CN204960277U - Modular fixed integrally lift up elevartor shaft regularization operation platform - Google Patents

Modular fixed integrally lift up elevartor shaft regularization operation platform Download PDF

Info

Publication number
CN204960277U
CN204960277U CN201520709154.8U CN201520709154U CN204960277U CN 204960277 U CN204960277 U CN 204960277U CN 201520709154 U CN201520709154 U CN 201520709154U CN 204960277 U CN204960277 U CN 204960277U
Authority
CN
China
Prior art keywords
operating platform
wood glue
load
elevator shaft
glue plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520709154.8U
Other languages
Chinese (zh)
Inventor
梁高峰
顾广海
李绍中
李猛
蒋家星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI TIANZHU CONSTRUCTION GROUP Co Ltd
Original Assignee
ANHUI TIANZHU CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI TIANZHU CONSTRUCTION GROUP Co Ltd filed Critical ANHUI TIANZHU CONSTRUCTION GROUP Co Ltd
Priority to CN201520709154.8U priority Critical patent/CN204960277U/en
Application granted granted Critical
Publication of CN204960277U publication Critical patent/CN204960277U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model relates to a modular fixed integrally lift up elevartor shaft regularization operation platform, platform are by bearing down tube, spacing shelves pole, horizontal joist, operation platform pole setting, constitute to horizon bar, the lumps of wood, wood glue board, steel pipe and high strength bolt with great ease, the bearing down tube according to 45 jiao of one end bearing the shear force on the wall, the other end supports on the floor of escalator gate department, set up spacing shelves pole and horizontal joist between the bearing down tube, the operation platform pole setting is installed on the bearing down tube, moving about freely and quickly to fix with the operation platform pole setting to horizon bar built -up connection and being in the same place, the wood glue board is spread on moving about freely and quickly to the horizon bar, the steel pipe passes the shear force wall and reserves in the hole inserts horizontal horizon bar, is in the same place through the bolt fastening. The utility model relates to an it is strong that the structure has stability, and the efficiency of construction is high, can realize integrally lift up and provide characteristics such as support for lift well formwork, has better economic technology benefit.

Description

Combined type fixes Integral lifting elevator shaft regularization operating platform
Technical field
The utility model relates to a kind of combined type and fixes Integral lifting elevator shaft regularization operating platform, in particular to the operating platform of a kind of shear wall preformed hole, expansible operating platform and the regularization of Integral lifting elevator shaft, construction of lift well closed by particularly suitable super highrise building.
Background technology
In recent years, along with the fast development of my highrise building, and in highrise building, elevator shaft is generally cast-in-situ steel reinforced concrete tubular construction.In the construction of elevator shaft body structure, tearing open of internal mold is a difficult point.Need to set up Tong Gaonei scaffold from bottom to top.In well, place is narrow, when adopting loose spelling steel (wood) mould, props up to tear open and requires great effort all very much.Particularly during form removal, because internal mold is concrete lateral pressure jam-packed, so tear particularly difficulty open, often cause distortion and the damage of template.
In current high-rise building elevator shaft, shear wall formwork construction operation platform generally adopts console mode steel tube fastener scaffold, in practice of construction, exposes on the one hand such as scaffold building, removes trouble, affect template construction progress, is not easy to the inspecting for acceptance of hoistway formwork installation quality, is not easy to building waste cleaning in hoistway, long-term overstocking lease many drawbacks such as equipment in a large number.On the other hand operating platform needs load-bearing brace and the stopping means of dismantling operation platform lower in lifting process, and operating platform stability need to investigate, and shear wall inner side template to install also be difficult point.Find a kind of quick, reliable construction method to overcome above-mentioned drawback thus, become construction of elevator shaft in high-rise building problem demanding prompt solution.
Given this, need a kind of speed of application of invention at present badly fast, can realize hoistway operation platform and integrally promote and stability strong, be the hoistway operation platform system that shear wall inner side template provides support.
Summary of the invention
The purpose of this utility model is to provide a kind of easy construction, can realize hoistway operation platform and integrally promote and stability strong, be the hoistway operation platform that shear wall inner side template provides support.
For achieving the above object, the utility model have employed following technical scheme:
A kind of combined type fixes Integral lifting elevator shaft regularization operating platform, it is characterized in that: mainly comprise load-bearing brace, spacing lever, operating platform vertical rod, horizontal joists, vertical equity bar, transverse horizontal bar, steel pipe, flitch, expansible wood glue plate, wood glue plate; Load-bearing brace two ends welding steel, load-bearing brace is bearing on elevator shaft shear wall by 45° angle one end, and the other end is supported on the flooring at escalator doorway place; Load-bearing brace arranges spacing lever and horizontal joists, and operating platform vertical rod is arranged on load-bearing brace; Vertical equity bar and transverse horizontal bar are connected and are fixed together with operating platform vertical rod, and expansible wood glue plate and wood glue plate are layered on flitch; Steel pipe inserts in transverse horizontal bar through elevator shaft shear wall reserving hole, is bolted on together.
Described load-bearing brace is made up of superstructure and substructure, superstructure and substructure is fixed together by high-strength bolt, and remove high-strength bolt, substructure can 360 degree of rotations.
Described operating platform vertical rod is fixed together by fastener and load-bearing brace.
Described expansible wood glue plate is made up of wood glue plate, hinge, pin hole, bolt rod; Together with wood glue plate is connected through the hinge with bellend offset plate, can along hinge through; Wood glue plate and bellend offset plate are provided with pin hole, by latch, both are fixed.
Described steel pipe inserts in transverse horizontal bar through shear wall reserving hole, is bolted on together, further increases the stability of elevator shaft platform.
Combinations thereof formula fixes the construction method of Integral lifting elevator shaft regularization operating platform, mainly comprises the following steps:
1) bottom load-bearing brace is set up: at load-bearing brace two ends welding steel, load-bearing brace is bearing on elevator shaft shear wall by 45° angle one end, and the other end is supported on the flooring at escalator doorway place;
2) spacing lever is installed: at load-bearing brace root near elevator shaft door opening inner side, the spacing lever and the elevator shaft door opening both sides body of wall that add two Φ 48*3.5mm hold out against, and the length that hole side is stretched at spacing pin two ends is not less than 30cm;
3) horizontal joists is installed: after spacing lever installs, the horizontal joists of support operation platform is upwards installed successively, horizontal joists adopts the steel pipe of two pass Φ 48*3.5mm, adds two pass connecting rod in twice horizontal joists centre position simultaneously, strengthens the globality of girder;
4) operating platform vertical rod is set up: 10cm place fitting operation platform vertical rod outside load-bearing brace on horizontal joists, operating platform vertical rod and horizontal joists adopt fastener to be connected, and adding separately a fastener above horizontal joists, prevent vertical rod from gliding;
5) bottom operating platform is set up: flooring 20cm place adds vertical equity bar, transverse horizontal bar 8 in distance, be connected for overall with operating platform vertical rod, horizon bar adopts the steel pipe of Φ 48*3.5mm, Φ 43*3.5mm steel pipe is adopted to insert in transverse horizontal bar assigned address through elevator shaft shear wall preformed hole, be fixed with bolts together, bottom operating platform completely spreads expansible wood glue plate, expansible wood glue plate top surface 10cm lower than floor, is convenient to upper strata elevator shaft shear wall formwork root to downward-extension;
6) set up upper operating platform: upper operating platform exceeds construction layer flooring 1.5m, and lays wood glue plate, stays the space of establishing 10 ~ 15cm between wood glue plate and shear wall formwork, be convenient to messenger wire and check shear wall formwork verticality;
7) Integral lifting: after this layer of construction completes, after elevator shaft shear wall reaches requirement of strength, remove shear wall formwork, shear wall formwork is placed on the operational platform, extract the bolt rod of expansible wood glue plate pin hole, remove all bolts on transverse horizontal bar, extract the steel pipe through shear wall preformed hole, remove a high-strength bolt of load-bearing brace bottom, namely can carry out Integral lifting to hoistway operation platform.
the utility model has following feature and beneficial effect:
(1) integral lifting template operation platform comprises bottom bearing structure, bottom operating platform and upper operating platform, operating platform forms and upper berth wood glue plate by being connected to horizontal steel tube in length and breadth, and bottom bearing structure, bottom operating platform are connected in aggregates with upper operating platform by operating platform vertical rod.Only need to remove and insert the steel pipe in transverse horizontal bar and the high-strength bolt on load-bearing brace, just can carry out Integral lifting to operating platform, substructure and the expansible wood glue plate of load-bearing brace can rotate, and do not affect the Integral lifting of operating platform.
(2) without the need to setting up scaffold in elevator shaft inside from the end to top, simplifying the construction technology of operating platform, saving lease equipment consumption.
(3) near elevator shaft door opening inner side, add two steel pipes with elevator shaft door opening both sides body of wall holds out against, as the spacing pin of the outside slippage of restriction girder, the length that hole side is stretched at two ends is not less than 30cm, effectively can guarantee that operating platform is stable.
(4), together with steel pipe is bolted with transverse horizontal bar through the preformed hole of shear wall, further ensure that operating platform is stable.
(5) can directly be shelved on the operating platform of bottom bottom template when elevator shaft inner side template is installed, elevator shaft inner side template is shelved on the operating platform of bottom after removing, can with operating platform entirety upwards hoisted in position, time saving and energy saving.
Accompanying drawing explanation
Fig. 1 is that the utility model combined type fixes Integral lifting elevator shaft regularization operating platform structural representation;
Fig. 2 is the schematic diagram of elevator shaft regularization operating platform Integral lifting process;
Fig. 3 is the connected mode figure of load-bearing brace superstructure and substructure;
Fig. 4 is the connection detail drawing between spacing lever, load-bearing brace, horizontal pressure pin, operating platform vertical rod;
Fig. 5 is that vertical, horizontal horizon bar is connected detail drawing with elevator shaft shear wall;
Fig. 6 is expansible wood glue plate constructional detail;
Detail drawing when Fig. 7 is the work of expansible wood glue plate;
Fig. 8 is construction flow chart of the present utility model;
In figure: 1. load-bearing brace; 2. steel plate; 3. high-strength bolt; 4. spacing lever; 5. operating platform vertical rod; 6. horizontal pressure pin; 7. vertical equity bar; 8. transverse horizontal bar; 9. flitch; 10. expansible wood glue plate; 11. wood glue plates; 12. shear wall formworks; 13. Screw arbor with nut at both-ends; 14. steel pipes; 15. shear wall reserving holes; 16. bolts; 17. hinges; 18. pin holes; 19. bolt rods; 20. wire rope; 21. load-bearing brace substructures; 22. load-bearing brace superstructures; 23. elevator shaft shear walls; 24. floorings.
Detailed description of the invention
Fig. 1 is that the utility model combined type fixes Integral lifting elevator shaft regularization operating platform structural representation.With reference to shown in Fig. 1, the utility model combined type is fixed Integral lifting elevator shaft regularization operating platform structure and is mainly comprised: load-bearing brace 1, steel plate 2, firm bolt 3, spacing lever 4, operating platform vertical rod 5, horizontal pressure pin 6, vertical equity bar 7, transverse horizontal bar 8, flitch 9, expansible wood glue plate 10, wood glue plate 11.
Load-bearing brace 1 two ends welding steel 2, load-bearing brace 1 is bearing on shear wall by 45° angle one end, and the other end is supported on the flooring at escalator doorway place; Arrange spacing lever 4 and horizontal joists 6 between load-bearing brace 1, operating platform vertical rod 5 is arranged on load-bearing brace 1; Vertical equity bar 7 and transverse horizontal bar 8 are connected and are fixed together with operating platform vertical rod 5, and expansible wood glue plate 10 and wood glue plate 11 are layered on flitch 9.
With reference to shown in Fig. 2, remove the bolt rod 19 on the high-strength bolt 3 of the bottom of load-bearing brace 1 and expansible wood glue plate 10 before Integral lifting, and extract steel pipe 14, in Integral lifting process, the substructure of load-bearing brace can rotate due to deadweight, does not hinder the Integral lifting of operating platform.
With reference to shown in Fig. 3, load-bearing brace is made up of two parts, and superstructure 22 and substructure 21 are connected and fixed by high-strength bolt 3.
With reference to shown in Fig. 4, spacing lever 4 holds out against with elevator shaft door opening both sides body of wall, and the length that hole side is stretched at spacing pin 4 two ends is not less than 30cm; After spacing lever 4 installs, install the horizontal joists 6 of support operation platform successively, 10cm place fitting operation platform vertical rod 5 outside girder on horizontal joists, operating platform vertical rod 5 adopts fastener to be connected with horizontal joists 6.
With reference to shown in Fig. 5, vertical equity bar 7 and transverse horizontal bar 8 are linked together by fastener, and steel pipe 14 inserts in transverse horizontal bar 7 through shear wall 23 preformed hole 15, adopt bolt 16 to be connected and fixed.
With reference to shown in Fig. 6,7, expansible wood glue plate 10 is made up of wood glue plate 11, hinge 17, pin hole 18, bolt rod 19; Together with wood glue plate 11 is connected through the hinge with bellend offset plate, can along hinge through in lifting process; During work, wood glue plate 11 and bellend wood glue plate are fixed by latch, and elevator shaft shear wall inner side template 12 is supported on expansible wood glue plate 10.
As shown in Figure 8, combined type fixes the construction method of Integral lifting elevator shaft regularization operating platform, mainly comprises the following steps:
1) bottom load-bearing brace is set up: at load-bearing brace 1 two ends welding steel 2, load-bearing brace 1 is bearing on shear wall 23 by 45° angle one end, on the flooring that the other end is supported on escalator doorway place 24;
2) spacing lever is installed: at load-bearing brace 1 root near elevator shaft door opening inner side, the spacing lever 4 adding two Φ 48*3.5mm suitable lengths holds out against with elevator shaft door opening both sides body of wall, and the length that hole side is stretched at spacing pin 4 two ends is not less than 30cm;
3) horizontal joists is installed: after spacing lever 4 installs, the horizontal joists 6 of support operation platform is upwards installed successively, horizontal joists 6 adopts the steel pipe of two pass Φ 48*3.5mm suitable length, adds two pass connecting rod in twice horizontal joists 6 centre position simultaneously, strengthens the globality of girder;
4) operating platform vertical rod is set up: 10cm place fitting operation platform vertical rod 5 outside load-bearing brace 1 on horizontal joists 6, operating platform vertical rod 5 adopts fastener to be connected with horizontal joists 6, and adding separately a fastener above horizontal joists 6, prevent vertical rod from gliding;
5) bottom operating platform is set up: flooring 20cm place adds vertical equity bar 7, transverse horizontal bar 8 in distance, be connected for overall with operating platform vertical rod 5, horizon bar adopts the steel pipe of Φ 48*3.5mm suitable length, adopt Φ 43*3.5mm steel pipe 14 to insert the inner assigned address of transverse horizontal bar 7 through shear wall 23 preformed hole 15, adopt bolt 16 to be connected and fixed.Bottom operating platform completely spreads expansible wood glue plate 10, and expansible wood glue plate 10 end face 10cm lower than floor, is convenient to upper strata shear wall formwork 12 root to downward-extension;
6) set up upper operating platform: upper operating platform exceeds construction layer flooring 1.5m, and lays wood glue plate 11, stays the space of establishing 10 ~ 15cm between wood glue plate 11 and shear wall formwork 12, be convenient to messenger wire and check shear wall formwork 12 verticality.
7) Integral lifting: after this layer of construction completes, after shear wall 23 reaches requirement of strength, remove shear wall formwork 12, shear wall mould 12 plate is placed on the operational platform.Extract the bolt rod 19 of expansible wood glue plate 10 pin hole 18, remove all bolts 16 on transverse horizontal bar 8, extract the steel pipe 14 through shear wall preformed hole, remove a high-strength bolt 3 of load-bearing brace 1 bottom, then just can carry out Integral lifting to hoistway operation platform.

Claims (4)

1. combined type fixes an Integral lifting elevator shaft regularization operating platform, it is characterized in that: mainly comprise load-bearing brace, spacing lever, operating platform vertical rod, horizontal joists, vertical equity bar, transverse horizontal bar, flitch, expansible wood glue plate, wood glue plate; Load-bearing brace two ends welding steel, load-bearing brace is bearing on elevator shaft shear wall by 45° angle one end, and the other end is supported on the flooring at escalator doorway place; Load-bearing brace arranges spacing lever and horizontal joists, and operating platform vertical rod is arranged on load-bearing brace; Vertical equity bar and transverse horizontal bar are connected and are fixed together with operating platform vertical rod, and expansible wood glue plate and wood glue plate are layered on flitch; Steel pipe inserts in transverse horizontal bar through elevator shaft shear wall reserving hole, is bolted on together.
2. combined type according to claim 1 fixes Integral lifting elevator shaft regularization operating platform, it is characterized in that: described load-bearing brace is made up of superstructure and substructure, by high-strength bolt, superstructure and substructure are fixed together, remove high-strength bolt, substructure can 360 degree of rotations.
3. combined type according to claim 1 fixes Integral lifting elevator shaft regularization operating platform, it is characterized in that: described operating platform vertical rod is fixed together by fastener and load-bearing brace.
4. combined type according to claim 1 fixes Integral lifting elevator shaft regularization operating platform, it is characterized in that: described expansible wood glue plate is made up of wood glue plate, hinge, pin hole, bolt rod; Together with wood glue plate is connected through the hinge with bellend offset plate, can along hinge through; Wood glue plate and bellend offset plate are provided with pin hole, by latch, both are fixed.
CN201520709154.8U 2015-09-11 2015-09-11 Modular fixed integrally lift up elevartor shaft regularization operation platform Expired - Fee Related CN204960277U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520709154.8U CN204960277U (en) 2015-09-11 2015-09-11 Modular fixed integrally lift up elevartor shaft regularization operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520709154.8U CN204960277U (en) 2015-09-11 2015-09-11 Modular fixed integrally lift up elevartor shaft regularization operation platform

Publications (1)

Publication Number Publication Date
CN204960277U true CN204960277U (en) 2016-01-13

Family

ID=55055351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520709154.8U Expired - Fee Related CN204960277U (en) 2015-09-11 2015-09-11 Modular fixed integrally lift up elevartor shaft regularization operation platform

Country Status (1)

Country Link
CN (1) CN204960277U (en)

Similar Documents

Publication Publication Date Title
CN105155830A (en) Construction method for combined type fixed and integral lifting of elevator shaft stereotyped operation platform
CN202090591U (en) Lift type climbing formwork of building operations
CN201695681U (en) Integral self-elevating type elevator hoistway tube mold
CN201826525U (en) Climbing shuttering system device for buildings
CN102877637B (en) Method for implementing operating platform in bottom wall construction of cantilever beam
CN108033367B (en) Synchronous lifting device and lifting method for steel column and cylinder frame alternately supported steel platform and tower crane
CN108979131B (en) Integral lifting platform device for high-rise building construction steel formwork and operation frame
CN105201195A (en) Liftable supporting leg type elevator shaft construction platform and method
CN207268073U (en) Novel flexible formwork bearing frame
CN201962944U (en) Hydraulic climbing formwork for building construction
CN101624871A (en) Instrumental operation platform for shear wall formwork of elevator shaft
CN109404010B (en) Aluminum tunnel mold system and operation method thereof
CN108252504A (en) Tube shear wall concrete structure large form hoisting type construction method and constructing device
CN106988485A (en) The construction method of structural transition layer Shaped Steel concrete beam
CN111255217A (en) Elevator shaft shaping operation platform and operation method thereof
CN112482434B (en) Shaped large formwork vertical thin-wall side wall and construction method
CN107419746A (en) A kind of mobile formwork system and its construction method
CN103993666A (en) Improved supporting system construction method suitable for large overhung outer floating plate roof
CN202370234U (en) Tool type elevator hoistway construction platform
CN205348761U (en) Basement does not have reinforced structure of no basic lift of installation on back board
CN202945798U (en) Overhanging type scaffold corner device
CN104775606A (en) Operation platform for prefabricated assembled residential building wall plate construction and construction method thereof
CN202401769U (en) Detachable concrete cloth machine for self-elevating creeping formwork system
CN105347142A (en) Plate penetrating installing method for installing construction lifting machine on basement top plate
CN205153515U (en) Overhanging bearing frame makes up positioner

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160113

Termination date: 20210911