CN204967137U - Conductor spacer and special mounting tool of two unifications in ball of preventing swooning - Google Patents

Conductor spacer and special mounting tool of two unifications in ball of preventing swooning Download PDF

Info

Publication number
CN204967137U
CN204967137U CN201520739308.8U CN201520739308U CN204967137U CN 204967137 U CN204967137 U CN 204967137U CN 201520739308 U CN201520739308 U CN 201520739308U CN 204967137 U CN204967137 U CN 204967137U
Authority
CN
China
Prior art keywords
top board
conductor spacer
ball
screw mandrel
lead screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520739308.8U
Other languages
Chinese (zh)
Inventor
赵红伟
黄龙
王艳华
彭文胜
刘彤
罗毅
李俊鹏
杨建兴
张靖宇
黄俊波
王文云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUNNAN POWER TANSMISSION-SUBSTATION ENGINEERING CORP
Original Assignee
YUNNAN POWER TANSMISSION-SUBSTATION ENGINEERING CORP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUNNAN POWER TANSMISSION-SUBSTATION ENGINEERING CORP filed Critical YUNNAN POWER TANSMISSION-SUBSTATION ENGINEERING CORP
Priority to CN201520739308.8U priority Critical patent/CN204967137U/en
Application granted granted Critical
Publication of CN204967137U publication Critical patent/CN204967137U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Fiber Materials (AREA)

Abstract

Conductor spacer and special mounting tool of two unifications in ball of preventing swooning, radial mesoporous lead screw (2) are had including upper portion, cross the mesoporous slidable operating handle of lead screw (1), go up the xarm through the channel -section steel type cantilever (3) of silk tooth cooperation suit on the lead screw, join in marriage the dress in lead screw (2) lower extreme and rotatable top board (4) through the silk tooth, the welding is in the lower xarm internal surface and holding down plate (5) relative with the top board of cantilever, the clamping face that top board and holding down plate are relative is the concave arc face. The utility model discloses use and convenient to carry, than traditional conductor spacer specialized tool with prevent that dizzy ball specialized tool is light, small and exquisite, and have the installation function of two unifications, the instrument that both can alleviate the high altitude construction personnel is loaded, can realize an instrument again and install the purpose of two kinds of gold utensils simultaneously.

Description

Conductor spacer and the two-in-one special installation tool of anti-dizziness ball
Technical field
The utility model relates to transmission line erecting tools technical field, especially the two-in-one special installation tool of conductor spacer and anti-dizziness ball when transmission line construction and overhaul technological transformation work high above the ground.
Background technology
In prior art, the specific purpose tool being provided with himself of conductor spacer, the installation of anti-dizziness ball also has the specific purpose tool of himself, and due to the specificity of its instrument separately, the two can not be general.So when transmission line construction and overhaul technological transformation, work high above the ground personnel need to carry two cover specific purpose tools.The heavy 2kg of original conductor spacer specific purpose tool, the heavy 4.5kg of anti-dizziness ball specific purpose tool, 6.5kg altogether, heavier-weight, can consume the muscle power of work high above the ground personnel greatly.Two cover specific purpose tools use simultaneously, and volume is very much not convenient for carrying, and is unfavorable for carrying out of work high above the ground, virtually reduces operating efficiency.
In addition, the various ways such as four apportion arrangements, six apportion arrangements and eight apportion arrangements are shown due to line conductor row, wire harness is more, operating space is less, and the operating grip of existing conductor spacer specific purpose tool is sleeved on ratchet, needs operating grip rotating 360 degrees during installation, and can only monolaterally operate, when wire harness multioperation space is little, operating grip is usually stopped by other sub-line, operates extremely inconvenient.
Summary of the invention
The purpose of this utility model just in order to overcome above-mentioned the deficiencies in the prior art provide a kind of light, small and exquisite, save time, laborsaving, be easy to realize power transmission line spacer and anti-dizziness ball is installed, and two-in-one special installation tool that can be general.
The purpose of this utility model is achieved by the following technical solution.
Conductor spacer and the two-in-one special installation tool of anti-dizziness ball, include top to be contained in channel steel type cantilever on screw mandrel by silk tooth engagement sleeves with the screw mandrel of radial mesopore, the slidably operating grip passing across screw mandrel mesopore, Top Crossbeam, be fitted in screw mandrel lower end by silk tooth and rotating top board, be welded on cantilever lower cross arm inner surface and the lower platen relative with top board, the clamping face that top board is relative with lower platen is cancave cambered surface.
The Top Crossbeam of channel steel type cantilever described in the utility model and the angle of lower cross arm and vertical arm equal 90 °, the arc length 70mm of the cancave cambered surface of top board and lower platen, chord length 57mm.
The utility model is easy to use and carry, than traditional conductor spacer specific purpose tool and anti-dizziness ball specific purpose tool light, small and exquisite, and there is two-in-one installation function, both the instrument load of work high above the ground personnel can have been alleviated, the object that two kinds of gold utensils installed by a kind of instrument simultaneously can be realized again, be more conducive to effectively carrying out of work high above the ground.The utility model is heavy 2kg only, greatly can reduce the physical demands of work high above the ground personnel.
Operating grip of the present utility model can slide by the mesopore in screw mandrel upper end, both can not stop by quilt line, can hold the operation of handle two ends by both hands again simultaneously, can improve installation rate, also can save operating personnel's muscle power.
Below in conjunction with drawings and Examples, the utility model is further elaborated.
Accompanying drawing explanation
Fig. 1 is front view of the present utility model;
Fig. 2 is left view of the present utility model;
Schematic diagram when Fig. 3 is the utility model installation interval rod;
Schematic diagram when Fig. 4 is the utility model installation anti-dizziness ball.
Embodiment
As shown in Figure 1 and Figure 2, the utility model include top to be contained in channel steel type cantilever 3 on screw mandrel by silk tooth engagement sleeves with the screw mandrel 2 of radial mesopore, the slidably operating grip 1 passing across screw mandrel mesopore, Top Crossbeam, be fitted in screw mandrel 2 lower end by silk tooth and rotating top board 4, be welded on cantilever lower cross arm inner surface and the lower platen 5 relative with top board, the clamping face that top board 4 is relative with lower platen 5 is cancave cambered surface.The angle a of the Top Crossbeam of channel steel type cantilever 3 and lower cross arm and vertical arm equals 90 °, the arc length 70mm of the cancave cambered surface of top board and lower platen, chord length 57mm.
The utility model can make as follows.Select diameter 10mm, the high strength round steel of long 250mm manufactures operating grip 1.Select diameter 20mm, the high strength round steel of long 180mm manufactures screw mandrel 2, screw mandrel top can be made into the smooth section of outer surface not with a tooth, smooth segment length 50mm, the long 130mm of silk tooth part.Select thickness to be the channel steel type cantilever 3 that the steel plate cutting of 20mm is welded into Top Crossbeam and bottom rail brachium 100mm, vertical arm height 200mm, it is that the nut silk facing of 21.5mm is contained on screw mandrel 2 that tapping that Top Crossbeam punches forms diameter.Select thickness to be top board 4 and the lower platen 5 that the steel plate of 10mm is processed into band cancave cambered surface, then top board 4 is fitted in the lower end of screw mandrel 2, lower platen 5 is welded on cantilever lower cross arm.
When adopting the utility model installation interval rod, as shown in Figure 3, top board 4 is placed in the upper cambered surface of conductor spacer 6, then rotating operating handle 1 makes screw mandrel 2 move down, until lower platen 5 is also pressed in the lower camber side of conductor spacer 6, upper and lower rubber cushion 7 in the middle of conductor spacer 6 is owing to being subject to the squeezing action of upper and lower pressure, and smaller volume thickness reduction, now just can penetrate pin 8 and complete installment work.During removable spacer rod, operate by same procedure.
When adopting the utility model that anti-dizziness ball is installed, as shown in Figure 4, top board is placed in the upper cambered surface of anti-dizziness ball 9, then rotating operating handle 1 makes screw mandrel 2 move down, until lower platen 5 is also pressed in the lower camber side of anti-dizziness ball 9, upper and lower rubber cushion 10 in the middle of anti-dizziness ball 9 is owing to being subject to the squeezing action of upper and lower pressure, and smaller volume thickness reduction, now just can penetrate pin 11 and complete installment work.When removing anti-dizziness ball, operate by same procedure.
Existing aluminium alloy conductor spacer specific purpose tool price is 1150 yuan/cover, and aluminium alloy anti-dizziness ball specific purpose tool is 1050 yuan/cover, adds up to 2200 yuan.And the utility model makes simple, can realize oneself processing, owing to using high strength round steel and steel plate to make, cheap, material and processing cost are 200 yuan/cover, save 2000 yuan, significantly reduce instrument cost, have good economic benefit.Adopt the utility model, only need kit just energy installation interval rod and anti-dizziness ball two kinds of gold utensils, both the instrument load of work high above the ground personnel had been alleviated, save physical demands, turn improve implement productivity, optimize operational method, achieve the object that a kind of instrument can install two kinds of gold utensils simultaneously very well, be more conducive to effectively carrying out of work high above the ground.

Claims (2)

1. conductor spacer and the two-in-one special installation tool of anti-dizziness ball, it is characterized in that, include top to be contained in channel steel type cantilever (3) on screw mandrel by silk tooth engagement sleeves with the screw mandrel (2) of radial mesopore, the slidably operating grip (1) passing across screw mandrel mesopore, Top Crossbeam, be fitted in screw mandrel (2) lower end by silk tooth and rotating top board (4), be welded on cantilever lower cross arm inner surface and the lower platen relative with top board (5), the clamping face that top board (4) is relative with lower platen (5) is cancave cambered surface.
2. conductor spacer according to claim 1 and the two-in-one special installation tool of anti-dizziness ball, it is characterized in that, the described Top Crossbeam of channel steel type cantilever (3) and the angle (a) of lower cross arm and vertical arm equal 90 °, the arc length 70mm of the cancave cambered surface of top board and lower platen, chord length 57mm.
CN201520739308.8U 2015-09-23 2015-09-23 Conductor spacer and special mounting tool of two unifications in ball of preventing swooning Active CN204967137U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520739308.8U CN204967137U (en) 2015-09-23 2015-09-23 Conductor spacer and special mounting tool of two unifications in ball of preventing swooning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520739308.8U CN204967137U (en) 2015-09-23 2015-09-23 Conductor spacer and special mounting tool of two unifications in ball of preventing swooning

Publications (1)

Publication Number Publication Date
CN204967137U true CN204967137U (en) 2016-01-13

Family

ID=55062178

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520739308.8U Active CN204967137U (en) 2015-09-23 2015-09-23 Conductor spacer and special mounting tool of two unifications in ball of preventing swooning

Country Status (1)

Country Link
CN (1) CN204967137U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105896377A (en) * 2016-05-27 2016-08-24 龚卫兵 Rotary spacer installation tool and assembly method thereof
CN108620462A (en) * 2018-04-25 2018-10-09 云南建投第二安装工程公司 Helical orbit simmers Special tamp processed and simmers the method for helical orbit processed

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105896377A (en) * 2016-05-27 2016-08-24 龚卫兵 Rotary spacer installation tool and assembly method thereof
CN105896377B (en) * 2016-05-27 2017-12-26 龚卫兵 Turn round conductor spacer installation tool and its assemble method
CN108620462A (en) * 2018-04-25 2018-10-09 云南建投第二安装工程公司 Helical orbit simmers Special tamp processed and simmers the method for helical orbit processed

Similar Documents

Publication Publication Date Title
CN104308040B (en) Line of power quick Fabrication assembling device
CN202062101U (en) Manual drilling device for stepped hole
CN204967137U (en) Conductor spacer and special mounting tool of two unifications in ball of preventing swooning
CN204108186U (en) Line of power quick Fabrication assembling device
CN203993693U (en) The anti-transfer of servo tightening machine mechanism
CN201493785U (en) Spanner for disassembling electrode cap of welding tongs
CN204934355U (en) The lower retainer plate forming frock of gas support
CN207723226U (en) A kind of square tube shaping tooling
CN204564905U (en) Combined impact punch die
CN202753041U (en) Bow-shaped clamp with hole
CN205201101U (en) Pipe fitting clamp
CN202185476U (en) Necking and cutting machine for metal pipes
CN205967121U (en) Multiple spot squeeze riveter
CN206353469U (en) The mobile demagnetization Anchor plate kit of handle pipe cleaning before copper plating machine
CN204843571U (en) Crane end beam centre gripping frock
CN206795714U (en) A kind of pneumatic quick assembling equipment of ball-and-socket gold utensil R type locking pins
CN210936624U (en) Steel pipe bending machine
CN203991831U (en) A kind of bending machine
CN203356279U (en) Circular-arc pressing device for bending machine
CN203003213U (en) Pinhole drilling tool of center wedge
CN108097748A (en) A kind of square tube shaping tooling
CN209736363U (en) Mechanical arm for stainless steel wire drawing machine
CN206794533U (en) A kind of metal plate bar circle circle frock
CN215317198U (en) Positioning mechanism for trimming
CN210850046U (en) Rotary force-borrowing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant