CN204940602U - For the T-shaped steel flanged beam steel pipe column compound wall of steel house - Google Patents
For the T-shaped steel flanged beam steel pipe column compound wall of steel house Download PDFInfo
- Publication number
- CN204940602U CN204940602U CN201520616727.2U CN201520616727U CN204940602U CN 204940602 U CN204940602 U CN 204940602U CN 201520616727 U CN201520616727 U CN 201520616727U CN 204940602 U CN204940602 U CN 204940602U
- Authority
- CN
- China
- Prior art keywords
- limb
- steel
- reinforcing prop
- pipe column
- compound wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520616727.2U CN204940602U (en) | 2015-08-17 | 2015-08-17 | For the T-shaped steel flanged beam steel pipe column compound wall of steel house |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520616727.2U CN204940602U (en) | 2015-08-17 | 2015-08-17 | For the T-shaped steel flanged beam steel pipe column compound wall of steel house |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204940602U true CN204940602U (en) | 2016-01-06 |
Family
ID=55008043
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520616727.2U Expired - Fee Related CN204940602U (en) | 2015-08-17 | 2015-08-17 | For the T-shaped steel flanged beam steel pipe column compound wall of steel house |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204940602U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105604216A (en) * | 2016-01-23 | 2016-05-25 | 合肥工业大学 | Pull-joint type double-steel-plate composite shear wall |
CN105672534A (en) * | 2016-01-23 | 2016-06-15 | 合肥工业大学 | Plug welding type double-steel plate composite shear wall |
CN105863082A (en) * | 2016-05-20 | 2016-08-17 | 西安建筑科技大学 | T-shaped through clapboard-type multi-chamber concrete filled steel tube combination column and steel beam joint and assembly method thereof |
CN106121049A (en) * | 2016-08-22 | 2016-11-16 | 合肥工业大学 | Compound shear wall is connected energy dissipation node and preparation method thereof with steel bar girder combination beam |
-
2015
- 2015-08-17 CN CN201520616727.2U patent/CN204940602U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105604216A (en) * | 2016-01-23 | 2016-05-25 | 合肥工业大学 | Pull-joint type double-steel-plate composite shear wall |
CN105672534A (en) * | 2016-01-23 | 2016-06-15 | 合肥工业大学 | Plug welding type double-steel plate composite shear wall |
CN105863082A (en) * | 2016-05-20 | 2016-08-17 | 西安建筑科技大学 | T-shaped through clapboard-type multi-chamber concrete filled steel tube combination column and steel beam joint and assembly method thereof |
CN106121049A (en) * | 2016-08-22 | 2016-11-16 | 合肥工业大学 | Compound shear wall is connected energy dissipation node and preparation method thereof with steel bar girder combination beam |
CN106121049B (en) * | 2016-08-22 | 2019-04-30 | 合肥工业大学 | Compound shear wall connect energy dissipation node and preparation method thereof with steel bar girder combination beam |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103541427B (en) | Box structure building system and method | |
CN204940602U (en) | For the T-shaped steel flanged beam steel pipe column compound wall of steel house | |
CN105003020A (en) | Ceramsite concrete metal net rack light wallboard and splicing structure thereof | |
CN206418663U (en) | A kind of prefabricated combined wall board of novel fabricated H types | |
CN107060150B (en) | Prefabricated assembled integral frame filling wall system and construction method thereof | |
CN202152508U (en) | Light composite wallboard | |
CN205224344U (en) | Real abdomen formula steel -pipe column faced wall of continuous trompil cross slab | |
CN204940603U (en) | For the L shape steel flanged beam steel pipe column compound wall of steel house | |
CN204919968U (en) | Ceramsite concrete metal rack light weight wallboard | |
CN204266373U (en) | A kind of assembled integral Steel Space grid box structure room for earthquake region | |
CN204940599U (en) | For the Z-shaped steel flanged beam steel pipe column compound wall of steel house | |
CN103556754A (en) | Single-line reinforcement thermal insulation bearing shear wall with T-shaped hidden posts at end parts and manufacturing method of shear wall | |
CN204940598U (en) | The reinforcement connecting structure of steel house steel flanged beam steel pipe column compound wall and structural beams | |
CN201024548Y (en) | Lattice type wall built by light aggregate formwork shell member | |
CN204940524U (en) | For the L shape accentric support lattice steel pipe column compound wall of steel house | |
CN107083815B (en) | Full-assembly hidden beam type through cavity combined steel plate shear wall structure | |
CN203514534U (en) | Steel channel web inserted type connection joint structure between steel girders and square concrete-filled steel-tubular column | |
CN203034879U (en) | Casing refuge bin structure of existing masonry structure | |
CN203546904U (en) | Box structure building system | |
CN109025002A (en) | A kind of integrated wall on assembled cash in bank island | |
CN205134980U (en) | Whole anti -seismic performance's of reinforcing adobe wall bearing local -style dwelling houses device | |
CN204609046U (en) | Thin wall steel tube concrete frame-light-steel light-concrete compound shear wall | |
CN210049489U (en) | Steel concrete combined frame column | |
CN210049379U (en) | Steel concrete combined frame column assembly type structure system | |
CN103046789A (en) | Wrapping refuge cabin of existing masonry structure and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Qiang Inventor after: Miao Dongmei Inventor after: Ma Rongquan Inventor after: Liang Jianjun Inventor after: Dong Jiyong Inventor after: Feng Guojun Inventor after: Sun Xuefeng Inventor after: Wang Hao Inventor after: Ge Jie Inventor before: Li Qiang Inventor before: Miao Dongmei Inventor before: Ma Rongquan Inventor before: Liang Jianjun Inventor before: Dong Jiyong Inventor before: Feng Guojun Inventor before: Sun Xuefeng Inventor before: Wang Hao Inventor before: Ge Jie |
|
COR | Change of bibliographic data | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160106 Termination date: 20210817 |