CN204922210U - Take heating device's valve - Google Patents

Take heating device's valve Download PDF

Info

Publication number
CN204922210U
CN204922210U CN201520691415.8U CN201520691415U CN204922210U CN 204922210 U CN204922210 U CN 204922210U CN 201520691415 U CN201520691415 U CN 201520691415U CN 204922210 U CN204922210 U CN 204922210U
Authority
CN
China
Prior art keywords
valve
valve body
cavity volume
holding cavity
cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520691415.8U
Other languages
Chinese (zh)
Inventor
项克元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WENZHOU JUYUAN FLUID EQUIPMENT CO Ltd
Original Assignee
WENZHOU JUYUAN FLUID EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WENZHOU JUYUAN FLUID EQUIPMENT CO Ltd filed Critical WENZHOU JUYUAN FLUID EQUIPMENT CO Ltd
Priority to CN201520691415.8U priority Critical patent/CN204922210U/en
Application granted granted Critical
Publication of CN204922210U publication Critical patent/CN204922210U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Valve Housings (AREA)

Abstract

The utility model relates to a valve, in particular to take heating device's valve, valve gap including the valve body, on locating the valve body, the valve rod in locating the valve body and connect the valve clack of valve rod, the other end that valve clack one end is connected to the valve rod is equipped with the hand wheel of being connected with the valve rod linkage, is equipped with in the valve body to supply admission passage that the medium got into and the outflow passageway that supplies the medium outflow, its characterized in that: admission passage or outflow passageway and pipeline between be equipped with heating device, charging device that this heating device is connected with the heating pipe including the holding chamber, outside locating the heating pipe of holding intracavity and being in the holding chamber, the both ends in holding chamber respectively with the valve body admission passage and the pipeline switches on and can dismantle with valve body and pipeline and be connected, be equipped with the opening on the holding chamber, the holding intracavity is placed in to the one end of heating pipe, the other end is connected with charging device outside placing the holding chamber in through the opening, the opening part of holding intracavity be equipped with the sealing member, the utility model provides a prevent the frozen take heating device's valve of medium.

Description

With the valve of heating equipment
Technical field
The utility model relates to a kind of valve, particularly a kind of valve with heating equipment.
Background technique
Valve is the controlling component in fluid delivery system, there is cut-off, regulate, the functions such as water conservancy diversion, traditional valve includes valve body, be located at the valve gap on valve body, be located at valve rod in valve body and connect the flap of valve rod, the other end that valve rod connects flap one end is provided with the handwheel be connected with valve rod, the inlet passage entered for medium and the flow pass flowed out for medium is provided with in valve body, this kind of valve can meet the different needs usually in industry or life, if but in winter of cold, particularly in the north, when valve is in the state of closedown, static medium is easy to freeze, again during Open valve, the medium freezed cannot circulate, this can give in life and bring certain difficulty.
Summary of the invention
For the deficiency that prior art exists, the utility model provides a kind of valve with heating equipment preventing medium from freezing.
For achieving the above object, the utility model provides following technological scheme: a kind of valve with heating equipment, include valve body, be located at the valve gap on valve body, be located at valve rod in valve body and connect the flap of valve rod, the other end that valve rod connects flap one end is provided with the handwheel be connected with valve rod, the inlet passage entered for medium and the flow pass flowed out for medium is provided with in valve body, it is characterized in that: described inlet passage or be provided with heating equipment between flow pass and pipeline, this heating equipment includes holding cavity, be located at the heating pipe in holding cavity and be in the outer charging unit be connected with heating pipe of holding cavity, the two ends of described holding cavity removably connect with valve body and pipeline with valve body inlet passage and pipeline conducting respectively, holding cavity is provided with opening, one end of heating pipe is placed in holding cavity, the other end is placed in outside holding cavity by opening and is connected with charging unit, opening in described holding cavity is provided with Sealing.
Adopt technique scheme, heating equipment is provided with at inlet passage or between flow pass and objective road, when medium flows in holding cavity, owing to being provided with heating pipe in holding cavity, and heating pipe is provided with charging unit, if so medium has freezed, heat through heating pipe, the medium of flowing will be become, or the medium through heating, because itself is provided with temperature in flowing, so would not freeze, here the opening in holding cavity has established Sealing, this prevents medium from revealing from opening, and the two ends of holding cavity removably connect with pipeline and valve respectively, this is the installation in order to prevent this heating equipment, if any damage, can convenient for maintaining, or summer has arrived, when not needing this device, heating equipment can be laid down, in sum, the valve of this band heating equipment, structure is simple, medium not easy freezing can be made, solve the problem that background technique proposes.
The utility model is set to further: described charging unit includes power supply and plug, the cavity volume be fixedly connected with holding cavity is provided with outside described holding cavity, fitting seat is provided with in cavity volume, described power supply is located in fitting seat, power supply is connected with heating pipe and plug respectively by power lead, and fitting seat is provided with power switch.
Adopt technique scheme; here charging unit includes power supply and plug; be provided with cavity volume here; power supply and plug are placed in cavity volume; here protect power supply and plug prevents it outside exposed, this structure is simple, but this just wherein a kind of charging modes; also can be other charging modes, do not do specific requirement here.
The utility model is further set to: cavity volume is separated into upper cavity volume and lower cavity volume by described fitting seat, the power line that described power supply is connected with heating pipe is conducting plate, this conducting plate is placed in lower cavity volume and heating pipe socket connection, described plug is placed in cavity volume, and upper cavity volume is provided with the cavity volume lid with upper cavity volume socket connection.
Adopt technique scheme, this structure is simple, and the setting of cavity volume lid is in order to protection power source and plug.
This use is real to be novelly further set to: described holding cavity and pipeline and valve body are spun by screw thread.
Adopt technique scheme, the Placement of screw thread is the simplest, also for convenience detach and installation.
Below in conjunction with accompanying drawing, the utility model is further described.
Accompanying drawing explanation
Fig. 1 is the cross-sectional view of the utility model embodiment;
Fig. 2 is the section decomposing schematic representation of the utility model embodiment.
Embodiment
A kind of valve with heating equipment as Figure 1-Figure 2, include valve body 1, be located at the valve gap 2 on valve body 1, be located at valve rod 4 in valve body 1 and connect the flap 3 of valve rod 4, the other end that valve rod 4 connects flap 3 one end is provided with the handwheel 5 be connected with valve rod 4, the inlet passage 6 entered for medium and the flow pass 7 flowed out for medium is provided with in valve body 1, it is characterized in that: described inlet passage 6 or be provided with heating equipment 9 between flow pass 7 and pipeline, this heating equipment 9 includes holding cavity 91, be located at the heating pipe 92 in holding cavity 91 and be in the outer charging unit 93 be connected with heating pipe 92 of holding cavity 91, the two ends of described holding cavity 91 removably connect with valve body 1 and pipeline with valve body 1 and pipeline conducting respectively, holding cavity 91 is provided with opening 94, one end of heating pipe 92 is placed in holding cavity 91, the other end is placed in outside holding cavity 91 by opening 94 and is connected with charging unit 93, opening 94 place in described holding cavity 91 is provided with Sealing 95, in such scheme, heating equipment 9 is provided with at inlet passage 6 or between flow pass 7 and pipeline, when medium to flow in holding cavity 91, owing to being provided with heating pipe 92 in holding cavity 91, and heating pipe 92 is provided with charging unit 93, if so medium has freezed, heat through heating pipe 92, the medium of flowing will be become, or the medium through heating, because itself is provided with temperature in flowing, so would not freeze, here opening 94 place in holding cavity 91 has established Sealing 95, this prevents medium from revealing from opening 94, and the two ends of holding cavity 91 removably connect with pipeline and valve body respectively, this is the installation in order to prevent this heating equipment 9, if any damage, can convenient for maintaining, or summer has arrived, when not needing this heating equipment 9, heating equipment 9 can be laid down, in sum, the valve of this band heating equipment 9, structure is simple, medium not easy freezing can be made, solve the problem that background technique proposes.
In the utility model embodiment, described charging unit 93 includes power supply 931 and plug 932, the cavity volume 96 be fixedly connected with holding cavity 91 is provided with outside described holding cavity 91, fitting seat 97 is provided with in cavity volume 96, described power supply 931 is located in fitting seat 97, power supply 931 is connected with heating pipe 92 and plug 932 respectively by power lead 933, fitting seat 97 is provided with power switch 98, in such scheme, here charging unit 93 includes power supply 931 and plug 932, be provided with cavity volume 96 here, power supply 931 and plug 932 are placed in cavity volume 96, here power supply 931 is protected and plug 932 prevents it outside exposed, this structure is simple, but this is wherein a kind of charging modes just, also can be other charging modes, here specific requirement is not done.
In the utility model embodiment; cavity volume 96 is separated into upper cavity volume 961 and lower cavity volume 962 by described fitting seat 97; the power line 933 that described power supply 931 is connected with heating pipe 92 is conducting plate 934; this conducting plate 934 is placed in lower cavity volume 962 and heating pipe 92 socket connection; described plug 932 is placed in cavity volume 961; upper cavity volume 961 is provided with the cavity volume lid 99 with the socket connection of upper cavity volume 961; in such scheme; this structure is simple, and the setting of cavity volume lid 99 is in order to protection power source 931 and plug 932.
In the utility model embodiment, described holding cavity 91 is spun by screw thread 11 with pipeline and valve body 1, and in such scheme, the Placement of screw thread 11 is the simplest, also for convenience detach and installation.
In the utility model, disclosed embodiment is only wherein a kind of embodiment, and to those of ordinary skill in the art, other embodiments obtained under the prerequisite not paying creative work, all within the utility model protection domain.

Claims (4)

1. the valve with heating equipment, include valve body, be located at the valve gap on valve body, be located at valve rod in valve body and connect the flap of valve rod, the other end that valve rod connects flap one end is provided with the handwheel be connected with valve rod, the inlet passage entered for medium and the flow pass flowed out for medium is provided with in valve body, it is characterized in that: described inlet passage or be provided with heating equipment between flow pass and pipeline, this heating equipment includes holding cavity, be located at the heating pipe in holding cavity and be in the outer charging unit be connected with heating pipe of holding cavity, the two ends of described holding cavity removably connect with valve body and pipeline with valve body inlet passage and pipeline conducting respectively, holding cavity is provided with opening, one end of heating pipe is placed in holding cavity, the other end is placed in outside holding cavity by opening and is connected with charging unit, opening in described holding cavity is provided with Sealing.
2. the valve of band heating equipment according to claim 1, it is characterized in that: described charging unit includes power supply and plug, the cavity volume be fixedly connected with holding cavity is provided with outside described holding cavity, fitting seat is provided with in cavity volume, described power supply is located in fitting seat, power supply is connected with heating pipe and plug respectively by power lead, and fitting seat is provided with power switch.
3. the valve of band heating equipment according to claim 1 and 2, it is characterized in that: cavity volume is separated into upper cavity volume and lower cavity volume by described fitting seat, the power line that described power supply is connected with heating pipe is conducting plate, this conducting plate is placed in lower cavity volume and heating pipe socket connection, described plug is placed in cavity volume, and upper cavity volume is provided with the cavity volume lid with upper cavity volume socket connection.
4. the valve of band heating equipment according to claim 1 and 2, is characterized in that: described holding cavity and pipeline and valve are spun by screw thread.
CN201520691415.8U 2015-09-09 2015-09-09 Take heating device's valve Expired - Fee Related CN204922210U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520691415.8U CN204922210U (en) 2015-09-09 2015-09-09 Take heating device's valve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520691415.8U CN204922210U (en) 2015-09-09 2015-09-09 Take heating device's valve

Publications (1)

Publication Number Publication Date
CN204922210U true CN204922210U (en) 2015-12-30

Family

ID=54971336

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520691415.8U Expired - Fee Related CN204922210U (en) 2015-09-09 2015-09-09 Take heating device's valve

Country Status (1)

Country Link
CN (1) CN204922210U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112377627A (en) * 2020-11-10 2021-02-19 德清三盛氟塑科技有限公司 Valve mechanism convenient to disassemble and use for beverage preparation machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112377627A (en) * 2020-11-10 2021-02-19 德清三盛氟塑科技有限公司 Valve mechanism convenient to disassemble and use for beverage preparation machine
CN112377627B (en) * 2020-11-10 2022-05-31 德清三盛氟塑科技有限公司 Valve mechanism convenient to disassemble and use for beverage preparation machine

Similar Documents

Publication Publication Date Title
CN204922210U (en) Take heating device's valve
CN106763931A (en) A kind of central hot water check valve and its central hot water circulation system
CN206439454U (en) A kind of central hot water check valve and its central hot water circulation system
KR101073522B1 (en) Ball valve for antifreezing
CN203980653U (en) A kind of gas instantaneous water heater automatic drainage freeze preventer
CN212298575U (en) Water supply pipeline anti-freezing system
CN202853063U (en) Air conditioning unit and air-conditioning water system thereof
CN107476375A (en) Water heat accumulation constant temperature water supply system
CN207092182U (en) Water heat accumulation constant temperature water supply system
CN209512148U (en) A kind of HVAC terminal pressure balancing device
CN205331540U (en) Pre -buried formula basin tap
CN203364412U (en) Antifreezing heat pump water heater
CN207830703U (en) A kind of energy saving anti-freezing valve
CN206943510U (en) A kind of check valve
CN207569248U (en) A kind of antifreeze water-supply valve
CN206191037U (en) Manual valve
CN207512832U (en) The tap water supply system of frost-cracking-preventing
CN204478522U (en) A kind of flow control apparatus for water of Teat pump boiler
CN204692667U (en) A kind of novel ball safety check
CN204611057U (en) A kind of automatic exhauster for air heater
CN204460803U (en) Solar water heater and solar water heater thawing apparatus in winter
CN203432111U (en) Device for evacuation and freeze prevention of solar water heater pipeline
CN202525934U (en) Zero pressure hydropower linkage energy-saving water dispenser
CN220320660U (en) Novel anti-freezing water nozzle structure
CN202966180U (en) Water supply system for automobile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151230

Termination date: 20170909

CF01 Termination of patent right due to non-payment of annual fee