CN204959736U - Transmission line foundation construction chamfer instrument - Google Patents

Transmission line foundation construction chamfer instrument Download PDF

Info

Publication number
CN204959736U
CN204959736U CN201520602657.5U CN201520602657U CN204959736U CN 204959736 U CN204959736 U CN 204959736U CN 201520602657 U CN201520602657 U CN 201520602657U CN 204959736 U CN204959736 U CN 204959736U
Authority
CN
China
Prior art keywords
chamfering
outer circular
extension rod
vertical rod
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520602657.5U
Other languages
Chinese (zh)
Inventor
杜春阳
张栋
刘伟
郭川
朱晨
丁笑影
张磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Electric Power Transmission and Transformation Engineering Corp
State Grid Corp of China SGCC
Original Assignee
Tianjin Electric Power Transmission and Transformation Engineering Corp
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Electric Power Transmission and Transformation Engineering Corp, State Grid Corp of China SGCC filed Critical Tianjin Electric Power Transmission and Transformation Engineering Corp
Priority to CN201520602657.5U priority Critical patent/CN204959736U/en
Application granted granted Critical
Publication of CN204959736U publication Critical patent/CN204959736U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本实用新型涉及一种输电线路基础施工倒角工具,包括外圆倒角器、立杆、延长杆、横杆以及定位轮,外圆倒角器下部制有内凹的圆弧面,该圆弧面用于制备线路基础上端边缘外圆弧倒角,外圆倒角器上端垂直固装有一立杆,立杆上端同轴连接有一延长杆,再延长杆的上端制有一悬臂式的横杆,横杆的悬臂端下端安装有定位轮。本实用新型结构简单、安装方便、便于使用,可靠性好,有效保证倒角的工艺尺寸,保证基础的倒角尺寸标准,使线路基础外形统一标准,倒角质量好。

The utility model relates to a chamfering tool for power transmission line foundation construction, which comprises an outer circular chamfering device, a vertical rod, an extension rod, a horizontal bar and a positioning wheel. The arc surface is used to prepare the outer circular arc chamfering of the upper edge of the line foundation. The upper end of the outer circular chamfering device is vertically fixed with a vertical rod, and the upper end of the vertical rod is coaxially connected with an extension rod, and the upper end of the extension rod is formed with a cantilevered horizontal rod. , the lower end of the cantilever end of the cross bar is equipped with a positioning wheel. The utility model has the advantages of simple structure, convenient installation, convenient use, good reliability, effectively guarantees the technical size of the chamfering, ensures the standard chamfering size of the foundation, makes the outline of the circuit foundation uniform and standard, and has good chamfering quality.

Description

一种输电线路基础施工倒角工具A chamfering tool for transmission line foundation construction

技术领域technical field

本实用新型属于电力施工工具领域,尤其是一种输电线路基础施工倒角工具。The utility model belongs to the field of electric power construction tools, in particular to a chamfering tool for power transmission line foundation construction.

背景技术Background technique

输电线路灌注桩基础的主体施工是在圆柱筒形的外圆套筒模板内填装材料,完成材料填装后按照工艺要求需要对圆台形线路基础进行倒角加工,要求倒角的均匀一致;等线路基础凝固后取下标准外缘模板,完成线路基础的实用。目前的倒角加工是由人工手持倒角工具操作,倒角尺寸很难保持标准统一,倒角质量受到人为因素影响较大。The main construction of the cast-in-place pile foundation for transmission lines is to fill the cylindrical outer sleeve formwork with materials. After the material is filled, the frustum-shaped line foundation needs to be chamfered according to the process requirements, and the chamfers are required to be uniform; After the line foundation is solidified, remove the standard outer edge formwork to complete the practical use of the line foundation. The current chamfering process is performed by manual hand-held chamfering tools. It is difficult to maintain a uniform standard for the chamfering size, and the quality of the chamfering is greatly affected by human factors.

发明内容Contents of the invention

本实用新型的目的在于克服现有技术的不足之处,提供一种结构简单、设计合理、使用方便、工艺可靠的输电线路基础施工倒角工具。The purpose of the utility model is to overcome the deficiencies of the prior art and provide a chamfering tool for foundation construction of transmission lines with simple structure, reasonable design, convenient use and reliable process.

本实用新型解决其技术问题是采取以下技术方案实现的:The utility model solves its technical problem and realizes by taking the following technical solutions:

一种输电线路基础施工倒角工具,包括外圆倒角器、立杆、延长杆、横杆以及定位轮,外圆倒角器下部制有内凹的圆弧面,该圆弧面用于制备线路基础上端边缘外圆弧倒角,外圆倒角器上端垂直固装有一立杆,其特征在于:立杆上端同轴连接有一延长杆,再延长杆的上端制有一悬臂式的横杆,横杆的悬臂端下端安装有定位轮。A chamfering tool for power transmission line foundation construction, comprising an outer circular chamfering device, a vertical rod, an extension rod, a horizontal rod and a positioning wheel. The outer circular arc chamfering of the upper edge of the line foundation is prepared, and a vertical rod is fixed vertically on the upper end of the outer circular chamfering device. , the lower end of the cantilever end of the cross bar is equipped with a positioning wheel.

而且,在延长杆中部横向安装有一辅助轮,该辅助轮用于支撑在外圆套筒模板的内壁上。Moreover, an auxiliary wheel is laterally installed in the middle part of the extension rod, and the auxiliary wheel is used for supporting on the inner wall of the outer cylindrical sleeve template.

而且,立杆与延长杆的连接位置同轴啮合安装有一制有内螺纹的调节套筒,立杆上端制有外螺纹,延长杆下端也制有外螺纹,转动调节套筒调节定位轮与外圆倒角器之间的距离。Moreover, the connecting position of the vertical rod and the extension rod is coaxially engaged with an adjusting sleeve with an internal thread. The upper end of the vertical rod is formed with external threads, and the lower end of the extension rod is also formed with external threads. Distance between filleters.

本实用新型的优点和积极效果是:Advantage and positive effect of the present utility model are:

本实用新型结构简单、安装方便、便于使用,可靠性好,有效保证倒角的工艺尺寸,保证基础的倒角尺寸标准,使线路基础外形统一标准,倒角质量好。The utility model has the advantages of simple structure, convenient installation, convenient use, good reliability, effectively guarantees the technical size of the chamfering, ensures the standard size of the chamfering of the foundation, makes the outline of the circuit foundation uniform and standard, and has good chamfering quality.

附图说明Description of drawings

图1为本实用新型结构示意图;Fig. 1 is the structural representation of the utility model;

图2为图1的左视图;Fig. 2 is the left view of Fig. 1;

图3为本实用新型的使用状态示意图。Fig. 3 is a schematic diagram of the use state of the utility model.

附图标记代表:1定位轮,2横杆,3延长杆,4辅助轮,5调节套筒,6外螺纹,7立杆,8外圆倒角器,9圆弧面,10外圆套筒模板,11线路基础。Reference signs represent: 1 positioning wheel, 2 cross bar, 3 extension rod, 4 auxiliary wheel, 5 adjusting sleeve, 6 external thread, 7 vertical rod, 8 outer circle chamfering device, 9 arc surface, 10 outer ring sleeve Barrel formwork, 11 line foundation.

具体实施方式detailed description

下面结合附图并通过具体实施例对本实用新型作进一步详述,以下实施例只是描述性的,不是限定性的,不能以此限定本实用新型的保护范围。The utility model will be further described in detail below in conjunction with the accompanying drawings and through specific embodiments. The following embodiments are only descriptive, not restrictive, and cannot limit the protection scope of the utility model.

一种输电线路基础施工倒角工具,包括外圆倒角器8、立杆7、延长杆3、横杆2以及定位轮1,外圆倒角器下部制有内凹的圆弧面9,该圆弧面用于制备线路基础11上端边缘外圆弧倒角,外圆倒角器上端垂直固装有一立杆7,该立杆带动外圆倒角器沿线路基础的边缘进行磨圆倒角加工。A chamfering tool for power transmission line foundation construction, comprising an outer circular chamfering device 8, a vertical rod 7, an extension rod 3, a cross bar 2 and a positioning wheel 1, the lower part of the outer circular chamfering device is formed with a concave arc surface 9, The arc surface is used to prepare the outer circular arc chamfering of the upper edge of the line foundation 11, and a vertical rod 7 is fixed vertically on the upper end of the outer circular chamfering device, and the vertical rod drives the outer circular chamfering device to perform rounding and chamfering along the edge of the circuit foundation Corner processing.

本实用新型的创新点在于:The innovation point of the present utility model is:

为了限位,立杆上端同轴连接有一延长杆,再延长杆的上端制有一悬臂式的横杆,横杆的悬臂端下端安装有定位轮,施工时将该定位轮沿线路基础外的外圆套筒模板10的上沿移动,外圆套筒模板是标准的圆柱筒形结构,有效限定外圆倒角器的加工位置,从而保证倒角的一致性。In order to limit the position, an extension rod is coaxially connected to the upper end of the vertical rod, and a cantilevered cross bar is formed on the upper end of the extension rod. A positioning wheel is installed at the lower end of the cantilever end of the cross rod. The upper edge of the circular sleeve template 10 moves, and the outer cylindrical sleeve template is a standard cylindrical structure, which effectively limits the processing position of the outer circular chamfering device, thereby ensuring the consistency of the chamfering.

为了增强限位准确性,在延长杆中部横向安装有一辅助轮4,该辅助轮用于支撑在外圆套筒模板的内壁上,限定外圆倒角器于外圆套筒模板的间距保持一致。In order to enhance the positioning accuracy, an auxiliary wheel 4 is horizontally installed in the middle of the extension rod, and the auxiliary wheel is used to support on the inner wall of the outer circular sleeve formwork, so that the distance between the outer circle chamfering device and the outer circular sleeve formwork is kept consistent.

为了适用于不同高度的线路基础施工,立杆与延长杆的连接位置同轴啮合安装有一制有内螺纹的调节套筒5,立杆上端制有外螺纹6,延长杆下端也制有外螺纹,转动调节套筒可以使伸长或缩短立杆与延长杆的长度,从而调节定位轮与外圆倒角器之间的距离。In order to be suitable for the construction of line foundations with different heights, an adjusting sleeve 5 with internal threads is installed in the coaxial engagement between the vertical rod and the extension rod, the upper end of the vertical rod is made with external threads 6, and the lower end of the extension rod is also made with external threads , turning the adjusting sleeve can extend or shorten the length of the vertical rod and the extension rod, thereby adjusting the distance between the positioning wheel and the outer circle chamfering device.

尽管为说明目的公开了本实用新型的实施例和附图,但是本领域的技术人员可以理解:在不脱离本实用新型及所附权利要求的精神和范围内,各种替换、变化和修改都是可能的,因此,本实用新型的范围不局限于实施例和附图所公开的内容。Although the embodiments and accompanying drawings of the utility model are disclosed for the purpose of illustration, those skilled in the art can understand that various replacements, changes and modifications can be made without departing from the spirit and scope of the utility model and the appended claims. It is possible, therefore, the scope of the present invention is not limited to the contents disclosed in the embodiments and drawings.

Claims (3)

1.一种输电线路基础施工倒角工具,包括外圆倒角器、立杆、延长杆、横杆以及定位轮,外圆倒角器下部制有内凹的圆弧面,该圆弧面用于制备线路基础上端边缘外圆弧倒角,外圆倒角器上端垂直固装有一立杆,其特征在于:立杆上端同轴连接有一延长杆,再延长杆的上端制有一悬臂式的横杆,横杆的悬臂端下端安装有定位轮。1. A chamfering tool for transmission line foundation construction, comprising an outer circular chamfering device, a vertical rod, an extension rod, a cross bar and a positioning wheel, the lower part of the outer circular chamfering device is shaped on a concave arc surface, and the arc surface It is used to prepare the outer circular arc chamfering of the upper edge of the line foundation. The upper end of the outer circular chamfering device is vertically fixed with a vertical rod. It is characterized in that: the upper end of the vertical rod is coaxially connected with an extension rod, and the upper end of the extension rod is formed with a cantilever type Cross bar, the lower end of the cantilever end of cross bar is equipped with positioning wheel. 2.根据权利要求1所述的输电线路基础施工倒角工具,其特征在于:在延长杆中部横向安装有一辅助轮,该辅助轮用于支撑在外圆套筒模板的内壁上。2. The chamfering tool for power transmission line foundation construction according to claim 1, characterized in that: an auxiliary wheel is installed laterally in the middle of the extension rod, and the auxiliary wheel is used to support on the inner wall of the outer circular sleeve formwork. 3.根据权利要求1所述的输电线路基础施工倒角工具,其特征在于:立杆与延长杆的连接位置同轴啮合安装有一制有内螺纹的调节套筒,立杆上端制有外螺纹,延长杆下端也制有外螺纹,转动调节套筒调节定位轮与外圆倒角器之间的距离。3. The chamfering tool for transmission line foundation construction according to claim 1, characterized in that: the connecting position of the vertical rod and the extension rod is coaxially engaged and installed with an adjusting sleeve with internal threads, and the upper end of the vertical rod is formed with external threads , the lower end of the extension rod is also shaped on an external thread, and the adjusting sleeve is rotated to adjust the distance between the positioning wheel and the outer circle chamfering device.
CN201520602657.5U 2015-08-11 2015-08-11 Transmission line foundation construction chamfer instrument Expired - Fee Related CN204959736U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520602657.5U CN204959736U (en) 2015-08-11 2015-08-11 Transmission line foundation construction chamfer instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520602657.5U CN204959736U (en) 2015-08-11 2015-08-11 Transmission line foundation construction chamfer instrument

Publications (1)

Publication Number Publication Date
CN204959736U true CN204959736U (en) 2016-01-13

Family

ID=55054811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520602657.5U Expired - Fee Related CN204959736U (en) 2015-08-11 2015-08-11 Transmission line foundation construction chamfer instrument

Country Status (1)

Country Link
CN (1) CN204959736U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113084758A (en) * 2021-04-13 2021-07-09 北京送变电有限公司 Chamfer plastering tool and using method
CN114775678A (en) * 2022-05-26 2022-07-22 国网江苏省电力有限公司镇江供电分公司 Chamfering tool for power transmission line foundation construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113084758A (en) * 2021-04-13 2021-07-09 北京送变电有限公司 Chamfer plastering tool and using method
CN114775678A (en) * 2022-05-26 2022-07-22 国网江苏省电力有限公司镇江供电分公司 Chamfering tool for power transmission line foundation construction

Similar Documents

Publication Publication Date Title
CN201799806U (en) Positioning device for nut welding
CN204959736U (en) Transmission line foundation construction chamfer instrument
CN203961334U (en) A kind of micromatic setting that supports
CN104400554B (en) A multifunctional knife setting device
CN201788218U (en) Portable altitude electroscope
CN205224569U (en) Template steel pipe support support structure
CN202577945U (en) Retractable Formwork Support Rods
CN201857976U (en) Anti-floating device of formwork jumbo for lining
CN205400083U (en) 360 disconnected tub of concrete vibrting spear is prevented in rotation
CN205348714U (en) Fillet outside -corner trowel of adjustable radian
CN204718855U (en) The simple type fast repairing leveling device of concrete core sample
CN104354226B (en) Cement Mortar Vibrator with Stirring Pot Support
CN201788840U (en) Combined brake pull rod
CN202710067U (en) Inverted buoyancy regulating device
CN204122689U (en) A kind of moving die plate mould and rising head syndeton
CN204081491U (en) A kind of construction formwork connecting pin
CN203583370U (en) Cable-stayed bridge cable guide tube fine adjusting frame
CN205046862U (en) Steel mesh frame ball joint point installation elevation adjusting device
CN204064294U (en) Reinforced concrete pole vertical gauge
CN203296384U (en) Building framework clamp
CN204359233U (en) A kind of milscale of replaceable spheric probe
CN204116345U (en) A kind of rubber parts quality detection apparatus of embedded metal pipe
CN104266633B (en) Reinforced Concrete Electric Pole Vertical Measuring Instrument and Method for Correcting Electric Pole
CN203553675U (en) A disconnecting switch static contact inspection and maintenance specially used tool
CN204278246U (en) Cement Mortar Vibrator with Stirring Pot Support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160113

Termination date: 20210811

CF01 Termination of patent right due to non-payment of annual fee