it is characterized in that, the diameter of described end socket is greater than described tank body internal diameter, described end socket is provided with circular projection towards that side of described tank body, and the circular projection of two end socket sides is inserted two ends of tank body respectively and seals with described tank body.
6. septic tank according to claim 5, is characterized in that, the inwall of described tank body is provided with multiple the first circular stiffening web.
7. septic tank according to claim 6, is characterized in that, the end face outside of described end socket is provided with the second stiffening web.
CN201520536832.5U 2015-07-22 2015-07-22 Septic tank Expired - Fee Related CN204981330U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520536832.5U CN204981330U (en) 2015-07-22 2015-07-22 Septic tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520536832.5U CN204981330U (en) 2015-07-22 2015-07-22 Septic tank

Publications (1)

Publication Number Publication Date
CN204981330U true CN204981330U (en) 2016-01-20

Family

ID=55115717

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520536832.5U Expired - Fee Related CN204981330U (en) 2015-07-22 2015-07-22 Septic tank

Country Status (1)

Country Link
CN (1) CN204981330U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108017247A (en) * 2017-12-21 2018-05-11 铜陵市绿美星环保建材有限公司 A kind of glass toughening manure pit
CN108671607A (en) * 2018-07-09 2018-10-19 无锡市诚信洗选设备有限公司 The more sewage disposal grille wells for drawing mouth clearly of installation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108017247A (en) * 2017-12-21 2018-05-11 铜陵市绿美星环保建材有限公司 A kind of glass toughening manure pit
CN108671607A (en) * 2018-07-09 2018-10-19 无锡市诚信洗选设备有限公司 The more sewage disposal grille wells for drawing mouth clearly of installation

Similar Documents

Publication Publication Date Title
CN204981330U (en) Septic tank
CN107244785B (en) Micro-power septic tank
CN206736035U (en) A kind of complex biological filter
CN203269740U (en) Novel high-strength fiberglass septic tank
CN204918330U (en) Imitate filtration type glass tempering manure pit by force
CN205235487U (en) Multistage recovery unit that subsides of rare earth polishing powder waste material
CN204474510U (en) A kind of integrated sewage treating apparatus
CN209957588U (en) Peasant household combined sewage treatment equipment
CN201261750Y (en) Septic tank
CN204251376U (en) A kind of small-sized air-floating apparatus
CN210384947U (en) Underground settling chamber for treating domestic sewage
CN209098463U (en) Unpowered sanitary sewage disposal cleaning equipment
CN208667407U (en) A kind of MBR intelligent integral sewage disposal device
CN202558669U (en) Air floatation tank for electroplating
CN203136508U (en) Biogas slurry sprinkling irrigation system
CN206955873U (en) A kind of microkinetic septic tank
CN208532554U (en) A kind of washing bay sewage-treatment plant
CN207219927U (en) Water source auto purification is used for the drip irrigation system of crop irrigation
CN205188093U (en) Novel glassfiber -reinforced plastic septic tank
CN206103425U (en) Clarifier system
CN203700133U (en) Multilevel environment-friendly septic-tank
CN205740498U (en) A kind of novel UASB tank
CN205205000U (en) Septic tank
CN2760017Y (en) Pipe type sewage filter
CN216191790U (en) Novel ecological pool for purifying rainwater quality

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160120

Termination date: 20180722