CN204920982U - Hoop prestressed reinforcement tunnel section of jurisdiction - Google Patents

Hoop prestressed reinforcement tunnel section of jurisdiction Download PDF

Info

Publication number
CN204920982U
CN204920982U CN201520642243.5U CN201520642243U CN204920982U CN 204920982 U CN204920982 U CN 204920982U CN 201520642243 U CN201520642243 U CN 201520642243U CN 204920982 U CN204920982 U CN 204920982U
Authority
CN
China
Prior art keywords
block
binds
jurisdiction
piece
tunnel section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520642243.5U
Other languages
Chinese (zh)
Inventor
王国富
王丹
路林海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Rail Transit Group Co Ltd
Original Assignee
Jinan Rail Transit Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Rail Transit Group Co Ltd filed Critical Jinan Rail Transit Group Co Ltd
Priority to CN201520642243.5U priority Critical patent/CN204920982U/en
Application granted granted Critical
Publication of CN204920982U publication Critical patent/CN204920982U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a hoop prestressed reinforcement tunnel section of jurisdiction. Tunnel section of jurisdiction part is main, and the both ends of encircleing the sole piece are equipped with an adjacent block respectively including encircleing the sole piece, and a connecting block is all hugged closely to the tip of arbitrary adjacent block, for the piece that binds between two connecting blocks, encircleing sole piece, adjacent block, connecting block and binding the outside of piece and all be equipped with the reservation recess, the piece that binds is inside to have the reservation pore, steel strand wires will encircle sole piece, adjacent block, connecting block and bind behind the pretension through reserving the recess, and the tip runs through and protrusion in the piece that binds, and applying of prestressing force is realized in the steel strand wires of the piece that binds by the tool to lock is fixed to the protrusion, hunch sole piece, adjacent block, the connecting block and the piece that binds constitute confined cylindrical structure jointly. The utility model provides a tunnel section of jurisdiction can effectual improvement section of jurisdiction wholeness and the ability of resisting pressure of surrounding rock, and the manufacturing method province's material that saves time.

Description

A kind of ring orientation prestress Strengthening Tunnel section of jurisdiction
Technical field
The utility model relates to railway traffic engineering association area, specifically, relates to a kind of ring orientation prestress Strengthening Tunnel section of jurisdiction.
Background technology
Along with the develop rapidly of China Transportation Industry, in tunnel construction because of shield-tunneling construction have efficiently, safety, the advantage such as environmental protection, the situation that shield construction is employed is more and more many.
Shield tunnel is when pipe sheet assembling, and the section of jurisdiction between hoop is bolted, and adjacent ring is difficult to carry out effective jam-packed to the gap between section of jurisdiction.During the operation of tunnel later stage, due to the dynamic load that the erosion of underground water, stratum differential settlement and train operation produce, make the gap of hoop section of jurisdiction become the fragile position of seeping water and leaking, and can there is the phenomenons such as extruding generation faulting of slab ends in section of jurisdiction, bring threat to the safety of shield tunnel.
In prior art, had part about the research of tunnel duct piece, but generally effect is all unsatisfactory.
Such as, application number be 2011101251817 Chinese patent disclose Shield tunnel prestressing force composite lining water-conveyance tunnel, the pin-connected panel section of jurisdiction ring that it comprises shield-tunneling construction formation is ordinary reinforced concrete outer lining, be connected by connecting bolt with ring each piece of section of jurisdiction, pin-connected panel section of jurisdiction ring hand hole installs joint bar, be lining with direct concreting outside to form liner and concrete and insert the shear connector that outer lining hand hole formed, liner and outer lining are combined into composite lining structure by joint bar and concrete shear bond.The method is time-consuming, effort, high material consumption, and cast-in-place inner lining concrete by inner reinforcing bar, bellows is more causes concrete leakiness, whole structure is poor.
And for example say, application number is 201,210,235,474 1 kinds of prestressing force sections of jurisdiction, and section of jurisdiction is provided with multiple steel strand duct along axis distribution, and circumferentially, communicate with one another between corresponding steel strand duct, every bar steel strand duct is provided with a ground tackle groove to multiple sections of jurisdiction composition.Additionally provide and a kind ofly adopt above-mentioned prestressing force section of jurisdiction to carry out shield tunnel pre-stress lining construction method, comprise the following steps: one, the step of shield driving pipe sheet assembling; Two, by the step of the ground tackle groove on section of jurisdiction along steel strand duct tension steel strand; Three, the step of concrete backfill; The construction of shield tunnel pre-stress lining is realized by above-mentioned steps.The method steel strand between section of jurisdiction is more difficult, and reserved slotted eye can weaken the intensity of section of jurisdiction.
Utility model content
The purpose of this utility model is for overcoming above-mentioned the deficiencies in the prior art, provides a kind of ring orientation prestress Strengthening Tunnel section of jurisdiction, and it effectively can improve the globality of section of jurisdiction and the ability of opposing pressure from surrounding rock.
In order to reach above-mentioned purpose, the utility model adopts following technical scheme
A kind of ring orientation prestress Strengthening Tunnel section of jurisdiction, comprise arch bottom, the two ends of arch bottom are respectively equipped with an adjacent block, and a contiguous block is all close in the end of arbitrary adjacent block, are the block that binds between two contiguous blocks;
The outside of described arch bottom, adjacent block, contiguous block and the block that binds is equipped with reserved groove, and block inside of binding has reserving hole channel;
Steel strand are by reserved groove by after arch bottom, adjacent block, contiguous block and the block pretension that binds, and end is run through and protruded from the block that binds, and the steel strand protruding from the block that binds fixedly are realized prestressed applying by lockset;
Described arch bottom, adjacent block, contiguous block and the block that binds form closed cylinder type jointly.
Preferably, described in the bind inner side of block there is fin, a part for reserving hole channel is positioned at fin inside, and what lockset was subject to is applied on fin with prestressing force opposite effect power.
Preferably, described reserved groove is at least three.
Preferably, the diameter of described reserved groove is greater than the diameter of steel strand, and steel strand are embedded after reserved groove not higher than the surface being embedded into object.
Preferably, the reserving hole channel intersection being positioned at the block that binds inner corresponding is communicated with.
Preferably, the distance between adjacent reserved groove is identical, makes prestressing force be applied to arch bottom, adjacent block, contiguous block uniformly and bind on block.
Preferably, the structure that is formed in one of described fin and the described block that binds.
While Structural Test of Tunnel Segments scheme, the utility model additionally provides a kind of manufacture above-mentioned ring orientation prestress Strengthening Tunnel section of jurisdiction method, mainly comprises the steps:
A, reserve groove at the back spaced set of arch bottom, adjacent block and contiguous block;
B, fin is set binding on block, and reserving hole channel and reserved groove are set on fin;
C, steel strand are in advance good according to the location arrangements of section of jurisdiction groove, guarantee that steel strand are positioned at reserved groove by the two ends of drawing steel stranded wire;
D, the two ends of steel strand are inserted respectively in the inner corresponding reserving hole channel of the block that binds;
E, insert and to bind block, and to steel strand Shi Hanzhang, utilize lockset to be fixed on fin by steel strand;
F, back-grouting is carried out to tunnel duct piece, complete prestressed applying.
The beneficial effects of the utility model are:
(1) tightened the gap between the adjacent section of jurisdiction of hoop by steel strand, the stress between adjacent section of jurisdiction can have been maintained preferably, effectively prevented from occurring between section of jurisdiction opening or faulting of slab ends, improve the water permeability resistance energy in gap between hoop section of jurisdiction;
(2) bind on block by being fixed on by prestress wire, the prestressing force of steel strand has pulling force upwards to the block that binds, and offsets a part and acts on the pressure from surrounding rock bound on block, improve the stability of section of jurisdiction;
(3) steel strand are arranged in outside section of jurisdiction, when tensioning fixation steel strand complete, by the slip casting of back, section of jurisdiction, steel strand and section of jurisdiction are integrated, strengthen the prestressed effect in section of jurisdiction, and save extra steel strand injecting paste material simultaneously, save manpower, man-hour.
Accompanying drawing explanation
Fig. 1 is the lateral view of tunnel duct piece of the present utility model;
Fig. 2 is the block sectional view that binds;
Fig. 3 is A-A profile in Fig. 2;
Fig. 4 is B-B profile in Fig. 2;
Fig. 5 is the block upward view that binds;
Fig. 6 is the block prestressed steel strand schematic diagram that binds;
Fig. 7 is the upward view of arch bottom, adjacent block and contiguous block;
The profile that Fig. 8 is arch bottom, adjacent block closes contiguous block;
In figure: 1, arch bottom, 2, adjacent block, 3, contiguous block, 4, bind block, 5, fin, 6, reserving hole channel, 7, reserved groove, 8, steel strand, 9, lockset.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in detail.
Embodiment: a kind of ring orientation prestress Strengthening Tunnel section of jurisdiction, its side direction structure as shown in figures 1 to 6, comprises arch bottom 1, and the two ends of arch bottom 1 are respectively equipped with an adjacent block 2, it is the block 4 that binds that the end of arbitrary adjacent block 2 is all close between contiguous block 3, two contiguous block 3;
The outside of arch bottom 1, adjacent block 2, contiguous block 3 and the block 4 that binds is equipped with reserved groove 7, and described reserved groove 7 is at least three.After the end of each reserved groove extends, all can be formed one closed pure round.
Shown in figure 2-Fig. 4, block 4 inside of binding has reserving hole channel 6, and on the basis with three reserved grooves 7, the quantity of reserving hole channel 6 is 6, and every two reserving hole channels 6 are corresponding, and the direction of this corresponding reserving hole channel 6 is contrary, and intersects;
Shown in figure 5-8,3 steel strand 8 are placed with in the inside of reserved groove 7, arch bottom 1, adjacent block 2, contiguous block 3 and the block 4 that binds all are carried out pretension by a reserved groove 7 by every bar steel strand 8, the end of every bar steel strand 8 is run through and is protruded from the block 4 that binds, and the end of every bar steel strand 8 is all fixed by lockset 9;
An arch bottom 1, two adjacent blocks 2, two contiguous blocks 3 and the block 4 that binds form the cylinder type closed jointly.
Continue with reference to shown in figure 6, in order to prevent from binding there are stress raisers in block 4, the bind inner side of block 4 has fin 5 mutually integrated with the block 4 that binds, a part for reserving hole channel 6 is positioned at fin 5 inside, an end of every bar reserving hole channel 6 is all positioned on fin 5, lockset 9 is positioned at outside fin 5, what lockset 9 was subject to is applied on fin 5 with prestressing force opposite effect power, make the prestressing force of steel strand 8 have pulling force upwards to the block 4 that binds, offset a part and act on the pressure from surrounding rock bound on block 4.
The diameter of reserved groove 7 is greater than the diameter of steel strand 8, does not protrude from the surface being embedded into object, ensure that each several part of section of jurisdiction all has higher roundness after making steel strand 8 embed reserved groove 7.
Distance between adjacent reserved groove 7 is identical, makes prestressing force be applied to arch bottom 1, adjacent block 2, contiguous block 3 uniformly and bind on block 4.
Meanwhile, the present embodiment additionally provides a kind of manufacture above-mentioned ring orientation prestress Strengthening Tunnel section of jurisdiction method, mainly comprises the steps:
A, the reserved groove 7 of back spaced set three at arch bottom 1, adjacent block 2 and contiguous block 3, it is identical with the distance that groove is reserved in both sides that groove is reserved at center, be 400mm, and the centre position that groove is positioned at arch bottom 1, adjacent block 2, contiguous block 3 and the block 4 that binds is reserved at center;
B, fin 5 is set binding on block 4, and reserving hole channel 6 and reserved groove 7 are set on fin 5;
C, laying arch bottom 1, adjacent block 2, before contiguous block 3, three steel strand 8 are good according to the location arrangements of reserved groove 7 in advance, after every part has been laid, carried out inspection steel strand 8 whether in reserved groove 7 by the two ends of drawing steel stranded wire 8;
D, before block 4 is bound in insertion, the two ends of steel strand 8 are inserted respectively in the corresponding reserving hole channel 6 of the block 4 that binds;
E, insert and to bind block 4, and to steel strand 8 Shi Hanzhang, utilize lockset 9 to be fixed on fin 5 by steel strand 8;
F, back-grouting is carried out to shaping section of jurisdiction, complete prestressed applying.
In above-mentioned manufacture method, reserved groove 7, along the elongated setting in hoop direction of arch bottom 1, adjacent block 2, contiguous block 3, is binding on block 4, and reserved groove 6 is being arranged by the edge of reserving hole channel 7 to section of jurisdiction.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are realized or uses the utility model.To be apparent for those skilled in the art to the multiple amendment of embodiment, General Principle as defined herein can when not departing from spirit or scope of the present utility model, realize in other embodiments, the part be not described in detail, for prior art, do not repeat at this.Therefore, the utility model can not be restricted to these embodiments shown in this article, but will meet the widest scope consistent with principle disclosed herein and feature.

Claims (7)

1. a ring orientation prestress Strengthening Tunnel section of jurisdiction, is characterized in that, comprises arch bottom, and the two ends of arch bottom are respectively equipped with an adjacent block, and a contiguous block is all close in the end of arbitrary adjacent block, is the block that binds between two contiguous blocks;
The outside of described arch bottom, adjacent block, contiguous block and the block that binds is equipped with reserved groove, and block inside of binding has reserving hole channel;
Steel strand are by reserved groove by after arch bottom, adjacent block, contiguous block and the block pretension that binds, and end is run through and protruded from the block that binds, and the steel strand protruding from the block that binds fixedly are realized prestressed applying by lockset;
Described arch bottom, adjacent block, contiguous block and the block that binds form closed cylinder type jointly.
2. ring orientation prestress Strengthening Tunnel section of jurisdiction according to claim 1, is characterized in that, described in the bind inner side of block there is fin, a part for reserving hole channel is positioned at fin inside.
3. ring orientation prestress Strengthening Tunnel section of jurisdiction according to claim 1, is characterized in that, described reserved groove is at least three.
4. ring orientation prestress Strengthening Tunnel section of jurisdiction according to claim 1, is characterized in that, the diameter of described reserved groove is greater than the diameter of steel strand.
5. ring orientation prestress Strengthening Tunnel section of jurisdiction according to claim 1, is characterized in that, the reserving hole channel intersection being positioned at the block that binds inner corresponding is communicated with.
6. ring orientation prestress Strengthening Tunnel section of jurisdiction according to claim 3, is characterized in that, the distance between adjacent reserved groove is identical.
7. ring orientation prestress Strengthening Tunnel section of jurisdiction according to claim 2, is characterized in that, the structure that described fin and the described block that binds are formed in one.
CN201520642243.5U 2015-08-24 2015-08-24 Hoop prestressed reinforcement tunnel section of jurisdiction Active CN204920982U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520642243.5U CN204920982U (en) 2015-08-24 2015-08-24 Hoop prestressed reinforcement tunnel section of jurisdiction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520642243.5U CN204920982U (en) 2015-08-24 2015-08-24 Hoop prestressed reinforcement tunnel section of jurisdiction

Publications (1)

Publication Number Publication Date
CN204920982U true CN204920982U (en) 2015-12-30

Family

ID=54970119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520642243.5U Active CN204920982U (en) 2015-08-24 2015-08-24 Hoop prestressed reinforcement tunnel section of jurisdiction

Country Status (1)

Country Link
CN (1) CN204920982U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178983A (en) * 2015-08-24 2015-12-23 济南轨道交通集团有限公司 Circumferential prestress strengthening tunnel segment and manufacturing method
CN107620598A (en) * 2017-09-01 2018-01-23 同济大学 A kind of shield tunnel lining segment and its reinforcement means
CN115012966A (en) * 2022-06-09 2022-09-06 宁波地铁产业工程有限公司 Rapid reinforcing system and method for deformation of shield tunnel

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178983A (en) * 2015-08-24 2015-12-23 济南轨道交通集团有限公司 Circumferential prestress strengthening tunnel segment and manufacturing method
CN107620598A (en) * 2017-09-01 2018-01-23 同济大学 A kind of shield tunnel lining segment and its reinforcement means
CN107620598B (en) * 2017-09-01 2019-12-31 同济大学 Shield tunnel lining segment and reinforcing method thereof
CN115012966A (en) * 2022-06-09 2022-09-06 宁波地铁产业工程有限公司 Rapid reinforcing system and method for deformation of shield tunnel

Similar Documents

Publication Publication Date Title
CN105178983B (en) A kind of ring orientation prestress Strengthening Tunnel section of jurisdiction and preparation method
CN104775428B (en) Compound-type pre-stvessed anchor cable structure and construction method thereof
CN103410161B (en) Oblique control slip casting steel anchor tube framework and construction method thereof
CN105134252B (en) A kind of duct pieces of shield tunnel longitudinal prestressing ruggedized construction and construction method
CN105201530A (en) Repairing and strengthening method for large cracks on rock tunnel lining
CN104790974A (en) City subway overlapped shield tunnel segment structure adopting special longitudinal connecting pieces
CN109184737A (en) The tunnel prestressing force constraint of pressure energy-absorbing can be allowed to fill liner supporting system and technique
CN112780304B (en) Strong-rigidity low-reinforcement prestress shield tunnel structure and construction method thereof
CN204920982U (en) Hoop prestressed reinforcement tunnel section of jurisdiction
CN203488189U (en) Tunnel structure for emptying renovation
CN102808422B (en) Bonded post-tensioned prestressed construction method for cast-in-place reinforced concrete structure
CN103015414B (en) A kind of precast concrete post grouting pile and grouting process
CN104790394A (en) Pressure anchor cable structure with prefabricated anchor head and construction method of pressure anchor cable structure
CN104514572A (en) Rod body connecting device, anchor rod and manufacturing method thereof
CN108119163A (en) For the assembled secondary liner structure of drill+blast tunnel and composite lining structure
CN106939791A (en) One kind can prestress steel structure concrete pipe sheet and its construction method
CN107387092B (en) A kind of multiple rectangular top pipes are connected in parallel on the engineering method of the formation underground space under complex environment
CN108266206A (en) A kind of bored tunnel corrugated steel-mixed mud composite lining structure
CN204662435U (en) The recoverable prestressed anchor head of a kind of pressure dispersing type
CN204418169U (en) The recoverable prestressed anchor cable of a kind of assembling
CN202989911U (en) Post-grouting pile of precast concrete
CN214783884U (en) Full-bonding type prestressed steel anchor pipe cable structure
CN105201525A (en) Repairable bottom heave control method
CN205776194U (en) A kind of mortar leakage prevention pointed stake
CN205370581U (en) High strength shield tunnel section of jurisdiction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant