CN204939269U - 15mm semi-tempered glass prepares structure - Google Patents

15mm semi-tempered glass prepares structure Download PDF

Info

Publication number
CN204939269U
CN204939269U CN201520500970.8U CN201520500970U CN204939269U CN 204939269 U CN204939269 U CN 204939269U CN 201520500970 U CN201520500970 U CN 201520500970U CN 204939269 U CN204939269 U CN 204939269U
Authority
CN
China
Prior art keywords
tempered glass
semi
level frame
process furnace
glass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520500970.8U
Other languages
Chinese (zh)
Inventor
刘东阳
代干
张榜
谢桃流
孙志军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AVIC SANXIN CO LTD
Original Assignee
AVIC SANXIN CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AVIC SANXIN CO LTD filed Critical AVIC SANXIN CO LTD
Priority to CN201520500970.8U priority Critical patent/CN204939269U/en
Application granted granted Critical
Publication of CN204939269U publication Critical patent/CN204939269U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Re-Forming, After-Treatment, Cutting And Transporting Of Glass Products (AREA)

Abstract

The utility model relates to the technical field that structure prepared by toughened glass, disclose 15mm semi-tempered glass and prepare structure, comprise level frame and process furnace, level frame has the horizontal plane for carrying 15mm full tempered glass, have in process furnace and be placed on heating chamber for level frame, the top of heating chamber is provided with after the 15mm full tempered glass continuous uniform heating be placed on level frame, also cooling is with the heating unit forming 15mm semi-tempered glass, and heating unit is evenly arranged.It is 15mm semi-tempered glass that the 15mm semi-tempered glass that the utility model provides prepares the glass that structure prepares, its stress equilibrium, property indices can reach GB/T17841-2008 related request, make up the blank adopting customary preparation methods cannot prepare 15mm semi-tempered glass product, and, it is simple that 15mm semi-tempered glass prepares structure, and cost is also lower.

Description

15mm semi-tempered glass prepares structure
Technical field
The utility model relates to the technical field that semi-tempered glass prepares structure, particularly relates to 15mm semi-tempered glass and prepares structure.
Background technology
Semi-tempered glass is also known as hot-reinforced glass, the kind of semi-tempered glass between ordinary plate glass and toughened glass, it has the certain advantages of toughened glass concurrently, float glass as more common in intensity is high, it is the twice of common float glass, avoid again toughened glass poor flatness simultaneously, easily revealed, once destroy i.e. overall pulverizing to wait the weakness not as people's will.When semi-tempered glass destroys, along formation of crack radially radial cracking, generally without tangent cracks expansion, so generally still entirety not slump can be kept after destroying.
Though semi-tempered glass is not shatter proof glass, but owing to there being certain intensity, and can not reveal, therefore, Application comparison is extensive, particularly 15mm semi-tempered glass.
In prior art, adopt the problem of method due to speed of cooling of Typical physical tempering, to be heated come out of the stove to certain temperature and certain hour after, even if do not blow cooling air, to come out of the stove naturally cooling, 15mm glass surface stress also can reach all steel surface stress, so adopt ordinary method cannot prepare 15mm semi-tempered glass.
Utility model content
The purpose of this utility model is to provide 15mm semi-tempered glass to prepare structure, is intended to solve in prior art, adopts Typical physical preparation method, cannot prepare 15mm semi-tempered glass, or, the problem that preparation method is complicated and cost is high.
The utility model realizes like this, 15mm semi-tempered glass prepares structure, comprise level frame and process furnace, described level frame has the horizontal plane for carrying 15mm full tempered glass, have in described process furnace and be placed on heating chamber for described level frame, the top of described heating chamber is provided with for being down to room temperature to form the heating unit of 15mm semi-tempered glass after being heated to certain temperature to 15mm full tempered glass continuous uniform, and described heating unit is evenly arranged.
Further, the horizontal plane of described level frame and the contact position of 15mm full tempered glass adopt to isolate and arrange.
Further, described level frame is steel pipe frame, and described steel pipe frame is formed with described horizontal plane.
Further, the horizontal plane of described level frame and the contact position of 15mm full tempered glass adopt high temperature cotton the isolation to arrange.
Further, described process furnace is bending furnace.
Further, described process furnace is the bending furnace of temperature-controllable.
Further, described level frame is placed on the mid-way of described heating chamber.
Further, described 15mm full tempered glass keeps horizontal layout on the horizontal plane of described level frame.
Further, described heating unit is electrical heating wire.
Compared with prior art, it is 15mm semi-tempered glass that the 15mm semi-tempered glass that the utility model provides prepares the glass that structure prepares, its stress equilibrium, property indices can reach GB/T17841-2008 related request, make up the blank adopting customary preparation methods cannot prepare 15mm semi-tempered glass product, further, it is simple that this 15mm semi-tempered glass prepares structure, and cost is also lower.
Accompanying drawing explanation
Fig. 1 is the quick-reading flow sheets schematic diagram of the 15mm semi-tempered glass preparation method that the utility model embodiment provides;
Fig. 2 is the schematic perspective view of the support that the utility model embodiment provides;
Fig. 3 is the rough schematic of the process furnace that the utility model embodiment provides.
Embodiment
In order to make the purpose of this utility model, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the utility model, and be not used in restriction the utility model.
Below in conjunction with specific embodiment, realization of the present utility model is described in detail.
With reference to shown in Fig. 1 ~ 3, it is the preferred embodiment that the utility model provides.
The semi-tempered glass that the present embodiment provides prepares structure, may be used for preparation 15mm semi-tempered glass.
15mm half tempered is prepared structure and is comprised level frame 11 and process furnace 12, level frame 11 is formed with the horizontal plane 111 for carrying 15mm full tempered glass, there is in process furnace 12 heating chamber 121, the top of this heating chamber 121 is provided with equally distributed heating unit, like this, 15mm full tempered glass is placed on the horizontal plane 111 of level frame 11, and, level frame 11 is advanced in the heating chamber 121 of process furnace 12, utilize the heating unit in heating chamber 121, homogeneous heating is carried out to 15mm full tempered glass.
Operation steps is as follows particularly:
1), float glass preparation is formed 15mm full tempered glass; Certainly, this preparation process can adopt the technique means of various routine, is not again repeating one by one;
2), by 15mm full tempered glass be placed on the horizontal plane 111 of level frame 11, and level frame 11 is placed in the heating chamber 121 of process furnace 12, and utilize heating unit continuous heating;
3), the heating of the Heating temperature of element to be heated within the scope of 470 ± 10 DEG C, control constant temperature 1.5h-2h;
4), after constant temperature terminates, stop heating, glass is cooled to room temperature with process furnace 12, and forms 15mm semi-tempered glass, then, is taken out by 15mm full tempered glass from process furnace 12.
Adopt above-mentioned 15mm semi-tempered glass to prepare structure and can prepare 15mm semi-tempered glass, the stress equilibrium of the 15mm semi-tempered glass prepared, property indices can reach GB/T17841-2008 related request, makes up the blank adopting customary preparation methods cannot prepare 15mm semi-tempered glass product; Further, it is simple that the 15mm semi-tempered glass that the present embodiment provides prepares structure, and cost is also lower.
In the present embodiment, 15mm full tempered glass is placed on the horizontal plane 111 of level frame 11, and the contact position between the horizontal plane 111 of 15mm full tempered glass and level frame 11 adopts to isolate and arranges, level frame 11 is placed in the heating chamber 121 of process furnace 12, thus realizes the heating to 15mm full tempered glass.Like this, can place level frame 11 and absorb heat too fast, temperature is too high, causes scald or scuffing etc. to the surface of glass.
Particularly, level frame 11 is steel pipe frame, and steel pipe frame is formed horizontal plane 111, and certainly, level frame 11 also can be the support body of other structural shapes, is not limited to steel pipe frame.
Particularly, adopt high temperature cotton to isolate in horizontal plane 111 and the contact position of glass of level frame 11 and arrange, thus under the effect of high temperature cotton, avoid steel pipe to absorb heat too fast, temperature is too high, is scalded on the surface of glass or scratches.
In the present embodiment, enter in the heating chamber 121 of process furnace 12 when level frame 11 carries 15mm full tempered glass, like this, the heating unit that utilization is evenly arranged then can realize the homogeneous heating to 15mm full tempered glass.
Particularly, heating unit is electrical heating wire, or, also can be other elements that can generate heat etc.
Level frame 11 is placed on after in the heating chamber 121 of process furnace 12, level frame 11 is positioned at the mid-way of the heating chamber 121 of process furnace 12, like this, more can ensure the homogeneous temperature of 15mm full tempered glass, further, 15mm full tempered glass keeps horizontal placement on the horizontal plane 111 of level frame 11.
When level frame 11 is placed on after in the heating chamber 121 of process furnace 12, close the fire door of process furnace 12, treat start heating; Process furnace 12 is the bending furnace of temperature controllable, or process furnace 12 also can be other types heating installation.
Within the scope of heating temperatures to 470 ± 10 in process furnace 12 DEG C, in this process, the temperature rise rate scope controlling process furnace 12 is 9 DEG C/min to 9 DEG C/min, concrete heating ramp rate can be decided according to the actual requirements.
After the complete 15mm semi-tempered glass of preparation takes out from process furnace 12, then can test to 15mm semi-tempered glass according to semi-tempered glass standard (GB/T-17841-2008), mainly comprise: thickness deviation, size deviation, quality of edges, visual appearance, sinuousness, flexural strength, surface stress, fragmentation status and heat shock resistance.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all do within spirit of the present utility model and principle any amendment, equivalent to replace and improvement etc., all should be included within protection domain of the present utility model.

Claims (9)

1.15mm semi-tempered glass prepares structure, it is characterized in that, comprise level frame and process furnace, described level frame has the horizontal plane for carrying 15mm full tempered glass, have in described process furnace and be placed on heating chamber for described level frame, the top of described heating chamber is provided with for being down to room temperature to form the heating unit of 15mm semi-tempered glass after being heated to certain temperature to 15mm full tempered glass continuous uniform, and described heating unit is evenly arranged.
2. 15mm semi-tempered glass as claimed in claim 1 prepares structure, and it is characterized in that, the horizontal plane of described level frame and the contact position of 15mm full tempered glass adopt to isolate to be arranged.
3. 15mm semi-tempered glass as claimed in claim 1 prepares structure, and it is characterized in that, described level frame is steel pipe frame, and described steel pipe frame is formed with described horizontal plane.
4. 15mm semi-tempered glass as claimed in claim 2 prepares structure, it is characterized in that, the horizontal plane of described level frame and the contact position of 15mm full tempered glass adopt high temperature cotton to isolate and arrange.
5. the 15mm semi-tempered glass as described in any one of Claims 1-4 prepares structure, it is characterized in that, described process furnace is bending furnace.
6. 15mm semi-tempered glass as claimed in claim 5 prepares structure, and it is characterized in that, described process furnace is the bending furnace of temperature-controllable.
7. the 15mm semi-tempered glass as described in any one of Claims 1-4 prepares structure, it is characterized in that, described level frame is placed on the mid-way of described heating chamber.
8. the 15mm semi-tempered glass as described in any one of Claims 1-4 prepares structure, it is characterized in that, described 15mm full tempered glass keeps horizontal layout on the horizontal plane of described level frame.
9. the 15mm semi-tempered glass as described in any one of Claims 1-4 prepares structure, it is characterized in that, described heating unit is electrical heating wire.
CN201520500970.8U 2015-07-10 2015-07-10 15mm semi-tempered glass prepares structure Expired - Fee Related CN204939269U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520500970.8U CN204939269U (en) 2015-07-10 2015-07-10 15mm semi-tempered glass prepares structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520500970.8U CN204939269U (en) 2015-07-10 2015-07-10 15mm semi-tempered glass prepares structure

Publications (1)

Publication Number Publication Date
CN204939269U true CN204939269U (en) 2016-01-06

Family

ID=55006712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520500970.8U Expired - Fee Related CN204939269U (en) 2015-07-10 2015-07-10 15mm semi-tempered glass prepares structure

Country Status (1)

Country Link
CN (1) CN204939269U (en)

Similar Documents

Publication Publication Date Title
CN103058507A (en) Manufacturing method of fireproof glass
CN103274585A (en) Processing method for rapidly tempering low-e glass
CN203440235U (en) Toughened glass heating furnace
CN104973804B (en) It is a kind of can tempering three silver medal LOW-E glass and its tempering treatment process
CN204939269U (en) 15mm semi-tempered glass prepares structure
CN110526561A (en) A kind of production technology of tempered glass
CN104986949A (en) Preparation method of 15-millimeter semi-tempered glass
CN203200160U (en) Toughened glass continuous furnace
CN102745888A (en) Technology for hot dipping of super large toughened glass plate
CN202543046U (en) Forced convection heating device for low emissivity coated glass
CN203999345U (en) A kind of Quartz Ceramic Roller for glass tempering furnace
CN204022664U (en) A kind of hot melting furnace
CN209284113U (en) A kind of layer of furnace door structure
CN201634572U (en) Glass tempering furnace produced in single and double type combining way
CN204265632U (en) A kind of heating device for annealing furnace
EP2860159B1 (en) Method for bending glass sheets and machine for carrying out the method
CN205528410U (en) Low -emissivity coated glass's compulsory convection heating device
CN206764657U (en) A kind of hot installation auxiliary device of rotor axle sleeve interference
CN205035263U (en) Middle school glass tempering furnace presentation device
CN110407608A (en) A kind of inorganic quartzite slate maintaining process
CN102944212A (en) Detection method of tile flatness inverse elasticity
CN202785993U (en) Microcrystal furnace
CN107900481A (en) A kind of radiator fibre brazier
CN103319081A (en) Tempering processing method for 8-12mm tempered glass
CN104058580B (en) Device and method for preparing spherical mirror from large-size optical glass flat mirror by hot working

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160106

Termination date: 20170710