CN204959614U - PC track roof beam connecting device - Google Patents

PC track roof beam connecting device Download PDF

Info

Publication number
CN204959614U
CN204959614U CN201520698173.5U CN201520698173U CN204959614U CN 204959614 U CN204959614 U CN 204959614U CN 201520698173 U CN201520698173 U CN 201520698173U CN 204959614 U CN204959614 U CN 204959614U
Authority
CN
China
Prior art keywords
rail beam
stiffening rib
plate
blocking
buttcover plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520698173.5U
Other languages
Chinese (zh)
Inventor
赵晓波
吴天
陈波
李艳青
张富贵
郭鸿飞
周胜怡
张炯
王波
涂海
赖力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING RAIL TRANSIT DESIGN AND RESEARCH INSTITUTE Co Ltd
Original Assignee
CHONGQING RAIL TRANSIT DESIGN AND RESEARCH INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING RAIL TRANSIT DESIGN AND RESEARCH INSTITUTE Co Ltd filed Critical CHONGQING RAIL TRANSIT DESIGN AND RESEARCH INSTITUTE Co Ltd
Priority to CN201520698173.5U priority Critical patent/CN204959614U/en
Application granted granted Critical
Publication of CN204959614U publication Critical patent/CN204959614U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a PC track roof beam connecting device, including two connecting pieces, every connecting piece includes end -blocking board, buttcover plate and preceding stiffening rib, and two end -blocking boards set up the terminal surface at two adjacent pin PC track roof beams respectively, are provided with two prestressing tendon punch combinations that are used for passing the prestress wire on the end -blocking board, buttcover plate one end is connected on corresponding end -blocking board, and the other end extends to another connecting piece and rather than the connection, preceding stiffening rib is located the inboard relatively of two end -blocking boards and is connected with corresponding end -blocking board and buttcover plate respectively. The utility model discloses a connecting device pours into a whole with the track roof beam to with the whole prestress wire anchors of track roof beam on the end -blocking board, thereby ensure the reliability that connecting device and track roof beam be connected, avoided secondary stretch -draw prestress wire. At PC track beam -ends troops under one's command side's setting support of the fixed beam body temporarily, need not to build again the falsework, reduced the construction process, reduced construction cost, improved the efficiency of construction.

Description

PC rail beam linkage
Technical field
The utility model relates to a kind of orbit connection device, particularly relates to a kind of PC rail beam linkage.
Background technology
In the work progress of traditional continuous P C rail beam, adopt wet joint mode, adjacent two Pin beams and pier stud bent cap are connected to form continuous rigid frame system, the long steel strand of through break-through are needed after the lifting of PC beam, and carry out two times tensioning, realize being converted into continuous rigid frame system by simply supported beam, its major defect is as follows:
1. the elongated prestress wire of two times tensioning, easily causes PC rail beam that the distortion that cannot repair occurs, and causes into bridge linear linear inconsistent with design, and then affects later stage safety in operation and comfortableness;
2. set a roof beam in place to the duration of bridge to be generally 15 days, PC rail beam adopts falsework to be fixed on bent cap around here, not only large on town road impact along the line, and himself is comparatively large by external interference, and easily fall beam event;
3. working measure costly, and the duration is longer, and when clashing with town road, its night work time is long;
In addition, in traditional Simple Rail Bearer system, adopt cast steel supporter between PC rail beam and bridge pier, it is from great and expensive.
In sum, the utility model people devises a kind of simple structure, with low cost, safe and reliable PC rail beam linkage, not only avoid the unfavorable factors such as traditional continuous rigid frame rail beam needs two times tensioning steel strand, builds the problem of falsework, the construction period is longer, more traditional Simple-supported PC Rail Beam in Light Rail has saved expensive cast steel supporter simultaneously, greatly reduces construction costs and later maintenance cost.
Utility model content
In view of this, the utility model provides a kind of PC rail beam linkage, what not only solve that existing continuous P C rail beam exists at work progress needs the elongated prestress wire of two times tensioning, builds the problems such as falsework, avoids the cast steel supporter that existing Simple-supported PC Rail Beam in Light Rail adopts simultaneously.
The utility model is solved the problem by following technological means:
The utility model provides a kind of PC rail beam linkage, comprise two connectors, each connector comprises end-blocking plate, buttcover plate and front stiffening rib, two end-blocking plates are separately positioned on the end face of adjacent two Pin PC rail beams, end-blocking plate is provided with two row for the prestressing force beam hole group through prestress wire, described buttcover plate one end is connected on corresponding end-blocking plate, the other end extends to another connector and is connected with it, and described front stiffening rib is positioned at the relative inner of two end-blocking plates and is connected with corresponding end-blocking plate and front stiffening rib respectively.
Further, each connector also comprise be embedded in PC rail beam end and with the rear stiffening rib of corresponding envelope end plate connection.
Further, the vertical median plane both sides of the buttcover plate apportion PC rail beam on two connectors and contact with each other and be bolted.
Further, described front stiffening rib to comprise before first of apportion buttcover plate both sides stiffening rib before stiffening rib and second, and before described second, stiffening rib docks with the first stiffening rib of another connector.
Further, before described first the long limit of stiffening rib and buttcover plate isometric.
Further, the edges at two ends place, left and right of described end-blocking plate is respectively arranged with a stirrup through hole group.
Further, each connector also comprises the bearing be arranged on below PC rail beam end, described bearing comprises the gripper shoe being arranged on and being connected below PC rail beam end and with rear stiffening rib and the back-up block be arranged on below gripper shoe, and described back-up block is connected with the backing plate be embedded on bent cap.
Further, described bearing also comprises and arranging and the fixed head be connected with back-up block with end-blocking plate isoplanar, two ends, fixed head left and right are respectively equipped with a bearing fixing hole, and described fixed head and the Connection Block 9 be arranged on backing plate are by being connected through the pin of described bearing fixing hole.
Further, the cross section of described back-up block in the perpendicular perpendicular to PC rail beam end face is at right angles trapezoidal, and the width of back-up block is less than the width of gripper shoe.
Further, described fixed head is connected with buttcover plate bottom.
The beneficial effects of the utility model: the utility model provides a kind of PC rail beam linkage, comprise two connectors, each connector comprises end-blocking plate, buttcover plate and front stiffening rib, two end-blocking plates are separately positioned on the end face of adjacent two Pin PC rail beams, end-blocking plate is provided with two row for the prestressing force beam hole group through prestress wire, described buttcover plate one end is connected on corresponding end-blocking plate, the other end extends to another connector and is connected with it, described front stiffening rib is positioned at the relative inner of two end-blocking plates and is connected with corresponding end-blocking plate and buttcover plate respectively.PC rail beam linkage of the present utility model and PC rail beam water and build up an entirety, and whole prestress wires of rail beam are anchored on end-blocking plate, not only ensure the reliability that connector is connected with rail beam, and avoid traditional continuous rigid frame rail beam and need carry out the elongated prestress wire of two times tensioning in high-altitude, also ensure that one-tenth bridge is linear with the linear goodness of fit of design.The falsework system that the bearing Connection Block that simple and easy bearing and bent cap are buried underground can replace traditional handicraft to build is set below PC rail beam end, decreases working procedure, reduce construction cost, improve efficiency of construction.By linkage of the present utility model, adjacent PC rail beam can be connected and with lower cover beam consolidation, not only eliminate the cast steel supporter of traditional Simple Rail Bearer costliness, and reduce the gap formed between rail beam, improve the comfortableness of train operation, reduce later stage operation expense.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further described.
Fig. 1 is the perspective view that the utility model PC rail beam linkage and PC rail beam and bent cap link together;
Fig. 2 is the perspective view of connector of the present utility model;
Fig. 3 is the top view of connector of the present utility model;
Fig. 4 is the left view of connector of the present utility model;
Fig. 5 is the rear elevation of connector of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in detail:
It is emphasized that "front", "rear" in the utility model, "left", "right" are corresponding with the "front", "rear" in " Fig. 2 ", "left", "right" respectively.
By shown in Fig. 1 to Fig. 5, a kind of PC rail beam linkage of the present utility model, comprise two connectors, each connector comprises end-blocking plate 2, buttcover plate 3 and front stiffening rib 4, two end-blocking plates 2 are separately positioned on the end face of adjacent two Pin PC rail beams 1, end-blocking plate 2 is provided with two row prestress wire through hole groups 20, described buttcover plate 3 one end is connected on corresponding end-blocking plate 2, the other end extends to another connector and is connected with it, and described front stiffening rib 4 is positioned at the relative inner of two end-blocking plates 2 and is connected with corresponding end-blocking plate 2 and buttcover plate 3 respectively.Described end-blocking plate 2, connecting as one between buttcover plate 3 and front stiffening rib 4.When prefabricated PC rail beam, for strengthening the reliability that end-blocking plate 2 is connected with PC rail beam 1, by whole steel strand anchorings of rail beam on end-blocking plate, need it also avoid at the elongated prestress wire of two times tensioning in operation of setting a roof beam in place simultaneously, ensured one-tenth bridge linear with design the linear goodness of fit.After adjacent two Pin PC rail beams 1 are linked together by described two connectors, at beam seam, place arranges cage of reinforcement, then concreting, makes PC rail beam become continuous beam by simply supported beam, and form consolidation with substructure, make entirely to be unified into as continuous rigid frame system structure.Use PC rail beam linkage of the present utility model, the gap formed between rail beam can be reduced, improve the comfortableness of train operation, reduce later stage operation expense.
As the further improvement of such scheme, each connector also comprises and being embedded in PC rail beam 1 end and the rear stiffening rib 5 be connected with corresponding end-blocking plate 2.Described rear stiffening rib 5 is connected effect for strengthening connector with PC rail beam 1 end is concrete.
As the further improvement of such scheme, the vertical median plane both sides of the buttcover plate 3 apportion PC rail beam 1 on two connectors and contact with each other and be bolted.Buttcover plate 3 arranges multiple through hole, by high-strength bolt through the buttcover plate 3 on two connectors, thus adjacent two Pin PC rail beams is linked together.Adopt above-mentioned setting, make the coupling stiffness between two connectors on adjacent two Pin PC rail beams larger.
As the further improvement of such scheme, described front stiffening rib 4 to comprise before first of apportion buttcover plate 3 both sides stiffening rib 41 before stiffening rib 40 and second, and before described second, stiffening rib 41 docks with the first stiffening rib 40 of another connector.Before buttcover plate 3 both sides arrange first, stiffening rib 41 before stiffening rib 40 and second, can strengthen the coupling stiffness between buttcover plate 3 and end-blocking plate 2.
As the further improvement of such scheme, before described first the long limit of stiffening rib 40 and buttcover plate 3 isometric.Before first, stiffening rib 40 can dock with stiffening rib 41 before second on another connector, thus strengthens the coupling stiffness between two connectors.
As the further improvement of such scheme, the edges at two ends place, left and right of described end-blocking plate 2 is respectively arranged with row for running through the hole group 21 of stirrup.Between beam seam, stirrup can form ring-shaped stirrup through after institute's hole group 21, and forms the reinforcing cage of node coagulation with vertical cage of reinforcement.
As the further improvement of such scheme, each connector also comprises the bearing 6 be arranged on below PC rail beam 1 end, described bearing 6 comprises the gripper shoe 60 being arranged on and being connected below PC rail beam 1 end and with rear stiffening rib 5 and the back-up block 61 be arranged on below gripper shoe 60, and described back-up block 61 is connected with the backing plate 7 be embedded on bent cap 8.After adjacent two Pin PC rail beams 1 have connected, bearing 6 is welded with the backing plate 7 be embedded in advance on bent cap 8, follow-up again at beam seam and adjacent two lower end, Pin PC rail beam 1 end concretings, make PC rail beam 1 and bent cap 8 become connecting overall.The cost of described bearing 6 about 0.7 ten thousand yuan, the cast steel supporter cost of original Simple Rail Bearer about 6.5 ten thousand yuan, and the concrete cost of building in lower end, PC rail beam end is very low, thus reduces cost.
As the further improvement of such scheme, described bearing 6 also comprises and arranging and the fixed head 62 be connected with back-up block 61 with end-blocking plate 2 isoplanar, fixed head about 62 two ends are respectively equipped with a bearing fixing hole 620, and described fixed head 2 and the Connection Block 9 be arranged on backing plate 7 are by being connected through the pin of described bearing fixing hole 620.The fixed head be positioned on two connectors of PC rail beam 1 left and right sides and two Connection Blocks be arranged on backing plate 7 are each passed through with two pins, make between bearing and backing plate fixing more reliable, thus play the effect of temporary fixed PC rail beam 1, no longer need to build falsework, decrease working procedure, reduce construction cost, improve efficiency of construction.
As the further improvement of such scheme, the cross section of described back-up block 61 in the perpendicular perpendicular to PC rail beam 1 end face is at right angles trapezoidal, and the width of back-up block 61 is less than the width of gripper shoe 60.The upper base of right-angled trapezium is welded with gripper shoe 60, and bottom is welded with the backing plate 7 be embedded on bent cap 8, adopts the design of right-angled trapezium, can reduce the weight of bearing 6.In addition, after PC rail beam links together, can concreting below PC rail beam 1 end, concrete also plays a part to support PC rail beam 1, thus the width design of back-up block 61 can be become be less than the width of gripper shoe 60, thus reduce the weight of bearing 6 further, and then reduce costs.
As the further improvement of such scheme, described fixed head 62 is connected with buttcover plate 3 bottom.Buttcover plate 3 bottom is extended, thus can weld together with fixed head 62, and then improve the rigidity of each connector.
What finally illustrate is, above embodiment is only in order to illustrate the technical solution of the utility model and unrestricted, although be described in detail the utility model with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, can modify to the technical solution of the utility model or equivalent replacement, and not departing from aim and the scope of technical solutions of the utility model, it all should be encompassed in the middle of right of the present utility model.

Claims (10)

1. a PC rail beam linkage, it is characterized in that: comprise two connectors, each connector comprises end-blocking plate (2), buttcover plate (3) and front stiffening rib (4), two end-blocking plates (2) are separately positioned on the end face of adjacent two Pin PC rail beams (1), end-blocking plate (2) is provided with two row for the prestressing force beam hole group (20) through prestress wire, described buttcover plate (3) one end is connected on corresponding end-blocking plate (2), the other end extends to another connector and is connected with it, described front stiffening rib (4) is positioned at the relative inner of two end-blocking plates (2) and is connected with corresponding end-blocking plate (2) and buttcover plate (3) respectively.
2. PC rail beam linkage according to claim 1, is characterized in that: each connector also comprises and being embedded in PC rail beam (1) end and the rear stiffening rib (5) be connected with corresponding end-blocking plate (2).
3. PC rail beam linkage according to claim 2, is characterized in that: the vertical median plane both sides of buttcover plate (3) apportion PC rail beam (1) on two connectors and contact with each other and be bolted.
4. PC rail beam linkage according to claim 3, it is characterized in that: described front stiffening rib (4) to comprise before first of apportion buttcover plate (3) both sides stiffening rib (41) before stiffening rib (40) and second, and before described second, stiffening rib (41) docks with first stiffening rib (40) of another connector.
5. PC rail beam linkage according to claim 4, is characterized in that: before described first the long limit of stiffening rib (40) and buttcover plate (3) isometric.
6. PC rail beam linkage according to claim 5, is characterized in that: the edges at two ends place, left and right of described end-blocking plate (2) is respectively arranged with row stirrup through hole group (21).
7. PC rail beam linkage according to claim 2, it is characterized in that: each connector also comprises the bearing (6) be arranged on below PC rail beam (1) end, described bearing (6) comprises the gripper shoe (60) being arranged on and being connected below PC rail beam (1) end and with rear stiffening rib (5) and the back-up block (61) being arranged on gripper shoe (60) below, and described back-up block (61) is connected with the backing plate (7) be embedded on bent cap (8).
8. PC rail beam linkage according to claim 7, it is characterized in that: described bearing (6) also comprises and arranging and the fixed head (62) be connected with back-up block (61) with end-blocking plate (2) isoplanar, fixed head (62) two ends, left and right are respectively equipped with a bearing fixing hole (620), and described fixed head (2) and the Connection Block (9) be arranged on backing plate (7) are by being connected through the pin of described bearing fixing hole (620).
9. PC rail beam linkage according to claim 8, it is characterized in that: the cross section of described back-up block (61) in the perpendicular perpendicular to PC rail beam (1) end face is at right angles trapezoidal, and the width of back-up block (61) is less than the width of gripper shoe (60).
10. PC rail beam linkage according to claim 8 or claim 9, is characterized in that: described fixed head (62) is connected with buttcover plate (3) bottom.
CN201520698173.5U 2015-09-10 2015-09-10 PC track roof beam connecting device Withdrawn - After Issue CN204959614U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520698173.5U CN204959614U (en) 2015-09-10 2015-09-10 PC track roof beam connecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520698173.5U CN204959614U (en) 2015-09-10 2015-09-10 PC track roof beam connecting device

Publications (1)

Publication Number Publication Date
CN204959614U true CN204959614U (en) 2016-01-13

Family

ID=55054689

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520698173.5U Withdrawn - After Issue CN204959614U (en) 2015-09-10 2015-09-10 PC track roof beam connecting device

Country Status (1)

Country Link
CN (1) CN204959614U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105274939A (en) * 2015-09-10 2016-01-27 重庆市轨道交通设计研究院有限责任公司 Connecting device for PC track beam
CN110318306A (en) * 2018-03-30 2019-10-11 比亚迪股份有限公司 For connecting the connection structure of track girder

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105274939A (en) * 2015-09-10 2016-01-27 重庆市轨道交通设计研究院有限责任公司 Connecting device for PC track beam
CN105274939B (en) * 2015-09-10 2017-05-10 重庆市轨道交通设计研究院有限责任公司 Connecting device for PC track beam
CN110318306A (en) * 2018-03-30 2019-10-11 比亚迪股份有限公司 For connecting the connection structure of track girder

Similar Documents

Publication Publication Date Title
CN205024907U (en) Vary joint construction of wide flange I -beam roof beam of prestressing force hollow floor and edge of a wing
CN202936736U (en) Cable-stayed bridge composite beam construction bridge floor crane
CN103938546B (en) Simply supported non-uniform construction method
CN201512345U (en) Multifunctional integrated lifting frame
CN105178163A (en) Novel continuous beam type rail
CN107419658A (en) A kind of bridge expansion joint installation
CN108193607B (en) Fabricated prestressed truss for reinforcement and construction method thereof
CN105274939A (en) Connecting device for PC track beam
CN102926504B (en) Construction method of steel and concrete overlapped beam combined part
CN105178194A (en) Continuous beam type rail construction method
CN103711067A (en) Transversely assembled corrugated steel web combined box girder with small number of supports and construction method thereof
CN203559354U (en) Stay cable anchoring structure applied to prestressed concrete partially cable-stayed bridge
CN204959614U (en) PC track roof beam connecting device
CN109881587B (en) Integral installation method of main tower upper cross beam support in strong wind environment
CN211815592U (en) Prefabricated assembled composite slab structure
CN101230660B (en) Force-bearing type underplate component
CN205382425U (en) Railway T type bridge adds builds sound barrier beam mold plate girder unwheeling
CN204959578U (en) PC track roof beam
CN111733697A (en) Prefabricated assembled composite slab structure
CN203924115U (en) A kind of subway twin columns overhead station steel reinforced concrete transformational structure reinforcing bar
CN110258633A (en) A kind of Underground Station section of track well with prestressed concrete beam
CN104746932A (en) Pressure weight type roof communication tower and mounting method
CN103911948A (en) Transverse truss type structure applied to wide concrete rib plate beam and construction method of structure
CN205205647U (en) Prefabricated segment formula concrete bridge's bottom plate joint construction
CN209837469U (en) Connecting structure of main beam and secondary beam of stiff concrete

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20160113